Você está na página 1de 11

1 Rev Separation Cell Function

2
3
4
5
6
7
8
9
10
11 Listed P&IDs define the Primary Separation Cell function:
12
13
14
15
16
17 Listed drawings define the Primary Separation Cell configuration:
18
19
20
21
22
23
24
25 Inlet Streams Summer Spring / Fall Winter
26 Source HMB IFD Low grade Average grade High Fine grade
27 Feed flow t/h
28 Feed flow m
3
/h
29 Feed composition:
1 Bitumen wt%
2 Water wt%
Client:
DATA SHEET
Project:
SEPARATION CELL
Plant/Area: Equip. No:
WO #: Equip. Name:
Rev: 0
ADL Doc. No: ENG-DAT-000406
Page 1 of 11
Client:
DATA SHEET
Project:
SEPARATION CELL
Plant/Area: Equip. No:
WO #: Equip. Name:
Rev: 0
ADL Doc. No: ENG-DAT-000406
3 Solids > 44 m wt%
4 Solids 44 m wt%
5 Air wt%
6 Feed pH
7 Feed solids D50 (Note 14)
8 Feed SG (air free)
9 Bitumen in feed SG
10 Water in feed SG
11 Solids in feed SG
12 Feed temperature C
13 Under wash flow t/h
14 Under wash flow m
3
/h
15 Under wash composition:
16 Water wt%
17 Solids 44 m wt%
18 Under wash SG
19 Under wash temperature C
20 Middlings displacement flow t/h
21 Middlings displacement flow m
3
/h
22 Middlings displacement composition:
23 Bitumen wt%
24 Water wt%
25 Solids > 44 m wt%
26 Solids 44 m wt%
27 Middlings displacement SG
28 Middlings displacement temp. C
Page 2 of 11
Client:
DATA SHEET
Project:
SEPARATION CELL
Plant/Area: Equip. No:
WO #: Equip. Name:
Rev: 0
ADL Doc. No: ENG-DAT-000406
1 Outlet Streams Summer Spring / Fall Winter
2 Source HMB IFD Low grade Average grade High Fine grade
3 PSC froth flow t/h
4 PSC froth flow m
3
/h
5 PSC froth composition
6 Bitumen wt%
7 Water wt%
8 Solids > 44 mm wt%
9 Solids 44 mm wt%
10 PSC froth SG
11 PSC froth temperature C
12 Middlings flow t/h
13 Middlings flow m
3
/h
14 Middlings composition:
15 Bitumen wt%
16 Water wt%
17 Solids > 44 m wt%
18 Solids 44 m wt%
19 Middlings SG
20 Middlings temperature C
21 Tailings flow t/h
22 Tailings flow m
3
/h
23 Tailings composition:
24 Bitumen wt%
25 Water wt%
26 Solids > 44 m wt%
27 Solids 44 m wt%
28 Tailings SG
29 Tailings temperature C
Page 3 of 11
Client:
DATA SHEET
Project:
SEPARATION CELL
Plant/Area: Equip. No:
WO #: Equip. Name:
Rev: 0
ADL Doc. No: ENG-DAT-000406
1 PSC Part Design Code Remarks
2 Tag number
3 Quantity
4 Governing PSC specification
5 Roof design code
6
7 Roof and support structure
8 Cylindrical Shell
9 Launder Shell
10 Bottom
11 Sump Shell
12 Flange, Blind
13 Cone design code Upper
14
15 Lower
16 Support Ring
17
18
19
20 Support Structure
21 Nozzles
22 Platforms
23 Other design
24 Vent design code
25 Lift / support lug safety factor 5 X
26 PSC geometry
27 Location
28 Site specific data
29 Fluid
1 Erosive constituents
2 Corrosive constituents
Page 4 of 11
Client:
DATA SHEET
Project:
SEPARATION CELL
Plant/Area: Equip. No:
WO #: Equip. Name:
Rev: 0
ADL Doc. No: ENG-DAT-000406
3 Operating: (Note 13)
4 Volume m
3
5 Temperature C
6 Pressure kPag
7 SG (Note 15)
8 Design:
9 Maximum DMT C
10
11 Maximum DMT C
12 Maximum DMT C
13 Maximum DMT C
14 Minimum DMT C
15 Minimum DMT C
16 Minimum DMT C
17 Minimum DMT C
18 Pressure kPag
19 Deposition in cone SG
20 Deposition in shell SG
21 Deposition in launder SG
22
23 Minimum acceptable clearance between bottom of launder and internal stiffeners is as follows:
24
25 mm
26 mm
27 mm
28 mm
29 Asymmetrical load
1
2
3 Hydrostatic Test:
4 Pressure kPag
Page 5 of 11
Client:
DATA SHEET
Project:
SEPARATION CELL
Plant/Area: Equip. No:
WO #: Equip. Name:
Rev: 0
ADL Doc. No: ENG-DAT-000406
5 Fluid
6 Maximum in flow std. m
3
/h
7 Maximum out flow std. m
3
/h
8 Maximum fill time not to exceed
9 Connections
10 Allowable connection loads
11 Appurtenances:
12 Feed pipe
13 Feed pipe break flanges
14 Feed pipe support system
15 Feed pipe maintenance walkway on both sides of feed pipe
16 Feed well removable cover
17 Feed well extraction lugs
18 Feed well roof load ring
19 Feed well suspension rods
20 Feed well
21 Feed well lifting lugs
22 Feed well tailing lugs
23 Feed well distributor
24 Self supporting vent stack for N14 A/B
25 Self supporting vent stack for N15
26 Underwash distribution
27 Underwash distribution support system
28 Sight glass flush
29 Sight glass flush support system
1 Middlings collection
2 Middlings collection support system
3 Launder internal stiffeners
4 Overflow box
5 Launder insulation support system
6 Sump insulation support system
Page 6 of 11
Client:
DATA SHEET
Project:
SEPARATION CELL
Plant/Area: Equip. No:
WO #: Equip. Name:
Rev: 0
ADL Doc. No: ENG-DAT-000406
7 Start-up insulation support system
8 Grounding lugs
9 PSC nameplate
10 Feed well nameplate
11 Cable tray
12 Cable tray support system
13 Roof platforms and stairways
14 Cone density platforms
15 Middlings displacement platform
16 Cone flush platform
17 M2 platform
18 Sightglass enclosure
19 Platforms at nozzles
20 Stairways
21 Ladders
22 Structural, platforms, walkways, ladders and stairs:
23 Design specification
24 Design specification
25 Design specification
26 General Notes
27 General Notes
28 Stair standard drawing
29 Handrail standard drawing
1 Ladder standard drawing
2 Corrosion allowance (CA) :
3 Sump mm
4 Cone mm
5 Cylindrical shell mm
6 Launder walls mm
7 Launder stiffeners mm
8 Overflow box mm
Page 7 of 11
Client:
DATA SHEET
Project:
SEPARATION CELL
Plant/Area: Equip. No:
WO #: Equip. Name:
Rev: 0
ADL Doc. No: ENG-DAT-000406
9 Feed well shell mm
10 Roof mm
11 Support ring mm
12 Column supports mm
13 Column braces mm
14 Internal protection:
15 Tailings outlet N9&10
16 Dump N11
17 Sump drain N12
18 Sump
19 Cone flush N7
20 Cone, bottom portion
21 Midds displacement deflector
22 Middlings displacement patch
23 Cone
24 Cone density deflector
25 Cone density wear patch
26 Cone, above wear lining
27 Cylindrical Shell
28 Middlings withdrawal holes
29 Roof underside
1 Feed pipe
2 Feed well inlet nozzle
3 Feed well shell
4 Feed well discharge nozzle
5 Feed well distributor
6 Exterior painting:
7 Ladders, cages and handrails
8 Under insulation
9 Insulation:
10 Launder
Page 8 of 11
Client:
DATA SHEET
Project:
SEPARATION CELL
Plant/Area: Equip. No:
WO #: Equip. Name:
Rev: 0
ADL Doc. No: ENG-DAT-000406
11 Sump
12 Start-up requirements
13 Earthquake design
14 Column bracing
15 Baseplate grouting
16 Grout type
17 Foundation type
18 Construction Data Remarks
19 Contractor
20 Contractor engineering location(s)
21 Contractor manufacturing location(s)
22 Construction:
23 Sump
24 Cone
25 Cylindrical shell
26 Launder
27 Launder stiffeners
28 Overflow box
29 Feed well shell
1 Roof
2 Nozzle flange
3 Nozzle neck
4 Nozzle reinforcement
5 Sight glass insert
6 Stud
7 Nut
8 Gasket
9 Support ring
10 Column supports
11 Column braces
12 Feed pipe
Page 9 of 11
Client:
DATA SHEET
Project:
SEPARATION CELL
Plant/Area: Equip. No:
WO #: Equip. Name:
Rev: 0
ADL Doc. No: ENG-DAT-000406
13 Under wash distribution
14 Downcomer
15 Sight glass flush
16 Middlings collection
17 PWHT
18 NDE welding
19 Piping Welding
20 Leak test:
21 Roof
22 Shell
23 Dimensional tolerances specified in API 650 are acceptable with the following exceptions:
24
25
26 Structural design:
27 Overturning moment kN
28 Shear force kN
29 Live loads kN
1 Dynamic loads kN
2 Weight:
3 Empty kg
4 Operating kg
5 Sanded kg
6 Full of water kg
7 Column baseplate configuration
8 Notes:
9
10
11
12
13
14
Page 10 of 11
Client:
DATA SHEET
Project:
SEPARATION CELL
Plant/Area: Equip. No:
WO #: Equip. Name:
Rev: 0
ADL Doc. No: ENG-DAT-000406
REVISION LOG
REV: DESCRIPTION DATE BY CHK'D APP'D
Page 11 of 11

Você também pode gostar