Você está na página 1de 1

Works under Invitation

Likely Bid Bid Sale Bid Security


S. Package PreBid Bids Reciving Bid Security Contract
City Name Name of the work Cost (in Document closing amount (in
No. Number Meeting Date Validity Period
Cr.) on Sale date Lacs)
RUSDIP: Tranche-1

RUSDIP/ TR- Development of Sanitary landfill Sites in Jhalawar


1 Jhalawar 0.75 15-Jan-09 25-Feb-09 16-Apr-09 16-Apr-09 1.50 28-Sep-09 12
01/JHL/SW/06
Total(Tranche-1) 0.75

RUSDIP: Tranche-2
RUSDIP/ TR-02/ Construction of strom water drainage including re-sectioning of
1 Baran BRN/DR/02 Banganga river at Baran 7.00 2-Jan-09 20-Apr-09 11-May-09 11-May-09 14.00 23-Oct-09 24

RUSDIP/ TR- Design, Construction, Supply, Erection, Testing, Commissioning


02/ DLP/WW/02 and five years Operation & Maintenance of 10 MLD Sewage
Treatment plant based on UASB process with sewage pumping/
lifting station including all Civil, Electrical, Mechanical, Pumping
2 Dholpur and other allied works and Supply, Laying, Joining, Testing and 27.00 6-Mar-09 20-Apr-09 11-May-09 11-May-09 54.00 7-Dec-09 30
Commissioning of Outfall sewer, Trunk sewers and lateral
sewers, along with construction of manholes, appurtenances etc.
in Dholpur town.

RUSDIP/ TR- Construction of OHSRs and CWRs including Providing, Laying,


02/ BND/WS/02 Jointing, Testing and Commissioning of uPVC and DI pipelines in
3 Bundi Distribution system and Transmission system; Construction of 25.00 2-Jan-09 27-Apr-09 18-May-09 18-May-09 50.00 30-Oct-09 24
Tubewells; Construction of Pumping stations; Replacement of
Water Meters in Bundi

RUSDIP/TR-02/ Construction of CWRs & OHSRs including supply, laying and


BMR/WS/01 commissioning with testing of rising & distribution pipelines and
4 Barmer installation of Chlorination, flowmeter etc. for UWSS at Barmer 16.00 29-Aug-08 27-Apr-09 18-May-09 18-May-09 32.00 30-Oct-09 24

RUSDIP/TR- Design, Construction, Supply, erection testing, commissioning


2/RSM/WW/ 01 and first five years operation & maintanence of Sewage
Treatment plant near village Bhawa including all civil, electrical,
mechanical, pumping and other allied works including Supply,
5 Rajsamand laying, jointing etc.Supply, laying, joining, testing and 22.00 20-Sep-08 27-Apr-09 18-May-09 18-May-09 44.00 14-Dec-09 30
commissioning of various Trunk sewers, collecting and lateral
sewers connecting to out fall, along with all necessary manholes,
appurtenances, etc. at Rajsamand.

RUSDIP/TR-02/ Construction of CWRs & OHSRs including supply, laying and


BPR/WS/03 commissioning with testing of DI & uPVC pipelines and
6 Bharatpur construction of pumping stations and replacing of leakaged 17.50 31-Mar-09 29-Apr-09 14-May-09 14-May-09 35.00 26-Oct-09 24
pipeline etc. for UWSS Bharatpur.
RUSDIP/TR- Construction of CWRs & OHSRs including supply, laying and
02/SMD/WS/02 commissioning with testing of DI & uPVC pipelines and
7 Sawai Madhopur construction of pumping stations and replacing of leakaged
24.50 31-Mar-09 29-Apr-09 14-May-09 14-May-09 49.00 26-Oct-09 24
pipeline etc. for UWSS Sawai Madhopur
RUSDIP/TR- Design, Construction, Supply, Erection, Testing, Commissioning
02/BND/WW/03 and five years Operation & Maintenance of Sewage Treatment
plant 8 MLD including all Civil, Electrical, Mechanical, Pumping
8 Bundi and other allied works and Supply, Laying, Joining, Testing and 23.00 31-Mar-09 29-Apr-09 14-May-09 14-May-09 46.00 26-Oct-09 30
Commissioning of Outfall sewer, various Trunk sewers, collecting
and lateral sewers along with all necessary manholes,
appurtenances, etc. at Bundi
Total(Tranche-2)
162.00

Você também pode gostar