ABANDONMENT PROGRAM
DORE-1
MAURITANIA
ABANDONMENT PROGRAM
ABANDONMENT PROGRAM
DORE-1
CONTROLLED DOCUMENT
DOCUMENT INFORMATION
DRIMS#:
Rev: 1
Date:
Signature:
Date:
Signature:
Date:
Signature:
CONCURRENCE
Name
Grant Lintern
Group
Date
Signature
REVISION HISTORY
Revision
0
Description
Draft
Date
27.01.06
RELEASE STATEMENT
REVIEW STATUS
Unclassified
(Shared without Restrictions)
Restricted
(Freely Shared within Woodside and
Associated Companies)
Confidential
(Shared With Selected Personnel)
Prepared by
Approved by
Fraser Lawson
Graham SIngleton
PREPARED
(Check one box only)
Review Period
1 Year
By WEL
Review Period
3 Years
For WEL
Review Not
Required
Most Confidential
(Strict Need-to-Know Basis)
Woodside Energy Ltd. (Woodside) owns or is responsible for the copyright in this document. All rights reserved. Neither the
whole nor any part of this document may be reproduced, stored in or transmitted in any form by any means (electronic,
mechanical, reprographic, recording or otherwise) without the prior written consent of Woodside.
ABANDONMENT PROGRAM
DORE-1
INTRODUCTION
The Dore-1 exploration well was drilled to a total depth of 2833m BRT (Stena Tay). The well will be
abandoned with the wellhead left in place at the seabed.
OPERATIONS SUMMARY
After the drilling and wireline logging program has been completed, the well will be abandoned with a
9 5/8 cement retainer & cement plugs. The cement retainer will set ion wireline above the 9 5/8
casing shoe and pressure tested. Cement will be squeezed below the 9 5/8 shoe and a 180m
balanced plug set above the retainer to provide a permanent barrier. A 100m near seabed cement
plug, set on a high viscosity pill will provide a second permanent barrier. (Refer to Proposed
Abandonment Schematic).
After setting the surface cement plug, the subsurface BOP will be unlatched and recovered. After
installation of a corrosion cap and completion of the sea bed survey by the ROV, the rig will be
released off Woodside contract.
There is no requirement to cut casing or recover the wellhead.
GENERAL INFORMATION
Location
Co-ordinates
Well type
Concession
Situation
Water Depth
Well TD
Well fluid
Top HC
Btm HC
:
:
:
:
:
:
:
:
:
:
Dore-1
Easting 331 466.46 m, Northing 1 987 370.24 m
Exploration
PSC- Area B (block 4)
Mauritania
385.4 m (LAT)
2388m BRT
1.52 sg SBM
None BRT, (provisional)
None BRT, (provisional)
All BRT rotary table depths in this document are referenced to the Stena Tay rig (air gap: 38.4m).
ABANDONMENT PROGRAM
DORE-1
SEQUENCE OF OPERATIONS
General
Following completion of TD electric logging perform the following:
3.1
RIH and set 9 5/8 Weatherford cement retainer on electric line at +/- 1960m. Correlate with CCL. Do
not set in shoe track or close to casing connection. POOH to surface.
3.2
Once wireline above BOPs close shear rams and pressure test plug to 750psi /15 mins
(approximately 500psi above FIT with 1.52sg mud). Rig down Baker Atlas.
3.3
RIH cement retainer stinger assembly on 200m 3 drill pipe with 5 drillpipe to surface.
3.4
3.5
Pump down drillpipe and establish injectivity pressure and rate with cement unit. Plot pressures
against volumes pumped and report observed LOT value as injection is initiated. Squeeze 10 bbls
SBM below retainer to confirm injectivity. Minimum injectivity rate is 0.5bbl/min. Limit surface press to
3000 psi.
3.6
Pull out of cement retainer with stinger. Pick up 10-20ft above retainer.
3.7
Close annulus and take returns up choke line, maintaining approximately 500psi backpressure.
3.8
3.9
ABANDONMENT PROGRAM
DORE-1
3.24 Mix and displace balanced cement plug 2 from 600 to 500m. Use drill water spacers, underdisplace
plug as per Cemcade (3 bbls provisional).
3.25 Pull back to BOP and circulate clean. Drop foam ball to clean drill pipe.
3.26 Function test rams and annulars.
3.27 Wash and jet the wellhead/BOP's clean. Leave wear bushing in place.
3.28 POOH.
3.29 Hold rig floor safety meeting. R/U rigfloor for pulling riser.
3.30 Pull Riser/BOP as per Stena procedures.
3.31 While observing with ROV, unlatch BOP and pull same clear from wellhead. Recover VX gasket.
3.32 Move rig 50m away from wellhead.
3.33 Continue pulling riser as per Stenas procedures.
3.34 ROV installs corrosion cap & completes seabed survey.
3.35 Continue with rig demob operations. Blow down bulks.
3.36 Prepare signed Well Acceptance Criiteria (Drilling Programme Appendix F) and signed Statement of
Facts for remaining bulk commodities. Scan and send both documents to town. Ops DE in town will
prepare final abandonment schematic
ABANDONMENT PROGRAM
DORE-1