Você está na página 1de 19

T & D CIRCLE, JABALPUR

TEST SCHEDULE

TEST SCHEDULE FOR BROAD BAND MULTIPLAY


(BNG & RPR Switch)

Document No TD/ENG/NIB-Broadband/Multiplay/TS
No of Pages. 18

Issue No. 01

Issued By: T&D Circle, Jabalpur

Approved By: CGM T&D Circle

Date of Issue: 09-08-2007

Amendment No (If Any)

No of Pages:

Issued by:

D fI

“FIX IT RIGHT AT THE FIRST INSTANCE”


TECHNICAL & DEVELOPMENT CIRCLE ACCEPTANCE TESTING SCHEDUL
JABALPUR (BROADBAND MULTIPLAY)

INDEX
Multiplay Network Diagram Page 2
PART A- GENERIC TEST SCHEDULE Page 3 - 9
1. PRE-SWITCH ON TESTS Page 3-4
2. POST-SWITCH ON TESTS Page 5 to 7
2.1 CHECK OF BROADBAND NETWORK GATEWAY Page 5
2.3 CHECK OF RPR LAN SWITCH (T-I & T-II) Page 6

PART B – TEST PROCEDURE Page 8-18

ANNEXURE-I: TEST PROCEDURE FOR POST SWITCH Page 8-13


ON TEST OF BNG

ANNEXURE-III: TEST PROCEDURE FOR RPR T-I & T- Page 14-18


II LAN SWITCH

Page - 1 -
TECHNICAL & DEVELOPMENT CIRCLE ACCEPTANCE TESTING SCHEDUL
JABALPUR (BROADBAND MULTIPLAY)

Multiplay Network Diagram

Abbreviations
• Core Components
– BNG (Broadband Network Gateway)
– RPR (Resilient Packet Ring)
– OC LAN (Other City LAN)

• Access Components
– DSLAM
– CPE

Page - 2 -
TECHNICAL & DEVELOPMENT CIRCLE ACCEPTANCE TESTING SCHEDUL
JABALPUR (BROADBAND MULTIPLAY)

PART A: GENERIC TEST SCHEDULE

1. PRE-SWITCH ON TESTS (Applicable to all network elements)


SL.
NAME OF TEST REFERENCE GUIDELINES
NO.
1 Check of Earthing System and As per T&D EI and If earth is existing, then
its Distribution Installation document earth measurement is to be
(EI Ref No.: I-001) done, if not feasible, a
certificate from planning
along with last reading
(within six months) to be
taken
2. Check of Air Conditioning As per T&D Test Schedule If existing, required temp.
and humidity conditions are
to ensured as per node
requirement.
3. Check of Fire Alarm System - DO - If existing, it should be
operational
4. Check of False Flooring / In case of Core Router
Antistatic Flooring / False - DO - locations only.
Ceiling Optional for others.
5. Check of Engine Alternator - DO - If existing, sufficient
capacity and redundancy is
to be ensured.
6. Check of Power Plant / Battery - DO - If existing Power plant /
including inverter battery, sufficient capacity
is to be ensured
7. Check of Lighting and Power - DO - Should be adequate
Outlets
8. Check of Cable Laying and As per Installation Document Should be neatly laced and
Termination clean
9. Voltage Drop Test. It should be < 1 Volt
10. Approved Lay out/LAR/BOM, As per switching schedule.
Approved IP allotment & Approval from planning
General Inspection items branch is required.
11. Hardware Conformity Test As per approved Bill of
including racks, Laptop Material (BOM) for site
Computers, Spares & (Certified from concerned
Protocol/performance consignee)
analyzer etc.
12. Check of Optical Fiber patch Penta scanner
cord report/Certificate for GE
Cables should be obtained.
13. QA Certificate for the QA report is to be insisted
indigenous/imported Upon (QM333 for
equipments indigenous or Factory Test
Report for imported items)
14. Check of Documentation Documentation to be
provided as per BOM
15. Check of Licensed copy of As per Bill of Material (BOM) As per approved BOM

Page - 3 -
TECHNICAL & DEVELOPMENT CIRCLE ACCEPTANCE TESTING SCHEDUL
JABALPUR (BROADBAND MULTIPLAY)

Software CDs
16. Check for A/T of Transmission Refer relevant EI Ensure that the media is
media to be used A/Ted. Obtain certificate
from the Installer.

Note: The BOM verification of all the network elements including Servers, UPS, Battery in the
nonvalidation sites viz Noida, Chennai also needs to be carried out as part of the AT schedule.

Page - 4 -
TECHNICAL & DEVELOPMENT CIRCLE ACCEPTANCE TESTING SCHEDUL
JABALPUR (BROADBAND MULTIPLAY)

2. POST SWITCH ON TESTS

2.1 CHECK OF BROADBAND NETWORK GATEWAY(BNG)

SL NAME OF TEST REFERENCE GUIDELINES


NO
1 Power Supply Module redundancy As per Annexure I
Test No. 1
2 Main switch controller card As per Annexure I
Redundancy Test Test No. 2

3 Boot Process As per Annexure I Printout of Boot


Test No. 3 process in hard copy
or soft copy
4 Login as User and Logout (Using As per Annexure I
Console) Test No. 4

5 Login as User and Logout (Using As per Annexure I


Telnet) Test No. 5

6. Check date and time setting As per Annexure I


Test No. 6
7. Check log details As per Annexure I
Test No. 7
8. Check of Software Version As per Annexure I
Test No. 8
9. Backup and Restoration of As per Annexure I
configuration/Data Test No. 9

10. Check of Alarms (Hardware & As per Annexure I


Software display) Test No. 10

11. System User management functions As per Annexure I


for different levels Test No. 11

12. Check IP Pools As per Annexure I


Test No. 12
13. Test of GE ports As per Annexure I
Test No. 13
14. Check of connectivity for L3PE & Use the existing Verify for the GE
available RPR T-1 connectivity for L3PE interface through ping
& BNG and T1 &
BNG
15. Checking of power levels of optics Refer respective
vendor’s manual

Page - 5 -
TECHNICAL & DEVELOPMENT CIRCLE ACCEPTANCE TESTING SCHEDUL
JABALPUR (BROADBAND MULTIPLAY)

2.2 CHECK OF RPR LAN SWITCH (T-I & T-II)

SL GUIDELINES/Expected
NAME OF TEST REFERENCE
NO. Results
1. Check for Redundancy for As per Annexure III
Power Supply Test No. 1
2. Check for Redundancy for As per Annexure III
Processor Test No. 2
3. Power ON As per Annexure III Printout of Boot process
Test No. 3 in hard copy or soft copy
4. Log In and Log Out As per Annexure III
Test No. 4
5. Check date and time setting As per Annexure III
Test No. 5
6. Check log details As per Annexure III
Test No. 6
7. Backup and Restoration As per Annexure III
Test No. 7
8. Check of restoration by As per Annexure III
system reboot
Test No. 8
9. Check of Alarms As per Annexure III
Test No. 9
10. Check of Software Version As per Annexure III
Test No. 10
11. System User management As per Annexure III
functions for different levels Test No.11
12. Check of proper working for GE As per Annexure III FE is Applicable only for
& FE ports Test No. 12 T-I
13. Check of working & automatic As per Annexure III Ensure that there is no
changeover of RPR RING Test No. 13 interruption of
service/traffic.
14 Test on VLAN As per Annexure III Numbers of VLAN
Test No. 14 configuration for various
services to be verify.
15 Check for MAC addresses As per Annexure III
Test No. 15
16. Checking of power levels of Refer respective
optics vendor’s manual

Page - 6 -
TECHNICAL & DEVELOPMENT CIRCLE ACCEPTANCE TESTING SCHEDUL
JABALPUR (BROADBAND MULTIPLAY)

PART B TEST PROCEDURES

ANNEXURE 1 BROAD BAND NETWORK GATEWAY

Test No:1 Power Supply Module Redundancy


Diagram

Console Cable
BNG with
Redundant PC
Power Supply
Module

Procedure 1. Connect the BNG with the power supply units. Switch ON both
power inputs to the BNG using MCB’s.
2. Attach a PC to the management port of the BNG.
3. Ping the Management IP of the BNG from the PC.
4. Switch off one power supply of BNG, by switching off one MCB in
PDP or using the switch, on the power supply unit. Ping will not be
disturbed.
5. Switch on the power supply and repeat this process with the
other power supply as well.
Results †Passed †Failed
Remarks Redundancy of the Power supply Modules Tested

Test No: 2 Main switch controller card Redundancy Test


Diagram
Ethernet Cable
L3PE
CARD / GE
/ PC

CARD / XCRP

CARD / XCRP PC
Console Cable
BNG

Page - 7 -
TECHNICAL & DEVELOPMENT CIRCLE ACCEPTANCE TESTING SCHEDUL
JABALPUR (BROADBAND MULTIPLAY)

Procedure
1) Connect a laptop/PC to the BNG using console
2) Login using Username and Password
3) Check the status of the Controller Cards
4) Connect the GE port of the card to the L3PE (or to PC
through Converter if Network not available)
5) Configure the BNG port with an IP Address and the L3PE /
PC with another IP of the same subnet.
6) Start a ping L3PE / PC to the BNG.
7) Using the console login issue the command “reload switch-
over” in BNG
8) The ping will continue after switch-over

Note:
Primarily XCRP in slot no 7 is master and that in slot number 8 is
slave. To test the failover mechanism use the following command:
reload switch-over

Now XCRP in slot 8 is the master and that in slot 7 is the slave.
Results †Passed †Failed
Switchover between the master and slave supported
Remarks

Test No: 3 Boot Process


Ref Figure
Console Cable
PC
BNG

Procedure 1. Connect to the console port located on the controller card


and labeled “Craft 2” using the console cable. The other end
being connected to the PC
2. Launch the Hyper terminal application from the PC with the
following parameters (9600,N,8,1,no flow control)
3. Reboot the BNG and check for the boot process being
displayed on the hyper terminal

Results †Passed †Failed


Remarks Boot Process successfully tested

Page - 8 -
TECHNICAL & DEVELOPMENT CIRCLE ACCEPTANCE TESTING SCHEDUL
JABALPUR (BROADBAND MULTIPLAY)

Test No:4 Login as User and Logout (From console)


Diagram
Console Cable
BNG
PC

Procedure 1. Power should be connected and the system should be


working
2. Connect to the console port—Located on the controller card
and labeled “Craft 2” using the console cable. The other end
being connected to the PC
3. Launch the Hyper terminal application from the PC with the
following parameters
4. (9600,N,8,1,no flow control)
5. Enter the configured username and password
6. To quit , type the command “ EXIT ”
7. Relogin again
Results †Passed †Failed
Remarks Console Login tested

Test No : 5 Login as User and Logout (From Telnet Session)


Diagram

Cross Cable
BNG
PC

Procedure 1. Power should be connected and the system should be


working
2. The BNG should have been configured with a Management
IP , user along with a password.
3. Connect to the Ethernet management port—Located on the

Page - 9 -
TECHNICAL & DEVELOPMENT CIRCLE ACCEPTANCE TESTING SCHEDUL
JABALPUR (BROADBAND MULTIPLAY)

controller card and labeled “ENET”; We can connect a


terminal to the system over a LAN using this port
4. Launch the telnet application into the BNG using the
management IP
5. Enter the configured username and password
6. To quit , type the command “ EXIT”
7. Relogin again
Results †Passed †Failed
Remarks Telnet Login tested

Test No:6 Check date and time setting


Diagram
Console Cable
BNG
PC

Procedure 1. Connect to the BNG either by using console or Telnet


2. Enter the user name and password when prompted
3. To check the system date and time , type the following
command:
[local]Redback>show clock

The output should be as follows:


Wed Apr 12 17:03:49 2006 GMT

NOTE : The time displayed is based on configuration information


provided using the clock set command (in exec mode) and the
system clock timezone command (in global configuration mode). If
no time zone is configured as the local time zone, the system uses
GMT as the default time zone.

Results †Passed †Failed


Remarks Date and Time parameters can be set as per requirement

Page - 10 -
TECHNICAL & DEVELOPMENT CIRCLE ACCEPTANCE TESTING SCHEDUL
JABALPUR (BROADBAND MULTIPLAY)

Test No:7 Check log details


Diagram

Console Cable
BNG
PC

Procedure 1) Connect to the BNG


2) Type the following command:

show log [active | file filename] [all | fac log-fac-name | tdm-


console ] [level level] [since start-time] [until end-time]

Displays information about system event logs or a previously saved


log file.
Moreover , when we enter the reload command from the command-
line interface (CLI), or a reboot command from the bootrom, the
system copies its log and debug buffers into these two special files:
/md/loggd_dlog.bin and /md/loggd_ddbg.bin. As an aid to
debugging, we can display these files using the show log
command:

show log file /md/loggd_dlog.bin


show log file /md/loggd_ddbg.bin
Results †Passed †Failed
Remarks Logging feature enabled in the BNG

Test No :8 Check of software version

Console Cable
BNG
PC

Procedure 1) Log into the system


2) To check the software version execute the command at CLI Mode
to check the software version.
Results †Passed †Failed
Remarks Checked the software version

Page - 11 -
TECHNICAL & DEVELOPMENT CIRCLE ACCEPTANCE TESTING SCHEDUL
JABALPUR (BROADBAND MULTIPLAY)

Test No :9 Backup & Restoration of configuration


Diagram

Cross Cable
BNG
PC ( TFTP
Server)

Procedure 1) Connect to the BNG using the Console or Ethernet port.


2) The following is the commands to take back up: Save
config [device | URL ] filename Eg save config
/flash/redback.cfg
3) To copy a file to the external drive , use : copy
/flash/redback.cfg /md/redback.cfg
4) To copy a file back to flash:
Copy /md/redback.cfg /flash/redback.cfg
5) To Remove a file:
Delete <filename>
Results †Passed †Failed
Remarks Backup and Restoration of configurations are possible

Test No :10 Check of Alarms


Diagram Console Cable
BNG
PC

Procedure 1) Log into the system


2) To check the alarms type the following command:
show system alarm [all | slot[/port[:chan-num[:sub-chan-num]]]]
Displays system-level, card-level, port-level, channel-level, or
subchannel-level alarms. By Default Displays system-level alarms
only. Eg.
[local]Redback>show system alarm
[local]Redback#show system alarm 4
[local]Redback#show system alarm 13/2
Results †Passed †Failed
Use the show system alarm command to display system-level,
Remarks
card-level, port-level, channel-level, or subchannel-level alarms.

Page - 12 -
TECHNICAL & DEVELOPMENT CIRCLE ACCEPTANCE TESTING SCHEDUL
JABALPUR (BROADBAND MULTIPLAY)

Test No: 11 System User management functions for different levels


Diagram

Console Cable
BNG
PC

Procedure 1. Create two contexts ie Local and test


2. Create an administrator account in each of the contexts with
different privileges
3. First login using administrator@local and type the command
:Show config
4. Then login using administrator@test and type the command
:Show config
5. Check for the privileges in each of the modes
Results †Passed †Failed
An administrator authenticated to the “local” context, given
appropriate administrator privileges, can configure all functions on
Remarks the Smart Edge router, including functions for each context, and
global entities, such as ports, port profiles, SNMP, and so on.
Non-local administrators have no configuration mode privileges, and
have restricted exec mode privileges.

Test No: 12 Check IP pools


Diagram
Console Cable
BNG
PC

Procedure 1) Login to the BNG


2) Configure a context ip-dial with an ip pool
3) Type the following command :

show ip pool [name] [context summary]


Displays the status of the IP addresses in the specified IP pool, in
all IP pools in the specified interface, or in all IP pools in the current
context or range.

Page - 13 -
TECHNICAL & DEVELOPMENT CIRCLE ACCEPTANCE TESTING SCHEDUL
JABALPUR (BROADBAND MULTIPLAY)

Eg:
[local]Redback>context ip-dial
[ip-dial]Redback>show ip pool
Results †Passed †Failed
Check the IP Pools and also info like available addresses and
Remarks
reserved addresses from the pool.

Test No: 13 Test of GE ports


Diagram
Ethernet Cable
L3PE
CARD / GE
/ PC

CARD / XCRP

CARD / XCRP PC
Console Cable
BNG

Procedure 1. Connect a laptop/PC to the BNG using console


2. Login using Username and Password
3. Connect the GE port of the BNG to the L3PE (or to PC through
Converter if Network not available)
1) Configure the BNG port with an IP Address and the L3PE / PC
with another IP of the same subnet.
4. Check the LED status of the GE port. Check the status from
Console. Use command : Show Port
5. Start a ping L3PE / PC to the BNG.
Results †Passed †Failed
Remarks GE ports are active and functional

Page - 14 -
TECHNICAL & DEVELOPMENT CIRCLE ACCEPTANCE TESTING SCHEDUL
JABALPUR (BROADBAND MULTIPLAY)

ANNEXURE II TEST PROCEDURE FOR RPR T-I & T-II LAN SWITCH

Test Item:1 Power Supply redundancy


Procedure 1. Set up Switch with two PWIN cards
2. Connect PC to Console Port
3. Ping to Switch’s self IP
3. Pull out one PWIN card, observe the ping is still working.
Results †Passed †Failed

Test Item:2 Check for Redundancy for Processor


Procedure 1. Set up Switch with two OAM cards
2. Connect PC to Console Port

3. Ping to Switch’s self IP


4. Pull out active OAM card and observe the stand-by OAM card
takes over the control of the system
5. Observe the ping is still working
Results †Passed †Failed

Test Item:3 Boot Process


Procedure 1. Select a card
2. Select reboot mode with hard reboot or soft reboot
3. Observe cards alarm LED status
Results †Passed †Failed

Test Item:4 Login and Logout (From console)


Procedure 1. Connect Switch through Hyper Terminal from PC/Laptop
2. Login with user name and password
3. Telnet to shelf IP address of switch
4. Exit for logout
Results †Passed †Failed

Test Item:5 Check date and time setting


Procedure 1. Set the Switch Time & Date
2. Change the Switch Time & Date
3. Observe the change
Results †Passed †Failed

Page - 15 -
TECHNICAL & DEVELOPMENT CIRCLE ACCEPTANCE TESTING SCHEDUL
JABALPUR (BROADBAND MULTIPLAY)

Test Item:6 Check log details


Procedure 1. Select Log management
2. System Log
3. Operation Log
4. History session
Results †Passed †Failed

Test Item:7 Backup and Restoration of configuration


Procedure 1. Select Backup / Restore from Tools
2. Select Switch and select directory of Server
3. FTP user Name and password
4. Back up or restore
Results †Passed †Failed

Test Item:8 Check of Restoration by system reboot (through Console)

Procedure 1. Connect PC to console port


2. Do reboot through command & observe restoration
3. Do reboot through on/off switch & observe restoration
4. Observe cards & alarm LED status
Results †Passed †Failed

Test Item:9 Check of Alarms


Procedure 1. check all current alarm management in OMC-O GUI
2. check all history alarm management in OMC-O GUI
3. check NE current alarm management in OMC-O GUI
4. check NE history alarm management in OMC-O GUI
Results †Passed †Failed

Test No :10 Check of software version

Procedure 1) Log into the system


2) To check the software version execute the command at CLI Mode
to check the software version.
Results †Passed †Failed
Remarks Checked the software version

Page - 16 -
TECHNICAL & DEVELOPMENT CIRCLE ACCEPTANCE TESTING SCHEDUL
JABALPUR (BROADBAND MULTIPLAY)

Test Item:11 System User management functions for different levels


Procedure 1. create monitor user in security management menu
2. create admin user in security management menu
3. create operation user in security management menu
Results †Passed †Failed

Test Item:12 Check of proper working for GE & FE module


Procedure 1. Connect the Link to OCLAN switch (or a PC using converter if
Network not available) to the FE port of the switch.
2. Connect a DSLAM to the GE port of the switch (or a PC using
converter if Network not available).
3. Enable the GE / FE ports.
4. Check the GE / FE port’s status.
5. Disconnect the GE/ FE, check the status of GE/ FE port.

Results †Passed †Failed

Test Item:13 Check of working & automatic change over of RPR RING
Procedure
pc1 pc2

R0_a R0_b

NE1 R1_a NE2 R1_b NE3


R1_c
R0_c

1. Connect a DSLAM to the GE port (or a PC using converter if


Network not available) of the switch (NE1 in figure)
2. Ping to the BNG or other RPR switch (NE2) ip address from
DSLAM (or from PC if DSLAM not available)
3. Remove the fiber connection between NE1 & NE2

4. Observe the service; it should be normal.


Results †Passed †Failed

Test Item:14 Test on VLAN


Procedure 1. Connect two DSLAM (or two PC using converter if network not

Page - 17 -
TECHNICAL & DEVELOPMENT CIRCLE ACCEPTANCE TESTING SCHEDUL
JABALPUR (BROADBAND MULTIPLAY)

available) to the switch


2. Create Ethernet service, set up service’s VLAN ID 10 for both
the devices
3. Ping from one DSLAM to other (or between two PCs) and the
operation shall succeed
4. Change the service’s VALN ID into another value for one device
5. Repeat step3 and ping will fail

Results †Passed †Failed

Test Item:15 Check for MAC addresses


Procedure 1. Connect two DSLAM (or two PC using converter if Network not
available) to the switch
2. Create Ethernet service, set up service’s VLAN ID 10 for both
the devices
3. Ping from one DSLAM to other (or between two PCs) and the
operation shall succeed

4. Check L2 Unicast Forward state Table and query the port status
5. Observe the MAC addresses

Results †Passed †Failed

Page - 18 -