Você está na página 1de 22

Innovation Insight Series Number 12

http://www.psu.edu/president/pia/innovation/

2006 The Pennsylvania State University
This material has been developed by and cannot be used or reproduced without permission of the Office of Planning and Institutional Assessment, Penn State University.
Penn States IMPROVE model is a structured approach to facilitate problem solving, decision-making, and proc-
ess improvement teamwork. The model is an expansion of the Plan-Do-Check-Act model introduced by Walter
Shewhart and popularized by W. Edwards Deming. This structured approach to teamwork has helped teams at
Penn State to improve and redesign processes, programs and services.






This issue of Innovation Insights presents an overview of many of the tools that can be used at different stages
within the IMPROVE model. For each step in the IMPROVE model, some questions are included to help your
team start their discussion. For each tool, this overview provides a brief statement of the purpose/function of the
tool, and how to use it.
PENN STATES IMPROVE MODEL
I - Identify and Select Process for Improvement
M- Map the Critical Process
P - Prepare Analysis of Process Performance
R - Research and Develop Possible Solutions
O - Organize and Implement Improvements
V - Verify and Document Results
E - Evaluate and Plan for Continuous Improvement
1994 The Pennsylvania State University
This model has been developed by and cannot by used or reproduced without permission of the Office of Planning and
Institutional Assessment, Penn State University.
Tool s f or Or gani zat i onal I MPROVEment

Tools for Organizational IMPROVEment
Innovation Insights #12
2006 The Pennsylvania State University
This material has been developed by and cannot be used or reproduced without permission of the Office of Planning and Institutional Assessment, Penn State University.
2
IMPROVE Model: Tools and Relational Issues


1
Tools are paired with stages but many can be used for more than one stage of the IMPROVE model.
2
Many of the relational issues listed are present at more than one stage of the IMPROVE model. For more information, see
Innovation Insights #7, A Structured Approach to Organizational IMPROVEment, and Innovation Insights #10, Leading for Continuous
Improvement.
Stage

Goal
Data Tools
1
Relational Issues
2

I
Identify and Select
Process for
Improvement


Establish a clear
scope and purpose
for the project
Affinity Diagram
Brainstorming
Check Sheet
Is/Is Not Analysis
Pareto Chart
Stakeholder Communica-
tion: Surveys, Interviews,
and Focus Groups
Establish a constructive
group climate
Clarify roles, attendance ex-
pectations
Manage meetings effectively
Establish a shared under-
standing of the teams pur-
pose
M
Map the Critical
Process

Clarify the current
situation
Flowchart or Process Map Establish norms for the con-
structive use of conflict com-
munication and sensitivity to
diversity issues
Create Stakeholder Commu-
nication Plan
P
Prepare Analysis of
Process Performance
Assess process per-
formance and ana-
lyze the cause of
problems that are
identified
Histograms
Run Charts/Control Charts
Fishbone Diagram


Reinforce buy-in for the use
of structured communication
tools to encourage critical
thinking and avoid premature
conclusions
R
Research and Develop
Possible Solutions

Propose, assess and
prioritize potential
solutions
Benchmarking
Criteria Matrix
Multivoting

Reinforce equal participation
and focused communication
by assessing both the posi-
tive and negative aspects of
potential solutions
O
Organize and
Implement
Improvements

Plan and conduct the
implementation of
priority solutions
Gantt Chart
PERT Chart
Responsibility Matrix
Address organizational
change issues by planning
for stakeholder communica-
tion and their involvement in
the implementation
Clarify responsibility for im-
plementation.
V
Verify and Document
Results
Assess the effective-
ness of solutions
Histograms
Run Charts/Control Charts
Stakeholder Communica-
tion
Maintain team momentum
through the elapsed time
needed for implementation
E
Evaluate and Plan for
Continuous
Improvement
Share lessons
learned; anticipate
future improvements
Many of the above tools Stakeholder Communication
Encourage closure by cele-
brating the teams success
2
Tools for Organizational IMPROVEment
Innovation Insights #12
2006 The Pennsylvania State University
This material has been developed by and cannot be used or reproduced without permission of the Office of Planning and Institutional Assessment, Penn State University.
3
IDENTIFY & SELECT PROCESS FOR IMPROVEMENT

TOOLS:
Affinity Diagram
Brainstorming
Check Sheet
Is/Is Not Analysis
Pareto Chart
Stakeholder Communication: Surveys, Interviews, and Focus Groups

It is key that you select a process for improvement that will provide a return worthy of your teams effort. A
thorough analysis at the start will ensure that your teams time will be well spent.

Definitions
Stakeholders
Those groups of people who have an interest in what your unit does; also those groups of people who
have expectations about what your unit does.

Customers
A specific group of stakeholders, those who are the direct recipients or users of your products or ser-
vices; may also be called clients, constituents, guests, or some other term.


Questions to start your teams discussion
Whom do you serve? Who are your customers, clients, or constituents (internal or exter-
nal)?
What services or products do you provide to your customers, clients, or constituents?
What do your products or services do or make possible for them?
What do they expect of the services you provide?
What processes are in place to meet or exceed those expectations?
Who are your suppliers, those who provide input for your processes? What information
do you provide to them? What information do they need from you?
Who are your units other stakeholders? What do they expect? What information do you
provide to them about your unit, and your products and services?
Do you have information from your customers or co-workers that indicates that some of
the processes are not meeting expectations?
Which processes are within the scope of your units control?
Which process will give you the most improvement for your effort?
Is there a group of people who know enough to improve this process?
Does your workplace welcome change?




Tools for Organizational IMPROVEment
Innovation Insights #12
2006 The Pennsylvania State University
This material has been developed by and cannot be used or reproduced without permission of the Office of Planning and Institutional Assessment, Penn State University.
4

1. Working individually, have participants brainstorm
ideas or issues and record each idea on a sticky
note. Use a noun and a verb, and avoid using sin-
gle words.
2. Have participants post their sticky notes on a large
sheet of paper or other flat surface.
3. Without talking, have participants sort the sticky
notes into related groups with common themes.
Concentrate on meaning and connections.
4. Divide large theme groupings into smaller groups
based on sub-themes.
5. Write a concise phrase or sentence that describes
the groupings central idea on a larger or different
color sticky note and place that as the header for
the group.
6. Check to see if any new ideas fit into the grouping.


Affinity Diagram: Generate and organize a large number of ideas.

Brainstorming: Generate new ideas among team members
Clarify issue to be brainstormed.
Review guidelines for brainstorming:
No criticism, discussion, or evaluation
The more ideas the better
Be creative
Build on others responses
Record all ideas for group to see
Select type:
Silent each participant works individually for a few minutes; write each idea on one index card or
sticky note; then share with the group, either round robin or through a facilitator
Round Robin each participant shares one or a few (but not all) of their ideas; when all have had
an opportunity to share, individuals can share more ideas
Spontaneous all participants call out their ideas as they think of them; some participants may
dominate the group
Do it - quickly.
Discuss only to clarify, not to critique.
Affinity Diagram

Communication Information
Encourage
Feedback
Good Listener
Share Success
Share Information
Across Units
Clear Direction
Data Collection
Keep Notes
Update Process
Manual
Set Standards
Tools for Organizational IMPROVEment
Innovation Insights #12
2006 The Pennsylvania State University
This material has been developed by and cannot be used or reproduced without permission of the Office of Planning and Institutional Assessment, Penn State University.
5


Check Sheet: Track the frequency of a particular event over time.

Example
Goal: Reduce Interlibrary Loan (ILL) information phone calls by putting answers to most
common questions on the web
Data to be collected: Types of questions asked in phone calls








Is/Is Not Analysis: Sharpen the definition and scope of the issue at hand.
Answer the following questions about the issue before the team:
Who is/is not affected?
What are/are not symptoms of the problem?
When is the problem observed/not observed?
Where does the problem occur/not occur?
5
1. Agree on data to be collected:
Categories and definitions how
should those collecting the data
categorize their observations
Time period for data collection
make sure your time period is long
enough, and a typical time period,
to provide good data
2. Design form for data collection.
3. Make observations to collect data.
4. Calculate percentages for each category
from raw data; this can be used in con-
structing a Pareto Chart.

Types of Questions
Asked
Number of
Phone Calls
Percent of Total
How do I cancel my
book request?
4 16
How long will it take
to get an ILL book?
12 48
How do I request an
ILL book?
7 28
Other 2 8
Total 25 100
Check Sheet
Tools for Organizational IMPROVEment
Innovation Insights #12
2006 The Pennsylvania State University
This material has been developed by and cannot be used or reproduced without permission of the Office of Planning and Institutional Assessment, Penn State University.
6


Pareto Chart: Rank issues that have been identified from most significant to least, to identify which will yield the
greatest return with improvement.




Stakeholder Communication -- Surveys, Interviews, and Focus Groups: Collect additional data from stake-
holders.
Survey: a questionnaire with standard questions; it may be written or someone may ask the questions and re-
cord the answers.

Interview: one individual asks another a set of questions, but may ask additional questions for clarification or
additional detail as the interview progresses.

Focus group: a group of people guided by a moderator or facilitator in a discussion to provide information and
feedback on a specific topic.

Note: Steps 1-3 apply to data collected in interviews
or a survey. If you have used and completed a check
sheet, you will be able to go directly to step 4.
1. Examine all data, for example, the greatest number
of dissatisfied responses or items mentioned most fre-
quently as problems.
2. Determine categories; sort data by categories.
3. Add total responses in each category.
4. Draw horizontal and vertical axes for a bar chart.
5. Enter data along the horizontal axis, beginning with
the category containing the highest number of re-
sponses; each bar represents frequency of a single
problem or concern.
6. Add title and date.

Pareto principle: A small number of factors (20%)
cause most (80%) of the problems. Pareto charts fo-
cus team efforts.
InterlibraryLoan Team
C:\HGW\PRES\ PAREX.PRS
0
10
20
30
40
50
60
70
80
F
r
e
q
u
e
n
c
y
Timeliness Access Commu-
nication
Errors TooMuch
Paperwork
Other
Pareto Chart
How can the Library improve ILL services?
Tools for Organizational IMPROVEment
Innovation Insights #12
2006 The Pennsylvania State University
This material has been developed by and cannot be used or reproduced without permission of the Office of Planning and Institutional Assessment, Penn State University.
7
M
e
t
h
o
d

o
r

T
o
o
l

D
e
s
c
r
i
p
t
i
o
n

U
s
e
s

a
n
d

P
u
r
p
o
s
e
s

P
o
t
e
n
t
i
a
l

A
d
v
a
n
t
a
g
e
s

P
o
t
e
n
t
i
a
l

D
i
s
a
d
v
a
n
t
a
g
e
s

o
r

P
r
o
b
l
e
m
s

C
h
e
c
k

s
h
e
e
t


f
o
r
m

c
o
n
s
t
r
u
c
t
e
d

a
n
d

u
s
e
d

t
o

s
y
s
t
e
m
a
t
i
c
a
l
l
y

r
e
c
o
r
d

n
u
m
b
e
r

o
f

o
c
c
u
r
r
e
n
c
e
s

o
f

a
n

i
n
c
i
d
e
n
t

o
v
e
r

t
i
m
e



t
a
l
l
y

o
r

c
o
m
p
i
l
e

d
a
t
a

a
s

c
o
l
-
l
e
c
t
e
d


c
o
m
p
i
l
e

a
n
d

s
u
m
m
a
r
i
z
e

d
a
t
a

f
r
o
m

o
t
h
e
r

m
e
t
h
o
d
s



s
i
m
p
l
i
c
i
t
y


n
o

c
o
m
p
u
t
e
r

r
e
q
u
i
r
e
d


n
o
t

i
n
t
e
r
a
c
t
i
v
e

I
n
t
e
r
v
i
e
w

(
o
n
e
-
o
n
-
o
n
e
)


r
e
s
u
l
t
s
-
o
r
i
e
n
t
e
d

d
i
s
c
u
s
s
i
o
n
s


v
e
h
i
c
l
e

f
o
r

f
a
c
e
-
t
o
-
f
a
c
e

c
o
m
m
u
-
n
i
c
a
t
i
o
n

w
i
t
h

c
u
s
t
o
m
e
r


i
n
t
e
r
v
i
e
w
e
r

a
s
k
s

q
u
e
s
t
i
o
n
s
,

e
n
-
c
o
u
r
a
g
e
s
,

a
n
d

a
c
t
i
v
e
l
y

l
i
s
t
e
n
s

t
o

c
u
s
t
o
m
e
r

r
e
s
p
o
n
s
e
s


c
o
l
l
e
c
t

i
n
f
o
r
m
a
t
i
o
n

f
r
o
m

c
u
s
t
o
m
-
e
r
s
,

e
s
p
e
c
i
a
l
l
y

q
u
a
l
i
t
a
t
i
v
e

d
a
t
a


e
s
t
a
b
l
i
s
h

r
e
l
a
t
i
o
n
s
h
i
p

w
i
t
h

c
u
s
-
t
o
m
e
r
s


i
n
i
t
i
a
l

o
r

p
r
e
l
i
m
i
n
a
r
y

d
a
t
a
-
g
a
t
h
e
r
i
n
g


t
e
s
t

w
o
r
d
i
n
g

o
r

f
o
c
u
s

o
f

w
r
i
t
t
e
n

q
u
e
s
t
i
o
n
n
a
i
r
e



o
p
e
n

l
i
n
e
s

o
f

c
o
m
m
u
n
i
c
a
-
t
i
o
n


b
u
i
l
d

r
e
l
a
t
i
o
n
s
h
i
p
s


o
p
p
o
r
t
u
n
i
t
y

t
o

c
l
a
r
i
f
y

a
n
d

e
x
p
a
n
d

o
n

q
u
e
s
t
i
o
n
s

o
f

i
m
p
o
r
t
a
n
c
e

t
o

i
n
t
e
r
v
i
e
w
e
e


l
e
s
s

w
o
r
k

f
o
r

i
n
t
e
r
v
i
e
w
e
e


c
a
n

b
e

i
n
e
f
f
i
c
i
e
n
t

o
r

u
n
p
r
o
-
d
u
c
t
i
v
e

i
f

n
o
t

c
a
r
e
f
u
l
l
y

s
t
r
u
c
-
t
u
r
e
d


i
n
t
e
r
v
i
e
w
e
r

d
i
f
f
e
r
e
n
c
e
s


l
a
c
k

o
f

a
n
o
n
y
m
i
t
y


t
i
m
e
-
c
o
n
s
u
m
i
n
g

f
o
r

i
n
t
e
r
-
v
i
e
w
e
r
s


w
o
r
k
s

b
e
s
t

f
o
r

s
m
a
l
l

n
u
m
b
e
r

o
f

i
n
t
e
r
v
i
e
w
e
e
s

G
r
o
u
p

I
n
t
e
r
v
i
e
w

o
r

F
o
c
u
s

G
r
o
u
p


g
r
o
u
p

i
n
t
e
r
v
i
e
w

l
e
d

b
y

a

f
a
c
i
l
i
t
a
-
t
o
r

o
r

m
o
d
e
r
a
t
o
r


o
c
c
a
s
i
o
n
a
l
l
y

r
e
c
o
r
d
e
d

w
i
t
h

a
u
-
d
i
o
-

o
r

v
i
d
e
o
t
a
p
e

i
f

p
e
r
m
i
s
s
i
o
n

i
s

g
r
a
n
t
e
d


c
o
l
l
e
c
t

i
n
f
o
r
m
a
t
i
o
n

f
r
o
m

c
u
s
t
o
m
-
e
r
s


o
b
t
a
i
n

c
o
n
s
t
r
u
c
t
i
v
e

c
r
i
t
i
c
i
s
m


p
i
l
o
t

q
u
e
s
t
i
o
n
n
a
i
r
e
s


e
s
t
a
b
l
i
s
h

r
e
l
a
t
i
o
n
s
h
i
p

w
i
t
h

a
n
d

a
m
o
n
g

p
a
r
t
i
c
i
p
a
n
t
s


m
o
r
e

i
n
f
o
r
m
a
t
i
o
n

t
h
a
n

i
n

i
n
t
e
r
v
i
e
w

d
u
e

t
o

g
r
o
u
p

i
n
t
e
r
-
a
c
t
i
o
n


c
l
a
r
i
f
i
c
a
t
i
o
n

p
o
s
s
i
b
l
e


s
y
n
e
r
g
i
s
m

-

n
e
w

i
d
e
a
s


l
e
s
s

t
i
m
e

i
n
v
e
s
t
e
d

t
h
a
n

w
i
t
h

i
n
d
i
v
i
d
u
a
l

i
n
t
e
r
v
i
e
w
s





d
i
f
f
i
c
u
l
t

t
o

m
o
d
e
r
a
t
e


r
e
-
q
u
i
r
e
s

m
o
r
e

s
k
i
l
l

f
r
o
m

d
i
s
c
u
s
-
s
i
o
n

l
e
a
d
e
r


s
u
s
c
e
p
t
i
b
l
e

t
o

m
o
d
e
r
a
t
o
r

o
r

g
r
o
u
p

b
i
a
s


r
e
l
i
a
b
i
l
i
t
y

a
n
d

v
a
l
i
d
i
t
y

o
f
t
e
n

q
u
e
s
t
i
o
n
e
d


l
a
c
k

o
f

a
n
o
n
y
m
i
t
y


g
r
o
u
p
t
h
i
n
k

E
l
e
c
t
r
o
n
i
c

F
o
c
u
s

G
r
o
u
p

(
e
.
g
.
,

M
a
n
a
g
e
-
m
e
n
t

D
e
v
e
l
o
p
m
e
n
t

T
e
c
h
n
o
l
o
g
y

C
e
n
t
e
r

a
t

P
e
n
n

S
t
a
t
e
r

C
o
n
f
e
r
-
e
n
c
e

C
e
n
t
e
r

H
o
t
e
l
)



c
o
m
p
u
t
e
r

n
e
t
w
o
r
k

c
o
-
f
a
c
i
l
i
t
a
t
e
d

b
y

g
r
o
u
p

f
a
c
i
l
i
t
a
t
o
r

a
n
d

c
o
m
p
u
t
e
r

s
o
f
t
w
a
r
e

e
x
p
e
r
t

(
t
e
c
h
n
o
g
r
a
p
h
e
r
)


a
n
o
n
y
m
o
u
s

i
n
p
u
t

-

m
o
r
e

o
p
e
n
,

m
o
r
e

i
n
p
u
t


c
o
m
p
u
t
e
r

a
i
d
s

i
n

a
n
a
l
y
s
i
s


l
e
s
s

t
i
m
e

r
e
q
u
i
r
e
d


c
a
n

r
e
d
u
c
e

t
r
a
v
e
l

i
f

d
o
n
e

a
t

r
e
m
o
t
e

l
o
c
a
t
i
o
n
s


m
o
r
e

p
r
e
-
s
e
s
s
i
o
n

p
l
a
n
n
i
n
g


a
d
d
i
t
i
o
n
a
l

e
x
p
e
n
s
e

f
o
r

e
q
u
i
p
-
m
e
n
t

a
n
d

c
o
-
f
a
c
i
l
i
t
a
t
o
r
/
t
e
c
h
n
o
g
r
a
p
h
e
r

W
r
i
t
t
e
n

S
u
r
v
e
y



p
r
i
n
t
e
d

q
u
e
s
t
i
o
n
n
a
i
r
e

r
e
q
u
i
r
i
n
g

w
r
i
t
t
e
n

r
e
s
p
o
n
s
e
s


m
a
y

b
e

m
o
d
i
f
i
e
d

f
o
r

u
s
e

b
y

m
a
i
l
,

e
-
m
a
i
l
,

p
h
o
n
e
,

i
n
d
i
v
i
d
u
a
l

i
n
t
e
r
-
v
i
e
w
s

o
r

f
o
c
u
s

g
r
o
u
p
s



t
o

r
e
a
c
h

l
a
r
g
e

n
u
m
b
e
r

o
f

r
e
-
s
p
o
n
d
e
n
t
s


g
r
e
a
t
e
r

n
u
m
b
e
r

o
f

r
e
-
s
p
o
n
s
e
s

e
x
p
e
c
t
e
d


p
r
e
s
e
r
v
e
s

a
n
o
n
y
m
i
t
y


l
e
s
s

c
h
a
n
c
e

t
o

c
l
a
r
i
f
y

o
r

e
x
-
p
a
n
d

o
n

q
u
e
s
t
i
o
n
s

a
n
d

a
n
-
s
w
e
r
s


l
o
w

r
e
s
p
o
n
s
e

r
a
t
e

m
a
y

i
m
-
p
a
c
t

r
e
p
r
e
s
e
n
t
a
t
i
v
e

f
e
a
t
u
r
e
s

H
i
s
t
o
r
i
c
a
l

D
a
t
a


D
a
t
a

p
r
e
v
i
o
u
s
l
y

c
o
l
l
e
c
t
e
d


A
n
a
l
y
z
e

d
a
t
a

f
o
r

r
e
l
a
t
e
d

o
c
c
u
r
-
r
e
n
c
e
s
,

e
v
e
n
t
s

l
i
n
k
e
d

o
v
e
r

t
i
m
e
,

p
a
t
t
e
r
n
s

w
h
i
c
h

d
e
f
i
n
e

a

g
r
o
u
p
,

o
r

f
u
t
u
r
e

v
a
l
u
e

o
f

a

d
a
t
a

i
t
e
m


D
a
t
a

h
a
v
e

a
l
r
e
a
d
y

b
e
e
n

c
o
l
l
e
c
t
e
d

a
n
d

a
r
e

a
v
a
i
l
a
b
l
e


N
e
e
d

t
o

r
e
f
o
r
m
a
t

d
a
t
a

o
r

d
e
v
e
l
o
p

s
p
e
c
i
f
i
c

q
u
e
r
i
e
s

S
u
m
m
a
r
y

o
f

M
e
t
h
o
d
s

o
f

D
a
t
a

C
o
l
l
e
c
t
i
o
n

Tools for Organizational IMPROVEment
Innovation Insights #12
2006 The Pennsylvania State University
This material has been developed by and cannot be used or reproduced without permission of the Office of Planning and Institutional Assessment, Penn State University.
8
MAP THE PROCESS
TOOLS:
Flowchart (traditional and top down); also known as a Process Map


One of the key pieces of data in your improvement initiative is documentation of the current process. This
should lead to understanding among all team members of that process, and represent all the steps in that process
of which team members have knowledge.


Definition
Process
A sequence of steps to respond to a request or use resources (time, information, material, etc.) to pro-
duce and deliver the service or product a unit provides.

Questions to start your teams discussion
What are the steps you go through as you provide your product or service?
What is the sequence of steps from the time you receive a request or start a process to the time you de-
liver your product or service to your client?
How do you respond to missing or incorrect material or information?
Are there times between the steps when nothing is happening? How long and frequent are these wait
states?


Flowchart: Represent the steps in a process or procedure graphically.


Steps to develop a flowchart Pointers
1. Identify boundaries
Starting and ending point
All steps between represented on the team/at the table
2. Determine level of detail
Macro or micro

3. List major steps
Show what actually is, not the ideal or theoretical
Arrange in sequence
4. Draw a diagram
Symbols
Arrows
Only one arrow out of a process
No endless loops
No dead ends
5. Review
Accuracy
Consensus
6. Label
Title
Date
8
Tools for Organizational IMPROVEment
Innovation Insights #12
2006 The Pennsylvania State University
This material has been developed by and cannot be used or reproduced without permission of the Office of Planning and Institutional Assessment, Penn State University.
9
Traditional Flowchart Symbols


Start/Stop



Process step



Decision step




Wait state




Direction of flow
Tools for Organizational IMPROVEment
Innovation Insights #12
2006 The Pennsylvania State University
This material has been developed by and cannot be used or reproduced without permission of the Office of Planning and Institutional Assessment, Penn State University.
10
A Traditional Flowchart
Tools for Organizational IMPROVEment
Innovation Insights #12
2006 The Pennsylvania State University
This material has been developed by and cannot be used or reproduced without permission of the Office of Planning and Institutional Assessment, Penn State University.
11
2.0 Applications
submittedand
reviewed
3.0 Interviews
conducted
4.0 Candidate
selected
5.0 Offer
extended and
accepted
1.0 J ob opening
identified
and posted
2.2 Searchcommittee
reviews applications
2.3 Searchcommittee
selects candidates to
interview
2.4 Searchcommitteeverifies
candidates withHR
2.5 HR approves
interviews
4.1 Searchcommittee
makes selection
1.2 Supervisor
appoints search
committee
1.3 Searchcommittee
notifies HR rep
1.4 HR rep reviews job
description, forwards to search
committeefor approval
1.5 HR posts approved
job description
1.1 Supervisor
decides to fill vacancy
2.1 Applicants post job
applications on-line
4.2 Supervisor notifies
HR andnegotiates salary
5.1 Supervisor makes
offer to candidate
5.2 Candidateaccepts
offer
3.1 Searchcommittee
interviews candidates
A Top Down Flowchart
Penn States Staff Hiring Process
Note: A top down flowchart often reflects an ideal situation. You may need to develop a traditional
flowchart to analyze the current situation, and then a top down flowchart to describe the improved or
reengineered process.
Tools for Organizational IMPROVEment
Innovation Insights #12
2006 The Pennsylvania State University
This material has been developed by and cannot be used or reproduced without permission of the Office of Planning and Institutional Assessment, Penn State University.
12

PREPARE ANALYSIS OF PROCESS PERFORMANCE

TOOLS:
Histograms
Run Charts
Control Charts
Fishbone Diagram

In this stage, you are identifying a way to measure a units performance (and the improvement of that perform-
ance), and gathering baseline data of those measurements. You are also looking for the root causes of any
unsatisfactory performance.

Definitions
Data
A way of measuring a units performance, and improvement of that performance.

Root cause
The underlying, fundamental cause of a process performance problem. When you identify the root
cause and make improvements to address it, the problem will be solved and will not resurface else-
where.

Questions to start your teams discussion
What data would you like to have about your work units performance to know how well you are
meeting stakeholders expectations?
What change in those measures would indicate improvement?
In choosing a product or service, what are specific client, supplier, and other stakeholder expecta-
tions for your product or service?
What do clients, suppliers, and other stakeholders realistically expect with regard to your
product or service?
Ideally, what would clients, suppliers, and other stakeholders like to see in your product
or service?
What are specific client, supplier, and other stakeholder satisfaction or performance measures re-
garding their expectations for your product or service? For example:
Quality
Courtesy in dealing with them
Cost
Sharing of status information
Time from order to delivery
Error rate
Tools for Organizational IMPROVEment
Innovation Insights #12
2006 The Pennsylvania State University
This material has been developed by and cannot be used or reproduced without permission of the Office of Planning and Institutional Assessment, Penn State University.
13
Example
Over 10 days, you have asked those picking up Interlibrary Loan books
to complete a satisfaction survey. The data is shown in the table on the
right. You counted the occurrence of a particular event each day, in this
case the number of dissatisfied clients. You decided to use the tools be-
low to analyze your data.


Histogram: Display a summary of the frequency of occurrences; a ver-
tical bar chart.
1. List your data points in increasing order.
2. Identify the lowest and highest value data point.
3. Subtract the lowest value from the highest to determine the range of
your data.
4. Divide this range into an odd number of equally sized categories
(known as classes). The key is to have categories/classes of equal
size, and have each data point fit in only one category. You can create these categories manually,
starting with your lowest value
(or a value close to it) and add-
ing the same amount
(approximately equal to your
range divided by the number of
categories) until you have in-
cluded your largest value.
Mark these categories on the x
(horizontal) axis.
5. Count the number of data
points in each category or class,
and mark the y (vertical) axis
with values to reflect the small-
est to largest number of data
points in the categories.
6. For each category on the x axis,
draw a bar to reflect the number
of data points in that category


For more information on constructing histograms and calculating classes, see Brassard and Ritter,
The Memory Jogger II.

Day Number of Dis-
satisfied Clients
(Events)
1 15
2 19
3 15
4 25
5 17
6 10
7 8
8 13
9 12
10 15
Histogram - Number of Events
0
1
2
3
4
5
6
7.5 to 11.5 11.5 to 15.5 15.5 to 19.5 19.5 to 23.5 23.5 to 27.5
Numbe r o f Ev e nt s
n=1
Tools for Organizational IMPROVEment
Innovation Insights #12
2006 The Pennsylvania State University
This material has been developed by and cannot be used or reproduced without permission of the Office of Planning and Institutional Assessment, Penn State University.
14
Run Cha rt - Numbe r o f Ev e nt s
0
5
10
15
20
25
30
1 2 3 4 5 6 7 8 9 10
Day
N
u
m
b
e
r

o
f

E
v
e
n
t
s
Data Points
Average
Run Chart: Display performance
over time to identify trends, pat-
terns, and variations; a line graph.
1. List your data points in chrono-
logical (time, day, month, etc.)
order.
2. Set up the x (horizontal) axis to
reflect chronological points
(time, day, etc.).
3. Set up the y (vertical) axis to
reflect the range of values of the
data points.
4. For each chronological point on
the x axis, plot the value of the
data point for that time or day
on the y axis.
Control Chart: Display of performance over time (run chart) that also contains up-
per and lower boundaries of expected performance, based on past performance,
within the system. The type of control chart you construct will be determined by the
type of data (attribute, such as number of errors, or variable, such as length of time)
and type of sample (fixed size or changeable). For more information on the different
types of control charts and how to construct them, see Brassard and Ritter, The
Memory Jogger II.
Tools for Organizational IMPROVEment
Innovation Insights #12
2006 The Pennsylvania State University
This material has been developed by and cannot be used or reproduced without permission of the Office of Planning and Institutional Assessment, Penn State University.
15




15
6/26/98
E:\USERS\HRDC\REPOSI~1\PROGRAM\CQI_001\ILLFISH2.AF3
Too many days to
complete request for
interlibrary loan
materials
Equipment Materials
Environment
Procedures
Lender
Delivery
Record keeping
Suppliers choices
Non-availability
Hard to find
Poor copy quality
Slow
Lack
Awkward
Policy
People
Levels
Training
Number
Verification
Time restrictions
Communication
Breakdowns
INTERLIBRARY LOAN ROOT CAUSES
too manysteps
paper files
reprocess unfilledrequests
don't use fastestsuppliers
over-dependence on
consortial relationships
priorities
limit quantity
of requests
request not forwarded
lack of policyinformation
lost inmail
wrongitem
not sent
incomplete
printing
computers
queuingfor
computers
not enough
computers
terminals
unavailable
equipment problems
printers down
systems down
systems don't communicate
systemfailure to sendrequests
request "lost"onsystem
not updatedsystem
heldupon computer
different work levels
jobassignments
helpwithnew
technology
staff training
incorrect citation
unable to verify
interruptions
vacationand
sick days
leaving
messages
can't reach
patron
not yet published
not circulating
superfiche
in use
too new
too manyplaces to search
resent
copyunreadable
copyunclear first time
rare/old
1. Brainstorm possible
causes (not solutions).
2. Group causes into cate-
gories. The most com-
mon categories used are:
People
Equipment
Procedures
Materials
Environment
Custom categories can be
developed to fit a specific
process.
3. Draw a fishbone diagram
(like the skeleton of a
fish, with the effect at the
head, a backbone, and
smaller bones).
4. Move causes identified
to the fishbone diagram.
Continually ask why
after each cause to deter-
mine root causes, and
use smaller bones to add
the answers to the dia-
gram.

Fishbone Diagram
Fishbone Diagram: A graphic display of categories of causes that could be leading to a particular result
or effect; relationship among the causes of the problem. Also known as a Cause and Effect or Ishi-
kawa diagram, or the Five Whys approach.
Tools for Organizational IMPROVEment
Innovation Insights #12
2006 The Pennsylvania State University
This material has been developed by and cannot be used or reproduced without permission of the Office of Planning and Institutional Assessment, Penn State University.
16
RESEARCH & DEVELOP POSSIBLE SOLUTIONS

TOOLS:
Benchmarking
Criteria Matrix
Multivoting

Your team should be able to identify more than one possible way to improve the process you are working
on. The key, once you have identified several possible options, is to evaluate and select the most effective
combination of options to arrive at the solution.

Questions to start your teams discussion

1. Identifying possible solutions
Is information missing or incorrect?
Are there unnecessary steps?
Does each step add value to the process?
Are any steps duplicated?
Are steps in logical sequence?
Are there unnecessary layers of approval?
Are there overlapping paper and electronic processes?
Is all paperwork necessary?
Are multiple people responsible for the same task?
Does the process take too much time?
Can you reduce wait time?
Do unnecessary complications or delays exist?
Where are the bottlenecksplaces where everything backs up or slows down?
Is there rework being done?
Can you provide a new or better product or service?

You may have answered some of these questions when you developed your baseline flowchart.
Improvements and innovations that are identified and implemented early in the analysis are called
low hanging fruit.
16
Tools for Organizational IMPROVEment
Innovation Insights #12
2006 The Pennsylvania State University
This material has been developed by and cannot be used or reproduced without permission of the Office of Planning and Institutional Assessment, Penn State University.
17
2. Evaluating your possible solutions
What are the potential benefits of the solutions?
What could go wrong with the solutions?
What are the projected costs?
Have you gathered ideas from others involved in the process about how it can be im-
proved?
Are the solutions based on what you have learned?
Do the solutions address the causes?
Have you thought about eliminating or redesigning some of the steps in the process?
Have you identified ways to try out each solution?
Will the improvement address customer concerns?


Benchmarking: Compare your processes, procedures, services, and products to similar ones at highly
successful organizations.

Data sources include:
Existing Public Information: television, newspapers, trade journals; internal experts and stud-
ies; conferences and seminars; external experts
New Information: searches and original research
Personal Contact: meet with organizational representatives and exchange information

Organizational sources include:
Internal: compare with similar units in your organization
Competitors: compare with similar organizations in the same sector
Functional: compare with different organizations in other fields performing the same function
Generic: compare to an organization with a process that has a similar activity

Tools for Organizational IMPROVEment
Innovation Insights #12
2006 The Pennsylvania State University
This material has been developed by and cannot be used or reproduced without permission of the Office of Planning and Institutional Assessment, Penn State University.
18
Criteria Matrix: Systematically determine the feasibility of and likelihood of implementation for each proposed
solution.




Multivoting: Prioritize or rank ideas.
1. Follow brainstorming procedure.
2. Examine posted ideas and combine similar items.
3. Assign each member a number of votes (often one third of the total number of items to be voted
upon).
4. Members assign their votes to their preferred items; group can decide whether to allow only one vote
per item, or allow multiple votes to be cast for one item.
5. Select items with the most votes.

If necessary, repeat steps three to five to narrow the list to a manageable number for further consideration.


1. Review all of the constraints and cri-
teria for the solution.
2. Develop additional Required and De-
sirable criteria.
3. Estimate costs for each alternative.
4. Construct matrix.
5. Complete matrix by evaluating each
possible solution in terms of each cri-
terion, using a 0 to 10 scale, +or -, or
another approach.
5. Calculate the final score for each al-
ternative.

Note: Only solutions or solution sets that
meet all the required criteria should be
recommended.


Criterion Solution 1 Solution 2 Solution 3
Glossy
brochure
Provide
breakfast/lunch
Presentation to
each unit head
Required
Cost <$2000 $2000

1
$5 per person
$4000 for 800
0
No $$ cost

10
Do by J une 6 6 6
<40 hours to
produce
80 hours

0
No significant
time
6
20 hours

4
Desirable
Flexible 0 6 6
Provide
customer
feedback

1


4

10
Total score 8 22 36
Cr i t er i a Mat r i x
Task: Increase enrollment in CQI programs
Tools for Organizational IMPROVEment
Innovation Insights #12
2006 The Pennsylvania State University
This material has been developed by and cannot be used or reproduced without permission of the Office of Planning and Institutional Assessment, Penn State University.
19
ORGANIZE & IMPLEMENT IMPROVEMENTS

TOOLS:
Gantt Chart
PERT Chart
Responsibility Matrix

Once recommendations are accepted by those with the resources and responsibility to implement them, a plan for
this implementation must be developed and executed. Essentially, the improvement project needs to be managed.

Definition
Project Management
A means to identify and commit resources (time, money, people, facilities, etc.) to achieve an outcome
within budget, on time, and within standards.
Questions to start your teams discussion
What steps need to be taken to implement the solutions and how long will they take?
Is there leadership support to move forward?
Are additional resources (e.g., money, staff, equipment) needed?
Is training needed?
Have the persons responsible for implementing the change given input about potential roadblocks or
barriers, or factors that will facilitate the implementation?
Has a communication plan been developed to inform all the stakeholders about the proposed changes
in the process?
What is the plan for monitoring the process once the change has been implemented?
Tools for Organizational IMPROVEment
Innovation Insights #12
2006 The Pennsylvania State University
This material has been developed by and cannot be used or reproduced without permission of the Office of Planning and Institutional Assessment, Penn State University.
20
Example
Use a Gantt chart and PERT chart to plan for increasing enrollment in CQI programs through presenta-
tions to unit heads.

Gantt Chart: Show concurrent and sequential tasks with minimum total time to complete the
project; a horizontal bar chart.

PERT (Program Evaluation and Review Technique) Chart: Show the critical path, the longest path
with essential steps; for projects with many interactive steps.



Responsibility Matrix: Assign responsibilities and set target dates for completion.


1. Write tasks or responsibilities to be
accomplished on the left side of the
matrix.
2. Along the top list the individuals,
groups and stakeholders involved.
3. Leave the last column to the right
for deadline dates.
4. Each task must have at least one
person or group assigned the
primary responsibility.
Responsibility Matrix
Task
Agenda
Notebooks
AV equipment
Tent cards
Roomsetup
Angela Tim J anice Susan May Date
=Primary =Secondary =Need to know
5/11
5/8
5/11
5/11
5/12
.
.
.
.
.
.
Tools for Organizational IMPROVEment
Innovation Insights #12
2006 The Pennsylvania State University
This material has been developed by and cannot be used or reproduced without permission of the Office of Planning and Institutional Assessment, Penn State University.
21

VERIFY & DOCUMENT RESULTS
TOOLS:
Histograms
Run Charts/Control Charts
Stakeholder Communication: Surveys, Interviews, and Focus Groups

Repeat the pre-improvement data collection to provide information for an after assessment to compare with
the before. Use this to design the next iteration or implement the pilot system-wide. Also use this data to
share the information about your teams accomplishments.







EVALUATE & PLAN FOR CONTINUOUS IMPROVEMENT
TOOLS:
Many of the previously listed tools

The opportunities for improvement don't end once your process has been improved. Change is continuous and
improvement needs to be continuous as well.

Questions to start your teams discussion
Now that you have a solution in place, how do you continue to evaluate and improve your
process?
Where are there other areas for improvement?
What lessons have been learned about process improvement?
How can you continue to utilize the skills developed by the team members?













Tools for Organizational IMPROVEment
Innovation Insights #12
2006 The Pennsylvania State University
This material has been developed by and cannot be used or reproduced without permission of the Office of Planning and Institutional Assessment, Penn State University.
22

RESOURCES

Bens, I. (1999). Facilitation at a Glance - A Pocket Guide of Tools & Techniques for Effective
Meeting Facilitation. Cincinnati, OH: Association of Quality and Participation/Sarasota, FL:
Participation Dynamics.

Brassard, M. (1989). The Memory Jogger Plus +. Methuen, MA: GOAL/QPC.

Brassard, M. and Ritter, D. (1994). The Memory Jogger II: A Pocket Guide of Tools for Con-
tinuous Improvement and Effective Planning. Salem, NH: GOAL/QPC.

Scholtes, P. R, J oiner, B., & Streibel, B. (1996). The Team Handbook: How to Use Teams to
Improve Quality (2
nd
ed.). Madison, WI: J oiner Associates Inc.

Scholtes, P.R. (1998). The Leaders Handbook. New York, NY: McGraw-Hill.

The Team Memory Jogger: A Pocket Guide for Team Members (1
st
ed., 1995). Madison, WI:
GOAL/QPC and Oriel, Inc.



For more information, contact the Office of Planning and Institutional Assessment at 814-
863-8721 or psupia@psu.edu, or visit our website: http://psu.edu/president/pia.

The services of the Office of Planning and Institutional Assessment are provided free of
charge to The Pennsylvania State University and are adapted to the specific needs of
departments or individuals.
Printed J anuary 2006

Você também pode gostar