SCHEDULE OF FINDINGS PS-18031&18032-FF-R1-2011-02-16-DNSTP Page 1 of 2
Proposed Development: PROPOSED DOHA NORTH SEWERAGE TREATMENT & ASSOCIATED WORKS FOR ASHGHAL INFRASTRUCTURE AFFAIRS Permit ID No. 18031/ 18032 FF Location: NEW INDUSTRIAL AREA ASCO CONSULTING ENGINEERS Review: 02 Item Non-Compliance / Directions Remarks 1.0 GENERAL: 1.1 Copy of Approved Building Plans for this development shall be submitted. 1.2 Hazards of contents and processes shall be classified by the Registered Design Professional (RDP) or owner and submitted to QCDD for review and approval on the basis of the character of the contents and the processes or operations conducted in the building or structure. These shall be kept in the drawings. The type of required fire protection system is dependent on the contents of the building. Essentials 1.3 Submit copy of approved plan (from WOQOD) for the installation of LPG tanks near Dried Sludge Treatment Switch Room. Clarify why fire suppression system were not installed in the LPG Gas Tank Area. For this case, high risk analysis report shall be submitted.
1.4 Uploaded drawing shall have file name or drawing title to enable us to navigate through the drawings easier and quicker especially on large complex building and structures.
1.5 Delete the Fire Protection System in the drawing title and replace it with FIRE FIGHTING PLAN. QCD 2 FIRE PROTECTION PLAN: 2.1 FIRE FIGHTING: 2.1.1 QCD FSS 6.7 requires that all fire pumps installations must be designed to operate under the conditions of loss of primary power source and mechanical failure. A fire pump installation comprising a duty electric motor driven pump with a standby diesel engine driven pump is deemed to satisfy this requirement. Fire pump configuration for this case shall be revised. Please show the location of the fire pump room in the site plan and provide a separate drawing layout for such fire pumpset to indicate the capacity, ratings, listing and components as required in NFPA 20 and QCD approval. QCD 2.1.2 In DWG K654_402_02_0014_0_DC2, please include the necessary details as specified in QCD FSS 2.10 Fire Protection Water Supplies, show the calculation for the effective capacity of the fire water storage tank. Please furnish also sectional and elevation plan with dimensions to demonstrate the effective capacity of fire water storage tank in accordance with NFPA Standards and to satisfy QCD approval. Please submit this revised drawing for verification. QCD / NFPA 2.1.3 For sprinkler system protected facilities, please indicate in all related drawings the necessary details specified in Chapter 22 of NFPA 13 to satisfy your design and QCD approval. Please provide and show in the drawings the details indicated in Item 22.1.3 in NFPA 13 to satisfy QCD approval. NFPA CIVIL DEFENCE DEPARTMENT MINISTRY OF INTERIOR, QATAR SCHEDULE OF FINDINGS PS-18031&18032-FF-R1-2011-02-16-DNSTP Page 2 of 2
Proposed Development: PROPOSED DOHA NORTH SEWERAGE TREATMENT & ASSOCIATED WORKS FOR ASHGHAL INFRASTRUCTURE AFFAIRS Permit ID No. 18031/ 18032 FF Location: NEW INDUSTRIAL AREA ASCO CONSULTING ENGINEERS Review: 02 Item Non-Compliance / Directions Remarks 2.1.4 Hydraulic calculation to verify fire pump capacity and water requirements of the system shall be submitted. Please consider the following in selecting the flow and pressure requirements: a. The minimum flow and pressure requirements for private fire hydrants shall be in accordance with QCD FSS 4.4. Calculation for the pressure requirements for most remote hydrants shall be submitted. b. Calculation for the pressure requirements for most remote area of sprinkler and most remote hose reel in workers accommodation shall be submitted also. c. Submit also hydraulic calculation for water demand and pressure requirements of sprinklers in dried sludge storage building. Please submit design criteria for this calculation. d. Isometric diagram with node number and necessary dimensions to support the calculations shall be shown.
2.1.5 For sprinkler protected warehouse, please provide the section elevation details of the roof orientation incorporating the location of the sprinkler system and showing the storage rack arrangement to fully understand the design and comply with NFPA 13. Not submitted, please provide. NFPA 2.1.6 Isolating control valves/indicating valves shall be provided with supervisory switches connected to fire alarm control panel. All valves controlling connections to water supplies and supply to sprinkler pipes shall be listed indicating valves. Please indicate on drawings that type of gate valves utilized for the firefighting system must be OS&Y type. Please show/indicate this in the site plan drawing layout.
2.1.7 Emergency generators located within main plant structures should be protected by automatic sprinkler, water spray, foam-water sprinkler, or gaseous-type extinguishing systems in accordance with Item 29.3.5.1.3 of NFPA 5000 and NFPA 850 respectively.
2.1.8 Substations and switchyards located at the generating facility and utilizing combustible oilfilled equipment should be protected by the yard fire hydrant system. Provide fire hydrant near Substation H. NFPA 2.1.9 In DWG K654_406_02_4024_0_DC2, Fire Hose Reel(FHR) must be located in close proximity to the entrance/exit door and such that the coverage of each FHR must be no more than 30M excluding its throw. Please revise accordingly. Not submitted, please provide. QCD 2.1.10 In DWG K654_406_02_4024_0_DC2, please indicate the type of cooking equipment used in the Kitchen Area. Kitchen equipment using deep fryer and hot plate must be provided with adequate kitchen suppression system, please verify accordingly. Not submitted, please provide NFPA / QCD 16 FEBRUARY , 2011