Você está na página 1de 40

Alcatel-Lucent GSM

Add BTS, New Cell(s)


BTS Document
Reconfiguration Method
Release B10
3BK 17430 0841 RJZZA Ed.08
Status RELEASED
Short title MPI84 / MDR1
All rights reserved. Passing on and copying of this document, use
and communication of its contents not permitted without written
authorization from Alcatel-Lucent.
BLANK PAGE BREAK
2 / 40 3BK 17430 0841 RJZZA Ed.08
Contents
Contents
Preface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
1 Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
1.1 Presentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
1.1.1 Cases . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
1.1.2 Options . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
1.1.3 Restrictions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
1.1.4 Grouped Task Sequence . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
1.2 Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
1.2.1 Prerequisites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
1.2.2 Site Specific Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
1.2.3 External Tasks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
1.3 Scheduling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
1.4 Telecom/Supervision Outage and Operating Impact . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
1.5 Resources . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
1.5.1 Tools . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
1.5.2 Supplies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
1.5.3 Applicable Documents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
2 Scenario . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
2.1 Before Going Onsite . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
2.2 Before You Start . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
2.2.1 Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
2.2.2 Required Knowledge . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
2.3 Scenario Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
2.3.1 Initial Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
2.3.2 Create Abis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
2.3.3 Create BTS(s) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
2.3.4 Modify Logical Parameters . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
2.3.5 Connect BTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
2.3.6 Start Traffic on Added BTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
2.3.7 Call Tests and Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34
2.3.8 Create Adjacencies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35
2.3.9 Final Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35
2.4 Reverse Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36
2.4.1 Lock Cells . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36
2.4.2 Disconnect BTS(s) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36
2.4.3 C2: Unlock Cells . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
2.4.4 Delete Adjacencies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
2.4.5 Delete Cell . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
2.4.6 Delete BTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38
2.4.7 Delete Abis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38
2.4.8 Call Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39
2.4.9 Final Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39
3BK 17430 0841 RJZZA Ed.08 3 / 40
Contents
4 / 40 3BK 17430 0841 RJZZA Ed.08
Preface
Preface
Purpose This document describes how to add a BTS.
It is applicable to BSS at technical release level B10.
Whats New In Edition 08
Improvements were made in section Connect BTS (Section 2.3.5)
In Edition 07
In the entire document BTS Terminal was replaced with BTS NEM except
the tasks referring to G2 BTS.
In Edition 06
Update in Create BTS(s) (Section 2.3.3)
Update with the new equipment naming.
In Edition 05
Restriction 3BKA20FBR230654 added in Create Adjacencies (Section 2.3.8).
In Edition 04
Updates were made in section Restrictions (Section 1.1.3).
In Edition 03
Delivered in release.
The following sections have been updated due to system evolution:
Applicable Documents (Section 1.5.3)
Create BTS(s) (Section 2.3.3)
In Edition 02
Sections Create BTS(s) (Section 2.3.3)and Delete Abis (Section 2.4.7)were
updated following system evolution changes.
3BK 17430 0841 RJZZA Ed.08 5 / 40
Preface
In Edition 01
Sections Connect BTS (Section 2.3.5) and Disconnect BTS(s) (Section 2.4.2)
were updated following system evolution changes.
Overall document quality was improved following an editorial review.
Improvements were made in the following sections due to system evolution:
Prerequisites (Section 1.2.1)
Check Working PRC (Section 2.3.4.3)
Connect BTS (Section 2.3.5)
Start Traffic on Added BTS (Section 2.3.6).
The following sections were updated due to system evolution:
Create Abis (Section 2.3.2)
Create BTS(s) (Section 2.3.3)
Delete Abis (Section 2.4.7)
Delete BTS (Section 2.4.6).
The note regarding settings made in the Remote Settings panel was removed
from Create BTS(s) (Section 2.3.3).
First official release of the document for B10.
6 / 40 3BK 17430 0841 RJZZA Ed.08
Preface
Audience This document is intended for:
Field service technicians
Specialists
Project managers
Foremen.
Assumed Knowledge You must have a basic understanding of the following:
Planning:
Network architecture and reshuffling principles
Scheduling.
Implementation:
Alcatel-Lucent operations and maintenance concepts for BSS
9153 OMC-R operation
Equipment (BSC, BTS, MFS) hardware configurations
Windows environment.
3BK 17430 0841 RJZZA Ed.08 7 / 40
Preface
8 / 40 3BK 17430 0841 RJZZA Ed.08
1 Overview
1 Overview
This Overview gives information needed by project managers and foremen, for
presentation to the customer and for site planning.
3BK 17430 0841 RJZZA Ed.08 9 / 40
1 Overview
1.1 Presentation
The logical configuration can be activated completely independently from the
physical connection of the BTS. Creating adjacencies and call tests must be
done after the BTS is functional and connected to the network.
Co-ordination is needed between the BTS and OMC-R sites to define the initial
settings. The Qmux address must always be set. For 9100/9110 Micro BTSs,
the transmission mode is configured via OML.
G2 BTSs are supported by 9130 BSC Evolution only if they have a DRFU board.
G1 MKII BTSs and G2 BTSs are supported by 9120 BSC only if they have a
DRFU board.
In order to create the required configuration, it is possible to add more than one
new BTS and more than one cell. In this case, modify all the logical parameters
at the same time in the same PRC.
Manual Transmission Programming is recommended for multiple Abis
operations on 9120 BSC.
According to engineering rules:
It is not allowed to have a cross-connect on the secondary Abis
It is not allowed to attach a secondary Abis to a BTS that is in an Abis ring
It is not allowed to use a mixed configuration for the primary and secondary
Abis (terrestrial/satellite).
1.1.1 Cases
The following cases apply:
C1: BTS is installed on a new Abis link
C2: BTS is installed on an existing Abis link with downstream BTSs
C3: BTS is installed at the end of a non empty Abis chain (no downstream
BTSs)
C4: BTS has two Abis links.
1.1.2 Options
The method takes into account the following options:
O1: Configuring GPRS for the cells
O2: Abis connection via satellite
O3: Create cell(s) shared (applicable only to 9100 BTSs)
O4: Define BTS Extra Abis Timeslots
O5: Manual Transmission Programming
O6: Automatic Transmission Programming.
10 / 40 3BK 17430 0841 RJZZA Ed.08
1 Overview
1.1.3 Restrictions
None.
1.1.4 Grouped Task Sequence
The following figure shows the grouped task sequence for this scenario.
MSC site OMCR site
Initial Checks
BTS site
Create Abis
Modify Logical Parameters
Create BTS(s)
Call Tests and Checks
Connect BTS
Start Traffic on Added BTS
Final Checks
Create Adjancencies
3BK 17430 0841 RJZZA Ed.08 11 / 40
1 Overview
1.2 Preparation
1.2.1 Prerequisites
The following prerequisites apply:
BTS sites are clean, tidy, and easily reachable
The primary or/and secondary Abis links are installed and qualified
The BTS(s) is installed and commissioned
For C2, the jumper linking the upstream and downstream BTSs is installed.
This jumper is removed during the scenario.
For C4:
The added BTS must be an 9100 BTS equipped with a SUMA board or
an 9110-E Micro BTS equipped with a MSUMA board
If the primary Abis link is on satellite, the secondary Abis link must
also be on satellite
The added BTS must be alone on a primary Abis, in the end of chain
position
The added BTS must not have any G3 TRE or 9110 Micro BTS on
second Abis
The BTS must not contain any G3 TREs for a configuration with more
than 12 TREs.
For O3, clock synchronization cable(s) must already be installed between
BTSs involved in shared cells
For O3, in a cell shared over two BTSs, only one sector (main or secondary)
must support GPRS traffic (not both)
BTS(s) must be configured with the correct initial settings
There are adequate resources to handle the new traffic channels and LAPD
All BTS software packages and OMU-CPF are loaded in the BSC memory.
12 / 40 3BK 17430 0841 RJZZA Ed.08
1 Overview
1.2.2 Site Specific Information
You must have the following specific information to complete the scenario:
Identity of cases and options to perform
BTS site topology
For C1: the characteristics of the Abis (name, Qmux timeslot if BTS(s) to
add is G1/G2 BTS)
For C4: the name of the primary and secondary Abis link,
MAX_EXTRA_TS_PRIMARY
Characteristics of the BTS(s) (family, hardware generation, name, Qmux
address, number of sectors, type of transmission, antenna diversity, master
or slave, Qmux timeslot for G1/G2 BTS)
List of cells to create with parameter values (LAC, CI, frequency, timeslot
definition). The list must be exhaustive.
List of cells supporting GPRS and parameter values (Routing Area Code for
GPRS, Routing Area Color for GPRS, Min_Pdch, Max_Pdch_High_Load,
Max_Pdch, EN_EGPRS, Max_GPRS_CS, PS_PREF_BCCH_TRX,
TRX_Pref_Mark, MAX_ENGPRS_MCS)
List of adjacencies with parameters (list of impacted cells, direction of
the handover).
1.2.3 External Tasks
You must take the following external tasks into account:
All cells are declared at the MSC site
The MSC personnel must perform an MSC database update to take into
account the parameters for the new BTS
For O2, check and update, if needed, the CRC4 for the Abis at the BSC site
Update adjacencies on neighboring OMC-Rs, if necessary.
3BK 17430 0841 RJZZA Ed.08 13 / 40
1 Overview
1.3 Scheduling
Note: Time based on technical constraints
In the following table, the number of resources shown does not take into
account individual customer or safety requirements.
Grouped Task MSC TSC BSC BTS Imp.
BTS
OMC-R Time/Task
Initial Checks. - - - - - 1 ope. Durations are:
for 9120 BSC:
25 min
for 9130 BSC
Evolution: 21
min + 3 sec/cell
Create Abis. - - - - - 1 ope.
C1,C4: 1 min.
O5:
for 9120 BSC,
2 min + 6 min./
Abis
for 9130 BSC
Evolution, 2 min
+ 1 min./ Abis
C1,C4: 1 min.
O5:
for 9120 BSC,
2 min + 6 min./
Abis
for 9130 BSC
Evolution, 2 min
+ 1 min./ Abis
14 / 40 3BK 17430 0841 RJZZA Ed.08
1 Overview
Grouped Task MSC TSC BSC BTS Imp.
BTS
OMC-R Time/Task
Create BTS(s). - - - - - 1 ope.
3 min + 1 min./ BTS
+ 6 min.xn / BTS for
9120 BSC.
3 min + 1 min./
BTS + 1 min. /
BTS for 9130 BSC
Evolution.
C2, C3: +7 min.
C4: +5 min
O2: +3 min.
3 min +1 min/BTS
C2, C3:
7 min. for 9120
BSC
3 min. for 9130
BSC Evolution
C4 :
5 min. for 9120
BSC
1 min. for 9130
BSC Evolution
O5 :
1 min. + 6
min/BIU for 9120
BSC
1 min. + 15
sec/BTS for
9130 BSC
Evolution
O6 :
6 min/BTS for
9120 BSC
1 min./BTS
for 9130 BSC
Evolution
O2: +3 min.
Modify Logical
Configuration.
- - - - - 1 ope.
6 min + 10.5 min./
cell + 1.5 min./ TRX
+ 2 min/BTS.
O1: +7 min./ cell
O3: +3 min./ cell
6 min + 10.5 min./
cell + 1.5 min./ TRX
+ 2 min./BTS
O1: +7 min./ cell
O3: +3 min./ cell
3BK 17430 0841 RJZZA Ed.08 15 / 40
1 Overview
Grouped Task MSC TSC BSC BTS Imp.
BTS
OMC-R Time/Task
Connect BTS. - - - 1 com
C1, C4: 5
min./ Abis
C2:11
min.
C3: 1 min.
- 1 ope.
6 min./ BTS
C2: + 1 min. + 5
min./ cell + 2 min./
BTS*
7 min./ BTS
C1, C4: +5 min./
Abis
C2: +12 min. + 5
min./ cell + 2 min./
BTS*
C3: + 1 min.
Start Traffic on
Added BTS
- - - - - 1 ope.
6 min. / cell + 1
min.
C1, C2: + 1 min.
6 min./ cell + 1 min.
C1, C2, C4: + 1
min.
O1 + 1 min./cell
Call Tests and
Checks.
- - - 1 com
5 min./ cell
- 1 ope.
5 min.
C4:+10 min
5 min. + 5 min./ cell
C4:+10 min
Create
Adjacencies.
- - - - - 1 ope.
9 min./ cell
9 min./ cell
16 / 40 3BK 17430 0841 RJZZA Ed.08
1 Overview
Grouped Task MSC TSC BSC BTS Imp.
BTS
OMC-R Time/Task
Final Checks. - - - 1 com - 1 ope.
20 min.
15 min.
TOTAL TIME Durations are:
For 9120 BSC:
55 min. + 10 min./ BTS + 30.5 min./
cell + 1.5 min./ TRX
C1: + 2 min. + 5 min./ Abis
C2: + 20 min. + 2 min./ BTS* + 5 min./
cell
C3: + 7 min. + 1 min./ BTS
C4: + 17 min. + 5 min./ Abis
O1: + 8 min./ cell
O2: + 3 min.
O3: + 3 min./ cell (shared)
O5:3 min + 6 min/Abis + 6 min/BIU
O6:+ 6 min/BTS
For 9130 BSC Evolution.
51 min. + 10 min./ BTS + 30.5 min./
cell + 1.5 min./ TRX
C1: + 2 min. + 5 min./ Abis
C2: + 16 min. + 2 min./ BTS* + 5 min./
cell
C3: + 3 min. + 1 min./ BTS
C4: + 17 min. + 5 min./ Abis
O1: + 8 min./ cell
O2: + 3 min.
O3: + 3 min./ cell (shared)
O5: + 3 min. + 1 min/Abis + 15
sec/BTS
O6: + 1 min./ BTS
ope. : OMC-R Operator
BTS : for added BTS
BTS* : for downstream BTS
n : the number of impacted TSUs
3BK 17430 0841 RJZZA Ed.08 17 / 40
1 Overview
1.4 Telecom/Supervision Outage and Operating Impact
The following table describes the traffic outage and loss of supervision caused
by each grouped task.
Out.
Ref. Grouped Task
Tel Out/
GPRS Out. Tel Red Sup Out
OM
Out Impacts...
- Initial Checks. - - - - None.
- Create Abis
(C1, C4).
- - - - None.
- Create BTS(s). - - - - None.
- Modify Logical
Parameters.
- - - - None.
1 Connect BTS. C2: 2 min./
BTS* + 5
min./ cell +
11 min.
- C2: 11 min.
+ 2 min./
BTS*
- For C2, supervision outage,
telecom and GPRS outage for
downstream BTSs.
- Start Traffic on
Added BTS
- - 1.5 min - Sup. out. 1.5 min. during the
PRC activation.
- Call Tests and
Checks.
- - - - None.
- Create
Adjacencies.
- - - - None.
- Final Checks. - - - - None.
- TOTAL C2: 2 min./
BTS* + 5
min./ cell +
11 min.
- C2: 11 min.
+ 2 min./
BTS*
- C2: 2 min./ BTS* + 5 min./ cell
+ 11 min. GPRS + telecom
outage.
During the activation,
supervision outage: 1.5
min.
BTS : for added BTS.
BTS* : for downstream BTS.
18 / 40 3BK 17430 0841 RJZZA Ed.08
1 Overview
1.5 Resources
1.5.1 Tools
The following tables describe the necessary hardware tools, software tools,
and forms.
1.5.1.1 Hardware Tools
Item Part Number Use at ...
BTS NEM (PC with CD-ROM drive and cables). - BTS
Wiring tools to disconnect and reconnect PCM. - BTS
Mobiles for call testing. - BTS
1.5.1.2 Software Tools
Item Part Number Use at ...
BTS Terminal B10 software for G1/ G2 BTS, BTS
NEM B10 software for 9100 / 9110 BTS.
- BTS
LMT-CT (Craft Terminal) software at technical
release B10.
- BSC
Customer Documentation CD with the version
associated with the current document edition.
Remember that the document you are reading
cannot be used as a paper version. It is online
documentation using hypertext links which take
you to other parts of a document on the same
CD-ROM. All words in italics are hypertext links.
- BTS, BSC, OMC-R
1.5.1.3 Forms
None.
1.5.2 Supplies
The following table describes necessary the supplies.
Item Part Number Use at ...
Topology regarding operation. - BTS
3BK 17430 0841 RJZZA Ed.08 19 / 40
1 Overview
1.5.3 Applicable Documents
You must have the following documents or have electronic access to the
following documents:
B10 BSS Methods Handbook
BSS Configuration Handbook
BSS Surveillance Handbook
Network Reconfiguration Recommendations
BTS NEM User Guide
Transmission Terminal User Guide
Synchronize BTS Master/Slave Site
20 / 40 3BK 17430 0841 RJZZA Ed.08
2 Scenario
2 Scenario
This Scenario presents all checks needed before beginning the scenario, and
all detailed tasks to be performed on each site.
3BK 17430 0841 RJZZA Ed.08 21 / 40
2 Scenario
2.1 Before Going Onsite
Before going onsite, you must check that the following information and supplies
are available:
All Prerequisites (Section 1.2.1) are met
The customer has been informed of the:
Date and time
Site name and address
Purpose of operation.
Personnel are available (refer to Scheduling (Section 1.3))
Site Specific Information (Section 1.2.2) is available
Tools (Section 1.5.1) are available and ready for operation
Supplies (Section 1.5.2) are available and ready for operation
Applicable Documents (Section 1.5.3) are available.
Ensure that the technical release level of the delivered board is in accordance
with the BSS hardware technical release document.
Ensure that the method used at the BSS site is at the same level as at the
OMC-R.
22 / 40 3BK 17430 0841 RJZZA Ed.08
2 Scenario
2.2 Before You Start
2.2.1 Checks
Perform the following operations:
Check that all Prerequisites (Section 1.2.1) are met
Check the availability of all necessary Tools (Section 1.5.1) and Supplies
(Section 1.5.2)
Inform the operator.
Among the cases described in Cases (Section 1.1.1) and the options described
in Options (Section 1.1.2), identify which cases and options apply to you.
2.2.2 Required Knowledge
You must be familiar with the following:
Safety Rules and Precautions
Telecom/Supervision Outage and Operating Impact (Section 1.4)
Reverse Procedure
Grouped Task Sequence (Section 1.1.4)
Operating Hints
How to document Faults and Anomalies.
3BK 17430 0841 RJZZA Ed.08 23 / 40
2 Scenario
2.3 Scenario Description
This section describes how to add a BTS.
Note: Case-specific tasks are indicated by C1, C2, C3, or C4 in the Note column.
Detailed tasks that do not have C1, C2, C3, or C4 in the Note column are
common to all four cases and must always be performed.
Options are marked with O1, O2, O3, or O4 in the Note column. Detailed tasks
that have O1, O2, O3, or O4are applied only if that option is chosen.
2.3.1 Initial Checks
Note Task Description Site To Do Outage
- Perform an Audit Alarm State on the BSS. OMC-R 10 min. None.
- View Status of Managed Objects and Alarms:
For 9120 BSC, on all the BTSs of the
impacted TSU and for the impacted Abis (if
necessary).
For the 9130 BSC Evolution, on all impacted
BTSs and Abis.
Note:For impacted Abis, only apply the Show
Alarms task (in View Status of Managed
Objects and Alarms, at the Abis section, after
opening the "Abis Topology View" window at
Step 1, select the desired Abis, then jump
directly to Step 5).
Print the reports and close the windows.
OMC-R 10 min. None.
- To ensure that the final configuration is
supported, check for sufficient resources, using:
Display free TSU resources for 9120 BSC
or Display CCP Resources Usage and
Display Abis Resources Usage for an 9130
BSC Evolution.
OMC-R 5 min for
9120 BSC
50 sec + 3
sec/cell for
9130 BSC
Evolution
None
24 / 40 3BK 17430 0841 RJZZA Ed.08
2 Scenario
2.3.2 Create Abis
Note Task Description Site To Do Outage
O5 Suspend Automatic Transmission Programming OMC-R 2 min None
OMC-R 1 min + 6
min./ Abis
for 9120
BSC.
1 min
+1 min./
Abis for
9130 BSC
Evolution.
None. C1
C4
O6
Create Abis Chain/Ring.
Note:Create the primary or/and
secondary Abis link, if necessary
Wait for the transmission programming
flag to change from Busy to Idle.
OMC-R 1 min. None. C1
C4
O5
Create Abis Chain/Ring.
Note:Create the primary or/and
secondary Abis link, if necessary.
3BK 17430 0841 RJZZA Ed.08 25 / 40
2 Scenario
2.3.3 Create BTS(s)
In order to create a required configuration, it is possible to add more than
one new BTS.
Note Task Description Site To Do Outage
C2
C3
If the BTS(s) to add is G1 or G2, check if the Abis is
set with a timeslot for Qmux. If not, reserve one Qmux
timeslot, using Modify Abis Chain/Ring Characteristics.
OMC-R 2 min. None.
C2
C3
C4
Check for Sufficient Resources on Abis, check on primary
and / or secondary Abis link.
OMC-R 5 min
for 9120
BSC
1 min.
for 9130
BSC
Evolution
None.
OMC-R 2 min. +
6 min.
/ BTS
for 9120
BSC
2 min. +
1 min.
/ BTS
for 9130
BSC
Evolution
None. -
O6
Create BTS. Always set the Qmux address.
Wait for the "Information" confirming the creation of the
new BTS, and click on [ Ok ].
Wait for the transmission programming flag to change
from Busy to Idle.
Note:For:
C4, declare the secondary
Abis for the added BTS. Set
the appropriate values for
MAX_FR_TRE_PRIMARY
and
MAX_DR_TRE_PRIMARY.
O3, declare the new BTS
as slave and select the
concerned Master BTS
name, if necessary. In
shared cells, only one
sector (main or secondary)
must support GPRS traffic
(not both).
O4, set the appropriate
NExtraAbisTS.
26 / 40 3BK 17430 0841 RJZZA Ed.08
2 Scenario
Note Task Description Site To Do Outage
OMC-R 2 min. None -
O5
Create BTS. Always set the Qmux address.
Wait for the Information Window confirming the creation
of the new BTS, and click on [ Ok ].
Note:
For C4, declare the secondary
Abis for the added BTS. Set
the appropriate values for
MAX_FR_TRE_PRIMARY and
MAX_DR_TRE_PRIMARY.
For O3, declare the new BTS as
slave and select the concerned
Master BTS name, if necessary. In
cell shared only one sector (main
or secondary) must support GPRS
traffic (not both).
For O4: set the appropriate
NExtraAbisTS.
O5 Resume Automatic Transmission Programming OMC-R 1 min + 6
min./BIU
for 9120
BSC
1 min
+ 15
sec./BTS
for 9130
BSC
Evolution
None
O5 Automatic Hardware and Alarm Audits are launched for
the BSC. Wait for them to finish.
OMC-R 1-20 min None
EXCH Verify with the BTS site that the initial settings are correct.
If they are not correct, change the Q1address (see Edit
Q1 Address) at the BTS site for each new BTS.
OMC-R / BTS 1 min./
BTS
None.
O2 If the Abis is connected via satellite, Check Cyclic
Redundancy at the BSC side using the LMT-CT, and if
needed, Modify Ater CRC4 Value.
OMC-R / BSC 3 min. None.
- Check that the newly created BTS(s) appear in the
hierarchy view of the Radio Configuration Browser (SC).
OMC-R 1 min. None.
3BK 17430 0841 RJZZA Ed.08 27 / 40
2 Scenario
2.3.4 Modify Logical Parameters
In order to create a required configuration, it is possible to create more than
one cell. In this case, modify all the logical parameters at the same time
in the same PRC.
2.3.4.1 Create Working PRC
Note Task Description Site To Do Outage
- Create PRC (Working PRC).
The PRC opens automatically.
OMC-R 1 min. None.
- Copy BTS to PRC to copy the new BTSs from
the SC to the Working PRC.
OMC-R 2 min./
BTS
None.
O3 Copy OMC Cells to PRC (the cell(s) which
become shared with the new BTS), if necessary.
OMC-R 2 min./ cell None.
2.3.4.2 Configure Cells in Working PRC
Note Task Description Site To Do Outage
OMC-R 1 min./ cell None. O3 Link Cell to a Secondary BTS Sector.
Note: For each cell which becomes
shared.
- Create Provisioning Cell or Duplicate Cell.
The cell is created/duplicated in Working PRC
and is in a locked state. Create one cell for each
sector, if necessary.
OMC-R 2 min./ cell None.
OMC-R 2 min./ cell None. - Set Cell Telecom Parameters.
For GPRS on an extended cell:
MAX_PDCH, MAX_PDCH_HIGH_LOAD
and MIN_PDCH must have even values
NB_TS_MPDCH must be set to 0 when the
cell type is extended inner/outer
MAX_EGPRS_MCS is MCS4
EN_NACC, EN_PSI_STATUS and
EN_STREAMING are disabled
Note:Set Max_PDCH >0 to have GPRS
or LCS on a cell
Also set the following
parameters: EN_EGPRS,
Max_GPRS_CS,PS_PREF_BCCH_TRX,
MAX_EGPRS_MCS, if necessary.
- Create Radio Frequency OMC-R 0.5 min./
cell
None.
- Create Frequency Hopping System, if Frequency
Hopping is used.
OMC-R 1.5 min./
cell
None.
28 / 40 3BK 17430 0841 RJZZA Ed.08
2 Scenario
Note Task Description Site To Do Outage
OMC-R 0.5 min./
TRX
None. - Create TRX
Note: For O3, select the TRX in
[Secondary] TRX on a shared BTS sector,
if necessary.
- Configure Logical Channels OMC-R 1 min./ cell None.
- Configure TRX Channel Hopping Law to
hopping or no hopping.
OMC-R 1.5 min./
cell
None.
- Configure TRX OMC-R 0.5
min./TRX
None.
- Specify TRX Preference OMC-R 0.5 min./
TRX
None.
OMC-R 5 min./ cell None. O1 Set BSS/BSC Telecom Parameters in the
Working PRC to update GPRS parameters, if
needed. This task includes the modification of
CAE data specific to the MFS.
Note:The duration depends on the
number of parameters to modify. The
current example uses 10 parameters in
different windows.
OMC-R 2 min./ cell None. O1 If GPRS parameters have to be updated on
cell(s) then, Edit n Cells in the PRC.
Modify the following parameters:
Min_Pdch and Max_Pdch_High_Load
Max_Pdch
Routing Area Code
Routing Area Color.
Note:To have GPRS on the cell, the
TRX_PREF_MARK must be 0. To modify
it, use the Set/Update Circuit/Packet Mark
Configuration Using Script.
To modify only one cell, use the edit
cell command (see Set Cell Telecom
Parameters ).
- Click on [ Apply and check ] in the "Edit Cell"
window to save cell modifications in the Working
PRC.
Wait for the No error or warning message
and click on [ Ok ].
If the check produces error messages, correct
the configuration as required and re-attempt the
check. Continue corrections and checks until no
error messages occur.
OMC-R 0.5 min./
cell
None.
- Click on [ Close ] to exit the "Edit Cell" window. OMC-R 0.5 min./
cell
None.
3BK 17430 0841 RJZZA Ed.08 29 / 40
2 Scenario
Note Task Description Site To Do Outage
OMC-R 1 min./ cell None. - Map Cell to a BTS Sector
Note:Map each new cell.
- Synchronize PRC with SC OMC-R 1 min. None.
2.3.4.3 Check Working PRC
Note Task Description Site To Do Outage
- Use the Check All option in Check PRC(Working
PRC) (Without forcing the administrative state)
to check the parameters, hardware, and telecom
impact of your PRC.
If the check produces error messages, correct
the configuration as required and re-attempt the
check. Continue corrections and checks until no
errors messages occur.
OMC-R 1 min. None.
EXCH Ask MSC personnel to update the parameters
in the MSC database.
OMC-R / MSC 3 min. None.
30 / 40 3BK 17430 0841 RJZZA Ed.08
2 Scenario
2.3.5 Connect BTS
To minimize traffic outage, you must keep the time between lock and unlock
cells to a minimum.
For O3: clock synchronization cable(s) must already be installed between
the BTSs involved in the shared cell. If the cables are not installed, perform
this installation using Install Synchronization Cables from Synchronize BTS
Master / Slave Site.
Note Task Description Site To Do Outage
C1
C4
If not done previously, the BTS must be physically
connected to the new Abis link(s) (Connect BTS).
BTS 5 min./ Abis None.
C2
C3
EXCH
Inform the OMC-R that you are ready to insert the
BTS into the Abis link.
BTS/
OMC-R
1 min. None.
C2
EXCH
In the Abis Interface View window, select the Abis
chain/ring where you inserted the new BTS.
Write down the BTSs that are downstream from
the new BTS. Go to the SC and lock the cells of
these downstream BTSs, using Shut Down Cell
(WTC=3 min.).
Inform the BTS site when the cells are locked.
OMC-R 4 min./ cell START1,
start
telecom
+ GPRS
outage for
downstream
BTSs.
C2 Select the Abis where the BTS will be inserted, and
on upstream BTS TP, Inhibit Alarm Reporting on
Abis TP (select Inhibit Alarm Reporting on TP Up).
OMC-R 1 min. Outage1
C2 Lock BTS O&M Capability of the downstream
BTSs.
OMC-R 1 min./ BTS* Outage1
C2 Disconnect Jumper BTS 5 min. Outage1
C2 Connect BTS BTS 5 min. Outage1
3BK 17430 0841 RJZZA Ed.08 31 / 40
2 Scenario
Note Task Description Site To Do Outage
OMC-R 1 min. Outage1 - Remap BTS on the CCP board(s).(only in case of
9130 BSC Evolution)
Note:The calls can be lost during BTS
remapping.
Note:The remap is performed only when
some CCPs are much more overloaded
than the others. The BSC tries to map
as much as possible all TREs of a BTS
on the same CCP and balance the load
across the CCPs if necessary. The
overload situation is decided by a system
algorithm.
C2 Unlock BTS O&M Capability of the downstream
BTSs.
OMC-R 1 min./ BTS* Outage1
C2 Use Lock/Unlock Cell Traffic to unlock the cells of
the downstream BTSs.
OMC-R 1 min./ cell END1
- When connected, the new BTS enables its OML
link.
Unlock BTS O&M Capability of the added BTSs.
OMC-R 1 min./ BTS None.
- The download for each new BTS starts
automatically. After a period of time, the OMC-R
automatically triggers a hardware and alarm audit
for each new BTS.
All the boards of the BTS must appear in the
OMC-R BSS Equipment View.
Wait for the end of the BTS(s) audit.
OMC-R 6 min./ BTS None.
BTS* : for downstream BTS
2.3.6 Start Traffic on Added BTS
Note Task Description Site To do Outage
OMC-R 5 min./ cell None. - Activate PRC (Working PRC) in queued
mode, with cell clean-up, without forcing cell
administrative state.
Display Pending Activations List to see when
the activation is finished.
The activation time depends on the number of
cells activated.
During the activation, supervision outage: 1.5 min.
- Close PRC (Working PRC). OMC-R 1 min. None.
32 / 40 3BK 17430 0841 RJZZA Ed.08
2 Scenario
Note Task Description Site To do Outage
C1
C2
For added BTS, on the upstream BTS TPAllow
Alarm Reporting on Abis TP (select Allow
Alarm Reporting on TP Up and then Allow
Alarm Reporting on TP Down).
OMC-R 1 min. None.
C4 Allow Alarm Reporting on Abis TP (select
Allow Alarm Reporting on TP Up) if the Abis is
newly created, for both primary and secondary
Abis, if necessary.
OMC-R 1 min. None.
O1 Unlock GPRS Traffic on Cell
Unlock GPRS for the cells of the new BTS(s).
OMC-R 1 min./cell None
- Unlock Cell
Unlock the cells of the new BTS(s).
OMC-R 1 min./ cell None.
3BK 17430 0841 RJZZA Ed.08 33 / 40
2 Scenario
2.3.7 Call Tests and Checks
Note Task Description Site To Do Outage
OMC-R 10 min None. C4 ViewStatus of Managed Objects
and Alarms for the impacted
BTS.
Note:If there is degradation of the HSDS at the cell level, the
following alarm is displayed: Extra TS Not Fully Usable.
To discover the problem, Display cell HSDS configuration
synthesis.
Ask TAC to solve the problem. If the problem remains,
perform Reverse Procedure (Section 2.4).
BTS 5 min./ cell None. - Perform Call Test for each new
cell.
This task must be done in parallel with the next task.
Unlock Cell from Call Test is not necessary.
Perform call tests for all impacted cells and for cells on
downstream BTSs (C2).
OMC-R 5 min. None. CHECK Display USD Detailed Cell
Information .
Check that GSM and GPRS
calls are made on impacted
BTS(s). If calls fail, perform the
Reverse Procedure (Section
2.4).
34 / 40 3BK 17430 0841 RJZZA Ed.08
2 Scenario
2.3.8 Create Adjacencies
RESTRICTION
3BKA20FBR230654
When creating adjacencies, make sure to take into account that for one BSC
only a maximum of 64 HOs are allowed.
Note Task Description Site To Do Outage
- Create Adjacency for the new cell,
using notes taken during Initial Checks
(Section 2.3.1) (assuming that there are
adjacencies towards new internal cells
and adjacencies towards new external
cells).
OMC-R 5 min./ new
cell(s)
None.
- For each cell on the same OMC-R that
must be adjacent to the new ones, Modify
Adjacency to include the new cells.
OMC-R 2 min./ cell None.
- For each cell on the neighboring OMC-Rs
that must be adjacent to the new cells,
Modify Adjacency on neighboring
OMC-Rs to include the new cells.
neighboring
OMC-R
2 min./ cell None.
2.3.9 Final Checks
Note Task Description Site To Do Outage
- Perform an Audit Alarm State on BSS. OMC-R 10 min. None.
CHECK View Status of Managed Objects and Alarms:
For 9120 BSC on all the BTSs of the impacted
TSU and for the impacted Abis (if necessary).
For 9130 BSC Evolution on all impacted BTSs
and Abis.
Note:For impacted Abis, only apply the Show
Alarms task (in View Status of Managed Objects
and Alarms, in the Abis section, after opening the
"Abis Topology View" window in Step 1, select the
desired Abis, then jump directly to Step 5).
Compare with reports from Initial Checks (Section
2.3.1).
OMC-R 5 min. None.
3BK 17430 0841 RJZZA Ed.08 35 / 40
2 Scenario
2.4 Reverse Procedure
Use this procedure to restore the initial configuration.
2.4.1 Lock Cells
Note Task Description Site To Do Outage
- In the SC, use Lock Cell to lock all the cells
that correspond to the added BTSs.
OMC-R 1 min./ cell -
C2 In the SC, use Shut Down Cell for each cell
of the downstream BTSs (WTC=3 min.).
The GSM and GPRS traffic stops.
OMC-R 4 min./ cell -
2.4.2 Disconnect BTS(s)
Note Task Description Site To Do Outage
C2 Inhibit Alarm Reporting on Abis TP (select
Inhibit Alarm Reporting on TP Down).
OMC-R 1 min. -
C2 Lock BTS O&M Capability for all
downstream BTSs.
OMC-R 1 min./ BTS* -
- Lock BTS O&M Capability of the added
BTS(s).
OMC-R 1 min. -
- Disconnect BTS (for each added BTS). BTS 5 min. -
C2 Connect Jumper. BTS 5 min. -
C2 Unlock BTS O&M Capability of the
downstream BTSs.
OMC-R 1 min./ BTS* -
C2 Allow Alarm Reporting on Abis TP (select
Allow Alarm Reporting on TP Down).
OMC-R 1 min. -
OMC-R 1 min. - - Remap BTS on the CCP board(s).(only in
case of 9130 BSC Evolution)
Note:The remap is performed only when
some CCPs are much more overloaded than
the others. The BSC tries to map as much
as possible all TREs of a BTS on the same
CCP and balance the load across the CCPs if
necessary. The overload situation is decided
by a system algorithm.
BTS* : for downstream BTS
36 / 40 3BK 17430 0841 RJZZA Ed.08
2 Scenario
2.4.3 C2: Unlock Cells
Note Task Description Site To Do Outage
C2 In the SC, use Unlock Cell to unlock all cells of the
downstream BTSs.
Traffic restarts on the cells of the downstream
BTSs.
OMC-R 1 min. -
2.4.4 Delete Adjacencies
Note Task Description Site To Do Outage
- Delete Adjacency in order to delete all
adjacencies on the created cell(s).
OMC-R 1 min./cell -
2.4.5 Delete Cell
Note Task Description Site To Do Outage
- Open PRC (Working PRC). OMC-R 1 min. -
O3 Unlink Cell from a Secondary BTS Sector
to unlink the cell(s) shared with the added
BTS(s).
OMC-R 1 min./ cell -
O3 Delete TRX to delete all TRXs for the
secondary sector.
OMC-R 1 min./ cell -
O3 Delete Radio Frequency to delete all
frequencies for the secondary sector.
OMC-R 1 min./ cell -
- Delete OMC Cell from PRC to delete all the
cell(s) from the added BTS(s).
OMC-R 1 min./ cell -
- Activate PRC (Working PRC) without cell
cleanup and in queued mode.
The activation time depends on the number
of cells activated.
Display Pending Activations List to see
when the activation is finished.
OMC-R 5 min./ cell -
- Optionally, View Last PRC log Activation. OMC-R 1 min. -
- Close PRC (Working PRC). OMC-R 1 min. -
- Delete PRC (Working PRC). OMC-R 2 min. -
EXCH Ask MSC personnel to update the
parameters in the MSC database.
MSC 3 min. -
3BK 17430 0841 RJZZA Ed.08 37 / 40
2 Scenario
2.4.6 Delete BTS
Note Task Description Site To Do Outage
O5 Suspend Automatic Transmission Programming OMC-R 2 min None
-
O6
Delete BTS from OMC-R.
Wait for the transmission programming flag to
change from Busy to Idle.
OMC-R 30 sec + 6 min.
/ BTS for 9120
BSC.
2 min. + 1 min.
/ BTS for 9130
BSC Evolution.
-
-
O5
Delete BTS from OMC-R. OMC-R 30 sec. -
2.4.7 Delete Abis
Note Task Description Site To Do Outage
C1
C4
O6
Delete Abis Chain / Ring, if necessary. Wait
for the transmission programming flag to
change fromBusy to Idle.
OMC-R 30 sec + 6
min./ Abis for
9120 BSC.
30 sec. + 1
min./ Abis for
9130 BSC
Evolution.
-
C1
C4
O5
Delete Abis Chain / Ring, if necessary. OMC-R 30 sec. -
O5 Resume Automatic Transmission
Programming
OMC-R 1 min + 6
min./BIU for
9120 BSC
1 min +15
sec./BTS for
9130 BSC
Evolution.
None
O5 Automatic Hardware and Alarm Audits are
launched for the BSC. Wait for them to finish.
OMC-R 1-20 min None
38 / 40 3BK 17430 0841 RJZZA Ed.08
2 Scenario
2.4.8 Call Tests
Note Task Description Site To Do Outage
BTS 5 min./ cell None. - Call Test
Check that the downstream BTSs are in traffic.
This task must be done in parallel with the
next task.
Unlock Cell from Call Test is not
necessary.
Perform call tests for all impacted cells
and for cells on downstream BTSs (C2).
CHECK Display USD Detailed Cell Information. OMC-R 5 min./ cell -
2.4.9 Final Checks
Note Task Description Site To Do Outage
- Perform an Audit Alarm State on the BSS. OMC-R 10 min. -
CHECK View Status of Managed Objects and Alarms:
For 9120 BSC, on all the BTSs of the impacted
TSU and for the impacted Abis (if necessary).
For 9130 BSC Evolution on all impacted BTSs
and Abis.
Note:For impacted Abis, only apply the Show
Alarms task (in View Status of Managed Objects
and Alarms, in the Abis section, after opening the
"Abis Topology View" window in Step 1, select the
desired Abis, then jump directly to Step 5).
Compare with reports from Initial Checks (Section
2.3.1).
OMC-R 5 min. -
3BK 17430 0841 RJZZA Ed.08 39 / 40
2 Scenario
BLANK PAGE BREAK
40 / 40 3BK 17430 0841 RJZZA Ed.08