GUDDU BARRAGE Rehabilitation Project MM Pakistan Pvt. Ltd.

issue=002 Page 1
Project
GUDDU BARRAGE Rehabilitation Project
Calculations for CDC
Caisson No.1 Left Pocket Divide wall QAW ISSUE
STRUCTURAL DESIGN HAS 2
Refer Drawing No. MMD-275608-EES-TD-DIV-007
Plans and Details of concrete caisson wall-
Pocket wall
Abbreviations:
LL = Live Load
FILL = Load of Granular fill
WATER = Load due to Water level on outer side-
of pocket wall
SELF = Load of Empty Caisson unit
Analysis Software = SAP 2000 V-14
Reference Log = Moments and Reactions for-
Rectangular Plates EM No. 27(USBR)
Design code = ACI 318-05
General :
Dimensions of Caisson-unit as shown in Plan
L (in) = 209
INNER SPACE
B (in) = 164
l (in) = 245
OUT to OUT Dimensions
b (in) = 200
ELEVATION
Height of Pocket wall (ft) = 37.67
Height of pocket wall above base slab (ft) = 36.33
top slab thickness (in) = 16
Thickness of pile Cap (in) = 30
Bottom slab thickness (in) = 16
Side walls thickness (in) = 18
Area of concrete Caisson-unit
base slab (in2) = 49000 = 340.28 ft2
Top Slab (in2) = 34276 = 238.03 ft2
side wall type ( long side) (in2) = 106821 = 741.81 ft2 (out to out)
side wall type (short side) (in2) = 71504.66 = 496.56 ft2 (in to in)
Area of Pile Cap (in2) = 34276 = 238.03 ft2
Checked by Date:
MM PAKISTAN
Div/Dept Job / File No.
Calculated by Date: 05/03/2014
GUDDU BARRAGE Rehabilitation Project MM Pakistan Pvt. Ltd.
issue=002 Page 2
Net Concrete Area w/o pile cap (in2) = 439927.3 = 3055.05 ft2
Density of concrete (kips/ft3) = 0.15
Self Load of Empty caisson (kips) = 672.93
Density of fill material (kips/ft3) = 0.125
Fill volume of Tank (ft3) = 7735.98
Load of Fill (kips) = 967.00
Total Load On piles ( SELF +FILL+LL ) (kips) = 1673.95
TOTAL # of piles = 9
Live Load on Top slab (kips/ft2) = 0.1
Net Live Load (kips) = 34.03
Total FILL + Live Load (kips) = 1001.03
GUDDU BARRAGE Rehabilitation Project MM Pakistan Pvt.Ltd
issue=002 3
GUDDU BARRAGE Rehabilitation Project MM Pakistan Pvt. Ltd
Issue = 002 4
Design PILE CAP
X- Direction t&b (Long Direction)
Ultimate Moment Mu (kip.ft) = 107.14 ( From SAP analysis)
(1.2DL+1.6LL)
width considered for steel area b (in) = 12
concrete cover (in) = 2.5
Depth d (in) = 27.5
Compressive strength of concrete f'c (ksi) = 4
Steel yield stress (ksi) f'y (ksi) = 60
minimum steel ratio as per ACI 318 = 0.0018
required Steel Ratio from flexural analysis =. 0.002412615 OK
Governing steel ratio = 0.002412615
Area of steel required (in2) = 0.796163093
Reinforcement Bar No.= 8
Area of Reinforcement Bar (in2) = 0.79
spacing (in) = 11.91
Provide Reinf No. 8
at spacing (in) 8
Y- Direction t&b (Short Direction)
Ultimate Moment Mu (kip.ft) = 47.03 ( From SAP analysis)
width considered for steel area b (in) = 12
Depth d (in) = 27
Compressive strength of concrete f'c (ksi) = 4
Steel yield stress (ksi) f'y (ksi) = 60
minimum steel ratio as per ACI 318 = 0.0018
required Steel Ratio from flexural analysis =. 0.001085693 min steel ratio governs
Governing steel ratio = 0.0018
Area of steel required (in2) = 0.5832
Reinforcement Bar No.= 8
Area of Reinforcement Bar (in2) = 0.79
spacing (in) = 16.26 Provide Reinf No. 8
at spacing (in) 8
GUDDU BARRAGE Rehabilitation Project MM Pakistan Pvt. Ltd
Issue = 002 5
PILE CAP SAP2000 Model :
GUDDU BARRAGE Rehabilitation Project MM Pakistan Pvt. Ltd
Issue = 002 6
MMAX (maximum moment ) contours for Pile CAP :
GUDDU BARRAGE Rehabilitation Project MM Pakistan Pvt. Ltd
Issue=001 7
a = 10.21 ft
b = 32.50 ft (height of wall)
Fill level above pile cap (ft) v =
a/b = 0.3141
ka = 0.333
Density of Fill (kips/ft3) = 0.125
p = 1.35 kip/ft2 per foot
Moment Coefficient in X direction * REFER table A
Due to FILL
Mx MAX Coeff = 0.0208 Mx MAX (kip.ft) = 29.72
Mx MIN Coeff = -0.0099 Mx MIN (kip.ft) = -14.15
Moment coefficient in y-direction * REFER table A
My MAX Coeff = 0.02 My MAX (kip.ft) = 28.58
My MIN Coeff = -0.0061 My MIN (kip.ft) = -8.72
For MIN water level:
Water level above pile cap (ft) w = 6.37 ft w/b = 0.19591
approximated w/b = 0.167
a/b = 0.3141
Density of water = 0.0624 kips/ft3
p = -0.397 kip/ft2 per foot
Due to water
Moment Coefficient in X direction * Refer Table B
Mx MAX Coeff = 0.0013 Mx MAX (kip.ft) = -0.55
Mx MIN Coeff = -0.0004 Mx MIN (kip.ft) = 0.17
Moment coefficient in y-direction * Refer Table B
My MAX Coeff = 0.0027 My MAX (kip.ft) = -1.13
My MIN Coeff = -0.0006 My MIN (kip.ft) = 0.25
Moment Analysis of side wall type (long) :
GUDDU BARRAGE Rehabilitation Project MM Pakistan Pvt. Ltd
Issue=001 8
moments due to water at same location where max and min moments were observed due to FILL
Due to water
Moment Coefficient in X direction * Refer Table B
Mx Coeff of Water (Corresponding to Mx MAX due to Fill) = 0.0005
Mx Coeff of water (Corresponding to Mx MIN due to FILL) = -0.0003
Moment coefficient in y-direction * Refer Table B
My Coeff (Corresponding to My MAX due to FILL) = 0.0027
My Coeff (Corresponding to My MIN due to FILL) = 0
Mx due to Water (Corresponding to Mx MAX due to Fill) = -0.21 Kip.ft
Mx due to water (Corresponding to Mx MIN due to FILL) = 0.13 Kip.ft
My due to Water (Corresponding to Mx MAX due to Fill) = -1.13 Kip.ft
My due to water (Corresponding to My MIN due to FILL) = 0 Kip.ft
Hence Net moments observed
Mx MAX (kip.ft) = 29.51
Mx MIN (kip.ft) = -14.02
My MAX (kip.ft) = 27.45
My MIN (kip.ft) = -8.72
Hence Factored Ultimate Moments are
Hydraulic factor = 1.3
Dead Load Factor = 1.2
Live Load Factor = 1.6
Mx MAX (kip.ft) = 45.93
Mx MIN (kip.ft) = -21.81
My MAX (kip.ft) = 42.23
My MIN (kip.ft) = -13.60
GUDDU BARRAGE Rehabilitation Project MM Pakistan Pvt. Ltd
Issue=001 9
TABLE A
GUDDU BARRAGE Rehabilitation Project MM Pakistan Pvt. Ltd
Issue=001 10
Table B
GUDDU BARRAGE Rehabilitation Project MM Pakistan Pvt. Ltd
Issue=001 11
y
FREE
F
I
X
F
I
X
f
t
3
2
.
5
0
b
=
6.367ft
0 x
p= FIX p=
-0.3973008 a a 1.3528
External WATER Pressure 10.2083 ft earth FILL Pressure

0
GUDDU BARRAGE Rehabilitation Project MM Pakistan Pvt. Ltd.
Issue=002 12
Design of Long Wall
X- Direction (t & b) Horizontal steel
Ultimate Moment Mu (kip.ft) = 45.93
width considered for steel area b (in) = 12 (always per foot width is considered)
Concrete Cover (in) = 2.5
Depth d (in) = 15.5
Compressive strength of concrete f'c (ksi) = 4
Steel yield stress (ksi) f'y (ksi) = 60
minimum steel ratio as per ACI 318 = 0.002
required Steel Ratio from flexural analysis =. 0.003 OK
Governing steel ratio = 0.003
Area of steel required (in2) = 0.61
Reinforcement Bar No.= 6
Area of Reinforcement Bar (in2) = 0.44
spacing (in) = 8.65
Provide Reinf No. 6
at spacing (in) 6
Y- Direction (t & b) Vertical Steel
Ultimate Moment Mu (kip.ft) = 42.23
width considered for steel area b (in) = 12
Concrete Cover (in) = 2.5
Depth d (in) = 15.5
Compressive strength of concrete f'c (ksi) = 4
Steel yield stress (ksi) f'y (ksi) = 60
minimum steel ratio as per ACI 318 = 0.002
required Steel Ratio from flexural analysis =. 0.003 OK
Governing steel ratio = 0.003
Area of steel required (in2) = 0.56
Reinforcement Bar No.= 6
Area of Reinforcement Bar (in2) = 0.44
spacing (in) = 9.43 Provide Reinf No. 6
at spacing (in) 6
GUDDU BARRAGE Rehabilitation Project MM Pakistan Pvt.Ltd.
Issue=002 13
a = 8.33 ft
b = 32.50 ft (height of wall)
Fill level above pile cap (ft) v =
a/b = 0.256
ka = 0.333
Density of Fill (kips/ft3) = 0.125
p = 1.35 kip/ft2 per foot
Moment Coefficient in X direction * REFER table A
Due to FILL
Mx MAX Coeff = 0.0114 Mx MAX (kip.ft) = 16.29
Mx MIN Coeff = -0.0057 Mx MIN (kip.ft) = -8.15
Moment coefficient in y-direction * REFER table A
My MAX Coeff = 0.0107 My MAX (kip.ft) = 15.29
My MIN Coeff = -0.0031 My MIN (kip.ft) = -4.43
For MIN water level:
Water level above pile cap (ft) w = 6.367 ft w/b = 0.1959
approximated w/b = 0.16667
a/b = 0.25641
Density of water = 0.0624 kips/ft3
p = -0.40 kip/ft2 per foot
Due to water
Moment Coefficient in X direction * Refer Table B
Mx MAX Coeff = 0.0009 Mx MAX (kip.ft) = -0.38
Mx MIN Coeff = -0.0004 Mx MIN (kip.ft) = 0.17
Moment coefficient in y-direction * Refer Table B
My MAX Coeff = 0.0025 My MAX (kip.ft) = -1.05
My MIN Coeff = -0.0002 My MIN (kip.ft) = 0.08
Moment Analysis of side wall type (Short) :
GUDDU BARRAGE Rehabilitation Project MM Pakistan Pvt.Ltd.
Issue=002 14
moments due to water at same location where max and min moments were observed due to FILL
Due to water
Moment Coefficient in X direction * Refer Table B
Mx Coeff of Water (Corresponding to Mx MAX due to Fill) = 0.0002
Mx Coeff of water (Corresponding to Mx MIN due to FILL) = -0.0001
Moment coefficient in y-direction * Refer Table B
My Coeff (Corresponding to My MAX due to FILL) = 0.0025
My Coeff (Corresponding to My MIN due to FILL) = -0.0002
Mx due to Water (Corresponding to Mx MAX due to Fill) = -0.084 Kip.ft
Mx due to water (Corresponding to Mx MIN due to FILL) = 0.042 Kip.ft
My due to Water (Corresponding to Mx MAX due to Fill) = -1.05 Kip.ft
My due to water (Corresponding to My MIN due to FILL) = 0.084 Kip.ft
Hence Net moments observed
Mx MAX (kip.ft) = 16.21
Mx MIN (kip.ft) = -8.10
My MAX (kip.ft) = 14.24
My MIN (kip.ft) = -4.35
Hence Factored Ultimate Moments are
Hydraulic factor = 1.3
Dead Load Factor = 1.2
Live Load Factor = 1.6
Mx MAX (kip.ft) = 25.24
Mx MIN (kip.ft) = -12.62
My MAX (kip.ft) = 23.85
My MIN (kip.ft) = -6.74
GUDDU BARRAGE Rehabilitation Project MM Pakistan Pvt.Ltd.
Issue=002 15
TABLE A
GUDDU BARRAGE Rehabilitation Project MM Pakistan Pvt.Ltd.
Issue=002 16
Table B
Table B
GUDDU BARRAGE Rehabilitation Project MM Pakistan Pvt.Ltd.
Issue=002 17
FREE
F
I
X
F
I
X
f
t
3
2
.
5
0
b
=
6.367ft
0 x
p= FIX p=
-0.40 a a 1.35
External WATER Pressure 8.33 ft earth FILL Pressure

0
GUDDU BARRAGE Rehabilitation Project MM Pakistan Pvt. Ltd.
Issue=002 18
Design of Short Wall
X- Direction t & b ( Horizontal steel)
Ultimate Moment Mu (kip.ft) = 25.24
width considered for steel area b (in) = 12 (always per foot width is considered)
Concrete Cover (in) = 2.5
Depth d (in) = 15.5
Compressive strength of concrete f'c (ksi) = 4
Steel yield stress (ksi) f'y (ksi) = 60
minimum steel ratio as per ACI 318 = 0.0018
required Steel Ratio from flexural analysis =. 0.0018 min steel ratio governs i.e =0.0018
Governing steel ratio = 0.0018
Area of steel required (in2) = 0.3348
Reinforcement Bar No.= 6
Area of Reinforcement Bar (in2) = 0.44
spacing (in) = 15.77
Provide Reinf No. 6
at spacing (in) 6
Y- Direction t&b (vertical Steel)
Ultimate Moment Mu (kip.ft) = 23.85
width considered for steel area b (in) = 12
Concrete Cover (in) = 2.5
Depth d (in) = 15.5
Compressive strength of concrete f'c (ksi) = 4
Steel yield stress (ksi) f'y (ksi) = 60
minimum steel ratio as per ACI 318 = 0.0018
required Steel Ratio from flexural analysis =. 0.0017 min steel ratio governs i.e =0.0018
Governing steel ratio = 0.0018
Area of steel required (in2) = 0.3348
Reinforcement Bar No.= 6
Area of Reinforcement Bar (in2) = 0.44
spacing (in) = 15.77 Provide Reinf No. 6
at spacing (in) 6
GUDDU BARRAGE Rehabilitation Project MM Pakistan Pvt. Ltd.
Issue=002 19
Design of Top Slab
X- Direction (Steel along Longer direction )
Ultimate Moment Mu (kip.ft) = 27.19
width considered for steel area b (in) = 12 (always per foot width is considered)
Concrete Cover (in) = 2.5
Depth d (in) = 13.5
Compressive strength of concrete f'c (ksi) = 4
Steel yield stress (ksi) f'y (ksi) = 60
minimum steel ratio as per ACI 318 = 0.0018
required Steel Ratio from flexural analysis =. 0.002543 OK
Governing steel ratio = 0.002543
Area of steel required (in2) = 0.411985
Reinforcement Bar No.= 6
Area of Reinforcement Bar (in2) = 0.44
spacing (in) = 12.82
Provide Reinf No. 6
at spacing (in) 8
Y- Direction (Steel along shorter direction )
Ultimate Moment Mu (kip.ft) = 39.43
width considered for steel area b (in) = 12
Concrete Cover (in) = 2.5
Depth d (in) = 13.5
Compressive strength of concrete f'c (ksi) = 4
Steel yield stress (ksi) f'y (ksi) = 60
minimum steel ratio as per ACI 318 = 0.0018
required Steel Ratio from flexural analysis =. 0.003729 OK
Governing steel ratio = 0.003729
Area of steel required (in2) = 0.604035
Reinforcement Bar No.= 6
Area of Reinforcement Bar (in2) = 0.44
spacing (in) = 8.74 Provide Reinf No. 6
at spacing (in) 6
GUDDU BARRAGE Rehabilitation Project MM Pakistan Pvt. Ltd.
Issue=002 20
Top Slab SAP 2000 Model :
GUDDU BARRAGE Rehabilitation Project MM Pakistan Pvt. Ltd.
Issue=002 21
MMAX (Maximum Moment) contours from SAP 2000:
GUDDU BARRAGE Rehabilitation Project MM Pakistan Pvt. Ltd
Issue=002 22
Design of Bottom Slab
X- Direction t&b Long Direction
Ultimate Moment Mu (kip.ft) = 40
width considered for steel area b (in) = 12 (always per foot width is considered)
Concrete Cover (in) = 2.5
Depth d (in) = 13.5
Compressive strength of concrete f'c (ksi) = 4
Steel yield stress (ksi) f'y (ksi) = 60
minimum steel ratio as per ACI 318 = 0.0018
required Steel Ratio from flexural analysis =. 0.003784 OK
Governing steel ratio = 0.003784
Area of steel required (in2) = 0.613064
Reinforcement Bar No.= 6
Area of Reinforcement Bar (in2) = 0.44
spacing (in) = 8.61
Provide Reinf No. 6
at spacing (in) 8
Y- Direction t&b Steel along short direction
Ultimate Moment Mu (kip.ft) = 42
width considered for steel area b (in) = 12
Concrete Cover (in) = 2.5
Depth d (in) = 13.5
Compressive strength of concrete f'c (ksi) = 4
Steel yield stress (ksi) f'y (ksi) = 60
minimum steel ratio as per ACI 318 = 0.0018
required Steel Ratio from flexural analysis =. 0.003981 OK
Governing steel ratio = 0.003981
Area of steel required (in2) = 0.644873
Reinforcement Bar No.= 6
Area of Reinforcement Bar (in2) = 0.44
spacing (in) = 8.19 Provide Reinf No. 6
at spacing (in) 8