1 Prepared by Milan Ivic Well Testing Engineer


Date: 11/08/2008 P/N 0318.0000

LIGHTWEIGHT SLICKLINE UNIT WELL TEST PROCEDURE




BEFORE THE TEST

Locate unit on distance more than 10m from the well
Shut in Master valve on a Christmas tree
Shut in valve on gas or oil line from the well
Take off the plunge from the Christmas tree
Install wellhead adapter
Install jean-beam on the Christmas tree and anchor
Remark: place jean-beam on the opposite side of slickline unit
Install transmission system for the rig up of raisers and pull out sequences
of jean-beam and anchor them
Assemble the whole BOP composition planned for the test above
Christmas tree and check it on the attested pressure
The test must take at least 15min
Unwind the wire from drum and pass it through slickline stuffing box
Before RIH check the well using the available weight to the depth of
memory gauge test
Remark: The well must be absolutely clear to the depth of the test
If the well is not clear the instrumentation must be carried out
Connect the string with wire according to the instruction NG3021045
String design must be according to the wellhead pressure
Rig up BOP composition with the string in and mount it on the Christmas
tree
Ratify ZERO for the string
Open the Master valve slowly to provide equalization pressures in the well
and BOP equipment above the Christmas tree
Conduct PT test according to the deigned program






Version 3.1 Prepared by Milan Ivic Well Testing Engineer
Date: 11/08/2008 P/N 0318.0000



AFTER THE TEST


After the test ends POOH the string into the BOP composition
Remark: The whole string must be above BOP preventer
Shut the Master valve
Open the bleeding valve on raiser and bleed off the pressure
Disassemble the whole BOP composition on the ground after
disconnection from the Christmas tree
Cut 1.5m from the end of wire
Uninstall jean-beam and pick up the whole equipment
Leave the rig site in the state as it was before the test