Analysis for Actro span prop combine shuttering

Project delayed Total Duration is = 4 Months


Option: 1
Total shuttering material is used for terrace slab of Toer 1 !
abo"e second floor of Toer # $ie% Only for & slab ould ha"e cast%'
Tower 1 divided into two parts
Pore 1 & pore 2
One set of shuttering used:
Quantity of shuttering available = 20,000 s!ft!
"#t is $alled One set of shuttering%
(or pore1:
)olumn *rection: $Day one to To'
#n two day &os! of $olu'n ere$ted = 2( nos!
a% )irst day =1(nos!
b% *e$ond day = 10nos!
Quantity of shuttering reuired for 2( nos! of $olu'n = 1(00s!ft!
Per day +0 $arpenters available for ere$tion of for' wor,!
-ea' & slab a$tivity is parallel!
+tair case ! ,ift all:$Day three to four'
*tair $ase shuttering . /ift wall shuttering = +00 s!ft
-eam *rection :$ Day three to ten'
-ea' shuttering ere$tion reuired = +days
"Provided only on periphery of slab%
Quantity for -ea' shuttering = 1200 s!ft!
+lab +huttering *rection :$ Day three to ten'
*lab shuttering ere$tion reuired =(days
Quantity for *lab shuttering = 10,000 *!ft!
*lab & bea' a$tivity start parallel & total ti'e reuired + days!
Option: #
To $onstru$ted fast they adopt 'a1i'u' resour$es li,e 'an &
'aterial!

Total shuttering material is from .
th
storied of Toer 1 to abo"e
second floor of Toer # $ie% Only for & slab ould ha"e cast%'
Tower 1 divided into two parts
Pore 1 & pore 2
One & half set of shuttering used:
Quantity of shuttering available = 20,000 s!ft!
"#t is $alled One set of shuttering%
(or pore1:
)olumn *rection: $Day one '
#n two day &os! of $olu'n ere$ted = 2( nos!
a% )irst day =1(nos!
b% *e$ond day = 10nos!
Quantity of shuttering reuired for 2( nos! of $olu'n = 1(00s!ft!
Per day 30 $arpenters available for ere$tion of for' wor,!
+tair case ! ,ift all :$ Day to to four'
*tair $ase shuttering . /ift wall shuttering = +00 s!ft
-eam *rection: $Day four to Ten'
Quantity for -ea' shuttering = 1200 s!ft!
-ea' shuttering ere$tion reuired = +days
"Provided only on periphery of slab%
+lab +huttering *rection: $Day four to Ten'
*lab shuttering ere$tion reuired =(days
Quantity for *lab shuttering = 10,000 *!ft!
*lab & bea' a$tivity start parallel & total ti'e reuired + days!
#f we apply option1 for shuttering, duration reuired for slab is
*lab 1
Pore 1 reuired = 1( days
Pore 2 reuired = 1( days
/ag between pore 1 & pore 2 = + days
There fore slab one reuired for $asting = 20 days
*lab 2
Pore 1 reuired = 1( days
Pore 2 reuired = 1( days
/ag between pore 1 & pore 2 = + days
There fore slab one reuired for $asting = 20 days
Total duration for two slab = 20 . 20 = (2 days!
-ut the /ag between slab1 & slab 2 is 12 days
There fore
slab 1 . slab 2 = +0days
per slab reuired 20 days for $asting
&ow re'aining slab is 4 so reuired ti'e duration is tone
= &os! of slab 5 6uration
= 4 5 20
= 1+0 6ays! "+ 'onth 20 days%
#f we apply option # for shuttering, duration reuired for slab is
*lab 1
Pore 1 reuired = 12 days
Pore 2 reuired = 12 days
/ag between pore 1 & pore 2 = + days
!
There fore slab one reuired for $asting = 20 days
*lab 2
Pore 1 reuired = 12 days
Pore 2 reuired = 12 days
/ag between pore 1 & pore 2 = + days
There fore slab one reuired for $asting = 20 days
-ut the /ag between slab1 & slab 2 is 12 days
There fore
slab 1 . slab 2 = 23days
per slab reuired 1+ days for $asting
&ow re'aining slab is 4 so reuired ti'e duration is
= &os! of slab 5 6uration
= 4 5 1+
= 736ays! "2 'onth 3 days%
That 'eans $rashing the duration by 1'onth 12 days!
The following a$tivity has delay by $ertain duration "following all a$ting for
Tower 1 & Tower 2 e1$luding 899! :or,%

1% 8$$! :or, for slab, $olu'n, bea' ")or above se$ond floor to terra$e of
tower2 = + 'onths
2% -ri$, wor, . #nternal Plaster = 1( days "Parallel to 8$$! ;$tivity 0
'onths reuired (!( 'onth to $o'plete%
2% Plu'bing = 20 days "parallel to bri$, wor, reuired ('onths%
+% )loor finishing . 6oor & ;lu'iniu' :indow = 10days "parallel to
plastering reuired ('onths%
(% Podiu' slab . e1ternal sand fa$e plaster = 1(days "parallel to internal
plaster reuired 2'onths!%
0% *anitary fitting = 1('onth "parallel to door, window & podiu' reuired
0'onths%
4% Painting . ;ll <la=e window =1( days "parallel to e1ternal plaster
reuired 2!( 'onths!%
3% 9leaning & >and over = 1(days
;bove a$tivity reuired total duration is =3 'onth
-ut ti'e available up to 21 'ar$h 2003 i!e! = + 'onth
Their fore pro?e$t was delay = +'onth!
8!9!9! 9utting & bending
6uration & 'an power reuired for 20,000s! ft! slab for $utting &
bending
Per s! ft! 2,g reuired for P!T! slab "as per design%
)or total slab, steel reuired
"in$luding $olu'n, bea' & slab%

= *lab area @ per s! steel reuired! ",g%
= 20,000 @ 2
= 00,000 Ag
Ti'e li'it for reinfor$e'ent $utting &bending for one slab is 20 days!
"-e$ause of shuttering%
>ow 'u$h produ$tion and resour$es reuired B
*uare feet per day = slab area Cday li'it!
= 20,000 C20
= 1000 s!ft "2000 ,g per day%
Dan per day = *! ft produ$tion per dayC per labour produ$t!
= 1000 C 27
= 2+!+3 E 2( /abour!
Per day labour reuired is 2( i!e
Per day produ$tion is 1000 ,g of steel!
-ecause of folloing crucial point the project as delayed:
1% F1$avation a$tivity too, a very long ti'e than esti'ated as the strata in
'ost of the pla$e is hard ra$, $alled Da?rya ro$,!

2% 6elay in re$eiving detail fro' ;r$hite$ts and 8$$! 9onsultants lot of
revision in drawings involving rewor, in e1$avation!
2% *hortage of resour$es in initial stage of $onstru$tion li,e labour,
'aterial, euip'ent et$!
+% *hortage of te$hni$al and 'anage'ent staff li,e $ivil engineer,
$onstru$tion 'anage'ent person!
)onclusion ! /ecommendation:
1' ;ll per'ission tentatively re$eived in initial stage!
#' )or high rise building detail soil investigation should done by
$o'petent authority!
0' Fuip'ent resour$es 'ust be adeuate at $o''en$e'ent of wor,!
4' Dostly prefer that de$ision should not be $hange in e1$ept any $riti$al
$ondition!
1' Te$hniue 'ention as above to be revised fro' ti'e to ti'e!
.' Ti'e 'anage'ent should have been given eual i'portan$e along
with uality depart'ent dune at site!