Você está na página 1de 47

English

ENGINEERING
CONSTRUCTION
CIVIL WORKS
MAINTENANCE MAINTENANCE
INVESTIGATION
2
AREMA is a group of professionals who are
striving to improve the environment through
high quality well-executed projects high quality, well-executed projects.
Use of the latest technology, our own
research, environmental quality and
management systems, continual training,
commitment to internationalization, dealing
personally with our clients and responding
quickly to their needs all form part of our quickly to their needs all form part of our
formula for success.
We hope that we will have an opportunity to p pp y
work with you on the exciting challenge of
preserving our surroundings.
3
INDEX
The Company
INDEX
p y
Field of performance
Products Products
Technology
References References
Contact information and
branch offices branch offices
4
THE COMPANY
Company specializing in designing,
THE COMPANY
p y p g g g
constructing and running water treatment
plants.
P f l l f d d ff
General Information
Professionals qualified in many different
fields with extensive knowledge and solid
experience.
Experience in producing urban and
industrial water treatment plants,
drinking-water installations, recycling g y g
water and desalinisation.
Founded in 1995, the company has
d l d h 600 developed more than 600 projects in
Spain, the rest of Europe, America and
Africa.
Certified to be contracted for state
projects.
5
THE COMPANY
Commitments
To use of the latest environmental technology.
To look for ways to save and to recycle, and for energy
efficiency.
To find the best long-term solutions.
To guarantee the solutions proposed.
6
THE COMPANY THE COMPANY
Category awarded by the Spanish Ministry of Economics and Treasury Category awarded by the Spanish Ministry of Economics and Treasury
Group K: Miscellaneous p
K-8 E: Design & Construction in Water Treatment Plants.
G O C ti d i t f t Group O: Conservation and maintenance of property.
O-4 D: Conservation an comprehensive maintenance of water installations.
Group E: Hydraulics
E-1 E: Supply and plumbing.
E 4 E Di h d d i E-4 E: Ditches and drainage.
E-5 E: River banks and channelling defences.
E-7 E: Non-specific hydraulic projects.
7
THE COMPANY THE COMPANY
Category awarded by the Spanish Ministry of Economics and Treasury Category awarded by the Spanish Ministry of Economics and Treasury
Group I: Electrical installations
I-1 B: Lighting and illumination.
I-5 C: High voltage transformation and distribution centres. g g
I-6 D: Low voltage distribution.
I-8 C: Electronic installations.
I-9 D: Non-specific electrical installations I-9 D: Non-specific electrical installations.
G J M h i l i t ll ti Group J: Mechanical installations
J-5 D: Non-specific mechanical installations.
8
THE COMPANY THE COMPANY
Certifications
EUROPEAN QUALITY ASSURANCE
Quality Management
S t Q lifi ti
EUROPEAN QUALITY ASSURANCE
System Qualification
UNE - EN - ISO 9001
7583 - E
Enviromental Management
SystemQualification SystemQualification
UNE - EN - ISO 14001
7583 - E
Health & Safety Management
S t Q lifi ti System Qualification
OHSAS 18001
7583 - E
9
FIELD OF PERFORMANCE FIELD OF PERFORMANCE
EEngineering
We offer our experience to
organizations wanting to develop water-
related projects. p j
We have thorough knowledge of the
bl d h h d problems associated with the product,
with the market and with the latest
trends in technology.
We are not connected to a manufacturer,
ff i d d t d i i so we can offer independent advice in
our clients best interests.
10
FIELD OF PERFORMANCE FIELD OF PERFORMANCE
P M Project Management
Selection of equipments and management of purchasing.
Development of civil works. Development of civil works.
Production of control programmes.
Assembly and start-up.
Comprehensive management of projects, with extensive p g p j ,
experience in international turn-key projects.
11
FIELD OF PERFORMANCE FIELD OF PERFORMANCE
C l k Civil works
Carrying out civil works
Our own fleet of machinery
Option for the client
to supervise the civil
work if they prefer work if they prefer
12
FIELD OF PERFORMANCE FIELD OF PERFORMANCE
MMaintenance
Maintenance of
installations, including
those not built by
AREMA
Ongoing advisory
support.
Training programmes for
operating personnel.
AREMA.
13
FIELD OF PERFORMANCE FIELD OF PERFORMANCE
R h Research
Development of our own products through:
Research + Development + Innovation
(R+D+i).
Participation in programmes organized by the
Centro para el Desarrollo Tecnolgico Industrial
(Centre for Industrial Technological
Development).
Incorporation of new technology and on-going
staff training.
14
PRODUCTS PRODUCTS
Regeneration of urban water
Pioneer in EU to the Project for the Pioneer in EU to the Project for the
Regeneration of Urban Waste Water to
refill the water table and combat salt
water intrusion in aquifer water intrusion in aquifer.
Regeneration of 20.000 m
3
/day. g y
15
PRODUCTS PRODUCTS
Regeneration of industrial water
Carried out one of the biggest textile
industrial water regeneration project
i E in Europe.
Regeneration of 12.500 m
3
/day.
I ll i hi h di Installation which treats dirty water so
it can be reused, using a tertiary
treatment which comprises sand
f l l f l d filtration, ultra-filtration and reverse
osmosis.
Re-use of industrial water to preserve
the Tordera River.
16
PRODUCTS PRODUCTS
Desalinisation
Desalinisation Socit Algerienne du
Chlore (Soachlore) Algeria
17
Chlore (Soachlore) Algeria.
Producing ultra-pure water.
Agullana Lmits de la Jonquera
PRODUCTS
Waste-water treatment plants for small towns
Castellar de NHug Tous
18
Vilalba Artesa de Segre
PRODUCTS
Waste-water treatment plants for medium-sized towns
Deltebre Asc
19
La Unin Santa Maria de Palautordera
PRODUCTS
Waste-water treatment plants for large towns
La Roda Piedras Negras (Mexico)
20
Meat industry Food industry
PRODUCTS
Industrial water treatment plants
Hydrocarbon recovery services Slaughter house y y g
21
PRODUCTS PRODUCTS
Hydraulic projects Hydraulic projects
Construction of the new pump station for
the waste-water treatment plant in Igualada
(Barcelona)
Increase in capacity to 3.000 m
3
/hour (72.000
m3/day.)
22
PRODUCTS PRODUCTS
Drinking water supply and pipes Drinking water supply and pipes
Sector Barcelona Sector El Prat
Construction of the second phase of the hydraulic barrier to combat salt water
intrusion in the Delta de Llobregat, production, transport and injection wells.
The treatment process comprises micro-filtration, ultra-filtration, reverse osmosis
and ultra violet disinfection.
Th i ll i i i 20 000
3
/d
23
The installations treatment capacity is 20.000 m
3
/day.
PRODUCTS
Transportation of water from the waste-
PRODUCTS
Drinking water supply and pipes
Transportation of water from the waste-
water treatment plant in Prat de
Llobregat, regenerated by the tertiary
treatment, to be injected into the Delta
Drinking water supply and pipes
, j
de Llobregat water table.
Construction of 11 injection wells, each
72 metres deep.
Installation of 10 km of high-density
l h l b 200 d 400 polyethylene piping, between 200 and 400
mm in diameter.
C t ti f 16 lti t i Construction of 16 multi-parametric
control piezometres to transmit data
immediately.
12 horizontal tunnels excavated by
remote-control, measuring between 160
and 400 mm in diameter, totalling 2,153 and 400 mm in diameter, totalling 2,153
metres.
800 m long tunnel passed under the River
24
g p
Llobregat.
TECHNOLOGY TECHNOLOGY
Design criteria Design criteria
High efficiency systems using diffusers High efficiency systems using diffusers.
Reduction of hydraulic losses.
Elimination of nutrients in the biological tank,
controlled with O
2
and Rx probes. controlled with O
2
and Rx probes.
Reduction in civil works through not using
anoxyc chambers anoxyc chambers.
25
TECHNOLOGY TECHNOLOGY
C l S Control Systems
Complete control of the process
through probes and PLC, and our
own design of control g
programmes.
System of alarm management, System of alarm management,
sending text messages and pre-
recorded messages.
System of graphic control, like
Scada, and maintenance reports.
Telemetric systems to send
information by GSM, integration
with existing centralized systems with existing centralized systems.
26
TECHNOLOGY TECHNOLOGY
Waste water treatment plants for small towns of less than 5 000 inhabitants
Construction of settling tanks using our own
PRVF moulds with diameters between 2 30 m and
Waste-water treatment plants for small towns of less than 5,000 inhabitants
PRVF moulds with diameters between 2.30 m and
9.00 m, with a 56 slope and a polished finish
inside, and the option of stainless steel cones.
Technology sufficient for installations in towns of
up to 5,000 inhabitants, with the possibility to
install two cones in the same tank.
Very compact installations which can be round,
square or oval.
Elimination of nutrients in the tank, controlled by
O
2
and Rx probes.
Reduction in civil works which are only necessary Reduction in civil works, which are only necessary
for the biological tank.
High energy efficiency and low consumption.
27
Totally automatic.
TECHNOLOGY TECHNOLOGY
Technology to eliminate nitrates from drinking water supplies Technology to eliminate nitrates from drinking water supplies
We represent K-Nord , which produces the technology to eliminate nitrates p p gy
from drinking water supplies.
Technology to eliminate nitrates through biological systems.
Low costs compared with other technology: 0,12 /m
3
(RO, EDR, EDI, etc.).
Quick supply.
Easy maintenance. y
Easy to transport.
Minimal civil works.
28
TECHNOLOGY TECHNOLOGY
Biological compact plant with mobile bed Biological compact plant with mobile bed
C i i 40 f hi i i f 1 000 i h bi Capacity to treat water in a 40 feet shipping container for 1,000 inhabitants.
Technology based on the development of biofilms on plastic supports.
Operates on large quantities of biological contaminants.
Low energy consumption. Low energy consumption.
Easy maintenance.
Easy to transport.
Minimal civil works.
No odours.
Compact and modular
29
Compact and modular.
REFERENCES REFERENCES
Finished projects
Project Contracted by Developed in Starting date
Completion
date
Observations
Riudarenes Construcciones Rubau Girona 09/1995 05/1996 WWTP with extended aeration
El Sosiego FCC Barcelona 11/1995 02/1996 WWTP with extended aeration
Procsa Zunfer Pontevedra 12/1995 04/1996 WWTP with extended aeration
Velilla del Rio Carrin Sato Palencia 01/1996 02/1997 WWTP with extended aeration
Consell Sato Balearic Islands 03/1996 02/1997
WWTP with extended aeration and sludge
treatment
Ecoimsa Ecoimsa Barcelona 06/1996 08/1996
WWTP with extended aeration and
physical-chemical treatment p y
Enguera Egevasa Valencia 06/1996 03/1998
WWTP with extended aeration and sludge
treatment
Slautherhouse in Barbastro
Gines Navarro
Construcciones
Huesca 07/1996 07/1996 WWTP with extended aeration
Construcciones
Dodro Corsan Pontevedra 09/1996 10/1996 WWTP with extended aeration
Els Muntells Elsan Tarragona 10/1996 02/1997 WWTP with extended aeration
30
Els Muntells Elsan Tarragona 10/1996 02/1997 WWTP with extended aeration
REFERENCES REFERENCES
Finished projects
Project Contracted by Developed in Starting date
Completion
date
Observations
Enlargement of Telde Canaragua Las Palmas 02/1997 04/1997 WWTP with extended aeration
Pinofranqueado OCP Cceres 02/1997 08/1997 Drinking water plant
La Goba Copcambra Girona 03/1997 09/1997 WWTP with extended aeration
Bussot Lubasa Alicante 04/1997 05/1997
WWTP with biological treatment, bio-
cylinders and treatment of sludge
Ceramica Saloni Becsa Castelln 05/1997 08/1997 WWTP compact
Soriguerola Junta Plan Soriguerola Girona 06/1997 11/1997 WWTP with extended aeration
Congelados y Derivados,
S.A.
Congelados y Derivados,
S.A.
Len 09/1997 04/1998 Reverse osmosis
Oliva Nova
Construcciones Hispano
Germanas
Alicante 09/1997 09/1998 WWTP with extended aeration
Germanas
Negreira Covsa A Corua 10/1997 08/1998
WWTP for biogical treatment in carrousel
and sludge treatment
Belalcazar Diputacin de Crdoba Crdoba 11/1997 12/1998
WWTP with extended aeration and
li i i f i i
31
Belalcazar Diputacin de Crdoba Crdoba 11/1997 12/1998
elimination of nutritious
REFERENCES REFERENCES
Finished projects
Project Contracted by Developed in Starting date
Completion
date
Observations
Temisas Canaragua Las Palmas 12/1997 05/1998 WWTP with extended aeration
Vielha Isolux Wat Lleida 01/1998 05/1998 WWTP with extended aeration
Carballeda de Avia Construcciones Alea Ourense 01/1998 08/1998 WWTP with extended aeration
Salinas Lubasa Alicante 01/1998 02/1999
WWTP with extended aeration and physical-
chemical treatment
Esterri d'Aneu Agncia Catalana de l'Aigua Lleida 02/1998 08/1998 WWTP with extended aeration
Catalana de Polimers Catalana de Polimers Barcelona 02/1998 11/1998
WWTP with extended aeration and physical-
chemical treatment
Xunqueira de Ambia Elsan Ourense 03/1998 06/1998 WWTP with extended aeration
Santa Maria de Palautordera Agncia Catalana de l'Aigua Barcelona 03/1998 08/1998
WWTP with extended aeration and
elimination of nutrients elimination of nutrients
Santomera Obrascon Murcia 04/1998 04/1999 WWTP with extended aeration
Vallada Egevasa Valencia 05/1998 08/1998 WWTP with extended aeration Vallada Egevasa Valencia 05/1998 08/1998 WWTP with extended aeration
32
REFERENCES REFERENCES
Finished projects
Project Contracted by Developed in Starting date
Completion
date
Observations
Cuartel Colmenar Viejo Tremesa Madrid 06/1998 08/1998 WWTP with extended aeration
Tous Lubasa Valencia 06/1998 05/1999 WWTP with extended aeration
Sslautherhouse in Burriana Luis Batalla, S.A. Castelln 07/1998 11/1998
WWTP with extended aeration and physical-
chemical treatment
Industrial estate Sant Pere
Molanta
Sugemesa Grupo Gallina
Blanca
Barcelona 08/1998 12/1998 Industrial water with biological treatmet
Casinos Egevasa Valencia 08/1998 03/1999
WWTP with biological filter and sludge
treatment
Begonte Construcciones Alea Lugo 08/1998 04/1999 WWTP with extended aeration
Castro Caldelas Construcciones Alea Ourense 08/1998 06/1999 WWTP with extended aeration
Viladrau -Vidra
Folgueroles La Guixa
Agncia Catalana de l'Aigua Girona 08/1998 06/1999 WWTP with extended aeration
Folgueroles - La Guixa
Enlargement of
Rafelguaraf - L'Enova
Egevasa Valencia 08/1998 09/1999 WWTP with extended aeration
Carlet Obrascon Valencia 08/1998 10/1999 WWTP with extended aeration Carlet Obrascon Valencia 08/1998 10/1999 WWTP with extended aeration
33
REFERENCES REFERENCES
Finished projects
Project Contracted by Developed in Starting date
Completion
date
Observations
WWTP Valparaiso Proinosa Tarragona 01/1999 02/1999 Pump station
Linyola Agncia Catalana de l'Aigua Lleida 01/1999 07/2001 WWTP with extended aeration
WWTP Flix Edar Flix Ute Tarragona 03/1999 03/1999 Ferric chloride dosage
Slautherhouse in Mahn Ganados Pellicer Balearic Islands 06/1999 08/1999 WWTP with extended aeration
Llanos del Espinar Diputacin de Crdoba Crdova 06/1999 12/1999 WWTP with extended aeration
Tales Sueras Lubasa Castelln 06/1999 12/1999 WWTP with extended aeration
Cabanes Lubasa Castelln 06/1999 01/2000 WWTP with extended aeration
Piedras Negras
Comisin Estatal de Aguas y
Saneamiento Estado de Mexico 07/1999 12/2000
WWTP with extended aeration. elimination
Piedras Negras Saneamiento - Estado de
Coahuila
Mexico 07/1999 12/2000
of nutrients
La Unin
Regin de Murcia
Consejera de Medio
A b A l A
Murcia 07/1999 06/2001 WWTP with extended aeration
Ambiente Agricultura y Agua
34
REFERENCES REFERENCES
Finished projects
Project Contracted by Developed in Starting date
Completion
date
Observations
Bertamirans Isolux Wat A Corua 08/1999 09/1999 WWTP with extended aeration
La Roda Junta de Castilla La Mancha Albacete 08/1999 11/1999 WWTP with extended aeration
Servitint Servitint Alicante 10/1999 06/2000
industrial water treatment plant with
extended aeration
Dos Torres Diputacin de Crdoba Crdoba 11/1999 05/1999
WWTP with extended aeration and
elimination of nutrients
Intamasa Corviam Teruel 01/2000 04/2000 Industrial treatment plant
La Restinga Canaragua Sta. Cruz de Tenerife 03/2000 04/2000 WWTP with extended aeration
Enlargement of La Bisbal
dEmpord
Agncia Catalana de l'Aigua Girona 03/2000 04/2000 Pre-treatment
San Felipe A.C.S. Las Palmas 03/2000 09/2000 WWTP with extended aeration
Sardina A.C.S. Las Palmas 04/2000 10/2000 WWTP with extended aeration
Turbaco
Instituto Colombiano de
Bi t F ili
Colombia 09/2000 12/2000 WWTP with extended aeration
Bienestar Familiar
35
REFERENCES REFERENCES
Finished projects
Project Contracted by Developed in Starting date
Completion
date
Observations
S it Al i d
Soachlore Mostaganem
Socit Algrienne du
Chlore
Algeria 09/2000 12/2000 Reverse osmosis and demineralisation
El Puente Bogot
Instituto Colombiano de
Bienestar Familiar
Colombia 01/2001 06/2001 WWTP with extended aeration
Enlargement of
Cunit Cubelles
Agncia Catalana de l'Aigua Tarragona 05/2001 12/2001 Improvements in WWTP
Mntrida, Torre de Esteban
Hambrn Portillo de Toledo
Junta de Comunidades
Toledo 09/2001 01/2003
4 sewage-treatment plants with extended
Hambrn, Portillo de Toledo
and Santa Cruz de Retamar
J
de Castilla - La Mancha
Toledo 09/2001 01/2003
g p
aeration
WWTP Bahamonde Construcciones Alea Lugo 10/2001 11/2001 Construction of pumping stations
Cala Galdana
Sorea - Antonio Gomila
Ute
Balearic Islands 11/2001 07/2002
WWTP with extended aeration and
elimination of nutrients
Deltebre Agncia Catalana de l'Aigua Tarragona 02/2002 12/2002
WWTP with extended aeration and
li i ti f t i t
g g g
elimination of nutrients
Enlargement of Martorell Agncia Catalana de l'Aigua Barcelona 03/2002 12/2003 WWTP by activated sludge
Gestin de Infraestructuras Sewage system and WWTP with extended
Montoro
Gestin de Infraestructuras
de Andalucia (G.I.A.S.A.)
Crdoba 06/2002 01/2003
Sewage system and WWTP with extended
aeration
36
REFERENCES REFERENCES
Finished projects
Project Contracted by Developed in Starting date
Completion
date
Observations
Collectors at Viladrau and Collectors at Viladrau and
Folgueroles
Agncia Catalana de l'Aigua Girona 07/2002 11/2001 Sewage system
Terciary Treatment - La
Unin
Regin de Murcia-
Consejera de Medio
Ambiente Agricultura y Agua
Murcia 07/2002 12/2002
System of de filtration and re-use of water
for agricultural porpoises
Ambiente Agricultura y Agua
El Chaparral Eurodepuracin Cadiz 09/2002 11/2002 WWTP with extended aeration
WWTP and general collector
El M j l i N
Agncia Catalana de l'Aigua Barcelona 12/2002 03/2003 Decantation well and biological
El Mujal in Navs
g g g
WWTP San Miguel Grupo Mahou - San Miguel Burgos 02/2003 04/2003 Pumping station
Castellar de N'Hug Agncia Catalana de l'Aigua Barcelona 09/2003 10/2004 WWTP with extended aeration
Improvement work at
WWTP in Villena
Generalitat Valenciana Epsar Alicante 09/2003 07/2005 Aerated lagoon
Artesa de Segre Agncia Catalana de l'Aigua Lleida 11/2003 10/2004 WWTP with extended aeration
WWTP and collectors
Al
Junta de Andalucia -
Consejera de Medio Mlaga 03/2004 03/2005 Activated sludge
Alcaucn
j
Ambiente
g g
37
REFERENCES REFERENCES
Finished projects
Project Contracted by Developed in Starting date
Completion
date
Observations
WWTP d ll f WWTP and collector of
la Agullana
Agncia Catalana de l'Aigua Girona 05/2004 10/2004 Green filter
Glaxo Smith Kline
Boudouaou
Glaxo Smith Kline Algeria 09/2004 01/2005 WWTP with extended aeration
Improvements in the WWTP
of Igualada, dena, Santa
Margarida de Montbui
and Vilanova del Cam.
Agncia Catalana de l'Aigua Barcelona 11/2004 12/2005 Construction of a new pre-treatment
Opuntia Rafael Jubindo Sta. Cruz de Tenerife 04/2005 08/2005 WWTP with extended aeration
WWTP and collector
of Els Limits
Agncia Catalana de l'Aigua Girona 06/2005 01/2006 Activated sludge
Connection work at
Cerdanya neighborhood to
the general collector of
Castellar de N'Hug
Agncia Catalana de l'Aigua Barcelona 06/2006 06/2007 Collectors and pumping
g
WWTP and collector
township high Asc
Agncia Catalana de l'Aigua Tarragona 04/2007 04/2008
Activated sludge with elimination of
nutrients
WWTP and collectors of
Villalba Saserra
Agncia Catalana de l'Aigua Barcelona 08/2007 08/2008
Activated sludge with elimination of
nutrients
38
REFERENCES REFERENCES
Finished projects
Project Contracted by Developed in Starting date
Completion
date
Observations
C t ti f Construction of a new pump
station in the WWTP of
Igualada, dena, Santa
Margarita de Montbui
and Vilanova del Cam
Agncia Catalana de l'Aigua Barcelona 10/2007 01/2008 Enlargement WWTP
Tertiary Treatment of the
regeneration of the textil
industry of Fibracolor
Agncia Catalana de l'Aigua Barcelona 11/2007 03/2008
Filtration, ultrafiltration, reverse osmosis,
de-carbonation
Llanos de Arinade Dbocan Sta. Cruz de Tenerife 02/2008 09/2008 WWTP with extended aeration
La Jaquita Hoteles Meli Sta. Cruz de Tenerife 02/2008 09/2008 WWTP with extended aeration
Urbanifisation Ms Moregons Construcciones Caler Tarragona 04/2008 05/2008 WWTP with extended aeration
Rehabilitation of the WWTP
Es Mercadal
Govern se les Illes Balears -
Agncia Balear de l'Aigua i
d l Q li A bi l
Balearic Islands 04/2008 08/2008
Refurbishment of aeration system. New
pre-treatment. Installation of sludge
d h d i
s Mercadal
de la Qualitat Ambiental dehydratation
WWTP at Sant Cornelli de
Cercs core
Agncia Catalana de l'Aigua Barcelona 04/2008 09/2008
Activated Sludge with elimination of
nutrients
Emptied of Lagoon of
drainages in E T A P Abrera
UTE Fangs Abrera Barcelona 06/2008 12/2008 Remodelation of drain lagoon
drainages in E.T.A.P. Abrera
g g
39
REFERENCES REFERENCES
Finished projects
Project Contracted by Developed in Starting date
Completion
date
Observations
Palmeiro in Xove Xunta de Galicia Lugo 06/2008 06/2009 WWTP with extended aeration
Jina SC Prometal Romania 07/2008 06/2009 WWTP with extended aeration
Sura Mica SC Prometal Romania 07/2008 12/2009 WWTP with extended aeration
Installation of the reserve for
the guarentee of the
i i t ti f t d Ult filt ti i d suministration of regenerated
water against the saline
intrusion to the aquifer of
Baix Llobregat
Agncia Catalana de l'Aigua Barcelona 10/2008 06/2010
Ultrafiltration, reverse osmosi, deep
inyection wells
Collector net to supply pp y
purified water to the
injection wells and
piezometres
Agncia Catalana de l'Aigua Barcelona 10/2008 06/2010
Collectors D.450 to supply the wells for
the hydraulic barrier
Citromil Citromil Murcia 02/2009 05/2009 Anaerobic Digestor g
Rehabilitation of Lagoon UTE Potabilizadora Barcelona 03/2009 05/2009 Remodelation of drain lagoon
Camping Zmar Astramatic Portugal 04/2009 09/2009 WWTP with extended aeration Camping Zmar Astramatic Portugal 04/2009 09/2009 WWTP with extended aeration
40
REFERENCES REFERENCES
Finished projects
Project Contracted by Developed in Starting date
Completion
date
Observations
Can Ram Copisa Barcelona 05/2009 12/2009 WWTP with extended aeration
WWTP and collectors at
high Sant Pere Sacarrera
Agncia Catalana del Agua Barcelona 05/2009 01/2011
Activated Sludge with elimination of
nutrients
Renovation and extension of
WWTP in Vacarisses
Agncia Catalana del Agua Barcelona 11/2009 01/2011 Extension of WWTP by MBR System
Rosia SC Prometal Romania 11/2009 10/2012 WWTP with extended aeration
Sports center Bell-lloc Incasol Lleida 01/2012 12/2012 Sports center
Lyulyakovo Municipality of Ruen Bulgaria 06/2012 12/2012 WWTP with extended aeration
Taphco Ltd. Softal Algeria 10/2012 12/2012 Chemical line treatment p g
Installations Idiada Energy Enginyeria Tarragona 12/2012 01/2013 Deposit Wet Handling
41
REFERENCES REFERENCES
Finished projects
Project Contracted by Developed in Starting date
Completion
date
Observations
Beclean (Cluj-Napoca) Aquabis Romania 06/2012 12/2013
DWTP Potable Water Treatment, 90.000
inhabitants
Glaxosmithkline - LPA
Laboratoire Pharmaceutique
Algerien
Algerie 06/2013 01/2014
Industrial Water treatment & Domestic
Water Treatment
42
REFERENCES REFERENCES
Current projects
Project Contracted by Developed in Starting date
Completion
date
Observations
Richis SC Prometal Romania 11/2009 -- WWTP with extended aeration
Biertan SC Prometal Romania 11/2009 -- WWTP with extended aeration
Arpas SC Prometal Romania 11/2009 -- WWTP with extended aeration
Feldru Aquabis Romania 10/2013 -- WWTP with extended aeration
Krichim Krichim Municipality Bulgaria 01/2014
--
WWTP with extended aeration
Byala Slatina Municipality of Byala Slatina Bulgaria 10/2013 -- WWTP with extended aeration
Radenvo Municipality of Radenvo Bulgaria 02/2014 WWTP with extended aeration
43
REFERENCES REFERENCES
Maintenance
Water treatment plant
of:
Client Final contractor Type of treatment Starting date
Completion
date
Velilla UTE Sato Arema Junta de Castilla y Len extended aeration 03/1988 03/1999
Esterri dAneu UTE Comapa Arema Junta de Sanejament
extended Aeration and elimination of
nutritious and phosphorus
03/1988 03/1999
Santa Maria de
Palautordera
UTE Oshsa Arema Junta de Sanejament
extended Aeration and elimination of
nutrients and phosphorus
01/1999 06/2000
Negreira
Construcciones Obras y
Viales, S.A.
Xunta de Galicia extended aeration 05/1999 02/2000
,
Vidr UTE Osona Agncia Catalana de l'Aigua extended aeration 09/1999 10/2000
Folgueroles UTE Osona Agncia Catalana de l'Aigua extended aeration 01/2000 12/2000
La Roda UTE La Roda
Junta de Comunidades de
Castilla - La Mancha
extended Aeration and elimination of
nutrients
01/2000 12/2007
Comisin Estatal de aguas y
Piedras Negras
Aguas Depuradas, S.A.
(Adesa)
Comisin Estatal de aguas y
saneamiento CEAS
Coahuila - Mexico
extended Aeration and elimination of
nutrients
01/2000 12/2019
Viladrau UTE Osona Agncia Catalana de l'Aigua extended aeration 05/2000 05/2001
44
REFERENCES REFERENCES
Maintenance
Water treatment plant
of:
Client Final contractor Type of treatment Starting date
Completion
date
X t d G li i
Xunqueira Elsan
Xunta de Galicia
Cons. Medio Ambiente
extended aeration 07/2000 07/2001
Linyola Agncia Catalana de l'Aigua Agncia Catalana de l'Aigua extended aeration 01/2001 01/2002
La Guixa UTE Osona Agncia Catalana de l'Aigua extended aeration 02/2001 01/2002
Martorell Agncia Catalana de l'Aigua Agncia Catalana de l'Aigua
extended Aeration and elimination of
nutrients
01/2002 12/2004
Deltebre Agncia Catalana de l'Aigua Agncia Catalana de l'Aigua
extended Aeration and elimination of
nutrients
12/2002 04/2004
La Unin
Entidad Regional de
Saneamiento y Depuracin
Regin de Murcia.
Consejera de Medio
extended Aeration and elimination of
i
01/2003 05/2004 y p
(Esamur)
j
Ambiente
nutrients
El Mojal Agncia Catalana de l'Aigua Agncia Catalana de l'Aigua
Primary tretament with clarifying well
and biological filter
05/2003 05/2004
WWTP f M id WWTP of: Mntrida,
Torre de Esteban
Hambrn, Portillo de
Toledo and Santa Cruz
de Retamar
Junta de Comunidades de
Castilla - La Mancha
Junta de Comunidades de
Castilla - La Mancha
extended Aeration and elimination of
nutrients
10/2003 03/2010
45
REFERENCES REFERENCES
Maintenance
Water treatment plant
of:
Client Final contractor Type of treatment Starting date
Completion
date
t d d A ti d li i ti f
Agullana Agncia Catalana de l'Aigua Agncia Catalana de l'Aigua
extended Aeration and elimination of
nutrients
12/2004 12/2006
Artesa de Segre Agncia Catalana de l'Aigua Agncia Catalana de l'Aigua
extended Aeration and elimination of
nutrients
01/2005 12/2006
Castellar de N'Hug Agncia Catalana de l'Aigua Agncia Catalana de l'Aigua
extended Aeration and elimination of
nutrients
05/2005 05/2006
Lmits de La Jonquera Agncia Catalana de l'Aigua Agncia Catalana de l'Aigua
extended Aeration and elimination of
nutrients
02/2007 02/2008
Terciary treatment to
regenerate industrial water
at Fibracolor
Agncia Catalana de l'Aigua Agncia Catalana de l'Aigua
Filtration, ultrafiltration, reverse
osmosis, de-carbonatatin
03/2008 06/2011
Barrier against the sea
water intrusion. First phase
water table of Baix
Llobregat
Agncia Catalana de l'Aigua Agncia Catalana de l'Aigua
Ultrafiltration, reverse osmosi, deep
inyection wells
08/2008 05/2010
Vilalba Sasserra Agncia Catalana de l'Aigua Agncia Catalana de l'Aigua
extended Aeration and elimination of

11/2008 11/2009 Vilalba Sasserra Agncia Catalana de l Aigua Agncia Catalana de l Aigua
nutrients and phosphorus
11/2008 11/2009
WWTP at Sant Corneli de
Cercs core
Agncia Catalana de l'Aigua Agncia Catalana de l'Aigua
extended Aeration and elimination of
nutrients and phosphorus
01/2012 12/2012
WWTP and collectors at
A ncia Catalana de l'Ai a A ncia Catalana de l'Ai a
extended Aeration and elimination of
03/2012 03/2013
high Sant Pere Sacarrera
Agncia Catalana de l Aigua Agncia Catalana de l Aigua
nutrients and phosphorus
03/2012 03/2013
46 46
CONTACT
Avda Meridiana 350, 14 B
CONTACT
INFORMATION
Avda Meridiana 350, 14 B
08027 Barcelona, Spain
Tel: (+34) 93 418 47 88
Fax: (+34) 93 417 01 87
INFORMATION
and branch offices
info@arema.com
http://www.arema.com
We are also represented in following countries:
Algeria
Bulgaria
Colombia Colombia
Mxico
Romania

Você também pode gostar