Annex 1

Item No Description
Supply
Numbers
Available
Numbers Remarks
Room No -01
1 Two gang switch 1 1
2 Socket outlet 4 4 2 Socket outlet, 2 network
3
Air Condition Machine with
Controller 1 1
4 Curtain 2 2
5 Glass Windows 2 2
6 Door and Lock and 2 Keys 1 1
7 Double fluorescent lamp 2 2
Room No -02
8 Two gang switch 1 1
9 Socket outlet 3 3 2 Socket outlet, 1 network
10
Air Condition Machine with
Controller 1 1
11 Curtain 2 2
12 Glass Windows 2 2
13 Door and Lock and 2 Keys 1 1
14 Double fluorescent lamp 2 2
15 Room No -03
16 Two gang switch 1 1
17 Socket outlet 3 3 2 Socket outlet, 1 network
18 Curtain 1 1
19 Glass Windows 1 1
20 Door and Lock and 2 Keys 1 1
21 Single Circle fluorescent lamp 1 1
Kitchen
22 Kitchen Table and work space 1 1
23 Socket outlet 1 1
24 Single Circle fluorescent lamp 1 1
25 Extraction Blower 1 1
26 Two gang switch 1 1
27 Door and look and 2keys 1 1
28 Glass windows with curtain 1 1
Room-Store
29 Socket outlet 2 2 1 Socket outlet, 1 network
30 Single Circle fluorescent lamp 1 1
31 Door and look and 2keys 1 1
32 Glass windows with curtain 1 1
Living Area
33
Air Condition Machine with
2 controller 1 1
34 Double fluorescent lamp 8 8
35 Socket outlet-wall 1 1 1 network
36 Socket outlet-floor 12 12 4 Socket outlet,8 network
37 glass windows with curtain 2 2
Handing Over of Engineer's Main Office at Mankulam
Items Supplied by Contractor (CATIC)-Fixed Items to the Building
1 of 2
Annex 1
38 front door with 6keys 1 1
39 3 gang switch 1 1
40 4gang switch 1 1
Conference room
41
Air Condition Machine with
2 controller 1 1
42 Double fluorescent lamp 8 8
43 Socket outlet-wall 4 4 3 Socket outlet,1 network
44 Socket outlet-floor 2 2 1 Socket outlet,1 network
45 Glass windows with curtain 4 4
46 Double Glass door with keys 1 1
Bath room
47 wc 2 2
48 W basin 2 2
49 Hand shower 2 2
50 Bidet shower 2 2
51 Door and lock and 4 keys 2 2
Out Side
52 Single Circle fluorescent lamp 1 1
53 Steel Gate 1 1
54 Security Hut 1 1
55 Wire Fence 1 1
Handed Over By Taken Over By

Mr.Liu Hongguang Mr. N.R. Pothuwila
Project Manager Resident Engineer (C1A)
A9 Road Project Engineer's Office-CECB
CATIC-ENG office Mankulam.
A9 Road Date: ..
Mankulam.
Date: ..
Witness By

Mr.C.Vathanakumar
Project Engineer A9
Road Development Authority
Mankulam.
Date: ..
Living area Room 01
Kitchen
Room 03 Room 02
BR
1
B
R
2
Store
C
o
n
f
e
r
e
n
c
e

R
o
o
m

2 of 2
Annex 1
Item No Description
Supply
Numbers
Available
Numbers Remarks
Room No -01
1 One gang switch 1 1
2 Socket outlet 5 5 2 Network
3
Air Condition Machine with
controller 1 1
4 Curtain 1 1
5 Glass Windows 1 1
6 Door and Lock and 3 Keys 1 1
7 Double fluorescent lamp 1 1
Room No -02
8 One gang switch 1 1
Two gang switch 1 1
9 Socket outlet 5 5 2 Network
10
Air Condition Machine with
controller 1 1
11 Curtain 1 1
12 Glass Windows 1 1
13 Door and Lock and 3 Keys 1 1
14 Double fluorescent lamp 1 1
Room No -03
15 one gang switch 1 1
16 Socket outlet 5 5 2 Network
17
Air Condition Machine with
controller 1 1
18 Curtain 1 1
19 Glass Windows 1 1
20 Door and Lock and 3 Keys 1 1
21 Double fluorescent lamp 1 1
Kitchen
22 Kitchen Table and work space 1 1
23 Socket outlet 3 3
24 Single Circle fluorescent lamp 2 2
25 Extraction Blower 1 1
26 Two gang switch 1 1
27 Door and look and 1 keys 2 2
28 Glass windows with curtain 2 2
Room-caretaker
29 Socket outlet 3 3 1 Network
30 Double fluorescent lamp 1 1
31 Door and lock and 12 keys 1 1
32 Glass windows with curtain 1 1
33 One gang switch 1 1
Handing Over of Engineer's Main House at Mankulam
Items Supplied by Contractor (CATIC)-Fixed Items to the Building
3 of 3
Annex 1
Living Area
34
Air Condition Machine with
2 controller 1 1
35 Double fluorescent lamp 8 8
36 Socket outlet-wall 8 8 3 Network
37 Glass windows with curtain 2 2
38 front door with 6keys 1 1
39 2 gang switch 2 2
40 3 gang switch 2 2
41 Single Circle fluorescent lamp 1 1
Bath room 01
42 Water Closet 1 1
43 Hand shower 1 1
44 Bidet shower 1 1
45 Door and lock and 4 keys 1 1
46 Single Circle fluorescent lamp 1 1
Bath room 02
47 Water Closet 1 1
48 Wash basin 1 1
49 Hand shower 1 1
50 Bidet shower 1 1
51 Door and lock and 4 keys 1 1
52 Single Circle fluorescent lamp 1 1
53 Bath tub 1 1
54 Tub shower 1 1
55 Wall Mirror 1 1
56 Window 1 1
Bath room 03 (Servant)
57 Water Closet 1 1
58 Wash basin 1 1
59 Bidet shower 1 1
60 Door and lock and 4 keys 1 1
61 Hand shower 1 1
62 Double fluorescent lamp 2 2
63 Socket outlet 3 3 1 Network
64 geyser 1 1
Out Side
65 Single Circle fluorescent lamp 1 1
Kitchen
B R 01
Room 02
Room 03 Servant R
Room 01
B R 02
B R 03
Living area
4 of 3
Annex 1
Handed Over By Taken Over By

Mr.Liu Hongguang Mr. N.R. Pothuwila
Project Manager Resident Engineer (C1A)
A9 Road Project Engineer's Office-CECB
CATIC-ENG office Mankulam.
A9 Road
Mankulam. Date: ..
Date: ..
Witness By

Mr.C.Vathanakumar
Project Engineer A9
Road Development Authority
Mankulam.
Date: ..
5 of 3