BTS Document Reconfiguration Method Release B10 3BK 17430 0841 RJZZA Ed.08 Status RELEASED Short title MPI84 / MDR1 All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel-Lucent. BLANK PAGE BREAK 2 / 40 3BK 17430 0841 RJZZA Ed.08 Contents Contents Preface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 1 Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 1.1 Presentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 1.1.1 Cases . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 1.1.2 Options . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 1.1.3 Restrictions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 1.1.4 Grouped Task Sequence . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 1.2 Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 1.2.1 Prerequisites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 1.2.2 Site Specific Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 1.2.3 External Tasks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 1.3 Scheduling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 1.4 Telecom/Supervision Outage and Operating Impact . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 1.5 Resources . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19 1.5.1 Tools . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19 1.5.2 Supplies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19 1.5.3 Applicable Documents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 2 Scenario . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 2.1 Before Going Onsite . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22 2.2 Before You Start . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23 2.2.1 Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23 2.2.2 Required Knowledge . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23 2.3 Scenario Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24 2.3.1 Initial Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24 2.3.2 Create Abis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25 2.3.3 Create BTS(s) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26 2.3.4 Modify Logical Parameters . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28 2.3.5 Connect BTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31 2.3.6 Start Traffic on Added BTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32 2.3.7 Call Tests and Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34 2.3.8 Create Adjacencies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35 2.3.9 Final Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35 2.4 Reverse Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36 2.4.1 Lock Cells . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36 2.4.2 Disconnect BTS(s) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36 2.4.3 C2: Unlock Cells . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37 2.4.4 Delete Adjacencies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37 2.4.5 Delete Cell . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37 2.4.6 Delete BTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38 2.4.7 Delete Abis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38 2.4.8 Call Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39 2.4.9 Final Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39 3BK 17430 0841 RJZZA Ed.08 3 / 40 Contents 4 / 40 3BK 17430 0841 RJZZA Ed.08 Preface Preface Purpose This document describes how to add a BTS. It is applicable to BSS at technical release level B10. Whats New In Edition 08 Improvements were made in section Connect BTS (Section 2.3.5) In Edition 07 In the entire document BTS Terminal was replaced with BTS NEM except the tasks referring to G2 BTS. In Edition 06 Update in Create BTS(s) (Section 2.3.3) Update with the new equipment naming. In Edition 05 Restriction 3BKA20FBR230654 added in Create Adjacencies (Section 2.3.8). In Edition 04 Updates were made in section Restrictions (Section 1.1.3). In Edition 03 Delivered in release. The following sections have been updated due to system evolution: Applicable Documents (Section 1.5.3) Create BTS(s) (Section 2.3.3) In Edition 02 Sections Create BTS(s) (Section 2.3.3)and Delete Abis (Section 2.4.7)were updated following system evolution changes. 3BK 17430 0841 RJZZA Ed.08 5 / 40 Preface In Edition 01 Sections Connect BTS (Section 2.3.5) and Disconnect BTS(s) (Section 2.4.2) were updated following system evolution changes. Overall document quality was improved following an editorial review. Improvements were made in the following sections due to system evolution: Prerequisites (Section 1.2.1) Check Working PRC (Section 2.3.4.3) Connect BTS (Section 2.3.5) Start Traffic on Added BTS (Section 2.3.6). The following sections were updated due to system evolution: Create Abis (Section 2.3.2) Create BTS(s) (Section 2.3.3) Delete Abis (Section 2.4.7) Delete BTS (Section 2.4.6). The note regarding settings made in the Remote Settings panel was removed from Create BTS(s) (Section 2.3.3). First official release of the document for B10. 6 / 40 3BK 17430 0841 RJZZA Ed.08 Preface Audience This document is intended for: Field service technicians Specialists Project managers Foremen. Assumed Knowledge You must have a basic understanding of the following: Planning: Network architecture and reshuffling principles Scheduling. Implementation: Alcatel-Lucent operations and maintenance concepts for BSS 9153 OMC-R operation Equipment (BSC, BTS, MFS) hardware configurations Windows environment. 3BK 17430 0841 RJZZA Ed.08 7 / 40 Preface 8 / 40 3BK 17430 0841 RJZZA Ed.08 1 Overview 1 Overview This Overview gives information needed by project managers and foremen, for presentation to the customer and for site planning. 3BK 17430 0841 RJZZA Ed.08 9 / 40 1 Overview 1.1 Presentation The logical configuration can be activated completely independently from the physical connection of the BTS. Creating adjacencies and call tests must be done after the BTS is functional and connected to the network. Co-ordination is needed between the BTS and OMC-R sites to define the initial settings. The Qmux address must always be set. For 9100/9110 Micro BTSs, the transmission mode is configured via OML. G2 BTSs are supported by 9130 BSC Evolution only if they have a DRFU board. G1 MKII BTSs and G2 BTSs are supported by 9120 BSC only if they have a DRFU board. In order to create the required configuration, it is possible to add more than one new BTS and more than one cell. In this case, modify all the logical parameters at the same time in the same PRC. Manual Transmission Programming is recommended for multiple Abis operations on 9120 BSC. According to engineering rules: It is not allowed to have a cross-connect on the secondary Abis It is not allowed to attach a secondary Abis to a BTS that is in an Abis ring It is not allowed to use a mixed configuration for the primary and secondary Abis (terrestrial/satellite). 1.1.1 Cases The following cases apply: C1: BTS is installed on a new Abis link C2: BTS is installed on an existing Abis link with downstream BTSs C3: BTS is installed at the end of a non empty Abis chain (no downstream BTSs) C4: BTS has two Abis links. 1.1.2 Options The method takes into account the following options: O1: Configuring GPRS for the cells O2: Abis connection via satellite O3: Create cell(s) shared (applicable only to 9100 BTSs) O4: Define BTS Extra Abis Timeslots O5: Manual Transmission Programming O6: Automatic Transmission Programming. 10 / 40 3BK 17430 0841 RJZZA Ed.08 1 Overview 1.1.3 Restrictions None. 1.1.4 Grouped Task Sequence The following figure shows the grouped task sequence for this scenario. MSC site OMCR site Initial Checks BTS site Create Abis Modify Logical Parameters Create BTS(s) Call Tests and Checks Connect BTS Start Traffic on Added BTS Final Checks Create Adjancencies 3BK 17430 0841 RJZZA Ed.08 11 / 40 1 Overview 1.2 Preparation 1.2.1 Prerequisites The following prerequisites apply: BTS sites are clean, tidy, and easily reachable The primary or/and secondary Abis links are installed and qualified The BTS(s) is installed and commissioned For C2, the jumper linking the upstream and downstream BTSs is installed. This jumper is removed during the scenario. For C4: The added BTS must be an 9100 BTS equipped with a SUMA board or an 9110-E Micro BTS equipped with a MSUMA board If the primary Abis link is on satellite, the secondary Abis link must also be on satellite The added BTS must be alone on a primary Abis, in the end of chain position The added BTS must not have any G3 TRE or 9110 Micro BTS on second Abis The BTS must not contain any G3 TREs for a configuration with more than 12 TREs. For O3, clock synchronization cable(s) must already be installed between BTSs involved in shared cells For O3, in a cell shared over two BTSs, only one sector (main or secondary) must support GPRS traffic (not both) BTS(s) must be configured with the correct initial settings There are adequate resources to handle the new traffic channels and LAPD All BTS software packages and OMU-CPF are loaded in the BSC memory. 12 / 40 3BK 17430 0841 RJZZA Ed.08 1 Overview 1.2.2 Site Specific Information You must have the following specific information to complete the scenario: Identity of cases and options to perform BTS site topology For C1: the characteristics of the Abis (name, Qmux timeslot if BTS(s) to add is G1/G2 BTS) For C4: the name of the primary and secondary Abis link, MAX_EXTRA_TS_PRIMARY Characteristics of the BTS(s) (family, hardware generation, name, Qmux address, number of sectors, type of transmission, antenna diversity, master or slave, Qmux timeslot for G1/G2 BTS) List of cells to create with parameter values (LAC, CI, frequency, timeslot definition). The list must be exhaustive. List of cells supporting GPRS and parameter values (Routing Area Code for GPRS, Routing Area Color for GPRS, Min_Pdch, Max_Pdch_High_Load, Max_Pdch, EN_EGPRS, Max_GPRS_CS, PS_PREF_BCCH_TRX, TRX_Pref_Mark, MAX_ENGPRS_MCS) List of adjacencies with parameters (list of impacted cells, direction of the handover). 1.2.3 External Tasks You must take the following external tasks into account: All cells are declared at the MSC site The MSC personnel must perform an MSC database update to take into account the parameters for the new BTS For O2, check and update, if needed, the CRC4 for the Abis at the BSC site Update adjacencies on neighboring OMC-Rs, if necessary. 3BK 17430 0841 RJZZA Ed.08 13 / 40 1 Overview 1.3 Scheduling Note: Time based on technical constraints In the following table, the number of resources shown does not take into account individual customer or safety requirements. Grouped Task MSC TSC BSC BTS Imp. BTS OMC-R Time/Task Initial Checks. - - - - - 1 ope. Durations are: for 9120 BSC: 25 min for 9130 BSC Evolution: 21 min + 3 sec/cell Create Abis. - - - - - 1 ope. C1,C4: 1 min. O5: for 9120 BSC, 2 min + 6 min./ Abis for 9130 BSC Evolution, 2 min + 1 min./ Abis C1,C4: 1 min. O5: for 9120 BSC, 2 min + 6 min./ Abis for 9130 BSC Evolution, 2 min + 1 min./ Abis 14 / 40 3BK 17430 0841 RJZZA Ed.08 1 Overview Grouped Task MSC TSC BSC BTS Imp. BTS OMC-R Time/Task Create BTS(s). - - - - - 1 ope. 3 min + 1 min./ BTS + 6 min.xn / BTS for 9120 BSC. 3 min + 1 min./ BTS + 1 min. / BTS for 9130 BSC Evolution. C2, C3: +7 min. C4: +5 min O2: +3 min. 3 min +1 min/BTS C2, C3: 7 min. for 9120 BSC 3 min. for 9130 BSC Evolution C4 : 5 min. for 9120 BSC 1 min. for 9130 BSC Evolution O5 : 1 min. + 6 min/BIU for 9120 BSC 1 min. + 15 sec/BTS for 9130 BSC Evolution O6 : 6 min/BTS for 9120 BSC 1 min./BTS for 9130 BSC Evolution O2: +3 min. Modify Logical Configuration. - - - - - 1 ope. 6 min + 10.5 min./ cell + 1.5 min./ TRX + 2 min/BTS. O1: +7 min./ cell O3: +3 min./ cell 6 min + 10.5 min./ cell + 1.5 min./ TRX + 2 min./BTS O1: +7 min./ cell O3: +3 min./ cell 3BK 17430 0841 RJZZA Ed.08 15 / 40 1 Overview Grouped Task MSC TSC BSC BTS Imp. BTS OMC-R Time/Task Connect BTS. - - - 1 com C1, C4: 5 min./ Abis C2:11 min. C3: 1 min. - 1 ope. 6 min./ BTS C2: + 1 min. + 5 min./ cell + 2 min./ BTS* 7 min./ BTS C1, C4: +5 min./ Abis C2: +12 min. + 5 min./ cell + 2 min./ BTS* C3: + 1 min. Start Traffic on Added BTS - - - - - 1 ope. 6 min. / cell + 1 min. C1, C2: + 1 min. 6 min./ cell + 1 min. C1, C2, C4: + 1 min. O1 + 1 min./cell Call Tests and Checks. - - - 1 com 5 min./ cell - 1 ope. 5 min. C4:+10 min 5 min. + 5 min./ cell C4:+10 min Create Adjacencies. - - - - - 1 ope. 9 min./ cell 9 min./ cell 16 / 40 3BK 17430 0841 RJZZA Ed.08 1 Overview Grouped Task MSC TSC BSC BTS Imp. BTS OMC-R Time/Task Final Checks. - - - 1 com - 1 ope. 20 min. 15 min. TOTAL TIME Durations are: For 9120 BSC: 55 min. + 10 min./ BTS + 30.5 min./ cell + 1.5 min./ TRX C1: + 2 min. + 5 min./ Abis C2: + 20 min. + 2 min./ BTS* + 5 min./ cell C3: + 7 min. + 1 min./ BTS C4: + 17 min. + 5 min./ Abis O1: + 8 min./ cell O2: + 3 min. O3: + 3 min./ cell (shared) O5:3 min + 6 min/Abis + 6 min/BIU O6:+ 6 min/BTS For 9130 BSC Evolution. 51 min. + 10 min./ BTS + 30.5 min./ cell + 1.5 min./ TRX C1: + 2 min. + 5 min./ Abis C2: + 16 min. + 2 min./ BTS* + 5 min./ cell C3: + 3 min. + 1 min./ BTS C4: + 17 min. + 5 min./ Abis O1: + 8 min./ cell O2: + 3 min. O3: + 3 min./ cell (shared) O5: + 3 min. + 1 min/Abis + 15 sec/BTS O6: + 1 min./ BTS ope. : OMC-R Operator BTS : for added BTS BTS* : for downstream BTS n : the number of impacted TSUs 3BK 17430 0841 RJZZA Ed.08 17 / 40 1 Overview 1.4 Telecom/Supervision Outage and Operating Impact The following table describes the traffic outage and loss of supervision caused by each grouped task. Out. Ref. Grouped Task Tel Out/ GPRS Out. Tel Red Sup Out OM Out Impacts... - Initial Checks. - - - - None. - Create Abis (C1, C4). - - - - None. - Create BTS(s). - - - - None. - Modify Logical Parameters. - - - - None. 1 Connect BTS. C2: 2 min./ BTS* + 5 min./ cell + 11 min. - C2: 11 min. + 2 min./ BTS* - For C2, supervision outage, telecom and GPRS outage for downstream BTSs. - Start Traffic on Added BTS - - 1.5 min - Sup. out. 1.5 min. during the PRC activation. - Call Tests and Checks. - - - - None. - Create Adjacencies. - - - - None. - Final Checks. - - - - None. - TOTAL C2: 2 min./ BTS* + 5 min./ cell + 11 min. - C2: 11 min. + 2 min./ BTS* - C2: 2 min./ BTS* + 5 min./ cell + 11 min. GPRS + telecom outage. During the activation, supervision outage: 1.5 min. BTS : for added BTS. BTS* : for downstream BTS. 18 / 40 3BK 17430 0841 RJZZA Ed.08 1 Overview 1.5 Resources 1.5.1 Tools The following tables describe the necessary hardware tools, software tools, and forms. 1.5.1.1 Hardware Tools Item Part Number Use at ... BTS NEM (PC with CD-ROM drive and cables). - BTS Wiring tools to disconnect and reconnect PCM. - BTS Mobiles for call testing. - BTS 1.5.1.2 Software Tools Item Part Number Use at ... BTS Terminal B10 software for G1/ G2 BTS, BTS NEM B10 software for 9100 / 9110 BTS. - BTS LMT-CT (Craft Terminal) software at technical release B10. - BSC Customer Documentation CD with the version associated with the current document edition. Remember that the document you are reading cannot be used as a paper version. It is online documentation using hypertext links which take you to other parts of a document on the same CD-ROM. All words in italics are hypertext links. - BTS, BSC, OMC-R 1.5.1.3 Forms None. 1.5.2 Supplies The following table describes necessary the supplies. Item Part Number Use at ... Topology regarding operation. - BTS 3BK 17430 0841 RJZZA Ed.08 19 / 40 1 Overview 1.5.3 Applicable Documents You must have the following documents or have electronic access to the following documents: B10 BSS Methods Handbook BSS Configuration Handbook BSS Surveillance Handbook Network Reconfiguration Recommendations BTS NEM User Guide Transmission Terminal User Guide Synchronize BTS Master/Slave Site 20 / 40 3BK 17430 0841 RJZZA Ed.08 2 Scenario 2 Scenario This Scenario presents all checks needed before beginning the scenario, and all detailed tasks to be performed on each site. 3BK 17430 0841 RJZZA Ed.08 21 / 40 2 Scenario 2.1 Before Going Onsite Before going onsite, you must check that the following information and supplies are available: All Prerequisites (Section 1.2.1) are met The customer has been informed of the: Date and time Site name and address Purpose of operation. Personnel are available (refer to Scheduling (Section 1.3)) Site Specific Information (Section 1.2.2) is available Tools (Section 1.5.1) are available and ready for operation Supplies (Section 1.5.2) are available and ready for operation Applicable Documents (Section 1.5.3) are available. Ensure that the technical release level of the delivered board is in accordance with the BSS hardware technical release document. Ensure that the method used at the BSS site is at the same level as at the OMC-R. 22 / 40 3BK 17430 0841 RJZZA Ed.08 2 Scenario 2.2 Before You Start 2.2.1 Checks Perform the following operations: Check that all Prerequisites (Section 1.2.1) are met Check the availability of all necessary Tools (Section 1.5.1) and Supplies (Section 1.5.2) Inform the operator. Among the cases described in Cases (Section 1.1.1) and the options described in Options (Section 1.1.2), identify which cases and options apply to you. 2.2.2 Required Knowledge You must be familiar with the following: Safety Rules and Precautions Telecom/Supervision Outage and Operating Impact (Section 1.4) Reverse Procedure Grouped Task Sequence (Section 1.1.4) Operating Hints How to document Faults and Anomalies. 3BK 17430 0841 RJZZA Ed.08 23 / 40 2 Scenario 2.3 Scenario Description This section describes how to add a BTS. Note: Case-specific tasks are indicated by C1, C2, C3, or C4 in the Note column. Detailed tasks that do not have C1, C2, C3, or C4 in the Note column are common to all four cases and must always be performed. Options are marked with O1, O2, O3, or O4 in the Note column. Detailed tasks that have O1, O2, O3, or O4are applied only if that option is chosen. 2.3.1 Initial Checks Note Task Description Site To Do Outage - Perform an Audit Alarm State on the BSS. OMC-R 10 min. None. - View Status of Managed Objects and Alarms: For 9120 BSC, on all the BTSs of the impacted TSU and for the impacted Abis (if necessary). For the 9130 BSC Evolution, on all impacted BTSs and Abis. Note:For impacted Abis, only apply the Show Alarms task (in View Status of Managed Objects and Alarms, at the Abis section, after opening the "Abis Topology View" window at Step 1, select the desired Abis, then jump directly to Step 5). Print the reports and close the windows. OMC-R 10 min. None. - To ensure that the final configuration is supported, check for sufficient resources, using: Display free TSU resources for 9120 BSC or Display CCP Resources Usage and Display Abis Resources Usage for an 9130 BSC Evolution. OMC-R 5 min for 9120 BSC 50 sec + 3 sec/cell for 9130 BSC Evolution None 24 / 40 3BK 17430 0841 RJZZA Ed.08 2 Scenario 2.3.2 Create Abis Note Task Description Site To Do Outage O5 Suspend Automatic Transmission Programming OMC-R 2 min None OMC-R 1 min + 6 min./ Abis for 9120 BSC. 1 min +1 min./ Abis for 9130 BSC Evolution. None. C1 C4 O6 Create Abis Chain/Ring. Note:Create the primary or/and secondary Abis link, if necessary Wait for the transmission programming flag to change from Busy to Idle. OMC-R 1 min. None. C1 C4 O5 Create Abis Chain/Ring. Note:Create the primary or/and secondary Abis link, if necessary. 3BK 17430 0841 RJZZA Ed.08 25 / 40 2 Scenario 2.3.3 Create BTS(s) In order to create a required configuration, it is possible to add more than one new BTS. Note Task Description Site To Do Outage C2 C3 If the BTS(s) to add is G1 or G2, check if the Abis is set with a timeslot for Qmux. If not, reserve one Qmux timeslot, using Modify Abis Chain/Ring Characteristics. OMC-R 2 min. None. C2 C3 C4 Check for Sufficient Resources on Abis, check on primary and / or secondary Abis link. OMC-R 5 min for 9120 BSC 1 min. for 9130 BSC Evolution None. OMC-R 2 min. + 6 min. / BTS for 9120 BSC 2 min. + 1 min. / BTS for 9130 BSC Evolution None. - O6 Create BTS. Always set the Qmux address. Wait for the "Information" confirming the creation of the new BTS, and click on [ Ok ]. Wait for the transmission programming flag to change from Busy to Idle. Note:For: C4, declare the secondary Abis for the added BTS. Set the appropriate values for MAX_FR_TRE_PRIMARY and MAX_DR_TRE_PRIMARY. O3, declare the new BTS as slave and select the concerned Master BTS name, if necessary. In shared cells, only one sector (main or secondary) must support GPRS traffic (not both). O4, set the appropriate NExtraAbisTS. 26 / 40 3BK 17430 0841 RJZZA Ed.08 2 Scenario Note Task Description Site To Do Outage OMC-R 2 min. None - O5 Create BTS. Always set the Qmux address. Wait for the Information Window confirming the creation of the new BTS, and click on [ Ok ]. Note: For C4, declare the secondary Abis for the added BTS. Set the appropriate values for MAX_FR_TRE_PRIMARY and MAX_DR_TRE_PRIMARY. For O3, declare the new BTS as slave and select the concerned Master BTS name, if necessary. In cell shared only one sector (main or secondary) must support GPRS traffic (not both). For O4: set the appropriate NExtraAbisTS. O5 Resume Automatic Transmission Programming OMC-R 1 min + 6 min./BIU for 9120 BSC 1 min + 15 sec./BTS for 9130 BSC Evolution None O5 Automatic Hardware and Alarm Audits are launched for the BSC. Wait for them to finish. OMC-R 1-20 min None EXCH Verify with the BTS site that the initial settings are correct. If they are not correct, change the Q1address (see Edit Q1 Address) at the BTS site for each new BTS. OMC-R / BTS 1 min./ BTS None. O2 If the Abis is connected via satellite, Check Cyclic Redundancy at the BSC side using the LMT-CT, and if needed, Modify Ater CRC4 Value. OMC-R / BSC 3 min. None. - Check that the newly created BTS(s) appear in the hierarchy view of the Radio Configuration Browser (SC). OMC-R 1 min. None. 3BK 17430 0841 RJZZA Ed.08 27 / 40 2 Scenario 2.3.4 Modify Logical Parameters In order to create a required configuration, it is possible to create more than one cell. In this case, modify all the logical parameters at the same time in the same PRC. 2.3.4.1 Create Working PRC Note Task Description Site To Do Outage - Create PRC (Working PRC). The PRC opens automatically. OMC-R 1 min. None. - Copy BTS to PRC to copy the new BTSs from the SC to the Working PRC. OMC-R 2 min./ BTS None. O3 Copy OMC Cells to PRC (the cell(s) which become shared with the new BTS), if necessary. OMC-R 2 min./ cell None. 2.3.4.2 Configure Cells in Working PRC Note Task Description Site To Do Outage OMC-R 1 min./ cell None. O3 Link Cell to a Secondary BTS Sector. Note: For each cell which becomes shared. - Create Provisioning Cell or Duplicate Cell. The cell is created/duplicated in Working PRC and is in a locked state. Create one cell for each sector, if necessary. OMC-R 2 min./ cell None. OMC-R 2 min./ cell None. - Set Cell Telecom Parameters. For GPRS on an extended cell: MAX_PDCH, MAX_PDCH_HIGH_LOAD and MIN_PDCH must have even values NB_TS_MPDCH must be set to 0 when the cell type is extended inner/outer MAX_EGPRS_MCS is MCS4 EN_NACC, EN_PSI_STATUS and EN_STREAMING are disabled Note:Set Max_PDCH >0 to have GPRS or LCS on a cell Also set the following parameters: EN_EGPRS, Max_GPRS_CS,PS_PREF_BCCH_TRX, MAX_EGPRS_MCS, if necessary. - Create Radio Frequency OMC-R 0.5 min./ cell None. - Create Frequency Hopping System, if Frequency Hopping is used. OMC-R 1.5 min./ cell None. 28 / 40 3BK 17430 0841 RJZZA Ed.08 2 Scenario Note Task Description Site To Do Outage OMC-R 0.5 min./ TRX None. - Create TRX Note: For O3, select the TRX in [Secondary] TRX on a shared BTS sector, if necessary. - Configure Logical Channels OMC-R 1 min./ cell None. - Configure TRX Channel Hopping Law to hopping or no hopping. OMC-R 1.5 min./ cell None. - Configure TRX OMC-R 0.5 min./TRX None. - Specify TRX Preference OMC-R 0.5 min./ TRX None. OMC-R 5 min./ cell None. O1 Set BSS/BSC Telecom Parameters in the Working PRC to update GPRS parameters, if needed. This task includes the modification of CAE data specific to the MFS. Note:The duration depends on the number of parameters to modify. The current example uses 10 parameters in different windows. OMC-R 2 min./ cell None. O1 If GPRS parameters have to be updated on cell(s) then, Edit n Cells in the PRC. Modify the following parameters: Min_Pdch and Max_Pdch_High_Load Max_Pdch Routing Area Code Routing Area Color. Note:To have GPRS on the cell, the TRX_PREF_MARK must be 0. To modify it, use the Set/Update Circuit/Packet Mark Configuration Using Script. To modify only one cell, use the edit cell command (see Set Cell Telecom Parameters ). - Click on [ Apply and check ] in the "Edit Cell" window to save cell modifications in the Working PRC. Wait for the No error or warning message and click on [ Ok ]. If the check produces error messages, correct the configuration as required and re-attempt the check. Continue corrections and checks until no error messages occur. OMC-R 0.5 min./ cell None. - Click on [ Close ] to exit the "Edit Cell" window. OMC-R 0.5 min./ cell None. 3BK 17430 0841 RJZZA Ed.08 29 / 40 2 Scenario Note Task Description Site To Do Outage OMC-R 1 min./ cell None. - Map Cell to a BTS Sector Note:Map each new cell. - Synchronize PRC with SC OMC-R 1 min. None. 2.3.4.3 Check Working PRC Note Task Description Site To Do Outage - Use the Check All option in Check PRC(Working PRC) (Without forcing the administrative state) to check the parameters, hardware, and telecom impact of your PRC. If the check produces error messages, correct the configuration as required and re-attempt the check. Continue corrections and checks until no errors messages occur. OMC-R 1 min. None. EXCH Ask MSC personnel to update the parameters in the MSC database. OMC-R / MSC 3 min. None. 30 / 40 3BK 17430 0841 RJZZA Ed.08 2 Scenario 2.3.5 Connect BTS To minimize traffic outage, you must keep the time between lock and unlock cells to a minimum. For O3: clock synchronization cable(s) must already be installed between the BTSs involved in the shared cell. If the cables are not installed, perform this installation using Install Synchronization Cables from Synchronize BTS Master / Slave Site. Note Task Description Site To Do Outage C1 C4 If not done previously, the BTS must be physically connected to the new Abis link(s) (Connect BTS). BTS 5 min./ Abis None. C2 C3 EXCH Inform the OMC-R that you are ready to insert the BTS into the Abis link. BTS/ OMC-R 1 min. None. C2 EXCH In the Abis Interface View window, select the Abis chain/ring where you inserted the new BTS. Write down the BTSs that are downstream from the new BTS. Go to the SC and lock the cells of these downstream BTSs, using Shut Down Cell (WTC=3 min.). Inform the BTS site when the cells are locked. OMC-R 4 min./ cell START1, start telecom + GPRS outage for downstream BTSs. C2 Select the Abis where the BTS will be inserted, and on upstream BTS TP, Inhibit Alarm Reporting on Abis TP (select Inhibit Alarm Reporting on TP Up). OMC-R 1 min. Outage1 C2 Lock BTS O&M Capability of the downstream BTSs. OMC-R 1 min./ BTS* Outage1 C2 Disconnect Jumper BTS 5 min. Outage1 C2 Connect BTS BTS 5 min. Outage1 3BK 17430 0841 RJZZA Ed.08 31 / 40 2 Scenario Note Task Description Site To Do Outage OMC-R 1 min. Outage1 - Remap BTS on the CCP board(s).(only in case of 9130 BSC Evolution) Note:The calls can be lost during BTS remapping. Note:The remap is performed only when some CCPs are much more overloaded than the others. The BSC tries to map as much as possible all TREs of a BTS on the same CCP and balance the load across the CCPs if necessary. The overload situation is decided by a system algorithm. C2 Unlock BTS O&M Capability of the downstream BTSs. OMC-R 1 min./ BTS* Outage1 C2 Use Lock/Unlock Cell Traffic to unlock the cells of the downstream BTSs. OMC-R 1 min./ cell END1 - When connected, the new BTS enables its OML link. Unlock BTS O&M Capability of the added BTSs. OMC-R 1 min./ BTS None. - The download for each new BTS starts automatically. After a period of time, the OMC-R automatically triggers a hardware and alarm audit for each new BTS. All the boards of the BTS must appear in the OMC-R BSS Equipment View. Wait for the end of the BTS(s) audit. OMC-R 6 min./ BTS None. BTS* : for downstream BTS 2.3.6 Start Traffic on Added BTS Note Task Description Site To do Outage OMC-R 5 min./ cell None. - Activate PRC (Working PRC) in queued mode, with cell clean-up, without forcing cell administrative state. Display Pending Activations List to see when the activation is finished. The activation time depends on the number of cells activated. During the activation, supervision outage: 1.5 min. - Close PRC (Working PRC). OMC-R 1 min. None. 32 / 40 3BK 17430 0841 RJZZA Ed.08 2 Scenario Note Task Description Site To do Outage C1 C2 For added BTS, on the upstream BTS TPAllow Alarm Reporting on Abis TP (select Allow Alarm Reporting on TP Up and then Allow Alarm Reporting on TP Down). OMC-R 1 min. None. C4 Allow Alarm Reporting on Abis TP (select Allow Alarm Reporting on TP Up) if the Abis is newly created, for both primary and secondary Abis, if necessary. OMC-R 1 min. None. O1 Unlock GPRS Traffic on Cell Unlock GPRS for the cells of the new BTS(s). OMC-R 1 min./cell None - Unlock Cell Unlock the cells of the new BTS(s). OMC-R 1 min./ cell None. 3BK 17430 0841 RJZZA Ed.08 33 / 40 2 Scenario 2.3.7 Call Tests and Checks Note Task Description Site To Do Outage OMC-R 10 min None. C4 ViewStatus of Managed Objects and Alarms for the impacted BTS. Note:If there is degradation of the HSDS at the cell level, the following alarm is displayed: Extra TS Not Fully Usable. To discover the problem, Display cell HSDS configuration synthesis. Ask TAC to solve the problem. If the problem remains, perform Reverse Procedure (Section 2.4). BTS 5 min./ cell None. - Perform Call Test for each new cell. This task must be done in parallel with the next task. Unlock Cell from Call Test is not necessary. Perform call tests for all impacted cells and for cells on downstream BTSs (C2). OMC-R 5 min. None. CHECK Display USD Detailed Cell Information . Check that GSM and GPRS calls are made on impacted BTS(s). If calls fail, perform the Reverse Procedure (Section 2.4). 34 / 40 3BK 17430 0841 RJZZA Ed.08 2 Scenario 2.3.8 Create Adjacencies RESTRICTION 3BKA20FBR230654 When creating adjacencies, make sure to take into account that for one BSC only a maximum of 64 HOs are allowed. Note Task Description Site To Do Outage - Create Adjacency for the new cell, using notes taken during Initial Checks (Section 2.3.1) (assuming that there are adjacencies towards new internal cells and adjacencies towards new external cells). OMC-R 5 min./ new cell(s) None. - For each cell on the same OMC-R that must be adjacent to the new ones, Modify Adjacency to include the new cells. OMC-R 2 min./ cell None. - For each cell on the neighboring OMC-Rs that must be adjacent to the new cells, Modify Adjacency on neighboring OMC-Rs to include the new cells. neighboring OMC-R 2 min./ cell None. 2.3.9 Final Checks Note Task Description Site To Do Outage - Perform an Audit Alarm State on BSS. OMC-R 10 min. None. CHECK View Status of Managed Objects and Alarms: For 9120 BSC on all the BTSs of the impacted TSU and for the impacted Abis (if necessary). For 9130 BSC Evolution on all impacted BTSs and Abis. Note:For impacted Abis, only apply the Show Alarms task (in View Status of Managed Objects and Alarms, in the Abis section, after opening the "Abis Topology View" window in Step 1, select the desired Abis, then jump directly to Step 5). Compare with reports from Initial Checks (Section 2.3.1). OMC-R 5 min. None. 3BK 17430 0841 RJZZA Ed.08 35 / 40 2 Scenario 2.4 Reverse Procedure Use this procedure to restore the initial configuration. 2.4.1 Lock Cells Note Task Description Site To Do Outage - In the SC, use Lock Cell to lock all the cells that correspond to the added BTSs. OMC-R 1 min./ cell - C2 In the SC, use Shut Down Cell for each cell of the downstream BTSs (WTC=3 min.). The GSM and GPRS traffic stops. OMC-R 4 min./ cell - 2.4.2 Disconnect BTS(s) Note Task Description Site To Do Outage C2 Inhibit Alarm Reporting on Abis TP (select Inhibit Alarm Reporting on TP Down). OMC-R 1 min. - C2 Lock BTS O&M Capability for all downstream BTSs. OMC-R 1 min./ BTS* - - Lock BTS O&M Capability of the added BTS(s). OMC-R 1 min. - - Disconnect BTS (for each added BTS). BTS 5 min. - C2 Connect Jumper. BTS 5 min. - C2 Unlock BTS O&M Capability of the downstream BTSs. OMC-R 1 min./ BTS* - C2 Allow Alarm Reporting on Abis TP (select Allow Alarm Reporting on TP Down). OMC-R 1 min. - OMC-R 1 min. - - Remap BTS on the CCP board(s).(only in case of 9130 BSC Evolution) Note:The remap is performed only when some CCPs are much more overloaded than the others. The BSC tries to map as much as possible all TREs of a BTS on the same CCP and balance the load across the CCPs if necessary. The overload situation is decided by a system algorithm. BTS* : for downstream BTS 36 / 40 3BK 17430 0841 RJZZA Ed.08 2 Scenario 2.4.3 C2: Unlock Cells Note Task Description Site To Do Outage C2 In the SC, use Unlock Cell to unlock all cells of the downstream BTSs. Traffic restarts on the cells of the downstream BTSs. OMC-R 1 min. - 2.4.4 Delete Adjacencies Note Task Description Site To Do Outage - Delete Adjacency in order to delete all adjacencies on the created cell(s). OMC-R 1 min./cell - 2.4.5 Delete Cell Note Task Description Site To Do Outage - Open PRC (Working PRC). OMC-R 1 min. - O3 Unlink Cell from a Secondary BTS Sector to unlink the cell(s) shared with the added BTS(s). OMC-R 1 min./ cell - O3 Delete TRX to delete all TRXs for the secondary sector. OMC-R 1 min./ cell - O3 Delete Radio Frequency to delete all frequencies for the secondary sector. OMC-R 1 min./ cell - - Delete OMC Cell from PRC to delete all the cell(s) from the added BTS(s). OMC-R 1 min./ cell - - Activate PRC (Working PRC) without cell cleanup and in queued mode. The activation time depends on the number of cells activated. Display Pending Activations List to see when the activation is finished. OMC-R 5 min./ cell - - Optionally, View Last PRC log Activation. OMC-R 1 min. - - Close PRC (Working PRC). OMC-R 1 min. - - Delete PRC (Working PRC). OMC-R 2 min. - EXCH Ask MSC personnel to update the parameters in the MSC database. MSC 3 min. - 3BK 17430 0841 RJZZA Ed.08 37 / 40 2 Scenario 2.4.6 Delete BTS Note Task Description Site To Do Outage O5 Suspend Automatic Transmission Programming OMC-R 2 min None - O6 Delete BTS from OMC-R. Wait for the transmission programming flag to change from Busy to Idle. OMC-R 30 sec + 6 min. / BTS for 9120 BSC. 2 min. + 1 min. / BTS for 9130 BSC Evolution. - - O5 Delete BTS from OMC-R. OMC-R 30 sec. - 2.4.7 Delete Abis Note Task Description Site To Do Outage C1 C4 O6 Delete Abis Chain / Ring, if necessary. Wait for the transmission programming flag to change fromBusy to Idle. OMC-R 30 sec + 6 min./ Abis for 9120 BSC. 30 sec. + 1 min./ Abis for 9130 BSC Evolution. - C1 C4 O5 Delete Abis Chain / Ring, if necessary. OMC-R 30 sec. - O5 Resume Automatic Transmission Programming OMC-R 1 min + 6 min./BIU for 9120 BSC 1 min +15 sec./BTS for 9130 BSC Evolution. None O5 Automatic Hardware and Alarm Audits are launched for the BSC. Wait for them to finish. OMC-R 1-20 min None 38 / 40 3BK 17430 0841 RJZZA Ed.08 2 Scenario 2.4.8 Call Tests Note Task Description Site To Do Outage BTS 5 min./ cell None. - Call Test Check that the downstream BTSs are in traffic. This task must be done in parallel with the next task. Unlock Cell from Call Test is not necessary. Perform call tests for all impacted cells and for cells on downstream BTSs (C2). CHECK Display USD Detailed Cell Information. OMC-R 5 min./ cell - 2.4.9 Final Checks Note Task Description Site To Do Outage - Perform an Audit Alarm State on the BSS. OMC-R 10 min. - CHECK View Status of Managed Objects and Alarms: For 9120 BSC, on all the BTSs of the impacted TSU and for the impacted Abis (if necessary). For 9130 BSC Evolution on all impacted BTSs and Abis. Note:For impacted Abis, only apply the Show Alarms task (in View Status of Managed Objects and Alarms, in the Abis section, after opening the "Abis Topology View" window in Step 1, select the desired Abis, then jump directly to Step 5). Compare with reports from Initial Checks (Section 2.3.1). OMC-R 5 min. - 3BK 17430 0841 RJZZA Ed.08 39 / 40 2 Scenario BLANK PAGE BREAK 40 / 40 3BK 17430 0841 RJZZA Ed.08