Subject: Quotation for Advance ALC Plant 100m3
Sr. No. Items Qty Amt
ALC Plant :
A] MIXING SECTION
1
Mixer (Blender)
Capacity: 2 tone Side
Plate: 10 mm
Main Shell: 8 mm
Main Shaft: 4"
MS Structure C channel: 3" x 6"
Motor with reduction gear: 15 HP
1 No.
2 Weighing system for Mixer (Load Cell) 1 No.
3 Control Pannel 1 No.
4
Slurry Mixer
Shell Thk: 6mm, Bottom side disc: 8mm, Tank
Capacity: 4000 ltr Motor
with reduction gear (1440 RPM): 10 HP
1 No
5 Pneumatic Butterfly Valve for Mixer 2 No.
6 Pumping System - 5 HP 1 No.
7
Screw Conveyor for Cement
Capacity: 25 TPH, Length: 5mtr, Power: 5.5 kw
1 No
8 Hopper for Cement 1 No
9
Screw Conveyor for Lime
Capacity: 25 TPH, Length: 5mtr, Power: 5.5 kw
1 No.
10 Hopper for Lime 1 No
11
Conveyor belt for Fly Ash
Length: 18ft, Motor: 1 HP
1 No
12 Hopper for Fly Ash 1 No
13 Vibrating Motor for Hopper 3 No.
14 Air Compressor- 5 HP 1 No
15 Digital Weighing Scale 1 No
16 Stirrer for Mixing slurry 1 No
17 Tool Kit 1 No
18 Water Pump 1 No
2,435,000.00
GUBBI ENTERPRISES
18/26, Dev Prayag CHS, Opp. Thanawala Garrage, Bhakti Mandir Road,
Nr. Hari Niwas Circle, Thane(W)-400 602
Tel No: 022- 25393839, 9322451475 Telefax No: 022- 25392279
Website: www.aacplant.net



Sr. No. Items Qty Amt
B] CUTTING SECTION
19
Wire Cutting Machine
(2000 x 2000 x 1950mm)
3 No.
20
Mould Opener
(2000 x 2000 x 2550mm)
1 No.
21 Mould Trolley (1300 x 1300mm)
1 No. (Sample)
111 Require
14,100.00
22 Mould Cover (1200 x 1200 x 625mm)
1 No.(Sample)
56 Require
11,900.00
23 Transfer Trolley (1500 x 1500mm)
1 No. (Sample)
3 Require
17,500.00
24 Track to be executed by customer
25 Trolley Pulling System 1 No 78,000.00
Sr. No. Items Qty Amt
C] STEAM CURING SECTION
26
a)
Steam Boiler:
Capacity: 1000 Ltrs/ Hrs, Design & safety valve set pressure up
to 10.54 kg/cm2
Fuel: Agro waste, briquetted fuel
Hydraulic test pressure: 15.81 kg/cm2
Grate area: 1.4m2
Furnace volume: 2.06m3
Heating surface: 38.5m2
Water holding capacity: 3.58m3
Steam space: 0.88m3
Fuel consumption: 170 kg/hr
1 Set 1,399,500.00
27 Transport Trolley 3 No.
28 Trolley Pulling System 1 No
29 Door for curing chamber both side doors 12 No.
30
a)
Pipeline work from Boiler for curing chamber
(6 chamber)
1 Set
b)
Automatiom for chambers with control panel for auto on/off
steam in chamber for desire temperature
2 Set
c) Safety Valve for chambers 12 Nos.
d) Chimney 2 No.
Total 6,500,000.00
Note:
* 24 hrs Cycling Time
* Based on Layout Chamber to be Finalised
* Site infrastructure need to be done locally by customer & raw material
1,800,000.00
744,000.00
to be executed by
customer
Terms and Conditions :
1 Taxes : 12.5% VAT Extra or 2% CST against C' form.
Packing & Forwarding : As applicable extra
Insurance : As applicable extra
Octroi : As applicable extra
Transport : As applicable extra
Excise Duty : No excise Duty right now.
2 Price: Price quoted is Ex - works
3 Installation: Erection & Commissioning charges Extra @ Rs. 500000/-
4 Payment Terms :
1. 30% of the order value as advance along with the signed purchase order
2. Gubbi Enterprises shall send a Proforma Invoice for the further 40% payment along with the
taxes and duties applicable to the client.
3. Gubbi Enterprises shall dispatch the goods to the client as per the purchase order on the receipt
of the complete payment.
4. Bank Details:
Gubbi Enterprises, HDFC Account no. 01462020000763, RTGS No. HDFC0000146,
Branch: Talao Pali, Thane
5 Payment Terms Erection portion:
1. 50% of erection value as mobilization advance before mobilizing the erection team.
2. 50% of erection value after erection and commissioning at site.
6 Schedule of erection work & Training:
10 days after confirming site suitability, subject to site readiness and raw material.
7 Delivery:
1. 6 weeks lead time after receipt P.O. and advance
2. All deliveries shall be ex-works' company's facility at Rabale. Gubbi Enterprises shall make
reasonable efforts to deliver equipment to a carrier at the delivery point on the estimated delivery
date for transportation to the locations specified in the clients P.O.
3. Deliveries shall be in quantities specified in the P.O. Part deliveries shall be allowed
after acceptance on both sides.
8 Acceptance:
1. The client shall accept the deliveries of equipment received from the Gubbi Enterprises and will
notify them of any defects within 2 days of receipt of the material to the company. If any such
defects within the given period, the deliveries shall be deemed to have been accepted complying
with all the terms and conditions in the P.O.
2. The Client will allow inspecting any defective equipment at the site.
9 Validity: The quotation is valid for 30days from the above date.
10 Warranty:
1. The warrant remains in effect only if full and timely payment has been received by Gubbi Enterprises
against supply of the equipment.
2. The warranty shall not cover any damages during transit, bad storage, misuse or mishandling of
equipment at the Client Side
3. The warranty shall not cover any damages resulting from adaptations or adjustments made to the
equipment by the Client without specific approval by Gubbi Enterprises.
11 Demurrage charges:
We have noticed several times that the material is ready after inspection and testing at our works
and there is a delay from the client side to pickup the material due to non readiness of site or some
other reason. The material lying in our shop occupies expensive floor space. Once the inspection
and testing is done and we have issued a ready to dispatch note to customer, if the client does not
pick up the material in 7 days, we will charge a demurrage of 0.5% of order value, per week. This
payment needs to be made before the dispatch.
12 Customer Scope:
1. A clear, level and freely accessible site suitable for all forms of access and mobile crane age.
2. Power available to operate erection tools and commission of crane.
3. Any civil work.
4. Unloading of the crane components close to the actual erection site
5. Loading in our scope & unloading in clients scope.
6. RFI check list need to adhere.
13 Advance & Sale: Once advance paid it will not be returned. If the customer is not paying balance
amount and not lifting the machinery advance will be forfeited and all the lose shall be born by the
customer.
Once Goods sold it will not be taken back.
We hope you will find this offer convincing, awaiting for your reply.