SECTION PROJECT

SECTION -PROJECT
Clause No. PARTICULARS Page
No.
1.0 GENERAL 1
2.0 PROJECT DESCRIPTION 1
3.0 SCOPE 1
4.0 SCHEDULE OF QUANTITIES 2
5.0 BASIC REFERENCE DRAWINGS 3
6.0 ORDER OF PRECEDENCE OF DIFFERENT PARTS OF
TECHNICAL SPECIFICATION
3
7.0 SPARES 4
8.0 SPECIAL TOOLS AND TACKLES 4
9.0 FACILITIES TO BE PROVIDED BY THE OWNER 4
10.0
11.0
SPECIFIC REQUIREMENT
SPECIFIC EXCLUSIONS
4
5
ANNEXURE I LIST OF DRAWINGS 6
1
SECTION-PROJECT
1.0 GENERAL
1.1 Power Grid Corporation of India Ltd. (POWERGRID), Govt. of India Enterprise
is responsible for bulk Power transmission and distribution of electrical energy
from various Central Govt. Power Projects to various utilities/beneficiaries and
interconnecting regional grids, operating and maintaining the National electrical
grid of India. It is established with mandate of "Establishment and operation of
regional and national power grids to facilitate transfer of power within and
across the regions with reliability, security and economy on sound commercial
principles, as its mission.
1.2 POWERGRID is implementing Process Bus Technology with Integration of
Optical Current transformer at 400/220kV Bhiwadi S/s.
2.0 PROJECT DESCRIPTION
2.1 At present, Power Grid has adopted Substation Automation through Station Bus
Technology. In this scheme, Protection relays & Bay control devices (Bay level)
are connected to each other and to the substation gateway (Substation Level)
and local Human Machine Interface (HMI) through a communication network
known as Station Bus. Here, Point to point connection is provided between
various process equipments and Protection relays & Bay control devices.
2.2 To further enhance the system reliability & efficiency, POWERGRID is looking
for Process Bus Technology. Process Bus shall facilitate time critical
communication between Control & Protection system (Bay Level) to the primary
process equipment (Process Level). Data gathered at the Process Level shall
be sampled, digitalized, formatted and transmitted through the process bus LAN
to Bay/Unit Level.
2.3 Fibre Optic Ethernet link shall be provided for communication between Bay
Level & Process level.
2.4 In the proposed scheme, all the input signals which are extended to the existing
protection scheme shall be duplicated. No tripping would be extended from the
proposed scheme. Parallel meter shall assess the accuracy of metering
thorough Optical Current Transformer.
3.0 SCOPE
3.1 Design, Engineering, Manufacturing, Testing, Supply, Storage & handing,
Erection and commissioning of
A. 1 no. Pilot Bay consisting of
i. 400kV Optical Current Transformer alongwith necessary support
insulators, structures etc.
Y:\Process Bus\Pilot Project\01-Section project_rev00.doc
2
ii. C&R Panel and HMI: Electronic & Protection panel with IEC 61850
compatible Distance Protection Relay with Ethernet module to accept
inputs from merging unit along with HMI PC
iii. Merging Unit
iv. Cable management box
v. All Power & Control cables and Cable terminations
vi. All Communication cables including Fibre optic cables
vii. Installation hardware equipment, connectors, jumpers, spacers,
grounding material etc. required for pilot bay.
3.2 Civil Works - The scope of work shall include but shall not be limited to the
following based on Owner supplied drawings to be provided during detailed
engineering:-
i. Foundation for Optical Current Transformer
ii. Foundation of BPI
iii. Cable Trench/other miscellaneous works required for installation of the
proposed system
3.3 POWERGRID SCOPE: POWERGRID shall provide the meter of the same
make as their existing meter (at Bhiwadi S/s) and integration of the same with
the existing metering workstation.
4.0 SCHEDULE OF QUANTITIES
The requirement of various items/equipments and civil works are indicated in
Bid price Schedules.
All equipments/items and civil works for which bill of quantity has been indicated
in BPS (Bid price Schedules) shall be payable on unit rate basis. During actual
execution, any variation in such quantities shall be paid based on the unit rate
under each item incorporated in Letter of award.
Wherever the quantities of items/works are not indicated, the bidder is required
to estimate the quantity required for entire execution and completion of works
and incorporate their price in respective Bid price schedules. For erection
hardware items, Bidders shall estimate the total requirement of the works and
indicate module-wise lump sum price bay wise and include the same in relevant
Bid price schedules. For module identification, Bidder may refer typical drawings
enclosed with the specifications. Any material/works for the modules not
specifically mentioned in the description in BPS, as may be required shall be
deemed to be included in the module itself.
Y:\Process Bus\Pilot Project\01-Section project_rev00.doc
3
Bidder should include all such items in the bid proposal sheets, which are not
specifically mentioned but are essential for the execution of the contract. Item
which explicitly may not appear in various schedules and required for successful
commissioning of substation shall be included in the bid price and shall be
provided at no extra cost to Owner.
5.0 BASIC REFERENCE DRAWINGS
5.1 Single line diagram and general arrangements are enclosed with the bid
documents for reference at Annexure-I, which shall be further engineered by the
bidder. The bidder shall maintain phase to earth clearance, phase to phase
clearance and sectional clearances as per IE rules.
5.2 The enclosed drawings give the basic scheme, layout of substation, proposed
scheme. In case of any discrepancy between the drawings and text of
specification, the requirements of text shall prevail in general. However, the
Bidder is advised to get these clarified from Owner.
6.0 ORDER OF PRECEDENCE OF DIFFERENT PARTS OF TECHNICAL
SPECIFICATION
For the purpose of present scope of work, technical specification shall consist of
following parts and they should be read in conjunction with each other.
1. Section : Project Rev 00
2. Section : General technical Requirement Rev 12
3. Section : Power & Control Cable Rev 05
4. Section : Switchyard Erection Rev 07
5. Section : Structure Rev 04
6. Section Civil Works Rev 07
7. Section : Control & Relay Panels for
Process Bus Technology
Rev 00
8. Section : Substation Automation System Rev 03
In case of any discrepancy between Section-PROJECT, Section-GTR and other
technical specifications on scope of works, Section-PROJECT shall prevail over
all other sections.
In case of any discrepancy between Section-GTR and individual sections for
various equipments, requirement of individual equipment section shall prevail.
7.0 SPARES
Y:\Process Bus\Pilot Project\01-Section project_rev00.doc
4
Mandatory Spares
The Mandatory Spares shall be included in the bid proposal by the bidder. The
prices of these spares shall be given by the Bidder in the relevant schedule of
BPS and shall be considered for evaluation of bid. It shall not be binding on the
Owner to procure all of these mandatory spares.
The bidder is clarified that no mandatory spares shall be used during the
commissioning of the equipment. Any spares required for commissioning
purpose shall be arranged by the Contractor. The unutilized spares if any
brought for commissioning purpose shall be taken back by the contractor.
8.0 SPECIAL TOOLS AND TACKLE
The bidder shall include in his proposal the deployment of all special tools and
tackles required for erection, testing, commissioning and maintenance of
equipment. The special tools and tackles shall only cover items which are
specifically required for the equipment offered and are proprietary in nature.
However a list of all such devices should be indicated in the relevant schedule
provided in the BPS. In addition to this the Contractor shall also furnish a list of
special tools and tackles for the various equipment in a manner to be referred
by the Employer during the operation of these equipment. The scope of
special tools and tackles are to be decided during detail engineering and the list
of special tools and tackles, if any shall be finalized.
9.0 FACILITIES TO BE PROVIDED BY THE OWNER
9.1 Owner shall make available the auxiliary power supply on chargeable basis at a
single point in the Sub-station. All further distribution from the same for
construction and permanent auxiliary supply shall be made by the contractor.
However, in case of failure of power due to any unavoidable circumstances, the
contractor shall make his own necessary arrangements like diesel generator
sets etc. at his own cost so that progress of work is not affected and Owner
shall in no case be responsible for any delay in works because of non-
availability of power.
9.2 Owner shall make available construction water supply at a single point in the
substation. All further distribution for the same shall be made by the Contractor.
In case of non-availability or inadequate availability of water for construction
work, the contractor shall make his own arrangement at his own cost and the
Owner shall in no case be responsible for any delay in works because of non-
availability or inadequate availability of water.
10.0 SPECIFIC REQUIREMENT
10.1 The Bidders are advised to visit Sub-stations site and acquaint themselves with
the topography, infrastructure, etc.
10.2 The bidder shall be responsible for safety of human and equipment during the
working. It will be the responsibility of the Contractor to co-ordinate and obtain
Y:\Process Bus\Pilot Project\01-Section project_rev00.doc
5
Electrical Inspectors clearance before commissioning. Any additional items,
modification due to observation of such statutory authorities shall be provided
by the Contractor at no extra cost to the Owner.
10.3 The Relay protection panels shall be placed in switchyard panel room (AC
Kiosk). The existing panel room (AC Kiosk) shall be used to house Relay
protection panels in switchyard. The architecture drawing & details of above
switchyard panel room is enclosed at AnnexureI of section project of technical
specification.
10.4 Erection and commissioning of 1 no. pilot bay consisting optical current
transformer. Erection, testing & commissioning of Control and protection Panels
shall be done by the contractors under the supervision of respective equipment
manufacturers. Charges for the above supervision shall be included by the
bidder in the erection charges for the respective equipment in the BPS.
10.5 In Section GTR and other Technical specifications, the term Purchaser and/or
Employer may be read as Owner.
10.6 The manufacturer(s) whose optical CTs are offered should have designed,
manufactured, tested as per IEC/IS or equivalent standard and supplied the
same for the 220kV or above system voltage and which are in satisfactory
operation for at least 1 (one) year as on the date of bid opening.
11.0 SPECIFIC EXCLUSIONS
The following clauses of specification for C&R panel (for automated sub-station)
are excluded for this project:
10.10.2 Back-up Directional Over Current and Earth fault protection scheme
11.0 Circuit Breaker Protection
12.0 Line Over Voltage Protection Relay
13.0 Reactor Protection
14.0 Transformer Protection
15.0 TEE Protection Differential Relay
16.0 Tripping Relay
17.0 DC Supply Supervision Relay
18.0 Bus Bar Protection
20.0 Disturbance Recording
21.0 Distance to Fault Locator
23.0 Relay Test Kit
Y:\Process Bus\Pilot Project\01-Section project_rev00.doc
6
24.0 Type Tests
25.0 Configuration of Relay and Protection Panels
27.0 Tropicalization
28.0 Monitoring, Control & Protection for Auxiliary Transformer
Y:\Process Bus\Pilot Project\01-Section project_rev00.doc
7
Annexure-I
LIST OF DRAWINGS
S. No. TITLE
1. Single Line diagram of 400/220kV Bhiwadi S/s.
2. Substation Layout of 400/220kV Bhiwadi S/s.
3. Proposed Scheme for Implementation of Process Bus Technology
4. Switchyard Panel Room of 400/220kV Bhiwadi S/s
Y:\Process Bus\Pilot Project\01-Section project_rev00.doc
8
Annexure-I
Y:\Process Bus\Pilot Project\01-Section project_rev00.doc
9
Bhiwadi S/s Layout
Proposed
NCIT
Y:\Process Bus\Pilot Project\01-Section project_rev00.doc
10
Proposed Scheme