Escolar Documentos
Profissional Documentos
Cultura Documentos
Faculty of Engineering
Civil Department
Thesis
Submitted in Partial Fulfillment of the Requirement of M.Sc
degree in "Structural-Engineering-Strength and testing of
materials"
By
Eng. Tamer Ibrahim Ahmed Ibrahim
B.Sc. Civil Engineering 2001,
Faculty of Engineering,
Menuofia University .
Under Supervision Of
2008
Menuofia University
Faculty of Engineering
Civil Department
Thesis
Submitted in Partial Fulfillment of the Requirement of M.Sc
degree in "Structural-Engineering-Strength and testing of
materials"
By
Eng. Tamer Ibrahim Ahmed Ibrahim
B.Sc. Civil Engineering 2001,
Faculty of Engineering,
Menuofia University .
Examiner committee
Prof. Dr. Mohamoud Ahmed Motawa
Prof. of strength and testing of materials
Faculty of Engineering
Azhar University
2008
Acknowledgement
-I-
Quality Control, Quality assurance and total quality management in construction sector
Abstract
This research was conducted to determine what the
requirement were for construction companies to successfully
implement and maintain a system of quality control known as total
quality management (TQM)
This research includes an extensive literature review to spot
light on Quality assurance, Quality Control and Total quality
management history, principle, cost and measurements to cover the
requirement of International quality standers.
Comparative study was carried out between 3 construction
companies according to its quality manual. A field survey was
established for the purpose of surveying the concepts of quality and
the level of practice of the TQM related activities. The data have
been collected by means of questionnaires. Important conclusions
and recommendations for the proper implementation of the Total
quality system in Egyptian construction companies were reached.
II
Quality Control, Quality assurance and total quality management in construction sector
CONTENTS
Page
Acknowledgements I
Abstract II
List of Contents III
Tables content VI
Figures content VII
Chapter (1) Introduction 1
1-1 General 1
1-2 Research Objectives. 2
1-3 Thesis out lines 2
Chapter (2) Literature Review 3
2-1 Introduction 3
2-2 Definition and concepts 3
2-2-1 Quality 3
2-2-2 Quality Control 4
2-2-2-1 The role of quality control throw the project development 4
2-2-2-2 Technical Inspection 5
2-2-2-3 Technical Inspector 6
2-3 Quality Assurance 6
2-3-1 Quality system requirements 6
2-3-2 Quality Management system 7
2-3-2-1 General Requirement 7
2-4 Quality Manual 8
2-4-1 Control of documents 8
2-4-2 Control of records 9
2-5 Quality system 9
2-6 Total quality management (TQM) 9
2-6-1 The implementation of Q.M. systems in construction industry 10
2-6-2 The implementation of Q.M. systems in developing countries 12
2-6-3 The implementation of Q.M. systems in Egyptian construction Ind. 14
2-7 Conclusions 18
III
Quality Control, Quality assurance and total quality management in construction sector
Page
3-5-4 Continuous improvement 35
3-6 Elements of TQM 37
3-6-1 Commitment and leadership of the chief executive officer. 37
3-6-2 Planning and organization 37
3-6-3 Using quality tools and Techniques 38
3-6-4 Education and training. 39
3-6-5 Involvement 40
3-6-6 Teamwork 40
3-6-7 Communications 41
3-6-8 Cultural change 42
3-7 Levels of TQM adaptation 43
3-7-1 Uncommitted 44
3-7-2 Drifters 44
3-7-3 Tool pushers 45
3-7-4 Improvers 46
3-7-5 Award winners 47
3-7-6 World class 47
3-8 Impracticable TQM theories for construction 48
3-8-1 Empowering workers 48
3-8-2 Standardization of products. 50
3-8-3 Just-in-time inventory 50
3-8-4 Limitation of suppliers. 52
3-8-5 Complete customer satisfaction 52
3-8-6 Research and development 54
3-8-7 Continuous process improvement 54
3-8-8 Focus on the customer 55
3-9- The cost of quality 56
3-9-1 Prevention costs 58
3-9-2 Appraisal costs 58
3-9-3 Failure costs 59
3-9-3-1 Internal failure costs 59
3-9-3-2 External failure costs 60
3-10- ISO 9000 Quality standards 61
3-10-1-The ISO 9000/2000 international standards 63
3-10-2-The relations between ISO 9000/94 and ISO 9000/2000 64
3-10-3-The ISO 9001/2000 International standards Models 68
3-10-4 ISO 9000 Implementation 70
3-10-4-1 Why ISO 9000 should be implemented 70
3-10-4-2 How to Implement ISO 9000? 70
3-10-4-3 Advantages of implementing ISO 9000 72
3-10-5 TQM and ISO 9000/2000 International standards 73
3-10-5-1 Comparison: Traditional Management versus (TQM) 75
3-11-World-class quality awards 76
3-11-1 Why was the Award Established? 77
3-11-2 Purpose and goals of the Award Criteria 77
3-11-2-1 The Deming prize 78
3-11-2-2 Malcolm Baldrige National Quality Award 83
3-11-2-3 The European Quality Award 88
3-11-2-4 The European Quality Award criteria 89
IV
Quality Control, Quality assurance and total quality management in construction sector
Page
3-11-2-5 Comparison between the world-class quality Awards 93
3-11-3 Comparison between world-class Quality Award and ISO 9000 95
3-12 Conclusions: 98
Chapter (4) Comparative study between three construction
companies according to quality manuals. 99
4-1 Introduction 99
4-2 Comparative points 100
4-2-1 Company Organization 101
4-2-2 Amendment record: 101
4-2-3 Company quality control and quality assurance procedures 102
4-2-3-1- Control of documents: 102
4-2-3-2 Control of records: 104
4-2-3-3-Quality Policy 106
4-2-3-4-Responsibility, Authority and communication 108
4-2-3-5-Purchasing 122
4-2-3-6-Control of production and service provision: 124
4-2-3-7-validation of processes for production and service provision. 125
4-2-3-8-entification and traceability:. 128
4-2-3-9-Customer property 129
4-2-3-10-Preservation of product 130
4-2-3-10-Customer satisfaction: 133
4-2-3-11-Internal Audit: 135
4-3 Conclusions 137
Chapter (5) Assessment Questionnaire 139
5-1 Introduction 139
5-2 Tools and techniques used in improvement 139
5-3 Implementing a quality system: 140
5-3-1 the most four critical factors for success 140
5-3-2 effective points for design quality system 141
5-4 Basics of questionnaire: 142
5-4-1 The reason for choosing Malcolm Baldrige criteria 142
5-5 key elements of Assessment questionnaire for construction companies using
a quality system management 143
5-6 The Assessment Results and Data Analysis 160
5-6-1 Introduction 160
5-6-2 Data Analysis: 160
5-7Conclusions 191
Chapter (6) Conclusions, Recommendations and further studies 192
6-1 Conclusions 192
6-2 Recommendations 192
6-3 further studies 193
195
References 196
ا 203
V
Quality Control, Quality assurance and total quality management in construction sector
Tables Content
Page
Table (2-1) Role of quality control during the project life cycle. 5
Table (3-1) Quality communication Model: 42
Table (3-2) requirements of the three main ISO 9000/94 standards 65
Table (3-3) Correspondence between ISO 9001/2000 and ISO 9001/94 66
Table (3-4) The Main differences between ISO 9000/2000 and TQM 75
Table (3-5) comparison between traditional Management and TQM 76
Table (3-6) Quality framework 86
Table (3-7) European quality Award criteria 89
Table (3-8) comparison between national quality Award and ISO 97
9000/2000 standards
Table (4-1) Company C records 106
Table (4-2) Table (4-2) : Scope of purchase in company C 124
Table (4-3) : Customer satisfaction questionnaire in Company B 134
VI
Quality Control, Quality assurance and total quality management in construction sector
Figures content
Page
improvement is a tool. 29
Figure (5-1) Presents the performance of all quality system elements in 183
every construction company compared to each other:
Figure (5-2) leadership 184
VII
Quality Control, Quality assurance and total quality management in construction sector
Page
VIII
Quality Control, Quality assurance and total quality management in construction sector
Menuofia University
Faculty of Engineering
Civil Department
Thesis
Submitted to Civil Dept.,
in Partial Fulfillment of the Requirement for The Master Degree
By
Eng. Tamer Ibrahim Ahmed Ibrahim
B.Sc. Civil engineering 2001
Faculty of engineering,
MenuofiaUniversity .
Under Supervision Of
2008
IX
Quality Control, Quality assurance and total quality management in construction sector
Menuofia University
Faculty of Engineering
Civil Department
Thesis
Submitted to Civil Dept.,
in Partial Fulfillment of the Requirement for The Master Degree
By
Eng. Tamer Ibrahim Ahmed Ibrahim
B.Sc. Civil engineering 2001
Faculty of engineering,
MenuofiaUniversity .
Examiner committee
Prof. Dr. Mohamoud Ahmed Modawh
Prof. of strength and testing of material
Faculty of Engineering
Azhar University
X
Ch (1): Introduction
Chapter (1)
Introduction
(1-1) General
-1-
Ch (1): Introduction
-2-
Ch (2): Literature Review
Chapter (2)
Literature Review
(2-1)Introduction
This chapter is divided into two parts:
The first part provides the definitions of key terms in the
research such that quality, quality assurance, quality control, quality
system.
Second part reviews the literature related to the
implementation of quality management systems in construction
industry worldwide with emphasize on TQM implementation in
developing countries and in Egypt in particular.
(2-2) Definitions and concepts
(2-2-1) Quality
ISO 8402(17) describes quality as “That which relates to the
evaluation of a product or service to its ability to satisfy a given
need”
Crospy(22) uses this definition: “Conformance to agreed and
fully understood requirements”
“Uniformity of the product characteristics or delivery of a
service around a nominal or target value”. This definition is
attributed to Anttila J. (1992) (59)
According to kelada (1996) (45), quality is “The totality of
characteristics of a product (Suitability, durability, reliability,
dependability, and soon) and accompany services (after-sales
servicing, maintenance and repairs, warranties and so on) that bear
on its ability to satisfy a number of stated or implied customer
needs”
Juran (1999) (39) defines quality as: “Fitness for purpose”
-3-
Ch (2): Literature Review
-4-
Ch (2): Literature Review
Table (2-1) Role of quality control during the project life cycle.
El-Shoony (2005)(68)
Activity during Objective Remarks
project stages
1 Concept & To focus & define Is the building the best solution for
feasibility quality target the owner? Definition of performance
requirements of the buildings
2 Design Specify quality Technical solutions
3 Planning for Quality assurance Preparation of bid documents with
construction the inclusion of quality control
requirements
4 Construction Produce & Planning the activities for execution
control quality & following them up
5 Delivery Verify quality The building quality and quality of
building registration
6 Operation and use Keep quality Periodical inspection and maintains
(2-2-2-2)Technical inspection
Technical inspection for reinforced concrete works:
The technical inspection, in general, shall include the
following items:
- Acceptance and testing of reinforced concrete constituent
materials.
- The works sits its storage area and equipment.
- Concrete mix design, proportions and control including its
acceptance and testing.
- From work starting from foundations until completing the erection
of the building.
- Surveillance and recording of external factors work conditions.
- The technical body necessary for operating the site.
-5-
Ch (2): Literature Review
-6-
Ch (2): Literature Review
-7-
Ch (2): Literature Review
-8-
Ch (2): Literature Review
-9-
Ch (2): Literature Review
-10-
Ch (2): Literature Review
In this context Gordon G., and et al., (1993) (47) said, “There are
significant differences between providing goods and services.
Services are typically intangible performances, not objects that can
readily be tested and measured in advance to determine quality.”
Graves R. (1993) (30) has the same opinion, in addition he sees that
services have no second chance to inspect and reject flaws before
they get to the customer.
However, Burati (1992) (31) sees that the construction industry
can successfully implement total quality management (TQM) by
adapting the techniques used in the manufacturing industry with
more studies to best employee TQM in the public construction
arena.
Quality management process will not succeed unless both the
technical and humanistic aspects are addressed.
Paul A. Nee (1996) (61), James L. Burat. Jr. (1991) (32), agree that
achieving success in implementing quality management approaches
in construction engineering requires integration of the interpersonal
and technical aspects.
The implementation of a quality management system in
construction industry demands of fundamental culture change.
Graves (1993)(30) believes that TQM is just an another
management ford that cannot work in the present culture of the
construction industry. Referring to Aly, M.S.(15) TQM is a culture
change, not a program. It’s a cause not a result. According to
F. Lawrence (1996) (51)
: to implement total quality management in
engineering organization, first begin with fundamental culture
change then consider some approaches to implementation. Laszlo
-11-
Ch (2): Literature Review
-12-
Ch (2): Literature Review
-13-
Ch (2): Literature Review
-14-
Ch (2): Literature Review
general factors that affect the quality of the buildings. Case studies
were analyzed to define specific and practical problems experienced
and perceived in the implementation of the current quality control
system of the small and medium scale buildings.
The results obtained from the investigation of the over all
relationship between parties involved in the current construction
industry and the analysis of the case studies, provide the following:
- Strong evidence that the low standards of the building quality do
exist.
- It’s not merely the analysis of the low standards of quality and the
factors that have contributed to it, but also the necessity of
improving the current quality control system of these scales of
buildings.
- Improving the quality of buildings is essential for the magnitude of
the construction industry in Egypt and to problem associated with
the building quality.
- The existing quality control system, in fact, is incapable of
fulfilling the current and future expectation demands of building,
in terms of quality, long life, and safety of occupants.
The results, moreover, focus on the nature of the developed
experiences, which could be used, in addition to the outcomes of the
above analysis, in initiating criteria and guidelines for improving
quality system in Egypt.
ISO 9000(1), Bs(2), ASTM(18), are not restricted to a certain
country or quality management system. They could be useful guides
a long initiating the Egyptian construction and quality management
system is achievable. It is also emphasis that initiating a quality
-15-
Ch (2): Literature Review
-16-
Ch (2): Literature Review
-17-
Ch (2): Literature Review
-18-
Ch (2): Literature Review
-19-
Ch (3) Comparison between different international standards regarding to total quality management
Chapter (3)
Comparison between different international
standards regarding to total quality management
(3-1)Introduction
In this chapter a great deal of attention is based to the total
quality management approaches, international quality standards and
world-class quality a ward and the relationship between all of them
to serve the research objective.
The levels of total quality management adoption are discussed
in this chapter to be able to define the status of Egyptian
construction firms according to these levels of adoption.
Standardization history in this chapter shows that ISO 9000
quality standards are of a great importance today. Therefore, the
requirements ISO 9000 standards are discussed in some details in
this chapter. A comparison between ISO 9000 quality standards and
TQM is made as well to illustrate how the international standards
and the quality management approach can be integrated.
The study is aimed to consider the successful evaluation
criteria. Therefore, the criteria of the most known world-class quality
Award for measuring and evaluating quality systems namely:
Deming prize, Malcolm Baldrdge National quality Award and
European Quality Award are presented in this chapter. The
relationship between those models is discussed to come out with the
common evaluation criteria in all of them and the criteria of focus in
each one.
-20-
Ch (3) Comparison between different international standards regarding to total quality management
-21-
Ch (3) Comparison between different international standards regarding to total quality management
-22-
Ch (3) Comparison between different international standards regarding to total quality management
-23-
Ch (3) Comparison between different international standards regarding to total quality management
-24-
Ch (3) Comparison between different international standards regarding to total quality management
-25-
Ch (3) Comparison between different international standards regarding to total quality management
-26-
Ch (3) Comparison between different international standards regarding to total quality management
(3-3-1)Deming’s 14 points
Deming(19) presented his approach to achieving quality in 14
points, which he stated, are the responsibilities of top management.
He summarized them as follows:
1- Create constancy of purpose towards improvement of product and
service. Innovate; allocate resources to long-term planning put
resources into research and education.
2- Adopt the new philosophy\. Do not tolerate commonly accepted
levels of errors and defects.
3- The performance standard is zero defects.
Setting requirements is a process that is readily understood.
This is not the case of the needs for meeting those requirements each
and every time. Establishing a shipped product quality level means
that a certain number of errors are planned. Established acceptable
quality levels represent the number of nonconforming items that can
occur in an acceptable lot. These performance standards however
convince people that the determination to get things done right just
is not there. The performance standard must be zero defect, not
“that’s close enough.”
4-The measurement of quality is the price of nonconformance:
Quality is considered not a management function, but rather a
technical one. Quality is near looked at in financial terms the way
everything else is. It’s measured by indexes and defect, or in other
terms management cannot understand. The best measurement for
quality is money. Quality should be measured by the price of
nonconformance that is by all the expenses involved in doing things
wrong.
-27-
Ch (3) Comparison between different international standards regarding to total quality management
-28-
Ch (3) Comparison between different international standards regarding to total quality management
Social leadership
mobilization teamwork
participation
recognition
Customer Shareholder
Technical Managerial s
Business planning
reengineering organization
continuous direction
improvement control People
Assurance
principle have been introduced in several ways, but they all agreed
quality management.
-29-
Ch (3) Comparison between different international standards regarding to total quality management
-30-
Ch (3) Comparison between different international standards regarding to total quality management
People
Planning
(15)
Figure (3-2) customer Driven organization, Aly M.S
-31-
Ch (3) Comparison between different international standards regarding to total quality management
Facts
Measureme
nt
Data
Analysis
Information
No
Decision
Action
Result of
achieve
objective
(15)
Figure (3-3) the fact to Act process Aly M.S
-32-
Ch (3) Comparison between different international standards regarding to total quality management
Knowledge
Education
information
reinforcement
mobilization
Motivation
Training
Rotation
The
Skills
Will
human
aspect
Authority
Empowerment
Power
-33-
Ch (3) Comparison between different international standards regarding to total quality management
exercise control over their own work, they will not try to spot their
errors or prevent them.
The final condition is the will to do a correct job. Anyone who
is not motivated to do a good job will not put the necessary effort to
do it. This is where individual motivation and group mobilization
come into play. Therefore, achieving or contributing to total quality
must be directly connected to the satisfaction of one’s personal
needs.
The knowledge concerns three conditions, that is, one must
know what to do, what one is doing, and how to correct it if it has
been done wrong.
Skill is necessary for one to avoid making errors. It’s acquired
through raining and experience accumulated through job rotation.
Power is the control over things or the authority to do or change
things, for that, one has to be given the power to do, to improve to
correct and to innovate. If people do not have the right to exercise
control over their own work, they will not try to spot their errors or
prevent them.
The final condition is the will to do a correct job. Anyone who
is not motivated to do a good job will not put the necessary effort to
do it. This is where individual motivation and group mobilization
come into play. Therefore, achieving or contributing to total quality
must be directly connected to the satisfaction of one’s personal
needs.
Fully involved people will be innovative and creative in
furthering the organization’s objectives. It’s beneficial for the
-34-
Ch (3) Comparison between different international standards regarding to total quality management
organization when people are satisfied with their jobs and are
actively involved in their personal growth and development.
(3-5- 4)Continuous improvement
Continuous improvement is a program, a philosophy, and a
strategy to improve the quality of goods and services of an
organization, Samueil (1999) (36).
Deming’s(19) plan-do-check-act (PDCA) cycle, shown in figure
(3-5), is the model for continuous improvement, and it is never stop
journey as figure (3-6) illustrates. It symbolizes problem analysis
steps for narrowing the gap between customer needs and present
performance. It is a systematic procedure for improving methods and
procedures by focusing on correcting and preventing defects.
This is accomplished by removing the root causes of problems
and continually established and revising new standards. The cycle
was first developed by Dr. Watter A. Shewhart and later introduced
by Dr. Edwards Deming in Japan (Samueil 1999) (36).
Samueil (1999)(36) stated that continuous improvement strategy
should be able to:
- Maintain and improve the working standards through small
gradual improvement.
- Delineate responsibility for maintaining standards to worker, with
management’s role being the improvement of standards.
- Produce a systems approach and problem solving tools that can be
applied to realizing this goal.
- Ensure that not a day goes by without some kind of improvement
being made somewhere in the company.
-35-
Ch (3) Comparison between different international standards regarding to total quality management
Take correction
action, standardize,
ACT Plan
and feed forward to Plan improvement for
A P
the next plan present practices
progress
Check Do
Verify the results of C D
Implement the plan
the plan
on small scale
(19)
Figure (3-5) Deming (PDCA) cycle.
Performance mode by
“We have done enough the competition
“Holder
Improvement
performance at this
level “
-36-
Ch (3) Comparison between different international standards regarding to total quality management
(3-6)Elements of TQM
The elements of TQM very from one view to another, but
there is a consensus among the different views that the following
elements are the key elements of TQM:
(3-6-1)Commitment and leadership of the chief executive officer
Chief executive officers (CEO’s) have to show total
commitment, take charge personally, provide direction and exercise
forceful leadership Dale (1999) (54) and Lt Gen H Lal. (1999) (24).
Kelada (1996) (45) stated that, “A leader is needed to oversee the
process. The leader champions the approach and is utterly convinced
that the process and the direction take are fundamentally sound. The
leader is ready to risk his or her own career and position to persuade
everyone of the paramount importance and necessity of creating total
quality”
(3-6-2)Planning and organization
Planning involves defining what quality consists of and then
determining how to do it. This means establishing the needs of
internal and external customers, and determining what to do in order
to meet or exceed their expectations organization involves
establishing the system and the methods necessary to achieve the
quality defined and specific and the planning phase, and moreover
evaluate the quality achieved. Therefore, this element of TQM
includes the following: (Dale 1999) (45)
- Developing a clear, long-term strategy for TQM integrated with
other business strategies.
-37-
Ch (3) Comparison between different international standards regarding to total quality management
-38-
Ch (3) Comparison between different international standards regarding to total quality management
- For developing some tools and techniques can be applied such that,
bench marking, cost of quality and design of experiments.
- For controlling some tools and techniques can be applied such that,
chick list, statistical process control and control charts.
- For improving performance some tools and techniques can be
applied such that, brainstorming, quality function deployment and
time management.
A planned approach for the application of quality management
tools and techniques is necessary. It’s wise to start with the more
simple tools and techniques. The temptation to single out one tool or
technique for special attention should be resisted; on the other hand
tools and techniques should be used in combination to get the
maximum benefit of using them.
(3-6-4)Education and training
Without training and education, behavior and attitude change
will not take place. So that, employees should be provided with the
appropriate level of education and training to ensure that their
general awareness of quality management concepts, skills and
attitudes are suited to the continuous improvement philosophy.
Establishing a training program is essential for achieving
TQM. This program is targeted for every level of the company and
planned to train everyone including managers. All of the people have
to learn to work together as a team, use new practice, and apply new
methodologies, tools and techniques to improve and achieve total
quality.
-39-
Ch (3) Comparison between different international standards regarding to total quality management
(3-6-5)Involvement
This element of TQM stresses on the recognition of the
employees as an asset, which appreciates overtime. In TQM,
employees are encouraged to participate and contribute in the
process of quality improvement, their opinions and views are
considered.
People have to be encouraged to control, manage and improve
the process within their limits of responsibility, Kelada (1996) (45) and
Barrie (1999) (54).
The logic of employee involvement is that the people closest
to the problem are in the best position to make decisions if they have
control of the improvement process, Hongyi Sun (2000) (27).
(3-6-6)Teamwork
TQM recognizes that people working together in teams to
word mutual goal is generally more effective than individual
working alone. Without teamwork, it is difficult to gain the commit
anent and participation of people throughout the organization
succeed in creating a high performance team it can then act as
significant resources to each other to help each other change and
sustain this change Steve B-and Thomas R. (1987) (10).
Kelada (1996)(45) introduces a number of principles for the
teamwork to be based on:
- Participation generates motivation.
- Teamwork is indispensable element in efficient management.
- The team, as a decision-making unit, it therefore given priority.
-40-
Ch (3) Comparison between different international standards regarding to total quality management
(3-6-7)Communication
Communication is the transfer of information from one person
to another (sender and receiver) to transmit ideas, facts, thoughts,
feelings and values (John W.N. and Keith D. 1993) (9).
The purpose of communication is achieving mutual
understanding. The message about quality needs to be
communicated effectively by the management to everyone in the
organization. It also needs to be communicated between all the
shareholders:
Communication process enables progress and feed back to be
assessed against a roadmap or checkpoints (Dale 1999)(54). Table
(3-1) illustrates how quality communication works. It shows the
cycle of communication, sender, message, receiver, and feedback. In
the Quality communication Model introduced by Samuel (1999)(36)
both sides-sender and receiver-are responsible for success. For
-41-
Ch (3) Comparison between different international standards regarding to total quality management
(3-6-8)Culture change
It is necessary to create an organization culture that is
conductive to continuous quality improvement and in which
everyone can participate. This requires changing people’s behavior,
attitudes and working practices in a number of ways such that:
-Employees must inspect their own work.
-Defects must not be passed, in whatever form, to the next
process. Each person must be committed to satisfying his
or her customer, both internal and external.
-Honesty, sincerity and care must be an integral part of daily
business life.
-Work ethics could be used to influence individual approach to
safety, efficiency, quality, and standardization.
Dale (1999)(54) stated that “changing people’s behavior and
attitudes is one of the most difficult tasks facing the management
and requires considerable powers and skills of motivation and
persuasion; considerable thought needs to be given to facilitating
and managing culture change.” It is needed, also to be clear that
culture change happens gradually because values cannot be created
overnight.
-42-
Ch (3) Comparison between different international standards regarding to total quality management
6-World Class
5-Award Winners
4-Improvers
Levels
Figure (3-7) Levels of TQM adoption.
Source: Lascells and Dale B.G, (1993) (54)
-43-
Ch (3) Comparison between different international standards regarding to total quality management
(3-7-1)Uncommitted
Organizations that belong to this level are those that have not
yet started a formal process of quality improvement. They might
gain ISO 9000 quality system registration but quality improvement
is not given priority in terms of either managerial time or resource-
allocation.
Level (1) organizations are termed “the committed” because
they have no long term plan for quality improvement and are not
aware of its benefits. Some characteristics of the uncommitted
organization are:
- The majority of employees have little concern of quality.
- Contact with customer is minimal.
- A lack of communication up and down the organization.
- Management and people are driven by fear not by commitment.
According to (Deming 1982) (19) uncommitted firms are unlikely
to survive the new economic age.
(3-7-2)Drifters
These organizations (level 2) have been practicing the process
of quality improvement for up to three years. They are facing the
danger that they enter a cycle of a program renewal and decline,
moving in ever decreasing circle of false starts, frustration and
disappointment.
Level (2) organizations are termed “the Drifters” because they
drift from one program to another in a stop-start fashion. Some
characteristics of the Drifters are:
- Quality improvement is still perceived as a program, rather than a
process.
-44-
Ch (3) Comparison between different international standards regarding to total quality management
-45-
Ch (3) Comparison between different international standards regarding to total quality management
-46-
Ch (3) Comparison between different international standards regarding to total quality management
(3-7-5)Award winners
In this level not all organization have actually won an
international quality a ward, but they have reached a point in their
TQM maturity where the kind of culture, values, trusts, capabilities,
and employee involvement required to win such an award have been
developed. The quality improvement has been total in nature as well.
Level (5) organization is characterized by the following:
- All employees are involved in improvement.
- Strategic benchmarking practiced at all levels, in conjunction with
an integrated system of internal and external performance
measurements.
- A more participative organizational culture was initiated.
- TQM is viewed sincerely by all employees as a way of managing
the business to satisfy and delight customers, both internal and
external.
- Level (5) organization may appear to form part of elite, but they
have not necessarily achieved “world-class” status.
(3-7-6)World class
This level is characterized by the total integration of quality
improvement and business strategy to delight the customer. By this
stage of TQM maturity the organization is continuously searching to
identify more product or service characteristics which will increase
customer satisfaction.
The never-ending pursuit of complete customer satisfaction is
a personal goal of everyone in the organization and an integral part
of their everyday working lives. TQM is no longer dependent on
top-down drives to improve motivation, but it is driven laterally
-47-
Ch (3) Comparison between different international standards regarding to total quality management
-48-
Ch (3) Comparison between different international standards regarding to total quality management
-49-
Ch (3) Comparison between different international standards regarding to total quality management
(3-8-2)Standardization of products
Another method of quality process improvement in
manufacturing is standardizing product the materials incorporated in
a finished product. It’s not possible to effectively institute this
process if a design team is intent on developing an entirely new
design for each project to prove its creative abilities.
Certainly the individual components in a building project can
be standardized. However even this is limited by architects choosing
to create an original design for each new project.
For standardization to be possible in construction, the
purchaser (building owner) would have to insist that the industry
begin to standardize its design on a national basis. This would be
particularly useful in public construction.
(3-8-3)Just-in-time inventory
Manufacturers with effective total quality programs require
their supplies to operate under a just-in-time inventory methods.
This program requires that inventories needed for the manufacturing
process be delivered when the material is needed, no sooner, and no
later.
In field construction, the most notable example of just-in-time
inventory is concrete deliveries. Concrete placement mandates the
concept to be used, as concrete obviously cannot be delivered weeks
in advance of need. Other materials delivered under this concept at a
construction site-include reinforcing steel on larger structural
concrete project, pre-cast parents, and other large items that can not
be delivered early date to site and space constraints.
-50-
Ch (3) Comparison between different international standards regarding to total quality management
-51-
Ch (3) Comparison between different international standards regarding to total quality management
-52-
Ch (3) Comparison between different international standards regarding to total quality management
-53-
Ch (3) Comparison between different international standards regarding to total quality management
-54-
Ch (3) Comparison between different international standards regarding to total quality management
-55-
Ch (3) Comparison between different international standards regarding to total quality management
-56-
Ch (3) Comparison between different international standards regarding to total quality management
Minimum
Failure costs
Appraisal costs
-57-
Ch (3) Comparison between different international standards regarding to total quality management
-58-
Ch (3) Comparison between different international standards regarding to total quality management
-59-
Ch (3) Comparison between different international standards regarding to total quality management
wasted in the process. These costs are some of the biggest factors in
determining the receive a great deal of attention.
The cost of investigation failure that manifest themselves in
problem like leaks, can also spiral out of control, but it usually more
prominent as an external failure cost.
(3-9-3-2)External failure Costs
External failure Costs manifest after the building had been
banded over to the client and where the client and professional teams
then idently poor quality. These can include patent defects that were
over looked or latent defects that could not reasonably have been
identified during the post handover inspection. These costs include
repair and servicing costs, Complaints, liability and loss of goodwill.
The costs of having to return too building, identifying the
cause of a problem and decertifying, has a major influence on the
contractor’s bottom line.
The client further incurs costs when being hampered from
using his building to its full extent and in having to communicate
problems to the contractor. This inevitably, will lead to a loss of
good will which, in the current market, is even more devastating
than repair costs as it can prevent a client from using the same
contractor in the future.
Failures are building can further because liability costs. The
collapse of a building or portion thereof will not only cost the
contractor or design team money in litigation but can also damage
their image to such and extent that the continued existence of the
company becomes endangered.
When sub-standard quality causes the client or the project
team to refuse to take possession of the building e.g. refusing to
certify that the building is ready for occupation.
-60-
Ch (3) Comparison between different international standards regarding to total quality management
The following items (3.10) are mainly extracted from the extensive
literature review carried out by ref (15,67)
However, TQM is a philosophy which is neither formal nor
documented. On the other hand formality and documentation are essential
requirement for ISO 9000 quality system. Therefore TQM approach
needs to be merged will ISO 9000 quality system to be enhanced with
documentation and to have the formal shape.
The section gives an over view about ISO 9000 Quality standards.
It explains why these standards were developed, what the main quality
models are and what the requirements of these models are. It also goes
through the ISO 9000 implementation process and gives answers for the
following questions;
-61-
Ch (3) Comparison between different international standards regarding to total quality management
-62-
Ch (3) Comparison between different international standards regarding to total quality management
main different ISO 9000 standards and their requirements are discussed in
details in the following section.
Total
quality
management
ISO 9000/2000
ISO 9004
ISO 9004
Quality
management
ISO 9000/94
ISO 9001
ISO 9001 ISO 9002 Quality assurance
ISO 9003
Quality control
Inspection
-63-
Ch (3) Comparison between different international standards regarding to total quality management
-64-
Ch (3) Comparison between different international standards regarding to total quality management
Models
Requirements
9001 9002 9003
Management responsibility. * * *
Quality system * * *
Contract review * *
Design control *
Document and data control * * *
Purchasing * * *
Control of customer-supplied product * * *
Product identification and tractability * * *
Process control. * *
- Inspection and testing. * * *
- Control of inspection, measuring, and test equipment. * * *
- Inspection and test status. * * *
- Control of Non-conforming product * * *
- Corrective and preventive action * *
- Handling, storage, preservation, packaging, and * * *
delivery. * * *
- Control of quality records. * *
- Internal quality Audits. * * *
- Training. * *
- Servicing. * * *
- Statistical techniques.
-65-
Ch (3) Comparison between different international standards regarding to total quality management
-66-
Ch (3) Comparison between different international standards regarding to total quality management
-67-
Ch (3) Comparison between different international standards regarding to total quality management
-68-
Ch (3) Comparison between different international standards regarding to total quality management
Continual improvement of
The quality management system
Management
responsibility Customers
Measurement, Satisfactions
Rescue
Analysis &
management
Customers improvement
Requirements
Product Output
realization Product
-69-
Ch (3) Comparison between different international standards regarding to total quality management
-70-
Ch (3) Comparison between different international standards regarding to total quality management
2-Determine Benefits
Establish quantifiable business objectives considering cost
reduction, error reduction and time reduction. Also improved
controls and discipline (e.g. prevents the use of shortcuts and
duplication of activities). Identification and resolution of problems.
3-Assess your current situation to Determine
- Your present costs associated with poor quality: try to eliminate
the costs associated with poor quality regarding the costs of:
a-Rework and scrape;
b-Excessive use of material due to poor design and process planning;
c-High inventory cost due to ineffective vendor management;
d-Inadequate utilization of plant and machinery due to production
planning;
e-Sorting out quality problems at the customer’s end and resulting
delayed payment;
f-Poor quality of purchased material; and
g-Opportunity of loss due to lost customers.
4-Needs for training
Training is required-at all levels within the company-on the
importance of product and service quality, in general, and the
reasons for the quality system and its benefits, in particular. This
will help to facilitate the right behavior, attitude and values of
employees towards the ISO 9000/2000 series and will encourage
total participation.
5-The present state of your documentation
Accurate procedures including operating and working
instructions should be documented. Wherever possible, what
-71-
Ch (3) Comparison between different international standards regarding to total quality management
-72-
Ch (3) Comparison between different international standards regarding to total quality management
-73-
Ch (3) Comparison between different international standards regarding to total quality management
World class
Improvement
Initiatives
ISO 9000
Uncommitted
-74-
Ch (3) Comparison between different international standards regarding to total quality management
Table (3-5) The Main differences between ISO 9000/2000(1) and TQM
-75-
Ch (3) Comparison between different international standards regarding to total quality management
-76-
Ch (3) Comparison between different international standards regarding to total quality management
-77-
Ch (3) Comparison between different international standards regarding to total quality management
-78-
Ch (3) Comparison between different international standards regarding to total quality management
-79-
Ch (3) Comparison between different international standards regarding to total quality management
-80-
Ch (3) Comparison between different international standards regarding to total quality management
-81-
Ch (3) Comparison between different international standards regarding to total quality management
2 Organization
management
7
Control
8 Quality assurance
9 Results
10
Planning
-82-
Ch (3) Comparison between different international standards regarding to total quality management
-83-
Ch (3) Comparison between different international standards regarding to total quality management
-84-
Ch (3) Comparison between different international standards regarding to total quality management
-85-
Ch (3) Comparison between different international standards regarding to total quality management
1- leadership 110
2-Strategic planning 80
-86-
Ch (3) Comparison between different international standards regarding to total quality management
System
Strategic
planning
Customer
and market
focus
Information 3
Driver analysis
4
Leadership
1 Human
resource
focus
Business
5 Results
Process
management
(15)
Figure (3-13) Malcolm Baldrige Model, Aly, M.S.
-87-
Ch (3) Comparison between different international standards regarding to total quality management
-88-
Ch (3) Comparison between different international standards regarding to total quality management
1- leadership 100
5-processes 140
7-People results 90
8-society results 60
-89-
Ch (3) Comparison between different international standards regarding to total quality management
which the organization and its people can excel. Leadership covers
the following sub-criteria:
- Leaders develop the mission, vision and values.
- Leaders are personally involved in ensuring the organizations
quality management system in developed, implemented and
continuously improved.
- Leaders are involved with customers, partners and representatives
of society.
- Leader motivates, support and recognize the organization’s people.
2- Policy and strategy
The policy and strategy of an organization is how it
implements its mission and vision via a clear stakeholder focused
strategy policy and strategy covers the following sub-criteria:
- Policy and strategy are based on the presenting future needs and
expectations of stakeholders.
- Policy and strategy are developed, reviewed and updated.
- Policy and strategy are communicated and implemented.
3-People Development & involvement
The full potential of an organization’s people is best released
through shared values and a culture of trust and empowerment,
which encourages the involvement of everyone. People cover the
following sub-criteria:
- People resources are planned, managed and improved
- People’s knowledge and competencies are identified, developed
and sustained.
- People are involved and empowered.
- People and organization have a dialogue.
-90-
Ch (3) Comparison between different international standards regarding to total quality management
-91-
Ch (3) Comparison between different international standards regarding to total quality management
People People
Processes 14%
Policy and Customer
strategy 8% results 20%
Partnership Society
& resources results
9% 6%
-Perception measures.
-Performance indicators
7-People results
People results are the achieving of the organization in relations
to its people. People results cover the following sub-criteria:
-Perception measures.
-Performance indicators
8-Society results
Society results are the achieving of the organization in relation
to local, national and international society as appropriate. Society
results cover the following sub-criteria:
-Perception measures.
-Performance indicators.
-92-
Ch (3) Comparison between different international standards regarding to total quality management
9-Business results
Business results are the achieving of the organization in
relation to its planned performance. Key performance results cover
the following sub-criteria:
-Key performance outcomes.
-Key performance indicators.
The model is based on the principle that the people are the
enablers who provide the results. In other words, customer
satisfaction, people satisfaction and impact on society are achieved
through the leadership policy and strategy, people management and
the management of resources and processes to lead to excellence in
business results.
-93-
Ch (3) Comparison between different international standards regarding to total quality management
the relationship with Europe, the EQM will probably be the most
appropriate.
The USA’s Baldrige Award is the American equivalent of the
Japanese Deming prize and the basic purpose of both awards is to
promote recognition of quality achievements and to raise awareness
of the importance and techniques to quality management. However,
the Baldrige Award characterized with the following;
- Focuses more on results and service,
- Relies upon the involvement of many different professional and
trade groups,
- Provides special credit for innovation approaches to quality,
- Includes a strong customer focus and,
- Tresses the importance of sharing information.
- Stresses the importance of sharing information.
On the other hand, there is a stronger emphasis in the Deming
application prize on the use of statistical methods than in the
Baldrage Award. (Juran’s Hand Book 1999) (39).
The MBNQA and EQA models are similar in concept and
comparable in their scoring, and in most cases 500 points out of
1000 score on the EQA model will equate to a similar score on the
MBNQA model. However, compared with American Baldrige
Award, the European Quality Award considers some areas as more
important.
-Impact on society,
-94-
Ch (3) Comparison between different international standards regarding to total quality management
-95-
Ch (3) Comparison between different international standards regarding to total quality management
National Quality
User results
EOA Award
50%
Management Assessment
(ISO 9000 + results)
DAP
?
MBA
ISO 9000 assessment/
Certification
100%
0 Assessment
of excellent Omni
Quality system
of quality comprehensive
referred only to
system quality system
products
-96-
Ch (3) Comparison between different international standards regarding to total quality management
-97-
Ch (3) Comparison between different international standards regarding to total quality management
(3-12)Conclusions
From the previous discussion it can be concluded that:
1- Although ISO 9000’s ultimate aim may be product quality, it
only examine the system that produces the product or
service.
2- ISO 9000 standard can not completely replace TQM, nor can it
achieve total quality, but it is a tool, and an effective one at
that.
3- For an ISO 9000 standard to be used successfully, it has to be
part of more global approach such that TQM.
4- For TQM approach to be implemented successfully it should
be supported by a documented mechanism such that ISO
9000 standards.
These conclusions support the main objective of the research,
by recognizing that: ISO 9000 quality system is a fundamental pillar
in an organization’s approach to TQM (Dale 1994)(45) and it helps to
ensure that any improvements made are help in place.
-98-
Ch (4): Comparative study between different construction companies regarding their quality manuals
Chapter (4)
Comparative study between different
construction companies regarding their quality
manuals.
(4-1) Introduction
To remain competitive in an increasingly environment,
companies have opted to implement quality schemes bases on the
principles of total quality management (TQM) and the ISO 9000
series of continuous in movement of overall performance and the
increase of customer satisfaction. Traditionally, quality
methodologies have been associated with manufacturing and few
companies in the construction sector have seized the opportunities
that these quality systems are able to bring.
This chapter assesses the impact on company performance and
implications of accepting quality schemes through the development
of three case studies. It analyses why and companies introduced
quality management, together with the key elements responsible for
the success of the initiatives and the results achieved.
The results of the analysis will interest companies wishing to
follow the road to quality, and useful strategies and areas for
improvement in the management of quality. Particular attentions has
been paid to the use of EN ISO 9000 systems by the industry as this
remains a significant driving force in the market place. The main
outcomes are presented below.
-99-
Ch (4): Comparative study between different construction companies regarding their quality manuals
(4-2)Comparative points
The comparison includes the following points:
(4-2-1)Company organization.
(4-2-2) company Amendment procedure.
(4-2-3)Company quality assurance and quality control
procedures which are:
1- Control of documents.
2- Control of records.
3- Quality policy.
4- Responsibility, authority and communication.
5- Purchasing.
6- Control of production and service provision.
7- Validation of processes for production and service provision.
8- Identification and tractability.
9- Customer property.
10- Preservation of product.
11- Customer satisfaction.
12- Internal Audit.
-100-
Ch (4): Comparative study between different construction companies regarding their quality manuals
-Company "A"
Is a leading contracting companies in construction sector. The
company has its own Design Department and a Specialist construction
division. Company has its different activities like as: Aluminum
fabrication, Carpentry & joinery, Stainless Steel, A/C duct fabrication,
Glazing, Extrusion, PVC fabrication.
-Company "B"
One of the biggest companies and also was upgraded in the next
four years to the unlimited category, which is the highest classification in
existence.
-Company "c"
Pioneered the supply of Ready Mixed concrete. It was also the first
national company to introduce and commission the concrete pump in
Middle East.
(4-2-2)Amendment record
Company "A"
Any amendment to Quality Manual shall be reviewed by the
Management Representative and approved by the General Manager
(Contracting).
In case of minor changes, requiring amendment of one or several
pages of the Quality Manual, only such page or pages shall be revised.
The type of amendment will be denoted on the History of Revision
list. In case of change to the Quality Manual require amendment of a
several numbers of pages, or after a significant number of minor changes,
the document will be residues. In this case the issue indicator will be
incremented and the revision number shall be re-set to zero.
The Management Representative will ensure that controlled copies
are updated promptly.
-101-
Ch (4): Comparative study between different construction companies regarding their quality manuals
Company "B"
All amendments to this quality Manual shall be reviewed, and
approved by the QA/QC manager. The revision updating and distribution
will be the responsibility of the QA/QC Manger.
The issue of complete sections will make changes. Each page of
each section will bear an issue number. When a change is made to a
section, its issue number will be incremented. Wherever practicable the
change in the document will be highlighted by underling and the issue
number will be denoted on the amendment sheet.
Company "C"
Amendments will be reviewed like original order and changes
intimated to affected departments/sections.
(4-2-3)Company quality control and quality assurance
procedures
(4-2-3-1)Control of documents
Every Company has established and maintains procedure for the
control of all documentation relating to the Quality Managements
System. (QMS).
Company "A" procedure ensures that:
1- All quality documents are reviewed and approved prior to issue.
2- The pertinent issues of appropriate documents are available at
locations where operations essential to the effective functioning of
the quality system are performed.
3- All changes to documents are in writing, reviewed and approved
prior to issue, and distributed to all holders of controlled copies.
4- A master set of applicable documents is maintained and updated.
5- Documents remain legible, readily identifiable.
-102-
Ch (4): Comparative study between different construction companies regarding their quality manuals
Record approval or
dental on change note
Implement change or
new document
Superseded document is
are withdrawn from use
End
-103-
Ch (4): Comparative study between different construction companies regarding their quality manuals
Company "C" procedure ensures that: the right only the right
document is available at the place of work.
Documentation:
1- Operational documents: a) Internal b) External
2-Recrods
-104-
Ch (4): Comparative study between different construction companies regarding their quality manuals
Retention of
quality records
-105-
Ch (4): Comparative study between different construction companies regarding their quality manuals
Company "C"
Its records to be maintained are listed in table below for
demonstrating conformance to specified requirements & effective
operation of Quality System. They will be legibly written, indexed
logically & stored to prevent damage/deterioration/loss & facilitate easy
& quick retrieval. They will be reviewed and destroyed after their
retention period (Up till next certification audit) is over. A document
generated before certification will be retained at least for one year. If in
contract relevant record will be made available to customer.
Formal Record Title Filling Responsible Life
Department years
No
Marketing
Equipment particulars
Purchase
(4-2-3-3)Quality Policy
Company "A"
Is dedicated to a quality policy focusing on exceeding the
Customers' expectation through out the life span of their buildings, by
providing a high quality product in the shortest duration and with
optimum investment.
It's category with respect to quality of its products and services,
conformance to the requirements of ISO 9001: 2000 as a benchmark.
-106-
Ch (4): Comparative study between different construction companies regarding their quality manuals
-107-
Ch (4): Comparative study between different construction companies regarding their quality manuals
-108-
Ch (4): Comparative study between different construction companies regarding their quality manuals
-109-
Ch (4): Comparative study between different construction companies regarding their quality manuals
-110-
Ch (4): Comparative study between different construction companies regarding their quality manuals
Company "B"
The responsibility, authority and the interrelation of all personnel
who manage, perform and verify work-affecting quality have been
defined and documented.
All personnel are responsible for ensuring that they comply with
the requirements of this manual and it’s associated Quality Procedures.
Each person with a defined responsibility is responsible for ensuring that
their deputy is aware of the Quality System activities to be undertaken
during their absence.
The Overall responsibility for checking and assuring the integrity
and continuity of the Quality System lies with the QA/QC Manager.
Name:
Position: Chief Quantity surveyor
Overall Mission: To maximize profit and minimize risk for all
construction activities within the company.
Responsibilities & Authorities
Responsibility
- Oversee site quantity surveyors work.
- Final subcontract agreement analysis.
- Site programs.
- Contract inspection.
Authority
- Agree final accounts.
- Agree insurance claims.
- Agree payment terms and conditions.
- Agree extension of times.
Reports Received
From:
Project Managers
-111-
Ch (4): Comparative study between different construction companies regarding their quality manuals
Estimators
Quantity surveyors
General Manager
Reports to be generated:
Budget Estimates
Final account analysis
Subcontract analysis
Variation & extension of Time Claims
Meetings to be attended:
Contracts Meeting-internal
Subcontract appointment meetings
Site coordination Meeting
Final account & Extension of Time Meetings
Name:
Position: Project manager
Overall Mission: TO mange a section of the group activities with the
achievement of goals and objectives within time and
cost to requisite quality in the most effective manager.
Responsibilities & Authorities:
Responsibility:
- To go through all specifications, drawings, contract documents, bill of
qty's etc.
- Analyze the project and specify the basic approach to be used.
- Break the project down in to reasonable number of activities to be
scheduled.
- Estimate the time required to perform each activity.
- Place the activities in sequence of time, taking into account the
requirements and prepare the programme of work.
-112-
Ch (4): Comparative study between different construction companies regarding their quality manuals
-113-
Ch (4): Comparative study between different construction companies regarding their quality manuals
Material approvals.
Comments on quarries.
Updated/revised drawings/sketches.
Subcontractors programme of works.
Variations/charge of specifications etc.
Subcontractors material procurement schedule.
Material submittal from subcontractors.
As built drawings.
Monthly Payment certificate.
Reports to be generated:
Programme of works for the complete project.
Short term programme for site activities.
Update subcontractors programme of works.
Labour histogram.
Weekly/monthly progress report.
Sketches
Material approval
Technical queries
Procurement schedule
Meetings to be attended:
Progress meeting with subcontractors
Progress meetings with consultant
Progress meeting with Head Office Management
Name:
Position: Project Engineer
Overall Mission: TO provide the engineering input necessary in order to
translate drawings and specifications into a build able
configuration for foreman/Charge-Hands to achieve
-114-
Ch (4): Comparative study between different construction companies regarding their quality manuals
-115-
Ch (4): Comparative study between different construction companies regarding their quality manuals
-116-
Ch (4): Comparative study between different construction companies regarding their quality manuals
-117-
Ch (4): Comparative study between different construction companies regarding their quality manuals
-118-
Ch (4): Comparative study between different construction companies regarding their quality manuals
-119-
Ch (4): Comparative study between different construction companies regarding their quality manuals
-120-
Ch (4): Comparative study between different construction companies regarding their quality manuals
- Protective clothing.
- Safety of scaffolding and barriers.
- Safety of machinery and equipment.
- Safety of site handing operations.
- Safety notices.
- First aid facilities and training of first aid officers.
- Safety training of operatives and labour.
- Handing of hazardous material.
- Fire fighting facilities.
- Sub-contractors safety facilities and safe working methods.
- Accident reports writing.
- Preparation of safety reports for project management.
Authority:
- To review the safety measures on site and can stop the work or use of
equipment if found not complying to the safety procedures and
specifications.
Reports Received:
From:
Nil
Reports to be generated:
Site safety report (if required)
Meetings to be attended:
Site safety meetings
-121-
Ch (4): Comparative study between different construction companies regarding their quality manuals
(4-2-3-5)Purchasing
Company "A"
maintained.
equipment as needed.
-122-
Ch (4): Comparative study between different construction companies regarding their quality manuals
Company "B":
Start
Purchase Dept.
Main Office
L.P.O Prepared
L.P.O. Purchase
QSP-7.4/02 Signed by purchase manager supervisor
End
-123-
Ch (4): Comparative study between different construction companies regarding their quality manuals
Company "C"
Scope of purchase is to all material and/or service that affect the
Quality fall under the scope and is shown in the table below.
Responsibility
Activity Capital Raw Spares & Sub
equipment materials consumables contracts
-124-
Ch (4): Comparative study between different construction companies regarding their quality manuals
-125-
Ch (4): Comparative study between different construction companies regarding their quality manuals
START
P.M.
Structure special Columns 1st floor or P.E.
list consultant concrete support G.F.
P.E.
Structure special 1st floor G.F.
list consultant
Scaffolding shuttering
reinforcement concrete
Structure special
list consultant
Typical Slab
Scaffolding shuttering
reinforcement concrete
Layout kicker
shuttering pour
kicker’s reinforcement
fix shuttering concrete
Continued
-126-
Ch (4): Comparative study between different construction companies regarding their quality manuals
Continued
P.E.
Structure special Typical walls G.F.
list consultant
Layout kicker
shuttering pour kickers
reinforcement fix
shuttering concrete
Cast in site
Layout
Shuttering
Reinforcement
Stair raises
Shuttering
Concrete
End of
superstructure
Company "C":
Not found
-127-
Ch (4): Comparative study between different construction companies regarding their quality manuals
-128-
Ch (4): Comparative study between different construction companies regarding their quality manuals
-129-
Ch (4): Comparative study between different construction companies regarding their quality manuals
Company "B"
The procedure ensures that the customer supplied products are
verified for conformity and/or suitability and will be subject to the
following controls:
- Check for correct identity and quantity and that it is free from damage
upon receipt.
- Continuous checking of identification during process.
- Storage separates from company materials in such a manner that
deterioration of materials.
- Good housekeeping to prevent damage and deterioration of materials.
Although the direct supply of materials by the customer (i.e. the
Client) is very rare, the procedures have been established to ensure
adequate control of customer supplied products as well as any of his
property or facilities for which company is responsible or which are used
by company.
Company "C"
Not found.
(4-2-3-10)Preservation of product
Company "A"
storage.
-130-
Ch (4): Comparative study between different construction companies regarding their quality manuals
Replacement or
retrieval of material
End
-131-
Ch (4): Comparative study between different construction companies regarding their quality manuals
Source/ responsible
Document activity person
START
Material
No available at
plant yard
Material
available Yes
other sites
Advise the site to
transfer material Yes
to required site
No
Timekeeper
acknowledges receipt of
materials/ equipment Timekeeper
by signing transfer note
and returning copy
END
-132-
Ch (4): Comparative study between different construction companies regarding their quality manuals
Company "C"
Equipment:
1- Aim: To ensure required process capability required for achieving
specified Quality through equipment management i.e.
selection, procurement, maintenance & calibration of
equipment.
2- Identification: Equipment that affects the final quality will be
identified. Effort on equipment management will be
commensurate with impact the equipment has on the
ultimate quality and or cost.
3- Calibration status: Calibration status (i.e., instrument ID, Date
Calibrated, Date due & Gauge reading Vs True reading)
will be clearly written on the instruments itself or on the tag
attached to it. If neither is viable, other suitable means will
be used.
(4-2-3-10)Customer satisfaction
Company "A"
The company shall monitor information related to customer
perception as to whether the organization has fulfilled customer
requirements, as one measure of system performance.
General Manager will arranged face to face discussions with
customer/client Reprehensive to discuss their satisfactions and
evaluations based on the performance & quality of work. Above will lead
into continual improvement and assessment of organizational
performance and effectiveness of the quality system.
Company "B"
Information relating to customer satisfaction is gathered during the
site meetings between the client/consultant, contractor and the
-133-
Ch (4): Comparative study between different construction companies regarding their quality manuals
1 Organization
Staff
Technical support
4 Co-ordination
5 Workmanship
6 Health and safety
7 Quality
8 Plant/Equipment
9 Overall performance
10 Corrective preventive actions
-134-
Ch (4): Comparative study between different construction companies regarding their quality manuals
Company "C"
(4-2-3-11)Internal Audit
Company "A"
activity and also explicitly on the results of the previous audits. The
ensures that in all cases the auditor(s) will be independent of the function
requirements of ISO 9001: 2000, and the quality policy and to determine
-135-
Ch (4): Comparative study between different construction companies regarding their quality manuals
Company "B"
Conducting the audit
START
Answer any
questions related to
conducting the audit
Nonconformance Report
QSP-8.2/B3
Review effectiveness of actions
implemented with auditee
END
Company "C"
Not found
-136-
Ch (4): Comparative study between different construction companies regarding their quality manuals
(4-3)Conclusions
Installing a quality management system which satisfies a standard
such as ISO 9001 or ISO 9002 is not on its own a guarantee for business
survival or improvement Quality systems are one separate aspect of
creating business improvement. In fact, the more important aspects
concern identification of markets and therefore clients, identifying the
services and products that are required and to then achieve client
satisfaction by delivery to specification, on time, on budget. A common
source of misunderstanding for the industry is that quality assurance and
certification/registration systems alone are not enough to achieve
continuous improvement. However, use of quality assurance and
certification/registration systems can be valuable in the development and
improvement of home-grown quality management systems and
procedures. We can make summary for companies quality manual as
following:
Quality control and quality Point of differentiation
assurance procedure
Control of document Company "A" company shows the
Control of records meaning using statements while
Purchasing Company "B" company uses the tables
Realization of product in its shows. On the other hand
Internal audit company "C" uses both.
Quality policy Company "A" Company focuses on the
customers a sits aims. While Company
"B" Company aims on ensuring
continues improvement according to
international standers. On the other
hand Company "C" sees that customer's
satisfaction is the most important aim.
-137-
Ch (4): Comparative study between different construction companies regarding their quality manuals
-138-
Ch (5): Analysis and Discussion Questionnaire Results
Chapter (5)
Analysis and Discussion Questionnaire Results
(5-1) Introduction
In the process of developing a quality management system to
be applied in the construction companies, this chapter aims at
analyzing and evaluating the current knowledge and practices of
quality, in general, and ISO 9000 and TQM, in particular in these
companies.
To achieve this goal, a filed survey was established for the
purpose of surveying the concepts of quality, the current applied
quality system in construction companies and the level of practice of
the TQM related activities. The data have been collected by means of
questionnaire.
(5-2)Tools and techniques used in improvement
TQM technology includes a number of methodologies, tools and
techniques used at either or both of the strategic and the operational levels,
some of these techniques are:
- Business Reengineering (BR) or business process Reengineering (BPR).
- Quality function deployment (QFD).
- Statistical process control (SPC)
- The ISO 9000 standards for quality Assurance.
- The Malcolm Baldrige National Quality Award Criteria.
- The European Quality Award Criteria.
- Deming’s 14 points.
- Crosby’s four absolutes.
-139-
Ch (5): Analysis and Discussion Questionnaire Results
-140-
Ch (5): Analysis and Discussion Questionnaire Results
-141-
Ch (5): Analysis and Discussion Questionnaire Results
-142-
Ch (5): Analysis and Discussion Questionnaire Results
-143-
Ch (5): Analysis and Discussion Questionnaire Results
-144-
Ch (5): Analysis and Discussion Questionnaire Results
2-Strategic planning
The strategic planning examines company goals for long and short term
and market requirement:
Yes No
Assessed item
Strongly Average Weakly
-145-
Ch (5): Analysis and Discussion Questionnaire Results
3-Contract Review
The contract review category examines records review, documented
procedure and a system for contract review for products according to
customer requirements.
Yes No
Assessed item
Strongly Average Weakly
-146-
Ch (5): Analysis and Discussion Questionnaire Results
-147-
Ch (5): Analysis and Discussion Questionnaire Results
5-Process Management
The process Management category examine customer focused, design,
product and service delivery processes, support processes, the category
examines how key processes are designed, effectively managed, and
improved to achieve better performance.
Yes No
Assessed item
Strongly Average Weakly
-148-
Ch (5): Analysis and Discussion Questionnaire Results
Yes No
Assessed item
Strongly Average Weakly
-149-
Ch (5): Analysis and Discussion Questionnaire Results
6-1 General
(6-1-a) Is there a system for quality audits?
(6-1-b) Do corrective action procedures
require that the cause of non-conformities be
defined and action taken to prevent
recurrence?
(6-1-c ) Are changes modes to procedures as
a result of corrective and preventive action?
6-2 Corrective action
(6-2-a) Are there procedures for analyzing all
processes, quality records and customer
complaints to detect and eliminate potential
causes of non-conforming?
(6-2-b) Are corrective actions taken and
effective?
6-3 Preventive Action
(6-3-a) Are there steps taken toward
preventive action to eliminate potential cause
of non conformity’s?
(6-3-b) Are corrective actions taken and
effective?
(6-3-c) Is there a system to verify the
effectiveness of preventive action?
(6-3-d) Are the taken corrective actions
submitted to management for review?
-150-
Ch (5): Analysis and Discussion Questionnaire Results
-151-
Ch (5): Analysis and Discussion Questionnaire Results
-152-
Ch (5): Analysis and Discussion Questionnaire Results
-153-
Ch (5): Analysis and Discussion Questionnaire Results
-154-
Ch (5): Analysis and Discussion Questionnaire Results
-155-
Ch (5): Analysis and Discussion Questionnaire Results
-156-
Ch (5): Analysis and Discussion Questionnaire Results
-157-
Ch (5): Analysis and Discussion Questionnaire Results
-158-
Ch (5): Analysis and Discussion Questionnaire Results
-159-
Ch (5): Analysis and Discussion Questionnaire Results
Yes Grade
Strongly 3
Average 2
Weakly 1
No 0
Then the total possible score for each section was calculated by
multiplying the number of questions by the highest score (3), then
according to the answers the actual score was relatively calculated by
the sum of individual questions.
-160-
Ch (5): Analysis and Discussion Questionnaire Results
(Group 1)
The chart presents the performance of all the Quality system
elements for every construction company.
Horizontal axe shows: Quality system elements,
Vertical axe shows: Average performance of all Quality system
elements in one company.
(Group 2)
-161-
Ch (5): Analysis and Discussion Questionnaire Results
(Group 3)
The chart presents a final judgment on the level of Quality in
all construction companies together after taking the average of all
Quality system elements in the five construction companies.
Horizontal axe shows: construction companies
Vertical axe shows: average score for each company in all
quality system elements.
-162-
Ch (5): Analysis and Discussion Questionnaire Results
Company
Company
Company
Company
Company
No.
(D)
(A)
(B)
(C)
(E)
Comment
1-a Strongly Average Weakly Average Weekly Company (A) having documented procedure and always
making review.
Company (B) and company (D) having documents but
partially reviewed. Company (C) and Company (E)
depend on manager instruction without written papers.
1-b Strongly Strongly Average Strongly Strongly For all companies expect company (C) all managers are
training enough to ensure flexibility and learning how to
deal with customer. In company (C) not all managers
are training.
1-c Strongly Strongly Weakly Strongly Average All companies having rewarding system but by different
ways
1-d Strongly Strongly Average Strongly Average Companies (A,B and D) making weekly meeting to
solve any problem for company (c) and (D) not
necessary to put it in meeting.
-163-
Ch (5): Analysis and Discussion Questionnaire Results
Question.
Company
Company
Company
Company
Company
No.
(D)
(A)
(B)
(C)
(E)
Comment
2-1-a Strongly Strongly Average Strongly Average Companies A, B and D have enough tools in all projects
and spar parts also. Other companies having tools
without available spare parts.
2-1-b Weakly Average Average Weakly Average Companies B, E and C according to the satiation and the
degree and some time allow. Companies A and D there
is system for replacement and responsible
2-1-c Weakly Average Strongly Weakly Average Companies A, D all equipment are own to them.
Companies B & E 60% of equipment are owned.
Company (c) 30% of equipment are owned.
2-1-d No Average Weakly No Weakly Companies A, D have the ability to do any service with
high quality. Company (B) in the way to be a leader.
Company (c) try to do all best for customer satisfaction
-164-
Ch (5): Analysis and Discussion Questionnaire Results
Question.
Company
Company
Company
Company
Company
No.
(D)
(A)
(B)
(C)
(E)
Comment
2-2-a Strongly Average No Strongly No Companies (A& D) ensure this in their quality manual.
Company (B) according to project size.
Companies (c& e) haven't a written mission statement.
2-2-b Strongly Average No Strongly Weakly Companies (A&D) have written longer and short-term
goals and follow it perfectly. Company (b) has also but
there some missing in implementing company (c) only
short-term goals.
2-3-a Strongly Strongly Weakly Strongly Average All companies consider market pricing but only
company (A) considers market expectation.
2-3-b Strongly Average Weakly Average Weakly Company (A) its aim to produce with high quality.
Companies (B & D) do in the way to do this companies
(C& e) try to do this.
-165-
Ch (5): Analysis and Discussion Questionnaire Results
Question.
Company
Company
Company
Company
Company
No.
(D)
(A)
(B)
(C)
(E)
Comment
3-a Strongly Strongly Strongly Strongly Strongly All companies have files for records contract review
3-b Strongly Strongly Strongly Strongly Strongly All companies ensure this in their quality manual.
3-c Strongly average Average Strongly Average Companies (A &D) having documents and review by
General manager to be done. Other companies having
documents but it take time to be done.
3-d Strongly Strongly average Strongly average All companies has capability to meet contract
requirement but companies (A, B and A) do it in exact
time. The other some time delay accrued.
-166-
Ch (5): Analysis and Discussion Questionnaire Results
Question.
Company
Company
Company
Company
Company
No.
(D)
(A)
(B)
(C)
(E)
Comment
4-a Strongly Strongly Average Strongly Average Companies (A, B,D) having documents almost in all
parts of organization companies (C & e) having
documents only in management sector.
4-b Average Weakly Weakly Weakly Weakly There is no certain way but company (a) start to make
computer flies for obsolete document and other
companies start to make written by hand.
4-c Strongly Average Weakly Strongly Average Company (A&D) depend on high communication like
internet and mobiles using legal paper. Company (B
&e) using post way to send papers. Company still
establishes system for this.
4-d average Average No Average Weakly Most companies didn't have put there tail methods for
seeking appropriate comparative information.
-167-
Ch (5): Analysis and Discussion Questionnaire Results
Question.
Company
Company
Company
Company
Company
No.
(D)
(A)
(B)
(C)
(E)
Comment
4-e Strongly Average No Strongly No Companies (A & D) always making evaluation for any
project after handing over. Company (B) make
evaluation for only high cost projects other companies
no.
4-f Strongly Weakly No Average No Only company (A) having stored files for out put.
Company (D) partially has flies for some projects.
Company (B) start to establish sector for this others no.
-168-
Ch (5): Analysis and Discussion Questionnaire Results
Question.
Company
Company
Company
Company
Company
No.
(D)
(A)
(B)
(C)
(E)
Comment
5-1-a Strongly Average Average Strongly Average Companies (A, D) make procedure to achieve customer
requirements by using questionnaire. Companies (B, C,
E) having documents for customer notes but partially
did.
5-1-b Strongly Average Average Average Average All companies ensure this in their quality manual. By
only company (A) making review for if design
processes meet quality or not.
5-1-c Average Average Weakly Average Weakly Most important thing for all companies to have a high
quality product but there no coordinate to ensure trouble
free
5-1-d Strongly Average Weakly Average Weakly There description in quality manual by only company
(A) having revision section for work. Companies (B&
D) partially review. Company (C) few review.
-169-
Ch (5): Analysis and Discussion Questionnaire Results
Question.
Company
Company
Company
Company
Company
No.
(D)
(A)
(B)
(C)
(E)
Comment
5-1-e Strongly Average Average Strongly Weakly Depend on professional managers who are there in
companies (A, D) and less training in other companies.
5-1-f Strongly Weakly Weakly Average Weakly For company (A) its name in the market no one
compares from it, second level company (B). other
companies in the way.
5-1-g Strongly Strongly Average Strongly Average Companies (A, B, D) always evaluate their projects to
check performance other companies only in big
projects.
5-1-h Strongly Strongly Average Strongly Average All companies ensure this in their quality manual to
have high quality product but it differ between
companies as shown
-170-
Ch (5): Analysis and Discussion Questionnaire Results
Question.
Company
Company
Company
Company
Company
No.
(D)
(A)
(B)
(C)
(E)
Comment
5-2-a Strongly Average Average Average Average Company (A) doing documents in shape of tables so it
easy to recognize. Other companies show it is shape of
statements.
5-2-b Strongly Strongly Average Strongly Average All companies ensure this in their quality manual by
only (A, B, D) making review for results.
5-2-c Strongly Average Average Strongly Average All companies include cycle time in their evaluation but
only companies (A, D) done their projects in exact time-
others no.
-171-
Ch (5): Analysis and Discussion Questionnaire Results
Question.
Company
Company
Company
Company
Company
No.
(D)
(A)
(B)
(C)
(E)
Comment
6-1-a Strongly Weakly No Average No For company (A) having in their quality manual
company (D) only documents without clear statement.
Company (B) try to make produce. Company (C) no.
6-1-b Average Average Weakly Average Weakly All companies didn't prevent action but make corrective
action only companies (A, B, D) define non-
conformities action others no.
6-1-c Strongly Average Weakly Average Weakly Company (A) take quality action to change procedures
according correction. Companies (B, D) not all changes
done-companies (C, e) few changes done.
6-2-a Strongly Strongly Weakly Strongly Weakly There are flies for recording cause of none conforming
and in weekly meeting mangers analysis all this it is
clear in companies (A, B, D) other try to analysis
problem as they can.
-172-
Ch (5): Analysis and Discussion Questionnaire Results
Question.
Company
Company
Company
Company
Company
No.
(D)
(A)
(B)
(C)
(E)
Comment
6-2-b Strongly Average Weakly Strongly Weakly All companies take corrective action by only (A, D)
there is no effect on work company (B) partially
effective companies (C, e) need more training.
6-3-a Average Weakly Weakly Average Weakly Companies (A, D) preparing system to prevent action as
they can but not done yet. Other companies try be
efforts to prevent action.
6-3-b Strongly Average Average Strongly Average All companies take corrective action by only companies
(A, D) the results effective
6-3-c Weakly No No Weakly No All companies didn't have but there's some trail in
companies (A, D)
6-3-d Strongly Weakly No Average Weakly Only company (A) all corrective action reviewed.
Company (D) partially reviewed. Companies (B, e) few
reviewed. Company (C) No.
-173-
Ch (5): Analysis and Discussion Questionnaire Results
Question.
Company
Company
Company
Company
Company
No.
(D)
(A)
(B)
(C)
(E)
Comment
7-a Strongly Average Weakly Average Average All companies identify all this in their quality manual
but company (A) updating quality manual other
companies no reviews are made.
7-b Average Average Weakly Average Weakly Companies (A, B, D) didn't have full files for quality
records but they maintain it to be conformed other
companies depend on quality manual procedure only.
7-c Average Average Weakly Average Weakly As mention before no all quality records filled and
stored.
7-d Strongly Weakly No Weakly Weakly Only company (A) determines section time other
according to manger instruction.
-174-
Ch (5): Analysis and Discussion Questionnaire Results
Question.
Company
Company
Company
Company
Company
No.
(D)
(A)
(B)
(C)
(E)
Comment
8-a Strongly Average Weakly Average Average Company (A) having separate section for quality audits.
Companies (B, D, E) depend on quality manual
procedure and they follow it. Company (c) using
computer programmes.
8-b Strongly Average Weakly Average Average We can set it in audits section for company (A).
Companies (B, D, E) make general schedule without
detail in every project. Company (C) we can find files
but without revision from quality sector
8-c Strongly Average Weakly Average Average As before company (A) have separate section so they
the independent other companies (B, D, E) to general
manager direct. Company (c) try for this.
-175-
Ch (5): Analysis and Discussion Questionnaire Results
Question.
Company
Company
Company
Company
Company
No.
(D)
(A)
(B)
(C)
(E)
Comment
8-d Average Average Weakly Average Average Most of them one qualified not all. And they have
training certificates.
8-e Strongly Average Weakly Average Weakly Company (A) auditors having files for evaluation their
quality system companies (B, D). Mangers do
evaluation company (C) after finishing project making
total evaluation.
8-f Strongly Weakly Weakly Average Weakly Demonstrated quickly in company (A) and partially
appear in company (D) other companies in the way.
-176-
Ch (5): Analysis and Discussion Questionnaire Results
Question.
Company
Company
Company
Company
Company
No.
(D)
(A)
(B)
(C)
(E)
Comment
9-1-a Strongly Average Average Average Average All company (A) stuff have experience enough to have
self-directed responsibility. Other companies have
responsibility but not in all divisions.
9-1-b Strongly Strongly Average Strongly Average Companies (A, B, D) have good communication system
through all projects using internet, faxes, mobiles even
in small instruction other companies not all previous
tools are available.
9-2-a Strongly Strongly Average Strongly Average Companies (A, B, D) ensure this in their quality manual
with brief description for everyone job. Other
companies ensure this but not in all parts of
organization.
-177-
Ch (5): Analysis and Discussion Questionnaire Results
Question.
Company
Company
Company
Company
Company
No.
(D)
(A)
(B)
(C)
(E)
Comment
9-2-b Strongly Average Weakly Strongly Average Human resource section in companies (A, D) training
enough to development their objects. Companies (B, e)
only head section is training. Company (C) try to
establish human resource section.
9-2-b Strongly Average Weakly Strongly Average Human resource section in companies (A, D) training
enough to development their objectives. Companies (B,
e) only head section is training. Company (c) tries to
establish Human resource section.
9-2-c Strongly Average Average Strongly Average Mangers at all levels ensure this but differ between
companies.
9-2-d Strongly Average Average Strongly Average All companies have qualified employs but heir skill not
same in all objectives of the project
-178-
Ch (5): Analysis and Discussion Questionnaire Results
Question.
Company
Company
Company
Company
Company
No.
(D)
(A)
(B)
(C)
(E)
Comment
9-2-e Average Average Weakly Average Weakly Companies (A, B, D) evaluate human resource as part
from final evolution not separately. Companies (c, e)
depend on managers evaluation without any procedure
9-3-a Strongly Strongly Average Strongly Average All employees in companies (A, B, D) having helmet
and safety choice. Other companies there few labours
didn't have.
9-3-b Strongly Average Average Average Average Every employee in company (A) has health insurance.
Other companies not all employee have health
insurance.
9-3-c Average Weakly Weakly Average Average Companies (A, D) have target but didn't have key
measures other company to try to achieve their target
9-3-d Strongly Strongly Average Strongly Average Companies (A, B, D) having rewarding system to
support well-being satisfaction other companies making
in individual.
-179-
Ch (5): Analysis and Discussion Questionnaire Results
Question.
Company
Company
Company
Company
Company
No.
(D)
(A)
(B)
(C)
(E)
Comment
10-a Average Average Weakly Average Weakly Not all customer groups selected according to his
requirements in companies (A, B, D) other companies
try to do this
10-b Strongly Average Average Strongly Average All companies have ability to determine their goals but
ways differ between them
10-c Strongly Average No Strongly No Companies (A, D) ensure this in contract company (B)
partially did other companies no
-180-
Ch (5): Analysis and Discussion Questionnaire Results
Question.
Company
Company
Company
Company
Company
No.
(D)
(A)
(B)
(C)
(E)
Comment
11-1-a Strongly Weakly No Average Weakly Company (A) making questions in it quality manual to
measure customer satisfaction. Companies (B, e, D)
depend on ensure in their quality manual to make
customer satisfy as they can company (C) no
11-2-a Average Weakly No Weakly Weakly Company (A) have records but not for all employees.
Companies (B, D, e) depend on manger evaluation
without written mission. Company (C) No
11-3-a Strongly Average Weakly Average Weakly Company (A) having documents for all this and review
by general manger. Company (b) and company (D)
having documents only for service quality and company
cycle time, there no. company (c) only cycle time.
11-3-b Average Weakly Weakly Average Weakly Companies (A, D) not full records. Other companies try
to establish procedure for this.
-181-
Ch (5): Analysis and Discussion Questionnaire Results
93% 100% 100% 89.7% 94.5% 83.5% 96% 92% 955 100% 75% 100% 1- Company
(a)
74% 67% 76.7% 79.5% 67% 675 67% 72% 67% 91.6% 71% 91.6% Company
(b)
45% 16% 23.55 59% 33.5% 33.5% 48% 56.5% 39% 83.3% 29% 75% Company
(c)
88.2% 83.3% 97% 89.7% 88.8% 67% 81.5% 89.7% 83.3% 100% 71% 91.7% Company
(d)
54% 33.3% 47% 67% 61% 41.7% 44.5% 59% 44.5% 83.5% 42% 75% Company
(e)
-182-
Ch (5): Analysis and Discussion Questionnaire Results
Chart (1)
Percentage
500.00
450.00
400.00
Comp. E
350.00
300.00 Comp. D
250.00 Comp. C
200.00 Comp. B
150.00
Comp. A
100.00
50.00
0.00
LS SP CR DC PM Ca Qc Iad Hr C&M(f) BR
Quality management system
Chart (1) presents the performance of all quality system elements in every construction company compared to each other:
The chart also shown:
1- Company (a) is the highest company in its percentage and its quality system elements percentages so closed and
almost same.
2- Both companies (c) & (E) are the lowest companies' percentage and most results less than 60%.
3- Company (D) in the second level after company (A) and in some elements intersection with company (A) like in
elements SP, HR, PM
4- Company (B) has medium score but height most results around 75% so with more improvement it will reach.
-183-
Ch (5): Analysis and Discussion Questionnaire Results
Chart (2)
LS
Leadership and management responsibility
Percentage
100.00
90.00
80.00
70.00
60.00
50.00 LS
40.00
30.00
20.00
10.00
0.00
Comp. A Comp. B Comp. C Comp. D Comp. E Companies
-184-
Ch (5): Analysis and Discussion Questionnaire Results
ContractCR
review
Percentage
100.00
90.00
80.00
70.00
60.00
50.00 CR
40.00
30.00
20.00
10.00
0.00
Comp. A Comp. B Comp. C Comp. D Comp. ECompanies
-185-
Ch (5): Analysis and Discussion Questionnaire Results
PM
Process management
Percentage
100.00
90.00
80.00
70.00
60.00
50.00 PM
40.00
30.00
20.00
10.00
0.00
Comp. A Comp. B Comp. C Comp. D Comp. E Companies
-186-
Ch (5): Analysis and Discussion Questionnaire Results
Qc
Control of quality records
Percentage
100.00
90.00
80.00
70.00
60.00
50.00 Qc
40.00
30.00
20.00
10.00
0.00
Comp. A Comp. B Comp. C Comp. D Comp. E Companies
-187-
Ch (5): Analysis and Discussion Questionnaire Results
Hr and management
Human resource development
Percentage
100.00
90.00
80.00
70.00
60.00
50.00 Hr
40.00
30.00
20.00
10.00
0.00
Comp. A Comp. B Comp. C Comp. D Comp. E Companies
-188-
Ch (5): Analysis and Discussion Questionnaire Results
BusinessBR
results
Percentage
100.00
90.00
80.00
70.00
60.00
50.00 BR
40.00
30.00
20.00
10.00
0.00
Companies
Comp. A Comp. B Comp. C Comp. D Comp. E
-189-
Ch (5): Analysis and Discussion Questionnaire Results
Chart (3)
Percentage
Average percentage of average
companies according to TQM
10.00
0.00
Comp. A Comp. B Comp. C Comp. D Comp. E Companies
-190-
Ch (5): Analysis and discussion of questionnaire results
(5-7)Conclusions
There was an agreement across the companies on the reasons for
quality loss, particularly the areas of information, analysis human
resources management and communications, and customer
information.
This was a strong evidence for the requirement of construction
company quality system management, which is the key to the
acceptance of the concept for quality improvement.
The employee’s awareness of quality principles and systems was
limited which indicated the importance of training in quality
terminology and methods as an integral part of TQM
implementation system.
There is a considerable culture tensions which contribute to a low
commitment to improvement and change, and have to be solved
before a quality management system can be effectively
implemented.
It was clear that the quality losses are systematic losses. They are
commonly identified in remarkably terms by directors of the
company which indicate the requirement of systematic approach
to be adopted to improve these losses.
-191-
Ch (6) : Conclusions, Recommendations and further studies
Chapter (6)
Conclusions, Recommendations and further studies
(6-1) Conclusions
The aim of research was to assess the importance of
the implementation of the TQM in construction
companies through a questionnaire that includes eleven
key items of the quality system elements. The
questionnaire was answered by individuals who are
responsible for implementation and management of Total
Quality Management in their companies. From this study
we reached the following conclusion:
1-The existing quality control systems in the construction
industry have some deficiencies, therefore it is essential
for construction companies to raise theis quality standards
and implement an improving quality approach.
2-Developing and applying a quality management system in
construction industry based on questionnaires is suitable
way to classify any company in construction sector
according to TQM
3- From the analysis of every element of the quality management
system which was made as a questionnaire to enhance the level
of any Construction Company to reach the performance
excellent; it is recommended to use the following techniques:
a-Flexible management.
b-Self-directed, cross-functional teams.
-192-
Ch (6) : Conclusions, Recommendations and further studies
c-Continuous improvement.
d-Reengineering.
e-Process-based management.
4-For an effective quality management system, it is
important to bring together the concepts of TQM of
continuous improvement and ISO 9000 quality
requirement.
(6-2) Recommendations
Important recommendations obtained from this study could be
concluded as follows:
1-It is important that the construction companies develop a quality
management system to meet the requirements of the
international quality standards. Moreover, it should contain:
quality manual, procedures manual and work instructions.
2-It’s highly recommended to bring together the concept of culture
change-by adopting the TQM approach-and the ISO 9000
quality standards to build an effective quality management
system.
3-Culture change, people involvement and people commitment are
main demands to implement a successful quality management
system.
4-Implement a management system based on the principle of total
quality
5-Develop quality systems of company and project level
concurrently
6-Maintain employee interest and involvement after certification has
been achieved, through new initiatives,
-193-
Ch (6) : Conclusions, Recommendations and further studies
7-Strike the right balance between added value and cost of quality
systems;
8-Encourage good leadership and establish effective communication
channels;
9-Delegate responsibility to project teams and to lower levels in the
hierarchy.
10-Systemise the collection of data on the efficiency of various
business processes, such as the measurement of the cost of
non-quality and of customer satisfactions; benchmark company
performance against the performance of others in the industry;
11-Use company specific performance indicators on a score card
type approach to measure trends appropriate to particular
objectives.
12-Train (in some cases by cascading know ledge) and reward site
personnel for achievements,
13-Develop good communication whilst avoiding abuse of informal
communication patterns.
14-Develop trust between the different parties involved in the
construction process whilst avoiding low degree of cross-
fertilization of ideas with other parties.
15-Categorise projects by size and identify routines appropriate for
each project category;
16-Identify certain work phases appearing in all projects and create
structures and standard procedures (even if construction
projects generally haven on repetitive character); phases can be
start-up purchase of materials sub-contracting works and
delivery.
-194-
Ch (6) : Conclusions, Recommendations and further studies
17-Consider customer satisfaction as the key company to ensure
appropriate links between quality and strategy within the
organization, and to guarantee that the quality approach
quickly fitters through to all parts of the company;
18-Nature a quality-aware culture by encouraging a pro-active
attitude in dealing in dealing with new ideas;
(6-3) Further studies
1- The difficulties behind the implementation of T.Q.M in the
construction industry sector in Egypt.
2- Making computer program for measuring TQM in construction sector.
3- Further research is required to define and investigate the different
element for the cost of quality related to the implementation of the
quality system in the Egyptian construction companies.
-195-
References
References
11-Mitawie, N.A. and Kamal, M.M.: "Quality Control (Why, How and By
Whom), Seminar on Quality Assurance and Quality Control for
Irrigation & Drainage Projects" (1991).
-196-
References
12-Eid, T.A. "Safety of Workers in Big Projects and its Effect on Quality
Control." Seminar on Quality Assurance and Quality Control for
irrigation & Drainage Projects, (1991).
13- Kamal, M. and abd-reheem. A H.” quality control between theory and
practice in building Industry” , Mansora Eng.journal
(MEJ),VOL.12,No.2, (1987).
-197-
References
the Requirement for the Degree of Doctor Philosophy, Civil
Engineering, August, (1987).
22-Crosby, P.: “Quality is Free: The Art of Making Quality Certain” Mc.
GrawHill, (1979).
24-Lt Gen H Lal, "New Quality Policy Initiative for Egypt, an approach
based on Indian experience"
ﻤﻥ ﺃﺠل ﺍﻝﺘﻭﺼل ﺇﻝﻲ "ﺍﻝﺠـﻭﺩﺓ ﺍﻝـﺸﺎﻤﻠﺔ، ﺍﻝﻤﺅﺘﻤﺭ ﺍﻝﺴﻨﻭﻱ ﺍﻷﻭل ﻝﻠﺠﻤﻌﻴﺔ ﺍﻝﻤﺼﺭﻴﺔ ﻝﻠﺠﻭﺩﺓ
27-Hongi Sun, Ip Kee Hui, Agnes Y.K. Tan and Jan Frick, "Employee
Involvement and Quality Management", The TQM Magazine,
volume 12,number 5, number 5, PP 350-354 (2000).
-198-
References
30-Graves, R., “Total Quality- Does it work in Engineering
Management,” Journal of Management in Engineering, ASCE, Vol.9
NO. 4, PP 444-455, Oct., (1993).
-199-
References
40-Alfredo Serpell and , Luis Fernado Alcon, "Construction Process
Improvement Methodology for Construction Projects", International
Journal of Project Management, Vol. 16, No.4, , PP. 215-221, (1998)
50-Abdel Hady Hosny, Khald Hamdy and Mona El-Desoki "Total Quality
Management in Research Institution in Egypt", Third International
Conference on Engineering Research ICER-99 Prot Said, Egypt,
Vol. II, November (1999).
-200-
References
51-F. Lawrence Bennett, P.E. "The management of Engineering", John
Wiley & Sons, Inc, (1996).
61-Paul A. Nee, "ISO 9000 in Construction", John Wiley & Sons, Inc,
(1996).
-201-
References
62-Mjahaj U. Khan, "The motivational theories and the implementation of
TQM in Saudi Arabia," SCECO_East 5th Annual TQM Conference,
May (1999).
-202-
ﺍﻝﻤﻠﺨﺹ ﺍﻝﻌﺭﺒﻲ
ا
ا
وآ! ادة وإدارة ادة اﻡ
ع
ا!!#
ﻴﺸﻬﺩ ﻗﻁﺎﻉ ﺍﻝﺘﺸﻴﻴﺩ ﻓﻲ ﻤﺼﺭ ﺍﻝﻌﺩﻴﺩ ﻤﻥ ﺍﻝﺘﻁﻭﺭﺍﺕ ﻤﺘﻤﺎﺸﻴﺎ ﻤـﻊ ﻤﺘﻁﻠﺒـﺎﺕ
ﻨﻅﻡ ﺍﻝﺠﻭﺩﺓ ﺍﻝﺤﺩﻴﺜﺔ ﻤﻥ ﺨﻼل ﺘﻁﺒﻴﻕ ﻨﻅﺎﻡ ﺇﺩﺍﺭﺓ ﺍﻝﺠـﻭﺩﺓ ﺍﻝـﺸﺎﻤﻠﺔ ﻋﻠـﻰ ﺠﻤﻴـﻊ
ﻭﺇﺩﺍﺭﺓ ﺍﻝﺠﻭﺩﺓ ﺍﻝﺸﺎﻤﻠﺔ ﻝﻴﺴﺕ ﺒﺎﻝﻤﺼﻁﻠﺢ ﺍﻝﺠﺩﻴﺩ ﻋﻠﻴﻨﺎ ﻓﻬﻲ ﻤﻭﺠﻭﺩﺓ ﻤﻨﺫ ﺍﻝﻘﺩﻡ
ﻭﻝﻘﺩ ﻤﺭﺕ ﺇﺩﺍﺭﺓ ﺍﻝﺠﻭﺩﺓ ﺒﻤﺭﺍﺤل ﻋﺩﻴﺩﺓ ﺨﻼل ﺍﻝﺘﻁﻭﺭ ﻓﻨﺠـﺩ ﺇﻨﻬـﺎ ﺒـﺩﺃﺕ
ﺒﻤﺭﺤﻠﺔ ﺍﻝﻤﺘﺎﺒﻌﺔ ﻭﺍﻝﻤﻼﺤﻅﺔ ﺍﻝﻤﺒﺎﺸﺭﺓ ﻓﻲ ﺍﻝﻤﻭﻗﻊ ﻗﺩ ﺍﻨﺘﻘﻠﺕ ﺒﻌﺩ ﺫﻝـﻙ ﺇﻝـﻲ ﻀـﺒﻁ
ﺍﻝﺠﻭﺩﺓ ﺍﻝﺫﻱ ﻗﺎﺩﻨﺎ ﻓﻲ ﺍﻝﻨﻬﺎﻴﺔ ﺇﻝﻲ ﺍﻝﻤﻔﻬﻭﻡ ﻷﺸﻤل ﻭﺍﻷﻋﻡ ﻭﺍﻷﺤﺩﺙ ﺃﻻ ﻭﻫـﻭ ﺇﺩﺍﺭﺓ
ﺍﻝﺠﻭﺩﺓ ﺍﻝﺸﺎﻤﻠﺔ.
ﺇﻥ ﺇﺩﺍﺭﺓ ﺍﻝﺠﻭﺩﺓ ﺍﻝﺸﺎﻤﻠﺔ ﻋﺒﺎﺭﺓ ﻋﻥ ﻋﻤﻠﻴﺔ ﺘﺤﺴﻴﻥ ﻭﺘﻁﻭﻴﺭ ﻝﺠﻤﻴﻊ ﺍﻷﻨـﺸﻁﺔ
-203-
ﺍﻝﻤﻠﺨﺹ ﺍﻝﻌﺭﺒﻲ
ﻭﻴﺸﻤل ﻫﺫﺍ ﺍﻝﺒﺤﺙ ﻋﻠﻰ ﻋﻤل ﺩﺭﺍﺴﺔ ﻤﻘﺎﺭﻨﺔ ﺒﻴﻥ ﺜﻼﺙ ﺸﺭﻜﺎﺕ ﺇﻨﺸﺎﺌﻴﺔ ﻋﻠﻰ
ﺃﺴﺎﺱ ﺨﻁﺔ ﺍﻝﺠﻭﺩﺓ ﻓﻲ ﻜل ﻤﻨﻬﺎ ﻭﻤﺩﻯ ﺘﻁﺒﻴﻕ ﻜل ﺸﺭﻜﺔ ﻝﺒﻨﻭﺩ ﺘﻠﻙ ﺍﻝﺨﻁﺔ .ﻫﺫﺍ ﻭﻗﺩ
ﻗﻤﻨﺎ ﺒﻌﻤل ﺍﺴﺘﺒﻴﺎﻥ ﻴﺸﺘﻤل ﻋﻠﻰ ﺃﺴﺌﻠﺔ ﻁﺒﻘﺎ ﻝﻤﺘﻁﻠﺒﺎﺕ ﺇﺩﺍﺭﺓ ﺍﻝﺠﻭﺩﺓ ﺍﻝـﺸﺎﻤﻠﺔ ﻭﺫﻝـﻙ
ﻋﻠﻰ ﺨﻤﺱ ﺸﺭﻜﺎﺕ ﻓﻲ ﻗﻁﺎﻉ ﺍﻝﺘﺸﻴﻴﺩ ﻭﻤﻥ ﺨﻼﻝﻪ ﻨﺴﺘﻁﻴﻊ ﺘﺤﺩﻴﺩ ﻤﻌﺩل ﺘﻁﺒﻴﻕ ﻜـل
ﺸﺭﻜﺔ ﻝﻨﻅﺎﻡ ﺇﺩﺍﺭﺓ ﺍﻝﺠﻭﺩﺓ ﺍﻝﺸﺎﻤﻠﺔ ﻭﻤﻌﺭﻓﺔ ﻨﻘﺎﻁ ﺍﻝﻘﻭﻯ ﻭﺍﻝﻀﻌﻑ ﻝﺩﻯ ﻜـل ﺸـﺭﻜﺔ
ﺍﻝﺒﺎﺏ ﺍﻷﻭل :ﻤﻘﺩﻤﺔ ﺘﺤﺘﻭﻱ ﻋﻠﻰ ﻤﻭﺠﺯ ﻝﺘﻘﺩﻴﻡ ﺍﻝﺒﺤﺙ ﻭﻋﺭﺽ ﺍﻝﻬﺩﻑ ﻤﻨﻪ.
ﺍﻝﺒﺎﺏ ﺍﻝﺜﺎﻨﻲ :ﻴﺸﻤل ﻋﻠﻰ ﻋﺭﺽ ﺍﻝﻤﻔﺎﻫﻴﻡ ﺍﻷﺴﺎﺴﻴﺔ ﺍﻝﻤﺘﻌﻠﻘﺔ ﺒﻀﺒﻁ ﻭﺘﻭﻜﻴـﺩ
ﻨﻔﺱ ﺍﻝﻤﺠﺎل.
ﺍﻝﺒﺎﺏ ﺍﻝﺜﺎﻝﺙ :ﻭﻴﺸﺘﻤل ﻫﺫﺍ ﺍﻝﺒﺎﺏ ﻋﻠﻰ ﺘﺠﻤﻴﻊ ﻭﺘﺤﻠﻴل ﻭﺘﺼﻨﻴﻑ ﻝﻠﺩﺭﺍﺴـﺎﺕ
-204-
ﺍﻝﻤﻠﺨﺹ ﺍﻝﻌﺭﺒﻲ
ﺍﻝﺒﺎﺏ ﺍﻝﺭﺍﺒﻊ :ﻴﺸﺘﻤل ﻋﻠﻰ ﻤﻘﺎﺭﻨﺔ ﺒﻴﻥ ﺜﻼﺙ ﺸﺭﻜﺎﺕ ﻓﻲ ﻗﻁﺎﻉ ﺍﻝﺘﺸﻴﻴﺩ ﻁﺒﻘﺎ
ﺍﻝﺒﺎﺏ ﺍﻝﺨﺎﻤﺱ :ﻴﺸﺘﻤل ﻋﻠﻰ ﻋﻤل ﺍﺴﺘﺒﻴﺎﻥ ﻤﻥ ﺨﻼل ﺃﺴﺌﻠﺔ ﻨﺎﺒﻌﺔ ﻤﻥ ﻤﺒـﺎﺩﺉ
ﺍﻝﻨﺘﺎﺌﺞ ﻭﺘﺤﻠﻴﻬﺎ ﻭﻤﻥ ﺨﻼل ﻫﺫﺍ ﺍﻝﺘﺤﻠﻴل ﻴﺘﻡ ﺘﻁﺒﻴﻘـﻪ ﻋﻠـﻰ ﺃﻱ
ﺍﻝﺒﺎﺏ ﺍﻝﺴﺎﺩﺱ :ﻴﺸﺘﻤل ﻋﻠﻰ ﻤﻭﺠﺯ ﻷﻫﻡ ﻤﺎ ﺘﻭﺼﻠﺕ ﺇﻝﻴﻪ ﺍﻝﺩﺭﺍﺴﺎﺕ ﺍﻝﺘﺠﻤﻴﻌﻴﺔ
ﻭﺍﻝﺤﻘﻠﻴﺔ ﺍﻝﺘﻲ ﺃﺠﺭﻴﺕ ﻋﻠﻰ ﻫﺫﺍ ﺍﻝﺒﺤﺙ ﻭﻤﻥ ﺃﻫﻡ ﻤﺎ ﺘﻭﺼل ﺇﻝﻴﻪ
ﺍﻝﺒﺤﺙ ﺍﻵﺘﻲ:
-205-
ﺍﻝﻤﻠﺨﺹ ﺍﻝﻌﺭﺒﻲ
-٤ﺘﻐﻴﺭ ﺜﻘﺎﻓﺔ ﺍﻝﺸﺭﻜﺎﺕ ﺇﺫﺍ ﻝﺯﻡ ﺍﻷﻤﺭ ﻭﺍﻝﺘﻭﺼﻴﺔ ﺒﺘﺩﺭﻴﺏ ﻜﺎﻓـﺔ ﺍﻝﻌﻨﺎﺼـﺭ
ﻭﻤﻥ ﺨﻼل ﻫﺫﻩ ﺍﻝﺩﺭﺍﺴﺔ ﺘﻡ ﺍﻝﺘﻭﺼل ﺇﻝﻲ ﻭﻀﻊ ﻨﻅﺎﻡ ﻴﻤﻜﻥ ﻤﻥ ﺨﻼﻝﻪ ﻗﻴـﺎﺱ
ﺤﻴﺙ ﻴﻌﺘﻤﺩ ﻫﺫﺍ ﺍﻝﻨﻅﺎﻡ ﻋﻠﻰ ﺘﺤﻠﻴل ﻨﺘﺎﺌﺞ ﺍﺴﺘﺒﻴﺎﻥ ﺍﻝﺫﻱ ﺘـﻡ ﺇﻋـﺩﺍﺩﺓ ﻝﻘﻴـﺎﺱ
ﺍﻵﺘﻲ:
-٩ﺍﻻﻗﺘﺭﺍﺏ ﻤﻥ ﺍﻝﺴﻭﻕ.
-206-
ﺟﺎﻣﻌﺔ ﺍﳌﻨﻮﻓﻴﺔ
ﻛﻠﻴﺔ ﺍﳍﻨﺪﺳﺔ
ﻗﺴﻢ ﻣﺪﱏ
وآ ا
دة وإدارة ا
دة
ا ع ا
ر
آء ت ا ل در ا
(' ا &%ﺱ ا- !"#و وا*ر ا اد
إاد
ﻣﻬﻨﺪﺱ /ﺗﺎﻣﺮ ﺇﺑﺮﺍﻫﻴﻢ ﺃﲪﺪ ﺇﺑﺮﺍﻫﻴﻢ
ﺑﻜﺎﻟﻮﺭﻳﻮﺱ ﺍﳍﻨﺪﺳﺔ ﺍﳌﺪﻧﻴﺔ
ﻛﻠﻴﺔ ﺍﳍﻨﺪﺳﺔ
ﺟﺎﻣﻌﺔ ﺍﳌﻨﻮﻓﻴﺔ
٢٠٠١
#$إﺵ!اف
ﺃ.ﺩ /ﻣﻨﲑ ﳏﻤﺪ ﻛﻤﺎﻝ
ﺃﺳﺘﺎﺫ ﻣﻘﺎﻭﻣﺔ ﻭﺍﺧﺘﺒﺎﺭ ﺍﳌﻮﺍﺩ
ﻛﻠﻴﺔ ﺍﳍﻨﺪﺳﺔ
ﺟﺎﻣﻌﺔ ﺍﳌﻨﻮﻓﻴﺔ
٢٠٠٨
ﺟﺎﻣﻌﺔ ﺍﳌﻨﻮﻓﻴﺔ
ﻛﻠﻴﺔ ﺍﳍﻨﺪﺳﺔ
ﻗﺴﻢ ﻣﺪﱏ
وآ ا
دة وإدارة ا
دة
ا ع ا
ر
آء ت ا ل در ا
(' ا &%ﺱ ا- !"#و وا*ر ا اد
إاد
ﻣﻬﻨﺪﺱ /ﺗﺎﻣﺮ ﺇﺑﺮﺍﻫﻴﻢ ﺃﲪﺪ ﺇﺑﺮﺍﻫﻴﻢ
ﺑﻜﺎﻟﻮﺭﻳﻮﺱ ﺍﳍﻨﺪﺳﺔ ﺍﳌﺪﻧﻴﺔ
ﻛﻠﻴﺔ ﺍﳍﻨﺪﺳﺔ
ﺟﺎﻣﻌﺔ ﺍﳌﻨﻮﻓﻴﺔ
٢٠٠١
٢٠٠٨