Você está na página 1de 225

WEAP

Water Evaluation And Planning System



Tutorial
A collection of stand-alone modules to aid in learning
the WEAP software












February 2009









WEAP
Water Evaluation And Planning System

Tutorial Modules
WEAP en una hora .................................................................................................... 1
Herramientas Basicas .............................................................................................. 29
Eescenarios ............................................................................................................... 39
Datos, Resultados y Formato ................................................................................. 61
Conectando Recursos y Demandas ....................................................................... 81
Refinando el analisis de Demanda ........................................................................ 87
Hidrologa ............................................................................................................... 109
Refinando el Suministro ....................................................................................... 127
Embalses y Generacin Hidroelctrica ............................................................... 141
Calidad del Agua ................................................................................................... 153
Anlisis Financiero ................................................................................................ 175
The WEAP/ QUAL2K Interface ........................................................................... 187
Linking WEAP to MODFLOW ............................................................................ 195








WEAP
Water Evaluation And Planning System

WEAP en una
hora
Un tutorial para
Crear una nueva area de estudio ............................................................................ 2
Definiendo Parametros Generales .......................................................................... 7
Ingresando Elementos al Esquema ....................................................................... 10
Los Primeros Resultados ........................................................................................ 25



February 2009










WEAP en una hora 2
Stockholm Environment Institute February 2009

Crear una nueva area de estudio

1.
ESTABLECIENDO UNA NUEVA AREA EN BLANCO

Al abrir el programa WEAP por primera vez, un rea proyecto llamado
Weaping River basin aparecer. En el menu vaya a Area y luego a
Create area para formalizar la creacin del rea nueva.



Una ventana como la que ve a continuacin aparecer. Haga clic en el botn
de la opcin Initially blank. Aqu Ud. puede nombrar su rea de estudio
(en el ejemplo My Ghana Area).

WEAP en una hora 3
Stockholm Environment Institute February 2009


Al hacer clic en OK aparecera otra ventana,




Presionar OK de nuevo. Ahora deber escoger el rea general de estudio,
esto es, del mapa del mundo, Ud. deber establecer un rea general en donde
estar su estudio. Con la flecha/cursor, presionar el botn izquierdo del
mouse y definir un rectangulo (que aparece de color verde) sobre el rea
general de su proyecto de estudio.

WEAP en una hora 4
Stockholm Environment Institute February 2009


En esta ventana ud. puede utilizar la barra de zoom en la esquina inferior
izquierdo para aumentar la zona definida anterior.




Haga clic en OK cuando este satisfecho con la zona definida por el
rectangulo. Puede redefinirla si no esta bien. Tambin puede corregirlo
usando la funcion Set Area Boundaries del men Schematic en la barra
de men.
WEAP en una hora 5
Stockholm Environment Institute February 2009




2.
AGREGAR UNA CAPA o ESTRATO DESDE GIS AL AREA

Se puede agregar un estrato vector o un estrato raster desde una base de
datos GIS en su rea de proyecto. De este modo se refinan los lmites del rea
de estudio. Para hacer esto, presione el botn derecho del mouse sobre la
ventana del medio en su pantalla y seleccione la opcin Add Raster Layer o
Add Vector Layer.
WEAP en una hora 6
Stockholm Environment Institute February 2009


Aparecer una ventana en la cual ud. puede escoger el archivo desde
cualquier directorio o desde la internet.

3.
SALVANDO Y GUARDANDO UN AREA

Para salvar y guardar el rea para usarlo posteriormente, vaya a Area en la
barra principal de men y escoja Save o presione las teclas Ctrl + S
simultneamente.

WEAP en una hora 7
Stockholm Environment Institute February 2009





Definiendo Parametros Generales

Vamos a aprender ahora a navegar por WEAP y descubrir sus cualidades y
funciones. Para lo que resta del ejercicio, usaremos una rea predefinida
llamada tutorial.
Para abrir esa rea, en el men principal vaya a Area y haga clic, luego en
Open al fijar la flecha/cursor sobre esta opcin, deber ver una lista de
reas incluyendo tutorial. Seleccione tutorial.

1.
Definiendo los parametros generales


WEAP en una hora 8
Stockholm Environment Institute February 2009
Una vez que el rea abra, en el menu principal vaya a General para definir
los aos e incrementos de tiempo, Years and Time Steps y las unidades
Units.

Se modelara el ao 2000 con 12 incrementos (meses) comenzando en Enero
(January). Mantenga las unidades en SI.



Nota: Los incremetos de tiempo deben ser escogidos para reflejar el nivel
de precisin de los datos que se tengan.

WEAP en una hora 9
Stockholm Environment Institute February 2009



2.
GUARDANDO DIFERENTES VERSIONES DEL AREA

Seleccione Save Version bajo la opcin Area del men principal. Una
ventana aparecer para anotar un comentario que describa la versin que ir
a guardar. Escriba general parameters set.


WEAP en una hora 10
Stockholm Environment Institute February 2009





Ingresando Elementos al Esquema

1.
DIBUJE UN RIO

En la pantalla principal, vaya a la ventana que contiene diferentes objetos.
Escoja la opcin River. Haga clic en esta opcin. Ahora presione
nuevamente el botn izquierdo sobre la opcin River y mantngalo
presionado. Arrastre el cursor hasta el comienzo del ro que nace en la
parte superior derecha del mapa. Cuando este en ese punto suelte el botn.
Mueva el cursor siguiendo el contorno del ro. Se dara cuenta que una lnea se
va creando desde el cursor. Haga clic en cada vuelta del ro de manera de ir
creando un seguimiento de este. Para finalizar este procedimiento haga doble
clic en el botn izquierdo.


WEAP en una hora 11
Stockholm Environment Institute February 2009

Nota: La direccin del trazado si importa. El primer punto ser la cabeza
del ro o su nacimiento desde donde fluira el agua. El ro se puede editar para
corregirlo si es necesario.



Al efectuar el doble clic aparecer una ventana que preguntara por un
nobre para el ro.

WEAP en una hora 12
Stockholm Environment Institute February 2009


Nombrelo main river

El nombre del ro puede moverse si se desea, para ello, presione el botn
derecho del mouse con el cursor sobre cualquier parte del ro. Aparecer una
ventana, escoja Move Label. Al hacer clic en esta opcin permite mover el
nombre.



WEAP en una hora 13
Stockholm Environment Institute February 2009



2.
INGRESAR DATOS PARA EL RIO PRINCIPAL (MAIN RIVER)

Para editar o ingresar datos para el Main River, hay dos mtodos. Presionar
el botn derecho del mouse estando sobre el ro y luego ir a la opcin Edit
Data y escoger cualquier funcin dentro de la lista. La otra forma es ir a la
barra de la derecha y presionar sobre el smbolo Data. Seleccionar Supply
and Resources del rbol de opciones que aparecer. Luego ir a river y
dentro de este ir a Main River. Para abrir y cerrar las ramas se debe
presionar sobre el smbolo +.

WEAP en una hora 14
Stockholm Environment Institute February 2009




Altenativamente se puede usar la opcin Tree de la barra de men en la
parte superior de la pantalla que se genera al ir a Data y escoger Expand
All para ver todas las ramas.



WEAP en una hora 15
Stockholm Environment Institute February 2009
A la derecha de la pantalla debe aparecer la opcin Inflows and Outflows,
si no aparece, presione ese botn de manera de abrirlo. Presione Headflow.
En la fila con el nombre River vaya hasta el numero 2000. Justo debajo de
este numero aparece un botn, presinelo. Debern aparecer dos opciones,
escoja Monthly Time Series Wizard. Aparecer una ventana.



Utilice esta ventana para ingresar los siguientes datos:

Month Flow (CMS)
Jan 12
Feb 7
Mar 11
Apr 17
May 80
Jun 136
Jul 45
Aug 32
Sep 38
Oct 18
Nov 9
Dec 7
WEAP en una hora 16
Stockholm Environment Institute February 2009


Al ingresar cada dato se ira generando el grfico . No modifique otros datos
aun .

3.
CREANDO UN NODO DE DEMANDA URBANO E
INGRESANDO DATOS RELACIONADOS

Creando este nodo de demanda es similar a crear un ro. Regrese al modo
esquema o Schematic. De las opciones en la ventana haga clic en
Demand Site. Ahora presione de nuevo el botn izquierdo y mantngalo
presionado y arrastre el nodo desde esta ventana de elementos y suelte
dentro del rea en amarillo a la izquierda del ro. Aparecer una ventana
solicitando nombrar este nodo. Nmbrelo Big City y fije su prioridad como
1.



Haga clic en el botn derecho sobre el nodo. Aparecern unas opciones. Vaya
a Edit Data. Ah, seleccione Annual Activity Level.

WEAP en una hora 17
Stockholm Environment Institute February 2009


Se debe seleccionar las unidades antes de ingresar cualquier otro dato. Dentro
de la carpeta Annual Activity Level vaya a Unit. Haga clic en N/A.
Aparecern una serie de opciones. Escoja People. De clic en OK.





Bajo el numero 2000 (ao 2000), ingrese 800000.

WEAP en una hora 18
Stockholm Environment Institute February 2009





Vaya a la carpeta Annual Water Use Rate. Bajo el numero 2000 haga clic en
la celda en blanco y anote 300.



WEAP en una hora 19
Stockholm Environment Institute February 2009
Finalmente abra la carpeta Consumption. Nuevamente bajo el numero 2000
anote el numero 15. Las unidades deben ser en porcentajes, unidad que esta
prefijada.










4.
CREAR UN NODO DE DEMANDA AGRICOLA

En el formato Schematic, haga clic nuevamente en la opcin Demand
Site. Arraste el cursor presionando el botn izquierdo y ubquelo debajo del
rea amarilla al otro lado de la ubicacin de Big City respecto del ro.
Nmbrelo Agriculture y fije su prioridad en 1.

WEAP en una hora 20
Stockholm Environment Institute February 2009


De igual manera que como se hizo para Big City, ingrese los datos en
Annual Activity Level y Annual Water Use Rate en las carpetas
correspondientes dentro del formato Data (primero presione sobre el
smbolo Data). Dentro de las unidades en la carpeta Annual Activity
Level seleccione hectares.


Bajo el nmero 2000 ingrese:

En annual activity level 100000
En Annual water use rate 3500

WEAP en una hora 21
Stockholm Environment Institute February 2009


Seleccione la carpeta Monthly Variation, bajo el nmero 2000 haga clic y
escoja Monthly Time Series Wizard, luego ingrese los siguientes datos:

Monthly Variation:
- 5% in April
- 10% in May and June
- 20% in July
- 30% in August
- 25% in September
- 0% for the rest of the year








Finalmente en la carpeta de Consumption anote 90.
WEAP en una hora 22
Stockholm Environment Institute February 2009




5.
CONECTAR LA DEMANDA CON EL SUMINISTRO

Ahora debemos decirle a WEAP cuanta demanda es satisfecha; esto se lleva a
cabo conectando o relacionando el suministro del recurso a cada nodo de
demanda. Regrese al formato Schematic y cree un eslabn o una conexin
de transmisin desde el ro hasta Big City y otro a Agriculture. Haga esto
arrastrando el cursor seleccionando Transmission Link primero
posicionandolo sobre el ro y luego soltandolo sobre el nodo. Hgalo primero
para Big City. Haga doble clic para finalizar la conexin. Lo mismo para
Agriculture. Defina las preferencias como 1 para ambos.



6.
CREAR UN FLUJO DE RETORNO

WEAP en una hora 23
Stockholm Environment Institute February 2009
Ahora crearemos una conexin de flujo de retorno desde la ciudad y desde el
rea de agricultura. Haga lo mismo que se realiz antes con la opcin
Transmission Link, pero escogiendo Return Flow.

El retorno de la demanda urbana debe estar aguas abajo del punto de extraccin de
agua del nodo de agricultura. En la direccin del flujo de agua del ro la secuencia
debe ser: extraccin de agua para la ciudad, extraccin para la agricultura, retorno de
agua de la ciudad, retorno del nodo de agricultura.



Lo siguiente es definir el Return Flow Routing para la ciudad y su flujo de
retorno (Return Flow). Haga esto presionando el botn derecho del mouse
con el cursor sobre la lnea de retorno y seleccionando Edit Data y luego
Return Flow Routing. Lo mismo se hace para el nodo de agricultura.

Defina en la carpeta de Return Flow Routing a 100 %.

WEAP en una hora 24
Stockholm Environment Institute February 2009






7.
REVISANDO NUESTRO MODELO

A esta altura, nuestro modelo deberia verse similar a la figura siguiente:

WEAP en una hora 25
Stockholm Environment Institute February 2009



Los Primeros Resultados

1.
CORRIENDO EL MODELO

En la barra vertical a la izquierda de la pantalla, presione sobre el smbolo de
resultados (Results) para comenzar a computar los datos. Cuando aparezca
la ventana consultando si se quiere re-calcular, clic en Yes. Esto permite
computar todo el modelo. Cuando este listo una tabla de resultados aparecer
en pantalla.



WEAP en una hora 26
Stockholm Environment Institute February 2009
2.
REVISANDO RESULTADOS

Clic en Table y seleccione Demand y en este seleccione Water Demand.
Tambin presione sobre Annual total.





Si se ingresaron todos los datos correctamente, ud. deber ver los siguientes
datos iguales para el periodo 2000 2005:

Annual demand for agriculture 350 M m3
Annual demand for urban area 240 M m3

WEAP en una hora 27
Stockholm Environment Institute February 2009


Nota: si no tiene los mismos resultados, vuelva atrs y revise que todos los
datos estn correctos. Si al correr los resultados el programa le muestra una
ventana con advertencia, lea cuidadosamente el mensaje pues en el puede
estar indicado el lugar del error.


3.
VER RESULTADOS ADICIONALES

Veamos la demanda mensual o Monthly Demand Coverage Rates en
forma grfica. Haga clic en Chart. Seleccione Demand y luego
Coverage desde el men en dicha carpeta.

WEAP en una hora 28
Stockholm Environment Institute February 2009


Elija el formato del grfico seleccionando la opcin 3-D al lado derecho de la
pantalla y asegrese que All months esta seleccionado del men. Mantenga
la opcin Monthly Average seleccionado. El grfico debera verse como el
siguiente:






Herramientas Basicas 29
Stockholm Environment Institute February 2009
WEAP
Water Evaluation And Planning System

Herramientas
Basicas
Un tutorial para
Creando y Usando Suposiciones Claves ............................................................. 30
UTILIZANDO EXPRESION BUILDER ........................................................... 33




February 2009











Herramientas Basicas 30
Stockholm Environment Institute February 2009
Creando y Usando Suposiciones
Claves
Note:
Para comenzar esta leccin vaya al men principal y seleccin Revert to
Version y escoja la versin llamada Starting Point for Basic Tools
module.


1.
UTILIZANDO SUPOSICIONES CLAVES (using Key assumptions)

La creacin de suposiciones se hace presionando sobre el smbolo Data y
luego presionando el botn derecho del mouse en la opcin Key
Assumption localizado en el rbol de opciones correspondiente.



Cree y nombre la siguiente suposicin. Asegurese de que las unidades estn
correctas:
Herramientas Basicas 31
Stockholm Environment Institute February 2009

Unit domestic water use 300 m3
Unit irrigation water needs 3500 m3






Con Key Assumptions es importante que las unidades designadas a cada
suposicin clave (cada Key Assumption) sea la misma que las definidas a lo
largo del rbol de datos.

Herramientas Basicas 32
Stockholm Environment Institute February 2009
Cree otra suposicin, Domestic Variation. Esta es sin unidades. Utilice la
opcin Monthly Time Series Wizard para ingresar los datos:

Domestic Variation
- Jan to Feb & Nov. to Dec.: 0.9
- Mar. to May & Sept. to Oct. 1.0
- June 1.1
- Jul, Aug 1.15




2.
CREANDO REFERNCIAS A LAS SUPOSICIONES CLAVES

Crear una referencia a las suposiciones claves para Big City Annual Water
Use Rate. Para hacer esto, vaya a Annual Water Use Rate y debajo del ao
2000 haga clic y seleccione Expression Builder.



Dentro de este, haga clic sobre la carpeta branches. Aparecer un rbol de
opciones en la parte superior. Expanda todo si es necesario. En la opcin
Herramientas Basicas 33
Stockholm Environment Institute February 2009
Key Assumption arrastre la suposicin Unit Domestic Water Use y
llvela hasta el cuadro inferior. Si el numero 300 sigue ah, brrelo. Solo debe
quedar Key/Unit Domestic Water Use. Clic en Finish



Repita para la rama de Agriculture. Remplace el valor 3500 con Key/Unit
Irrigation Water Needs. Clic Finish. Presione en el smbolo Results y
escoja Yes en la ventana que aparezca. Deber tener los mismos resultados
que antes:

Annual demand for agriculture 350 M m3
Annual demand for urban area 240 M m3


Utilizando EXPRESION BUILDER

1.
CREANDO EXPRESIONES MATEMATICAS

Herramientas Basicas 34
Stockholm Environment Institute February 2009
Ahora alteraremos la variacin mensual Monthly Variation en la demanda
de agua para Big City usando una expresin matemtica. Haga clic en
Monthlty Variation dentro de Big City y escoja la opcin Expression
Builder en la celda debajo del numero 2000.



En la ventana de Expression Builder clic en la carpeta Branches, expanda,
clic y arrastre la opcin Domestic Variation hasta el recuadro inferior y
agregue a continuacin *100/12. El recuadro deber contener la siguiente
expresin:
Domestic Variation * 100 / 12
Si aparece un error, vuelva a teclear lo mismo, pero ahora escoja Verify y
luego Finish.




Herramientas Basicas 35
Stockholm Environment Institute February 2009



Vea los nuevos resultados despus de efectuar estos cambios. Clic en el
smbolo Results y Yes para re-calcular. Deber tener los siguientes
resultados:



Note que ahora no hay demandas no cumplidas en diciembre para Big City
porque la fraccin para demanda en diciembre decreci de 8.5 % a 7.5%. Ud
Herramientas Basicas 36
Stockholm Environment Institute February 2009
puede revisar valores numricos calculados en Monthly Variation en la
expresin matemtica seleccionando Table en la entrada de datos en la
parte inferior de la ventana.






2.
UTILIZANDO FUNCIONES INTEGRADAS AL PROGRAMA

Asumiremos que la poblacin de Big City no es conocida (en el ao 2000),
pero si para el ltimo censo y su crecimiento estimado. Usando una funcin
predefinida, tal como GrowthFrom, se puede calcular la poblacin actual.
Se hace esto seleccionando Big City y luego Annual Activity Level y
dentro de esta, escoger Expression Builder bajo el numero 2000 (Deber
aparecer un valor fijo 800000) y en la carpeta Functions escoger
GrowtFrom. Aqu aparecern una descripcin y ejemplos. Elimine el valor
800000 y de clic en GrowthFrom y arrstrelo hasta el recuadro inferior.

Herramientas Basicas 37
Stockholm Environment Institute February 2009





Ingrese los siguientes datos en la expresin utilizando el formato definido en
la descripcin:
Date of last Census 1990
Population at last census 733,530
Estimated growth rate 1.75%
Teclee los datos siguiendo el formato de la expresin:
Herramientas Basicas 38
Stockholm Environment Institute February 2009
GrowthFrom(1.75%, 1990, 733530)


..//
















Eescenarios 39
Stockholm Environment Institute February 2009


WEAP
Water Evaluation And Planning System

Eescenarios
Un tutorial para
Preparando el Terreno Para los Eescenarios ....................................................... 40
Creando Eescenarios de Referencia ...................................................................... 41
Creando y Corriendo Eescenarios ........................................................................ 47
Usando el Metodo WATER YEAR ................................................................... 51




February 2009









Eescenarios 40
Stockholm Environment Institute February 2009
Preparando el Terreno Para los
Eescenarios
Note:
Para comenzar esta leccin vaya al men principal y seleccione Revert to
Version y escoja la versin llamada Starting Point for Escenarios'
module.



1.
ENTENDIENDO LA ESTRUCTURA DE EESCENARIOS EN WEAP

En WEAP el tpico eescenario de modelacin consiste en tres pasos. Primero,
Current Accounts o aos concurrentes son escogidos para servir de ao
base del modelo; los aos actuales son los que se han ingresado en las
lecciones anteriores en los modelos previos. Una Reference o escenario de
referencia, es establecida de Current Accounts para similar evoluciones del
sistema sin intervenir. Finalmente, what if o escenarios si ocurre esto
pueden ser creados para alterar los eescenarios de referencia y evaluar los
efectos de los cambios en polticas y tecnologas.


2.
CAMBIOS EN EL HORIZONTE DE TIEMPO PARA EL AREA

Bajo el menu General/Years and Time Steps, cambie Time Horizon es
decir, el horizonte de tiempo del rea:

Current Accounts Year 2000 (sin cambio)
Last Year of Escenarios 2015
Eescenarios 41
Stockholm Environment Institute February 2009
3.
CREAR UNA SUPOSICION CLAVE ADDICIONAL

Creemos la siguiente suposicin clave:

Population Growth Rate 2.2%
Esta suposicin no tiene unidades, pero no olvide modificar en la columna
Scale y definirla como porcentaje.


Creando Eescenarios de Referencia


1.
DESCRIBIR EL EESCENARIO DE REFERENCIA

El escenario de referencia siempre existe. Se debe cambiar la descripcin en
Area luego ir a Manage Escenarios para reflejar su rol actual. Se puede
notar que se debe estar en el modo Data o en schematic para ver y
acceder a Manage Escenario en la opcin dentro de Area.

Por ejemplo, Base Case Escenario with population growth
continuing at the 1960-1995 rate and slight irrigation technology
improvement.

Eescenarios 42
Stockholm Environment Institute February 2009



2.
CAMBIAR LA UNIDAD DE USO DE AGUA EN IRRIGACION

Dentro del modo Data, se debe cambiar la suposicin Unit Irrigation
Water Needs a un nuevo patrn anual para el periodo 2000 2015 de
acuerdo a Current Account Years. Para hacer esto, hay que seleccionar
reference eescenario desde el men se encuentra en la parte superior de la
pantalla. Use Yearly Time Series Wizard para construir la serie de tiempo.
Eescenarios 43
Stockholm Environment Institute February 2009





















Primero escoja la funcin Interpolate, luego presione Next





Eescenarios 44
Stockholm Environment Institute February 2009



Clic en Enter Data en la ventana que aparezca. Presione next. Ahora clic
en Add para agregar lo siguiente a la serie de tiempo:

Type of Time Series: Interpolate

Data:
2000 3500
2005 3300
2010 3200
2015 3150
Growth after last year: 0%

Note que el primer punto, para el ao 2000, deber estar ya listado porque ya
ha sido ingresado cuando Unit Irrigation Water Needs fue creado.


Eescenarios 45
Stockholm Environment Institute February 2009



3.
DEFINIR EL CRECIMIENTO DE POBLACION

Se debe definir el crecimiento con un porcentaje o tasa definido por
Population Growth Rate lo que se hizo al comienzo del ejercicio. Aqu de
nuevo ud. deber seleccionar Reference Escenario desde el men principal
estando en modo Data.

Asegurese de tener seleccionado Big City y Annual Activity Level.
Elimine la expresin y seleccione la funcin Growth dentro del Expression
Builder debajo del periodo 2001 2015. Haga clic en Branches. Aqu
arrastre la opcin Population Growth Rate al cuadro inferior. La funcin
final deber verse de la siguiente forma:

Growth(key\population growth rate/100)

Eescenarios 46
Stockholm Environment Institute February 2009


4.
CORRER EL EESCENARIO DE REFERENCIA

Correr el eescenario haciendo clic en el smbolo Results. Vea el grfico
Unmet Demand (seleccionando Annual Total) para ambos sitios o nodos.
Debera verse similar a las figuras que siguen,

Como evoluciona la demanda comparados en el grfico Unmet Demand?
Porque el total de Unmet Demand decrece primero y luego crece?

Eescenarios 47
Stockholm Environment Institute February 2009




Creando y Corriendo Eescenarios

1.
CREACION DE UN NUEVO EESCENARIO PARA MODELAR
UNA MAYOR TASA DE CRECIMIENTO POBLACIONAL

Eescenarios 48
Stockholm Environment Institute February 2009
Crear un nuevo eescenario para evaluar el impacto del crecimiento de la
poblacin para la ciudad Big City mayor que 2% para el periodo 2001
2015.

Vaya a Area\Manage Escenario y haga clic en el botn derecho estando
sobre Refence y luego de las opciones escoja Add. Nombre este
eescenario Higher Population Growth y escriba el siguiente comentario:
This escenario looks at the impact of increasing the population growth rate for Big
City from a value of 2.2% to 5.0%.






Eescenarios 49
Stockholm Environment Institute February 2009


2.
INGRESAR DATOS PASA ESTE EESCENARIO

Haga los siguientes cambios dentro de la pantalla Data una vez que haya
escogido el eescenario nuevo, Higher Population Growth,

Seleccione dentro de los Key Assumption el con nombre Population
Growth Rate y cambie el valor bajo el periodo 2001 2015 a 5.0. Notara que
el color del texto en los campos cambiara de color a rojo. Esto ocurre para
cualquier valor que cambia o se desvi del eescenario de referencia.




3.
COMPARE RESULTADOS PARA LA REFERENCIA Y UN
CRECIMIENTO DE POBLACION MAYOR

Comparemos grficamente los resultados de estos dos eescenarios, el de
Referencia y el de Mayor tasa de crecimiento de poblacin.

Eescenarios 50
Stockholm Environment Institute February 2009
Por ejemplo, seleccione Water Demand del men principal. Seleccione All
Escenarios en el men a la derecha del grfico. Escoja Big City en el men
donde se lee Branches: Demand Sites. El grfico deber verse como el
siguiente:



Note la mayor demanda de agua para la ciudad en el escenario Higher
Population Growth, que en el de referencia.

Ahora comparemos Unmet Demand. Solo debe cambiar en el men
principal y escoger Unmet Demand.

Eescenarios 51
Stockholm Environment Institute February 2009


Nuevamente se presento mas falta de agua para el segundo caso, Higher
Population Growth.


Usando el Metodo WATER YEAR

1.
DEFINICION DE LA CONDICIONES CLIMATICAS O
HIDROLOGICAS

En el ejercicio previo, se vario la demanda de agua; ahora variaremos
suministro. Queremos ver como la variacion natural en el clima se puede
ingresar a WEAP a travs de escenarios. Utilizaremos Water Year Method
como ejemplo. Este es un simple mtodo para representar variaciones de
clima tales como flujos de agua, lluvia y agua subterrneas. El mtodo
primero define como cambia el clima. Un ao normal tiene un valor 1; un ao
seco menor a 1 y una ao lluvioso mayor a 1.

Con el escenario de referencia escogido, expanda el rbol y haga clic sobre
Water Year Method la que est bajo la rama Hydrology.
Eescenarios 52
Stockholm Environment Institute February 2009



Seleccione Definitions e ingrese lo siguiente:

Very Dry 0.7
Dry 0.8
Normal 1.0
Wet 1.3
Very wet 1.45
Eescenarios 53
Stockholm Environment Institute February 2009



2.
CREAR SECUENCIAS DE AOS

El siguiente paso en el uso del mtodo Water Year Method es crear una
secuencia climtica para el periodo. Primero seleccione dentro de Data For:
Current Accounts (2000) y asegrese de que el ao 2000 este fijado como
Normal. Luego seleccione Reference e ingrese:

2001-2003 normal
2004 very dry
2005 wet
2006-2008 normal
2009-2010 dry
2011 very wet
2012 normal
2013 wet
2014 normal
2015 dry

Eescenarios 54
Stockholm Environment Institute February 2009


















Eescenarios 55
Stockholm Environment Institute February 2009
3.
DEFINIR EL MODELO PARA USAR EL METODO WATER YEAR
METHOD

En el rbol, cambie Headflow dentro de River y bajo Main River (haga
clic sobre este ltimo). Dentro de la carpeta Headflow debajo de Get
Values from, seleccione del men Water Year Method.




4.
VOLVER A CORRER EL MODELO

Presione sobre Results a la izquierda de la pantalla y seleccione Yes.
Observe el grfico y compare para Reference y para Higher Population
Growth.




Eescenarios 56
Stockholm Environment Institute February 2009


Note que el caso de la demanda no satisfecha, Unmet Demand, es mucho
mas errtica usando este mtodo que el caso anterior, asumiendo un flujo
constante en el ro.

Si hubiera querido comparar en el mismo grfico los resultados para Water
Year Method para aquellos asumiendo clima constante para el periodo de
tiempo, ud. puede crear un nuevo escenario que use el mtodo en vez de
cambiar informacin dentro del de referencia (Reference escenario). El
nuevo escenario se vera de la siguiente forma:


Eescenarios 57
Stockholm Environment Institute February 2009

Note que el caso de Referencia (clima constante) y el Water Year Method
(clima variable) usaran el dato de crecimiento de 2.2 % de la suposicin
Population Growth Rate para la ciudad.

5.
CAMBIOS EN LA HERENCIA DEL ESCENARIO

El siguiente ejemplo mostrara la utilidad de cambiar la herencia del escenario
dentro de WEAP.

Crear un nuevo escenario heredado de Reference y nombrelo Extended
Dry Climate Sequence. El rbol de escenarios se deber ver as,



En el ambiente Data seleccione este nuevo escenario para editarlo. Bajo
Hydrology haga clic en Water Year Method y edite lo siguiente:

2001-2003 normal
2004 wet
2005 normal
2006-2008 normal
Eescenarios 58
Stockholm Environment Institute February 2009
2009-2010 very dry
2011 normal
2012 dry
2013 normal
2014 normal
2015 dry
Ingrese esta informacin donde corresponda.

Los siguientes resultados corresponden a correr el programa con esta nueva
informacin.





Ahora cambiaremos el lugar del escenario Extended Dry Climate Sequence
colocndolo debajo de Higher Population Growth Rate para que herede la
tasa de 5% de crecimiento. En el Manage Scenarios, seleccione Extended
Dry Climate Sequence, haga clic en el men a la derecha debajo del texto
Extended Dry Climate Sequence is based on: y seleccione Higher
Population Growth rate como rama madre.

Eescenarios 59
Stockholm Environment Institute February 2009


Re calcule los datos y vea el grfico Unmet Demand para la ciudad.

Que cambios nota en este grfico para Extended Dry Climate Sequence?






Eescenarios 60
Stockholm Environment Institute February 2009

Datos, Resultados y Formato 61
Stockholm Environment Institute February 2009

WEAP
Water Evaluation And Planning System

Datos,
Resultados y
Formato
Un tutorial para
Intercambiando Datos ............................................................................................ 62
Importando Serias de Tiempo ............................................................................... 66
Trabajando con los Resultados .............................................................................. 69
FORMATING / Defniendo el formato ................................................................. 73

February 2009








Datos, Resultados y Formato 62
Stockholm Environment Institute February 2009

Intercambiando Datos
Note:
Para comenzar esta leccion vaya al menu principal y seleccione Revert to
Version y escoja la version llamada Starting Point for all modules after
Escenarios module.



1.
EXPORTAR DATOS A EXCEL

Se puede exporter todo el modelo a Excel tan solo estando en el ambiente o
modo Data y luego seleccionando edit y luego export to Excel.

Para efectos del ejercicio solo exporte el arbol y todas las ramificaciones y todas las
variables de current account (no exporte ninguno de los otros escenarios). Exporte
a una nueva hoja de trabajo workbook. Mantenga todas las opciones restantes.



Datos, Resultados y Formato 63
Stockholm Environment Institute February 2009





2.
USE LA OPCION DE AUTO FILTRO EN EXCEL

En la hoja de trabajo que se creo en el paso anterior, filter los contenidos para
desplegar en pantalla solamente la variable consumption. Probablemente
tendra que mover la pantalla hacia la derecha para llegar a la lista de
variables.

Use la flecha a la derecha de la palabra variable para obtener el listado y seleccione
consumption.

Datos, Resultados y Formato 64
Stockholm Environment Institute February 2009



3.
MODIFICANDO DATOS

En la hoja excel que se creo haga los siguientes cambios en la columna
amarilla. Puede ser conveniente ocultar varias columnas que no se esten
usando de manera de ver variable values y los demand sites a los que
corresponden.

Big City Consumption 5% (value was 15 originally)
Agriculture Consumption 5% (value was 90 originally)
Datos, Resultados y Formato 65
Stockholm Environment Institute February 2009


4.
IMPORTAR DATOS DESDE EXCEL

Re-importar los datos modificado en excel.

En WEAP, escoja edit, import from excel
Chequear que los datos de consumption han sido cambiados en el
modelo.


Datos, Resultados y Formato 66
Stockholm Environment Institute February 2009

Nota: en excel si se tienen mas de una hoja de trabajo abiertos, verifique que
se este importando desde la hoja adecuada.





Importando Serias de Tiempo

1.
CREANDO UN OBJETO MONITOR DE FLUJOS

Agregue un streamflow gauge al modelo.

Inserte un punto de monitoreo agues abajo de la ciudad big city, debajo del
retorno de flujo de ambos la ciudad y del nodo de agricultura.



Datos, Resultados y Formato 67
Stockholm Environment Institute February 2009

2.
IMPORTAR DATOS DE TEXTO

Importar datos de flujo desde un archive de texto con separador de coma
conteniendo aproximadamente 100 aos de datos sobre flujos de agua
medidos hasta el 2003. Para hacer esto utilice read from file en la carpeta
streamflow gauge o gauge data. En ambiente Data expanda la rama
supply and resources\river\streamflow gauge en el arbol.

Escriba la siguiente funcion, la cual leera el archive desde un directorio
llamado additional files localizado en su carpeta de Area:

readfromfile(additional files\river_flow.csv)









Datos, Resultados y Formato 68
Stockholm Environment Institute February 2009



3.
COMPARE EL FLUJO ACTUAL-REAL Y EL MODELADO

Recalcular los resultados y comparer los flujos historicos con WEAP y su
simulacion. Para hacer esto, haga clic en chart dentro del ambiente
results (presionar results a la izquierda de la pantalla principal),
seleccione del menu supply and resources\river\streamflow relative to
gauge(absolute).



Datos, Resultados y Formato 69
Stockholm Environment Institute February 2009
Escoja selected years y escoja los aos 2000 al 2003 (los datos actuales son
en 2000 y no hay mas info mas alla del 2003). El escenario de referencia
aparecera automaticamente cuando se selecciona selected years. Debera
obtener un grfico como el que sigue:






Trabajando con los Resultados

1.
CREANDO UN GRFICO FAVORITO

Creemos un grfico de flujo de agua que muestre ambos, el flujo actual
registrado por el monitor y el simulado en el nodo apropiado, en este
ejemplo, return flow node 2). Primero seleccione streamflow desde el
menu, luego seleccione streamgauge y below return flow node 2 desde la
lista que aparece cuando se escoge select nodes and reaches. Esto dentro
del menu Supply and Resources\River\Streamflow justo sobre la leyenda del
Datos, Resultados y Formato 70
Stockholm Environment Institute February 2009
grfico. Finalmente seleccione los aos 2000 al 2003 para ser represantados en
el grfico.

Guarde este grfico como favorite usando favorite y save chart as
favorite. Nombrelo simulated and observed streamflow comparison

2.
CREAR UNA VISTA GENERAL

Crear una vista general mostrando streamflow, inflow y outflow en grficos.

Seleccione overview. Bajo manage overviews seleccione inflows to
area, outflows to area y el grfico favorite recien guardado.

Datos, Resultados y Formato 71
Stockholm Environment Institute February 2009



3.
USANDO EL MAPA DINAMICO

Mapas dinamicos y resultados son rapidamente obtenidos desde una vista
general. En en el ambiente results seleccione map y juegue con la barra
de tiempo para observer los cambios durante el periodo de estudio.

Trate esto seleccionando main river streamflow.



Datos, Resultados y Formato 72
Stockholm Environment Institute February 2009
Note que mientras mueve el cursor un indicador aparecera sobre el grfico.
En el mapa, el ancho del ro crecera o decrecera de acuerdo a los datos
numericos de cada ao.


4.
EXPORTANDO RESULTADOS A EXCEL

Todos los resultados se pueden exporter a Excel desde el ambiente Results.
Una nueva hoja de trabajo es creada que contiene la informacion y resultados
con la misma estructura que WEAP muestra.

Vuelva a abrir el grfico favorite desde la opcion favorite del menu en
results. Exporte la informacion relacionada a Excel cambiando a la carpeta
table y presionando en la opcion export table to excel a la derecha de la
pantalla


5.
CALCULO DE ESTADISTICAS

Ud puede generar estadisticas en el ambiente results para cualquier tabla.
Solo haga clic en table y luego clic en stat en la columna de la derecha.

Datos, Resultados y Formato 73
Stockholm Environment Institute February 2009



FORMATING / Defniendo el formato

1.
CAMBIANDO LA APARIENCIA DEL FONDO DE UN VECTOR
LAYER

En schematic, cambia el color de big city presionando el boton derecho
del mouse sobre cities en el recuadro de estratos (layers) justo debajo del
reccuadro de elementos y seleccione edit. Haga clic en appearance y
luego escoja fill color. Una paleta de colores aparecera.

Cambie el color a naranja.

Datos, Resultados y Formato 74
Stockholm Environment Institute February 2009












Datos, Resultados y Formato 75
Stockholm Environment Institute February 2009





Ud puede mover los estratos hacia arriba o hacia abajo de su posicion
relative. Para ello presione el boton derecho del mouse y seleccione move
up o move down.




Datos, Resultados y Formato 76
Stockholm Environment Institute February 2009
2.
NOMBRE UN ESTRATO VECTOR

Se puede editar nombres para estratos presione el boton derecho con el
cursor sobre river polygons, seleccione edit y escoja label. Tambien se
puede cambiar el tamao del texto en la parte inferior de esta ventana.









Se pueden ocultar estratos estando en el ambiente schematic hacienda clic
en la caja pequea a la izquierda del nombre.

3.
AGREGAR UN ESTRATO RASTER

Datos, Resultados y Formato 77
Stockholm Environment Institute February 2009
En el ambiente schematicagregar un fondo en el mapa de la ciudad.
Presione el boton derecho con el cursor en el recuadro de layer y escoja
add raster layer,

Seleccione map.jpg localizado en el directorio _maps\tutorial\
(C:\program files\WEAP21\_maps\tutorial)





Datos, Resultados y Formato 78
Stockholm Environment Institute February 2009






El modelo deberia verse como el siguiente:




Datos, Resultados y Formato 79
Stockholm Environment Institute February 2009
4.
MOVIENDO LOS NOMBRES

Para completar el formato del area, cambiemos el texto del nodo y las
designaciones y movamolos de lugar.

Bajo schematic abra el menu Schematic desde las opciones arribe de la
pantalla. Escoja set WEAP node size o set WEAP node label size
dependiendo de lo que se quiera. Para cada opcion una ventana aparecera y
una regla permite modificar el tamao.








Datos, Resultados y Formato 80
Stockholm Environment Institute February 2009
Sobre cualquier objeto haga clic en el boton derecho y se puede seleccionar la
opcion move label para mover el nombre de lugar.



Nota: tambien se puede escojer no colocar o eliminar un nombre si se desea.












Conectando Recursos y Demandas 81
Stockholm Environment Institute February 2009
WEAP
Water Evaluation And Planning System

Conectando
Recursos y
Demandas
Un tutorial para

Modelando recursos de aguas subterraneas ....................................................... 82


February 2009










Conectando Recursos y Demandas 82
Stockholm Environment Institute February 2009
Modelando recursos de aguas
subterraneas
Note:
Para comenzar la leccion vaya al Menu principal y seleccion Revert to
Version y escoja la version llamada Starting Point for all modules after
Escenarios module.


1.
Crear un recurso de aguas subterranea

Crear un Groundwater node junto a la ciudad y nombrelo Big City
Groundwater. Tambien marquelo activo en current Accounts.




Dele a Big City Groundwater las siguientes propiedades (asegurese de este
en current accounts para ingresar esta informacin si no lo esta, la carpeta
inicial storage no aparecera):
Conectando Recursos y Demandas 83
Stockholm Environment Institute February 2009
Storage Capacity Unlimited (default, leave empty)
Initial Storage 100M m
3

Natural Recharge (use the Monthly Time Series Window, accessed in the field
under "2000")
- Nov. to Feb. 0M m
3
/month
- Mar. to Oct. 10M m
3
/month





2.
Conectando Big City Groundwater con Big City

Use una Transmission Link para conectar Big City Groundwater a Big
City demand site, y asignele una prioridad de 2.
Su modelo debiera verse como el que esta a continuacion:
Conectando Recursos y Demandas 84
Stockholm Environment Institute February 2009


3.
Actualizar las caracteristicas de la coneccion de transmision entre
the el ro principal y la ciudad
Cambie las caracteristicas de Transmission Link conectando Main River
(Withdrawal Node 1) y Big City (asegurese de estar en current accounts):
Supply Preference 1 (default)
Maximum Flow Volume 6 m
3
/sec


Conectando Recursos y Demandas 85
Stockholm Environment Institute February 2009

4.
Correr el Model y Evaluar los Resultados
Observemos los siguientes resultados y pensemos en preguntas.
- Es la extraccion de agua subterranean requerida a cumplir demandas
bajo estas condiciones sustentable?

Para ver este resultado, seleccione Groundwater Storage desde el menu de
Supply and Resources\Groundwater



- Como el uso relative del agua de Big City Groundwater y del ro
principal ( Main River) evoluciona a la demanda deBig City?

Para ver resultados grficos para Big City, primero seleccione "Supply
Delivered" bajo Demand usando el men variable primaria. Luego escija
"All Sources" dentro de las opciones al lado derecho de la. Luego, seleccione
Big City como el sitio de demanda, para verlo, use el menu centrado sobre el
grfico y directamente debajo de la variable primaria field. Clic on Annual
Total.


El volumen maximo de flujo o Percentaje de Demanda (parametros) representan restrictions en la
capacidad de un recurso (due, for example to equipment limits).
Conectando Recursos y Demandas 86
Stockholm Environment Institute February 2009



Groundwater recharge and interaction with rainfall and surface water can be modeled
rather that entered as inputs. Refer to the Hydrological Modeling tutorial for more
details.
Other resources can be modeled using the Other Supply object, which is characterized
by a monthly production curve. This object can be used to simulate a desalination plant
or inter-basin transfers, for example.






///
Refinando el analisis de Demanda 87
Stockholm Environment Institute February 2009
WEAP
Water Evaluation And Planning System

Refinando el
analisis de
Demanda
Un tutorial para

Demanda desagregada ........................................................................................... 88
Modelando el manejo de demanda, perdidas y Reuso ..................................... 94
Fijando prioridades de Demanda de distribucion ........................................... 104


February 2009







Refinando el analisis de Demanda 88
Stockholm Environment Institute February 2009
Demanda desagregada
Note:
Para comenzar esta leccion vaya al Menu principal y seleccione Revert to
Version y escoja la version llamada Starting Point for all modules after
Escenarios module.
1.
Crear un nevo sitio de demanda
En current accounts, cree un sitio nuevo de la demanda ro abajo de Big
City para simular la demanda rural. Denomine este nodo Rural y dele una
Prioridad de Demanda =1. Proporcione una Conexin de Transmisin desde
main river posicionadolo ro debajo de los retornos de flujos de la gran
Ciudad y de la Agricultura. La Preferencia del Suministro debe ser fijada en
1. Proporcione tambin un Flujo del Regreso para Rural que es posicionado
an ms ro abajo. Proporcione un return flor routing igual a 100%.
Su area debiera verse asi:

2.
Crear una estructura de datos para el nodo de demanda rural
Para crear esta estructura, clic derecho en la demanda Rural en el arbol de
data, y seleccione Add para implementar la siguiente estructura (no ingrese
datos aun):

Refinando el analisis de Demanda 89
Stockholm Environment Institute February 2009

Note que Showers, Toilets, Washing, y Others se agregaron en
subramas bajo Single Family Houses.

3.
Ingrese datos en Annual Activity Level
Ingrese lo siguiente en Rural Demand Site, y en la carpeta Annual Activity
Level:
Rural 120,000 Households
Single Family Houses 70% Share
Showers 80% Saturation
Toilets 90% Saturation
Washing 55% Saturation
Others 35% Saturation
Apartment Buildings Remainder share (use the Expression
Builder)
Refinando el analisis de Demanda 90
Stockholm Environment Institute February 2009






Share vs. Saturation: even though both types of percentages are treated
mathematically the same by WEAP, they are conceptually different. At a given level
of the tree, shares should always sum up to 100%. They also allow the use of the
remainder function. Saturation indicates the penetration rate for a particular device
and is independent of the penetration rate for other devices (i.e., saturation rates for
all sub-branches within a given branch do not have to sum to 100.
Refinando el analisis de Demanda 91
Stockholm Environment Institute February 2009
4.
Ingrese datos en Annual Water Use
Ingrese lo siguiente bajo Rural demand site, y en la carpeta Annual Water
Use Rate:
Rural
Single Family Houses
Showers 80 m
3
/household
Toilets 120 m
3
/household
Washing 60 m
3
/household
Others 40 m
3
/household
Apartment Buildings 220 m
3
/household
Consumption (in consumption tab) 80%
Note que valores en Consumptiones ingresado por la totalidad de Rural
demand node, y no para las subramas.
5.
Chequear los resultados
Calcule de nuevo sus resultados. En Results escoge Water demand como
la variable primaria del men. Escoja all branches del men justo encima de
la leyenda de grfico. Escoja 3 D y el grfico de barras como el (vea el
primero y el segundo ejemplo de pantalla abajo). Escoja el nodo Rural de la
demanda del men encima del grfico (vea la terera grafica de pantalla abajo).


Refinando el analisis de Demanda 92
Stockholm Environment Institute February 2009



Para ver los resultados de la Demanda de Agua (water demand) para todas las
sub-ramas Rurales (por ejemplo, single family houses\showers; apartments),
en el campo de levels seleccione 2 (justo encima del centro del grfico). El
grfico resultante debe parecerse al uno abajo:
Refinando el analisis de Demanda 93
Stockholm Environment Institute February 2009


Entiende por que la dmanda rural varia durante el ao sin que hayamos
ingresado alguna variacion?


The variation in Rural demand is due to the fact that WEAP assumes a constant daily
demand per day (no monthly demand was specified by the user), so months that have
less days (like February) have a lower demand than months that have more days (like
January).

Ahora cree un grfico en 3-D de Demand Site Coverage y seleccione all
demand sites para la presentacion

Refinando el analisis de Demanda 94
Stockholm Environment Institute February 2009


Entiende porque la cobertura de rural es 100% pero no para la ciudad
ni la agricultura, aun cuando estan definidas las prioridades?


Modelando el manejo de demanda,
perdidas y Reuso
1.
Implementando el manejo de demanda la aproximacion
desagregada
Ahora crearemos un eescenario nuevo que explora una estrategia de la
administracin del lado de la demanda. Llame este eescenario New washing
machines DSM; deber ser heredado del Reference y el eescenario tendr el
mismo clima y la tasa de crecimiento de poblacin de gran Ciudad como el de
Referencia. El rbol del eescenario en Manage escenarios debe parecerse a
esto:

The Rural withdrawal point is downstream of the return flow point for the Big City,
which means there is an additional volume of water available in the river; this return
flow can easily cover the rather small Rural demand.
Refinando el analisis de Demanda 95
Stockholm Environment Institute February 2009


Asumiremos que un tipo nuevo de lavadoras permite un 2/3 en reduccin
(66.7 %) al lavar en el consumo de agua. Este eescenario nuevo evaluar el
impacto de esta medida de la Administracin del Lado de la Demanda si 50%
de las casas se puede convencer a comprar la mquina que ahorra agua.

Primero, vuelve a current accounts en Data, donde usted crear dos nueva
ramas (old machines y New machines) en la estructura de datos Rurales.
Efectivamente, usted esta desagregando washing la variable que ahora
incluira dos subcategora nuevas. Note que usted debe volver a current
accounts porque todas estructuras nuevas de datos se tiene que entrar en
esta, incluso si la variable no deber ser activada (es decir, los niveles no cero
de la actividad) en current accounts y en el eescenario reference.

Cuando vaya a agregar la primera subrama en Washing, aparecera el
siguiente mensaje:
Refinando el analisis de Demanda 96
Stockholm Environment Institute February 2009

Clic yes, agregue la estructura siguiente:

Cambie las unidades para Mquinas Viejas y Mquinas Nuevas a
shares. Vuelva a entrar a water use rate for old machines (60
m3/household), como era el valor para la variable original ms alto en
washing.

Refinando el analisis de Demanda 97
Stockholm Environment Institute February 2009

Ingrese un valor de 100% para el old machines activity level. Deje en
blanco el Nivel de la Actividad para new machines - esto es igual que
entrando un cero. Recuerde, usted entra stos en current accounts, as
usted quiere slo Mquinas Viejas a ser activo en el eescenario de
Referencia. Esto recrea el mismo efecto teniendo como la variable
agregada washing en las Cuentas Actuales originales y en la
Referencia. La variable Mquinas Nuevas se activar en el
eescenario new washing machines DSM (ver abajo).



Ahora, cambia a New Washing Machines DSM.
Ingrese el valo de 50 para New Machines (50% de todas las maquinas
seran de esta nueva variedad) el resto (100) para Old Machines
(usaremo expression builder mas tarde).
Refinando el analisis de Demanda 98
Stockholm Environment Institute February 2009


Tendra que ingresar el original de Water Use Rate for the Old
Machines (60 m
3
/household) como tambien la nueva Water Use Rate
for the New Machines:
Old Machines 60 m
3
/household
New Machines 60*0.667 m
3
/household




Ahora compare los resultados numricos de la Demanda de Agua (water
demand) para la rama washing Branch del sitio Rural de la demanda para
Refinando el analisis de Demanda 99
Stockholm Environment Institute February 2009
el la Referencia y los eescenarios new washing machines DSM. En la
vista de Resultados, clic sobre la tabla y escoge la variable de la Demanda de
Agua. Escoja tambin Annual total en vez de monthly average y escoja
2001 (usted puede slo ve los resultados numricos por un ao individual al
comparar a la vez los eescenarios en la carpeta table, pero en esto no
presenta una dificultad para este ejemplo, como nosotros no tratamos de
modelar ningn crecimiento con tiempo para la variable washing). Escoja
demand site\Rural\washing\single family houses \washing de la izquierda
superior en el men y all branches a la derecha y arriba. Escoja el
Reference y new washing machines DSM del men en el fondo de la
ventana. La tabla debe parecerse a lo Siguiente:



Note que el uso de nuevas maquinas in 2001 (y asubsecuentes en New
Washing Machines DSM) resulta en alrededor de 460000 m
3
de agua menos
demandada que si solo se tienen Old Machines (el eescenario de Referencia
(referente)).



Demand-side management (DSM) refers to measures that can be taken on the
consumers side of the meter to change the amount or timing of water consumption
(as compared to the utility company's, or supply, side of the meter).
Another way of modeling disaggregated DSM is to reduce the unit consumption for
the affected category (in this case washing). There is no right or wrong way to model
DSM.
Refinando el analisis de Demanda 100
Stockholm Environment Institute February 2009
2.
Implementar el manejo de la demanda la aproximacion agregada
Si los datos de desagregados no estn disponibles, un valor equivalente de DSM
(manejo de demanda) se puede computar. En este ejemplo, asumiendo que
tuvimos ningun demanda desagregada Rural de agua, nosotros podramos llegar
al mismo resultado utilizando el la Administracin de la Demanda (demanda
management) la opcin para este Sitio de la Demanda en los Datos. En este
caso la reduccin ascendera a:
Original contribution of
washing to rural water use 2,772/26,316 = 10.5%
Share of New Machines 50%
Reduction of New Machines 66.6%
Multiplying all of these percentages together = 3.5%

Este valor puede ser ingresado a Demand Management/Demand Savings tab
para la rama Rural en el Demand Side Management escenario.








Demand Side Management (DSM) measures are not taken into account in the
demand view. To see the effect of a DSM measure, look at the change in Supply
Requirement rather than Water Demand.
Refinando el analisis de Demanda 101
Stockholm Environment Institute February 2009
3.
Modelando Reuso
Otra estrategia de la conservacin del agua que se podra estudiar con
eescenarios es agua re empleada. Cree un eescenario nuevo heredado del
Referencia y denominelo big city reuse. Cercirese est en este eescenario
y el clic en la rama big city. Haga clic en loss and reuse y haga clic la
carpeta reuse.

Ingrese la siguiente expression en el campo 2001-2015 usando el Expression
Builder:
Smooth(2001,5, 2005,18, 2015,25)

Primero seleccione la funcion Smooth dentro del texto de Expression builder.
Clic Next y entre los datos y valores. Deberia tener un grfico como el de mas
abajo. Note que Reuse en Current Accounts (2000) se mantiene cero. Clic
Finish.
Refinando el analisis de Demanda 102
Stockholm Environment Institute February 2009

Compare Unmet Demand para Big City antes (Reference) y despues (Big
City Reuse) de introducer esta conservacion de agua. Deberia tener el grfico
de abajo, el cual muestra reducciones substanciales en Big City Unmet
Demand cuando se usa la estrategia de reuso de agua.



4.
Modelando perdidas
Reedite el modelo para tener en cuenta el hecho que hay un 20% de tasa de
prdida en la red de gran Ciudad. Haga este cambio para las Cuentas Actuales
(current accounts) para que se llevara con el eescenario reference, y como
resultado de la caracterstica de herencia, a travs de todos eescenarios.
Refinando el analisis de Demanda 103
Stockholm Environment Institute February 2009


What happens to the unmet demand for the Big City, both in the
Reference escenario and the Big City Reuse escenario compared to
the earlier exercise without losses?




Losses can happen in Transmission Link, in the Demand Site itself or in the Return
flow. Losses in the Transmission Link will affect the supply to the Demand Site.
Losses in the Demand Site will affect the required Supply Requirements of this
Demand Site. Losses in the Return Flow will only affect the flow returned.
Refinando el analisis de Demanda 104
Stockholm Environment Institute February 2009
Fijando prioridades de Demanda de
distribucion
1.
Edit Demand Site Priority
Cree un eescenario nuevo, heredado del la Referencia ydenominelo
Changing demand priorities. Cambie la Prioridad de la Demanda del Sitio de
la Demanda de la Agricultura en data haciendo clic en la rama de la
Agricultura y entonces haciendo clic en el botn de la Prioridad, o haciendo clic
en el nodo en la Vista Esquemtica (schematic) y escogiendo "general info".

Cambie la Prioridad de la Demanda de 1 a 2.










Refinando el analisis de Demanda 105
Stockholm Environment Institute February 2009



A demand priority can be any whole number between 1 and 99 (99 is the default) and
allows the user to specify the order in which the water requirements of demand sites
are satisfied. WEAP will attempt to satisfy the water requirement of a demand site
with a demand priority of 1 before a demand site with a demand priority of 2 or
greater. If two demand sites have the same priority, WEAP will attempt to satisfy
their water requirements equally. Absolute values have no significance for the
priority levels; only the relative order matters. For example, if there are two demand
sites, the same result will occur if demand priorities are set to 1 and 2 or 1 and 99.
Demand Priorities allow the user to represent in WEAP water allocation as it actually
occurs in their system. For example, a downstream farmer may have historical water
rights to river water, even though another demand site positioned upstream could
extract as much river water as it desired, leaving the farmer with little water in the
absence of such water rights. The Demand Priority setting allows the user to set the
farmer's priority for water above that of the upstream demand site. Demand
Priorities can also change with time or change in a escenario - more advanced subject
matter to be dealt with later in the tutorial.
You can also change the Demand Priority in the Data View\Priority
screen\Demand Priority tab.

2.
Compare Resultados
Despliegue graficamente Unmet Demand para la Agriculture para
Reference y eescenarios Changing Demand Priorities. Deberia ser como
el de a continuacion:

Refinando el analisis de Demanda 106
Stockholm Environment Institute February 2009
Note que Unmet Demand para Agriculture se incrementa cuando la
prioridad es aumentada a 2. Esto porque Big City ahora tiene preferencia por
tener sus demandas que ser satisfechas primero. Evidencia de esto puede
verse generando un grfico de monthly average Demand Coverage for Big
City y Agriculture a traves de los aos del eescenario de referencia.



Ahora compare los resultados al mismo grfico generado por Changing
Demand Priorities.



Refinando el analisis de Demanda 107
Stockholm Environment Institute February 2009
Advierta que en el la Referencia, para la primavera y tarde meses de
verano, tanto la gran Ciudad como la Agricultura no obtienen el alcance
repleto de su demanda porque los dos compiten igualmente para flujo
Principal de Ro. Cundo gran Ciudad se da la preferencia para satisfacer su
demanda (Cambiando el guin de Prioridades de Demanda), sin embargo, su
alcance mejora relativo a la Agricultura. A veces, el alcance es 100% para la
Agricultura, pero no para gran Ciudad - eso es porque no hay la demanda de
la Agricultura (principalmente observado para los meses de invierno). Note
que el Alcance de la Demanda para el sitio Rural de la demanda es siempre
100% - esto es porque los flujos del regreso para la gran Ciudad y la
Agricultura satisfacen la demanda de agua creada por el sitio Rural de la
demanda.
Refinando el analisis de Demanda 108
Stockholm Environment Institute February 2009
Hidrologa 109
Stockholm Environment Institute February 2009

WEAP
Water Evaluation And Planning System

Hidrologa
Un tutorial para
Modelando Captaciones: modelo
aguas lluvias y " Runoff" ....................................... 110
Modelando Captaciones: modelo de
humedad del suelol ................................................. 115
Simulando interaccion superficie y
aguas subterraneas ................................................. 121



February 2009










Hidrologa 110
Stockholm Environment Institute February 2009
Modeando Captaciones: modelo aguas
lluvias y Runoff
Note:
Para comenzar la leccion vaya al Menu principal y seleccione Revert to
Version y escoja la version llamada Starting Point for all modules after
Escenarios module.
1.
Crear una nueva captacion
Cree un Captacin se opone en la vista Esquemtica para simular headflow
para el Ro Principal. Haga esto tirando sobre un nodo de Captacin y lo
localizando cerca del punto de partida del Ro Principal. Denomnelo el Ro
Principal Headflow. Una vez que posicionado, un cuadro de dilogo abrir y
solicitar los datos siguientes:
Runoff to Main River
Represents Headflow Yes (check box)
Infiltration to No inflow to GW
Includes Irrigated Areas No (Default)
Demand Priority 1 (default)

Note that when you have finished creating the Catchment node, a dashed blue
line will automatically appear in the schematic linking the node to the Main
River.

Hidrologa 111
Stockholm Environment Institute February 2009




2.
Crear la apropiada subestrutura para la cuenca
Primero clic en boton derecho del mouse en Catchment oseleccione de Data,
aparece una ventana preguntando metodo de Captacion:
Hidrologa 112
Stockholm Environment Institute February 2009


Tambin se puede hacer en la ventana (boton) advance:


En Data haga clic en el boton Land Use e ingrese:
Area 10M ha (you will have to choose the units first)
Effective Prec. 98%

Crop Coefficients (use the Monthly Time Series Wizard to input these
data)

Sep to Feb 0.9
March 1.0
April 1.1
May 1.4
Jun to Aug 1.1
Hidrologa 113
Stockholm Environment Institute February 2009


Note que si usted haba hecho clic s cuando pregunt si reas irrigadas
deban ser incluidas en esta captacin (bajo Informacin General al crear
captacin), otro botn la Irrigacin habra aparecido bajo la captacin en
los Datos ve. Este botn tendra dos etiquetas bajo lo: (1) Irrig, donde
usted hace la entrada o un 0 para no irrigado, o un 1 para irrigado para
una clase particular de la tierra; y (2) Irrig la fraccin donde usted
especificara la fraccin de agua de irrigacin suministr al rea que est
disponible para el evapotranspiration.


The Rainfall Runoff method is a simple method that computes runoff as the difference
between precipitation and a plants evapotranspiration. A portion of the precipitation can
be set to bypass the evapotranspiration process and go straight into runoff to ensure a base
flow (through the effective precipitation parameter).
The evapotranspiration is estimated by first entering the reference evapotranspiration,
then defining crop coefficients for each type of land use (Kcs) that multiply the reference
evapotranspiration to reflect differences occurring from plant to plant.
More information about this method can be obtained from the FAO Irrigation and
Drainage Paper 56, called Crop Evapotranspiration and available from the FAOs
website (www.fao.org).
Entering an effective precipitation other than 100% is one way of acknowledging the fact
that part of the rainfall is not submitted to evapotranspiration during high intensity
rainfall events, hence generating a minimal runoff to the river even when the rainfall is
lower than the potential evapotranspiration. Another solution is to move to more developed
models such as the 2-buckets soil moisture model coupled with Surface Water
Groundwater interaction modeling, as presented later in this module.
Hidrologa 114
Stockholm Environment Institute February 2009



3.
Ingrese datos climaticos
Climatic Data se ingresan a nivel de catchment. En Data View, seleccione
la nueva captacion bajo Demand Sites and Catchmentsen el arbol de data e
ingrese la siguiente tabla a Climate usando Monthly Time Series Wizard:
Month Precip. ETref
J an 21 42
Feb 37 47
Mar 56 78
Apr 78 86
May 141 131
J un 114 122
J ul 116 158
Aug 85 140
Sep 69 104
Oct 36 79
Nov 22 43
Dec 13 37


If not available from on-site stations, precipitation data can sometimes be derived from
world-wide climate models such as the one developed by Tim Mitchell at the University of
East Anglia (http://www.cru.uea.ac.uk/~timm/data/index.html). The use of GIS software to
extract the appropriate data is required. Such models provide average data in opposition to
actual data, implying that the calibration is much more delicate.
The Reference Evapotranspiration can be determined from a set of climatic and
topographic parameters using the Penman-Monteith equation. More details are provided
in the FAO publication mentioned earlier. Also, there exist global models of monthly
reference evapotranspiration put together by the FAO, available from the FAOs website.

4.
Miremos los Resultados
Results for Catchments are located in the Catchment category in the
primary variable pull-down menu.
Prdidas de la Precipitacin al Ro Principal debe parecer semejante al
grfico abajo. Escoja el la Referencia el guin del baja men encima
de la leyenda de grfico, el Ro Principal Headflow como la
sitio/rama de Demanda del men a la izquierda superior del grfico, y
del ao 2000 del Aos Escogidos la opcin que utiliza el men en el
fondo del grfico
Hidrologa 115
Stockholm Environment Institute February 2009
.


Modelando Captaciones: modelo de
humedad de suelo
1.
Reemplazando la demanda de agricultura por un sitio de captacion
Borre Agriculture demand site y cree una captacion en su lugar.
NombreloAgriculture Catchment y anote:
Runoff to Main River
Represents Headflow No (check box)
Infiltration to No inflow to GW
Includes Irrigated Areas Yes (check box)
Demand Priority 1 (default)
Note que la prioridad de demanda aparece en la ventana solo despues de
seleccionar Yes para Includes Irrigated Areas.
Hidrologa 116
Stockholm Environment Institute February 2009

2.
Connectar la nueva captacion
La captacin nueva ahora ya debe ser conectada al Ro Principal con una
Conexin de la Prdidas/Infiltracin. Agregue una Conexin de la
Transmisin del Ro Principal (mismo punto de partida como el sitio anterior
de demanda de Agricultura), con una Preferencia del Suministro de 1. Su
modelo ahora debe parecer semejante a la figura abajo:




The purpose of this transmission link is to allow supplying irrigated areas with water from
the river in case rainfall is insufficient.
Hidrologa 117
Stockholm Environment Institute February 2009
3.
Crear una subestructura en la captacion
Asumiremos que esta captacin tiene tres tipos de utilizacin de la tierra. En
los Datos Ve, agrega las ramas siguientes a su captacin nueva derecho hacer
cliclo en el rbol de datos y escogiendo Agrega. (Si usted escoge la
captacin para redactar por hacer clic de derecho en el nodo en la vista
esquemtica antes que atravesando los Datos ven, usted ser preguntado
escoger de antemano un mtodo de simulacin - escoge el la Lluvia Prdidas
(el modelo de la humedad de tierra) el mtodo). Agregue las ramas
siguientes:
Irrigated
Forest
Grasslands
4.
Entre los datos apropiados de uso de suelo
Si usted no ha hecho as ya, escoge la Captacin nuevamente creada en
los Datos ve y escoge el la Lluvia Prdidas (el modelo de la humedad
de tierra) el mtodo haciendo clic en el Avanzado el botn. Entonces
entre los datos siguientes despus de hacer clic en el utilizacin De la
tierra el botn:
Total Land Area 300,000 ha (you will have to select units
first)
Irrigated Forest Grasslands
Share of Land Area 33% 25%
remainder(100)
Hidrologa 118
Stockholm Environment Institute February 2009


Irrigated Forest Grasslands
Leaf Area Index 3.6 3.0 1.7
Root Zone Conductivity 60 35 45 mm/month
Preferred Flow Dir. 0.15 0.15 0.15
Initial Z1 50% 20% 20%
Las restantes variables son las mismas:

Initial Z2 20%
Root Zone Water Capacity 900 mm
Deep Water Capacity 35,000 mm
Deep Conductivity 240 mm/month
Kc Use the same values as input for the Main River Headflow
catchment in the previous exercise. You can simply
copy and paste that expression into the Kc field for
the Agriculture Catchment land classes.


The Rainfall Runoff (soil moisture model) method has been developed to provide a simple
yet realistic way of modeling hydrological processes with a semi-physical representation.
Details about the method and its parameters, as well as calibration procedures, can be
found in the appendix to this tutorial as well as in articles posted to the publication
section of WEAPs website (www.weap21.org). The related WEAP help topic provides a
description of each parameter and an overview of the model as well. The parameter values
displayed above are for illustration purposes only.
5.
Ingrese los datos apropiados de clima
En la misma ventana, seleccione Climate e ingrese lo siguientes data:
Hidrologa 119
Stockholm Environment Institute February 2009
Precipitation Use the same values as input for the Main
River Headflow catchment in the
previous exercise.
Temperature MonthlyValues( J an, 9, Feb, 12, Mar, 16,
Apr, 21, May, 24, J un, 27, J ul, 29, Aug, 29,
Sep, 27, Oct, 22, Nov, 16, Dec, 11
)
Humidity 65%
Wind 1m/s
Latitude 30


Data about snow coverage are not needed if the basin is not exposed to snow. WEAP
determines the appearance of snow based on the temperature and the melting and freezing
points parameters. If the last two are left empty, no snow will be allowed to accumulate.
6.
Defina las areas de riego
En la misma ventana (o ambiente), seleccione Irrigation e ingrese lo
siguiente
Irrigated Forest Grasslands
Irrigated Area 100% 0% 0%
Lower Threshold 45%
Upper Threshold 55%


Hidrologa 120
Stockholm Environment Institute February 2009
7.
Miremos los Resultados
Mire los resultados siguientes. Aqu otra vez, los resultados se localizan en el
Captacin la categora del los Resultados la vista. Escoja Afluencias de
Clase de Tierra y Desages bajo la variable primaria baja men. Escoja Todo
Srcs/Dests (corto para Todas Fuentes y los Destino) del baja men encima
de la leyenda del grfico. Para ver el Irrigado el segmento de la captacin de
la Agricultura, escoge Rama: los Sitios de la Demanda y
Captaciones\Captacin de Agricultura\Irrigado del baja men a la izquierda
superior del grfico. Escoja el ao 2000 del Aos Escogidos la opcin que
utiliza el baja men en el fondo, y el clic en el Promedio Mensual en la
extrema derecha superior.
Afluencias de Clase de tierra y Desages representa en una manera muy
detallada el equilibrio de agua para cada clase de utilizacin de la tierra. Usted
debe obtener un grfico semejante a la figura abajo para el Irrig afluencias
de clase de tierra y grfico de desages:



Usted puede mirar tambin tales parmetros como la Humedad de Tierra en
el cubo superior (la Humedad Relativa de Tierra 1 (%)), o el Flujo al Ro la
Irrigacin Repleta, que demuestra el agua que fluye al ro, inclusive el agua
del irrigacin en el exceso.
Hidrologa 121
Stockholm Environment Institute February 2009

As you can see from the series of graphs, irrigation only happens from April to September.
Soil Moisture in the first bucket is rather constant throughout the year at 45% to 50%,
which is consistent with the lower threshold we set.
Simulando interaccion superficie y
aguas subterraneas
1.
Crear un objeto agues subterranes
Crear nuevo node de groundwater.
Localice el objeto Groundwater junto a la captacion de Agriculture que
ud creo previamente. Nombrelo Agriculture Groundwater.

2.
Connecte el objeto Groundwater con la captacion
Crear las siguientes conecciones:
Transmission Link from Agriculture Groundwater to Agriculture
Catchment (Supply Preference 1)

Infiltration/Runoff Link from Agriculture Catchment to Agriculture
Groundwater.

Su modelo deberia verse como este:

Hidrologa 122
Stockholm Environment Institute February 2009



You can also create the Infiltration/Runoff Link between the catchment and the
groundwater node by right-clicing the catchment in the Schematic View, selecting
General Info and then choosing the groundwater field in the Infiltration to drop-
down menu.
3.
Ingrese los datos apropiados
En el ambiente Data seleccione Agriculture Groundwater, cambia a
Physical y seleccione Model GW-SW flows methodo de la carpeta de
metodos.



Hidrologa 123
Stockholm Environment Institute February 2009
Cambie al water quality yentonces regrese a physical ventana para el
cambio para que surta efecto (usted ahora ver varias etiquetas nuevas en la
ventana Fsico). Entre los datos siguientes (blanco de hoja si nada se
especifica) bajo las etiquetas o carpetas apropiadas:
Initial storage 50M m
3

Hydraulic Conductivity 10m/day
Specific Yield 0.1
Horizontal Distance 5000m (the extent of the aquifer perpendicular to
the river )
Wetted Depth 5m
Storage at River Level 50Mm
3




4.
Select the Reaches that Interact with the Aquifer
En el rbol de Data, ensanche todos los alcances del Ro Principal (main river)
haciendo clic en el + luego a en supply and resources\river. Escoja el
alcance que est debajo del nodo del flujo del regreso de la gran Ciudad
(Return flow node 1; usted quizs tenga que cambiar a schematics y hacer
clic en el boton derecho para encontrar el nombre de ese nodo en su modelo).
Entonces entre los datos siguientes en el reach length la etiqueta para este
alcance:

From Groundwater Select Agriculture Groundwater
Hidrologa 124
Stockholm Environment Institute February 2009



Reach Length 30,000 m

5.
Miremos los resultados
Mire a la Demand Site Inflows and Outflows para Agriculture catchment,
y select All Srcs/Dests para el ano 2000. Clic en Monthly Average.
Hidrologa 125
Stockholm Environment Institute February 2009



Note that these results include Inflow from Agriculture Groundwater (due to the
designation of the Agriculture Groundwater node as a source to supply irrigation water for
the Agriculture Catchment) and Outflow to Agriculture Groundwater (due to the
creation of a runoff/infiltration link between the two nodes).

Miremos tambien en Groundwater Inflows and Outflows (under Supply
and Resources\Groundwater) para el ao 2000 (monthly averages).



Hidrologa 126
Stockholm Environment Institute February 2009

Note that the Inflow from Upstream category indicates infiltration of Main River water
to Agriculture Groundwater along the river reach you selected earlier. Likewise, Outflow
to Downstream represents groundwater seepage into the Main River.

Mire tambin en la altura de agua subterrnea encima de la etapa del ro. Esto
puede ser visto escogiendo supply and resources\groundwater\height above
river de la variable primaria en el men. Escoja agricultura groundwater del
selected aquifers la opcin en el men encima de la leyenda del grfico.





Note that in the month where groundwater seepage to the Main River occurs (February),
the groundwater elevation is higher than the wetted depth of the river as designated in the
data (i.e., the difference in elevations is positive). Likewise, when Main River infiltration to
groundwater is occurring, the elevation difference is negative.

///
Refinando el Suministro 127
Stockholm Environment Institute February 2009


WEAP
Water Evaluation And Planning System

Refinando el
Suministro

Un turorial para
Cambiando las prioridades de
suminstro ................................................................ 128
Modelando reservas ................................................ 131
Agregando requerimientos de caudal
o flujos .................................................................... 137

February 2009








Refinando el Suministro 128
Stockholm Environment Institute February 2009
Cambiando las prioridades de
suministro
Note:
Para comenzar esta leccion vaya al Menu principal y seleccione Revert to
Version y escoja la version llamada Starting Point for all modules after
Escenarios module.
6.
Crear una nueva transmission para el reuso de agua
Crear una nueva transmission comenzando en Big City Demand Site y
terminando en Agriculture Demand Site. Este es un modelo conceptual de
reuso de aguas servidas de una zona urbana para propositos agricolas. Fije el
supply Preference en esta Transmission en 2.
Supply Preference 2


If water quality were a concern, a wastewater treatment plant could have been added to
treat the water from Big City before Agriculture received it. Having the treatment plant in
the schematic would make it possible to simulate the changes in water quality before and
after treatment.
7.
Resultados cuando se cambian las preferencias de suministro
Trate de cambiar las preferencias de suministros en las nuevas conecciones
qu ahora suministran a la agricultura y vea los resultados para Demand Site
Refinando el Suministro 129
Stockholm Environment Institute February 2009
Coverage. Para cambiar las prioridades haga clic en el boton derecho sobre
el transmission link en el ambiente schematics.

Trate las siguientes combinaciones:

Supply Preferences =1 from the Main River, 2 from Big City


Supply Preferences =2 from the Main River, 1 from Big City
Refinando el Suministro 130
Stockholm Environment Institute February 2009


Supply Preferences =1 from the Main River and 1 from Big City



Entiende porque cambian las demandas cuando las preferencias cambian?

You can modify the display of preferences on the schematic by using the
Schematic\Change the Priority View menu. The View Allocation Order option will
display the actual priority order in which WEAP computes supply. This is a function of the
Supply Preference of the link as well as the Demand Priority of the demand site.
Note that you can study the impact of changing Supply Preferences, like Demand Priorities,
by creating alternative escenarios.
Refinando el Suministro 131
Stockholm Environment Institute February 2009
8.
Regresar al modelo original
Puede hacer esto escogiendo Revert to Version dentro de Area en el men
principal. Escoja Starting Point for all modules after Escenarios module
como lo hizo para comenzar este exercise.

Modelando Reservas
1.
Create a Reservoir and enter the related data
Primero cree un nuevo eescenario heredado de Reference y nombrelo
Reservoir Added. Entonces agregue al objeto reservoir en Main River
ro arriba de Big City, y llamelo "Main River Reservoir" asegurese de
desbloquear la opcion donde pregunta si es active in Current Accounts.
Deje Demand Priority en 99 (default).


Refinando el Suministro 132
Stockholm Environment Institute February 2009


Clic en boton derecho sobre Main River Reservoir y select "Edit Data".
Seleccione la variable Storage Capacity y ingrese al ambiente Data
(asegurese de queReservoir Added este seleccionado). Clic en Startup
Year antes de alterar otros parametros.

escoja 2002 como punto de partida para Main River Reservoir

Clic en el boton Physical y cambia lo siguiente:
Storage Capacity 70 M m
3


Note que la escala (Scale) se fija en "Million"
Refinando el Suministro 133
Stockholm Environment Institute February 2009




More details about reservoirs operation and hydropower production are provided in the
Reservoirs and Power Production module of the WEAP tutorial.
2.
Run the Model and Evaluate the Results
Compare Demand Site Coverage paraAgriculture en los eescenarios
Reference y Reservoir Added.
- Demand Coverage: porque la agricultura posee mayor covertura con
la reserva en el lugar?

Refinando el Suministro 134
Stockholm Environment Institute February 2009


- Reservoir Storage Volume: Aparenta ser sustentable la construccion de
una reserva? Use el menu principal en chartpara seleccionar Reservoir
Storage Volume (bajo Supply and Resources\Reservoir), y seleccione
All Years a los pies del graphico.







Refinando el Suministro 135
Stockholm Environment Institute February 2009
- Flow in the River: Como cambia los flujos o caudales ro abajo de
la reserve en el ro principal? Seleccione Streamflow (bajo Supply
and Resources\River) del menu principal y clic en Monthly
Average. Escoja 2002 desde Selected Years y escoja Withdrawal
Node 2 para comparasion.




Escojamos escala logaritmica (opcion ubicada en la barra vertical a la
derecha) par aver mas claramente las diferencias ro arriba y ro debajo de
Main River Reservoir.
Refinando el Suministro 136
Stockholm Environment Institute February 2009


Seleccione debajo de Return Flow Node 1 para comparasion. Porque
es que streamflow en este alcance es mas parecido en ambos
eescenarios?




The creation of a large reservoir allows storage of excess water during high flow periods
to cover water demand during low flow periods. The price to pay is, however, a potentially
large impact on the hydrological regime of the river downstream of the reservoir. The
Return Flows from Big City and Agriculture provide the flow in the Main River during the
spring and winter months. A reservoirs operation variables and flow requirements can be
used to mitigate the reservoirs downstream impact.
Refinando el Suministro 137
Stockholm Environment Institute February 2009
Agregando requerimientos de caudal o
flujo
1.
Crear requerimientos de Caudal
Crer un nuevo eescenario: Flow Requirement Added. Este es heredado de
Reservoir Added. El arbol de eescenarios debe verse asi:


Ahora agregue Flow Requirement a Schematic debajo de withdrawal node
para Big City, pero agues arriba de withdrawal node para Agriculture.
Demand Priority 1 (default)


Refinando el Suministro 138
Stockholm Environment Institute February 2009



Clic derecho en Flow Requirement y seleccione Edit Data\Minimal Flow
Requirement. Agregue el valor (asegurese de que aun esta en el eescenario
Reservoir Added):

Minimal Flow Requirement 5 CMS


2.
Correr el Modelo y evalue los Resultados
Miremos los resultados y pensemos en las preguntas relacionadas.
- Como agregando un requerimiento de caudal cambia a flujo
(streamflow) en el alcance del flujo mas abajo de flujo requerido?
Compare streamflow debajo del requirement para Reference, Reservoir
Added, y Flow Requirement Added para el mismo ao (2002). DEberia
obtener el siguiente grfico:

Refinando el Suministro 139
Stockholm Environment Institute February 2009


- Cual es la covertura del caudal?
Se puede saber seleccionando "Instream Flow Requirement Coverage" bajo
Demand. (Cambie logaritmo por eje Y, y seleccione solo Flow Requirement
Added).



- Porque la covertura ha cambiado para la ciudad?
Seleccione Demand Coverage desde el menu principal, seleccione Big City
demand site, y seleccione Reference, Reservoir Added, and Flow
Requirement Added como eescenarios.
Refinando el Suministro 140
Stockholm Environment Institute February 2009


- Asumiendo que este requerimiento de flujo es mas importante que suministrar
a la ciudad Big City, Como dberia cambiar el modelo para asegurar que los
requerimientos de caudal se cumplan?


The relative level of Demand Priority for Big City, Agriculture and the Flow Requirement
will determine which demand is covered first. To ensure that the Flow Requirement is
covered first, change the Demand Priority of Big City to a value higher than for the Flow
Requirement, since it is upstream of the Flow Requirement.



Embalses y Generacin Hidroelctrica 141
Stockholm Environment Institute February 2009





WEAP
Water Evaluation And Planning System

Embalses y
Generacin
Hidroelctrica
UN TUTORIAL EN
Modelando Embalses .............................................. 142
Agregando Generacin
Hidroelctrica ......................................................... 146
Modelando Centrales de Pasada ............................. 149


febrero 2009




Embalses y Generacin Hidroelctrica 142
Stockholm Environment Institute February 2009
Modelando Embalses
Note:
For this module you will need to have completed the previous modules
(WEAP in One Hour, Basic Tools, and Escenarios) or have a fair knowledge
of WEAP (data structure, Key Assumptions, Expression Builder, creating
escenarios). To begin this module, go to the Main Menu, select Revert to
Version and choose the version named Starting Point for all modules after
Escenarios module.
3.
Creando un Embalse
Cree un Embalses en el Lago localizado aguas arriba de Big City.
Llmelo Embalse Big City.
Demand Priority 99 (default)

Entering a Demand Priority of 99 ensures that the reservoir will only fill if all other
needs are fulfilled, including downstream demand.
4.
Ingresando los Datos Fsicos
Haga clic en el botn derecho en Embalse Big City para modificar los
datos. Ingrese los siguientes datos en la ventana Physical
(asegrese de que este en Current Accounts).
Storage Capacity 70 M m
3

Initial Storage 25 M m
3

Volume Elevation Curve
Volume Elevation
M m
3
m
0.0 190
30.0 210
70.0 216
Net Evaporation 25 mm/month.
Embalses y Generacin Hidroelctrica 143
Stockholm Environment Institute February 2009






The Volume Elevation Curve is used both to model the surface for evaporation and to
compute the head in case hydropower production is simulated. A cylindrical shape is
assumed in converting volume and elevation into area.
Net evaporation needs to account for both rainfall and evaporation. It can therefore be a
positive or a negative number; monthly variations can be modeled using the Monthly
Time Series Wizard.
Embalses y Generacin Hidroelctrica 144
Stockholm Environment Institute February 2009
5.
Ingrese los Datos Operacionales
En la misma vista, ingrese los siguientes datos en la ventana
Operation.
Top of Conservation 60
Top of Buffer 40
Top of Inactive 5
Buffer Coefficient 1.0



As illustrated by the figure to the left,
WEAP allows the modeling of advanced
reservoir operation through the
definition of several zones that have
different operational constraints.
More can be learned through the
Help files Reservoir Zones and
Operation screen or by clicing
on the help button when in the
Reservoirs Operation tab.
6.
Entendiendo los impactos del Buffer Coefficient (Coeficiente de
Amortiguamiento)
Ahora cree un nuevo eescenario heredado del eescenario Referencia.
Llame a este eescenario Cambios en el Buffer Coefficient. Despus
Embalses y Generacin Hidroelctrica 145
Stockholm Environment Institute February 2009
vuelva a la vista de Datos (asegrese de que este en el Nuevo
eescenario que acaba de crear) y cambia el buffer coefficient a 0.1.
Haga clic en los resultados para correr el nuevo modelo.

Compare, para los eescenarios de Referencia y Cambios en el
Buffer Coefficient, los resultados para el Reservoir Storage Volume
(volumen almacenado en embalse), que se encuentra bajo la rama
Supply and Resources\Reservoirs de la primera variable del men.
Seleccione All Years desde el men desplegable al fondo de la
pantalla, y haga clic en Monthly Average arriba del grfico. Elija
los eescenarios Referencia y Cambios en el Buffer Coefficient
para ver desde el men desplegable arriba de la leyenda. Usted puede
elegir Embalse Big City desde el men desplegable justo arriba del
grfico.



Tambin compare los resultados para Demand Coverage (Cobertura
de Demanda) (bajo la rama de Demand). Seleccione los eescenarios de
Referencia y Cambio en el Buffer Coefficient desde el men
desplegable arriba de la leyenda del grfico. Seleccione Big City
como el sitio de demanda para ver desde el men desplegable que falta
arriba del grfico.

Embalses y Generacin Hidroelctrica 146
Stockholm Environment Institute February 2009




The Buffer Coefficient provides a way to regulate water releases when the water level in
the reservoir is within the buffer zone (see figure in the information box of the previous
step). The downstream demand is multiplied by the Buffer Coefficient to obtain actual
water release. Thus a Buffer Coefficient of 1 means that as much water is released as is
needed to cover downstream demand (in other terms, the buffer zone is a mere
extension of the conservation zone). A Buffer Coefficient of 0 means no water is
released. This is why lower Demand Site Coverage is observed for results in the Buffer
Coefficient Changes escenario above.
Agregando Generacin Hidroelctrica
1.
Entendiendo la manera en que WEAP modela las Produccin de
Energa
WEAP puede modelar Produccin de Energa de tras maneras
diferentes: a travs de embalses en lnea, a travs de embalses fuera de
lnea y a travs de centrales de pasadas.
Refer to the help for more information on each category.
Embalses y Generacin Hidroelctrica 147
Stockholm Environment Institute February 2009
2.
Agregue Capacidades de Generacin de Energa al Embalse Big City
En este ejemplo vamos a modelar la estacin hidroelctrica de un
embalse en lnea. Ingrese los siguientes datos bajo la ventana
Hydropower para el Embalse Big City en las Cuentas Actuales
(Current Accounts).
Min Turbine Flow 5 CMS
Max Turbine Flow 80 CMS
Tailwater Elevation 195m
Plant Factor 100%
Generating Efficiency 60%




Look at the Hydropower Calculations help topic for more information about how
WEAP computes power production.
3.
Compute la Produccin Hidroelctrica y Entienda los Resultados
Corra el modelo y mire a los resultados del modelo de referencias para
la produccin hidroelctrica para el ao 2000.
Los resultados pueden ser accedidos bajo el men desplegable
principal bajo Supply and Resources/Reservoir/Hydropower.

Embalses y Generacin Hidroelctrica 148
Stockholm Environment Institute February 2009


Entiende por que los niveles de produccin entre Mayo y Junio
son tan similares, a pesar de que los flujos en el Ro Principal
(Main River) y la descarga aguas abajo es mucho mas grande en
Junio? Para confirmar esto, mire los resultados de Streamflow
en el tramo arriba del Embalse Big City (Main River Headflow).




Embalses y Generacin Hidroelctrica 149
Stockholm Environment Institute February 2009

The streamflow that can be processed by the turbine has been capped to 80CMS (see
previous step), meaning that even though there is a higher discharge in June, the excess
quantity flows downstream without going through the turbine. Hydropower in June
would be the same for May and June if not for the fact that the Storage Elevation in Big
City Reservoir was slightly lower at the end of April than it was at the end of May (look
at the Storage Elevation results to confirm this - these numbers represent the status at
the end of each month indicated). This effect was slightly offset by the fact that May has
31 days to produce power, whereas June has 30 days, but June still ended up having
slightly higher total production.
Off-line, local reservoirs hydropower production can be modeled in the same way.
Modelando Centrales de Pasada
1.
Cree un objeto de Central de Pasada
Cree un Objeto de Central de Pasada en el Ro Principal (Main River)
aguas arriba del Embalse Big City creado en el ejercicio anterior.
Llmelo Central de Pasada Big City.


Ingrese los siguientes datos en la rama Supply and
Resources\River\Run of River Hydro del rbol de Datos en la Vista
de Datos:
Min Turbine Flow 5 CMS
Max Turbine Flow 80 CMS
Plant Factor 100%
Embalses y Generacin Hidroelctrica 150
Stockholm Environment Institute February 2009
Generating Efficiency 60%
Fixed Head 19.5 m

2.
Corra y Compare los Resultados
Corra su modelo y cree un grfico comparando la produccin de
energa para la central de pasada y para la estacin generadora en el
embalse. Haga esto seleccionado All Hydropower del men
desplegable arriba de la leyenda.

Cuales son las razones de las diferencias entre ambas curvas?

Embalses y Generacin Hidroelctrica 151
Stockholm Environment Institute February 2009



Note that the Run of River hydropower is slightly higher in May than June, in contrast
to Big City Reservoir power production. This is due to the additional day available in
May compared to June. Run of River hydropower production does not have Storage
Elevation as limiting effect, whereas the Reservoir was still filling in May, which
decrease the Reservoir production for that month compared to June.

Como afecta la central de pasada el flujo en el ro, en comparacin con la
estacin en el Embalse Big City?

Para ver esto en el grfico, seleccione Streamflow del men
desplegable principal y elija Selected Main River Nodes and
Reaches del men desplegables arriba de la leyenda. Seleccione los
siguientes tramos: Headflow, Central de Pasada Big City, Below
Central de Pasada Big City, Embalse Big City, y Below Embalse
Big City de la lista.

Embalses y Generacin Hidroelctrica 152
Stockholm Environment Institute February 2009




A reservoir can store water during high flows and release during low flow, thus having
a smoothing effect. A run-of-river operation, however, processes whatever water flows
in the river at any given point in time. Therefore, it does not affect the shape of the
streamflow curve.







WEAP
Water Evaluation And Planning System

Calidad del Agua
UN TUTORIAL EN
Preparando la modelacin de Calidad ..................... 154
Ingresando Datos de Calidad de Agua .................... 156
Considerando restricciones de Calidad del
Agua en un Sitio de Demanda ............................... 162
Ingresando Actividades Generadoras de
Contaminacin en un Sitio de Demanda ................ 165
Modelando una Planta de Tratamiento de
Aguas Servidas ....................................................... 167




febrero 2009


Calidad del Agua 154
Stockholm Environment Institute February 2009
Note:
For this module you will need to have completed the previous modules (WEAP in
One Hour, Basic Tools, and Escenarios) or have a fair knowledge of WEAP (data
structure, Key Assumptions, Expression Builder, creating escenarios). To begin this
module, go to the Main Menu, select Revert to Version and choose the version
named Starting Point for all modules after Escenarios module.
Preparando la modelacin de Calidad
1.
Entendiendo la Modelacin de Calidad del Agua en WEAP
WEAP puede modelar tanto contaminantes conservativos como no-
conservativos. Contaminantes conservativos son modelados a travs de un
simple balance de masas. Una serie de modelos se ofrecen para
contaminantes no-conservativos.
Lea el tpico de ayuda Environment Overview para una descripcin ms
detallada de las capacidades de WEAP.
2.
Cree un set de Contaminantes
Cree el set de contaminantes que va a ser modelado en el men
General\Water Quality Constituents. En la caja de dialogo, haga el
siguiente cambio para Temperature (ya parte de la lista) y agregue TSS
(Total Suspended Solids, Solidos Suspendidos Totales) y Sal a la lista de
constituyentes (BOD y DO deberan tambin aparecer listados):
Name Calculate by Decay Rate
Temperature Change to modeled
TSS Decay 0.25 per day
Salt Conservative
Calidad del Agua 155
Stockholm Environment Institute February 2009



Calidad del Agua 156
Stockholm Environment Institute February 2009




More details are provided on the different models used for BOD and DO models in the
Dissolved Oxygen and Biochemical Oxygen Demand help topic.
Ingresando Datos de Calidad de Agua
1.
Ingrese datos de Calidad del Agua de Rios
En el rbol de las vista de Datos, seleccione Supply and Resources\River y
haga clic en el Main River (Ro Principal). Despus abra la pantalla de
Water Quality e ingrese los siguientes datos, que representan la calidad del
agua en la cabecera del ro:
Calidad del Agua 157
Stockholm Environment Institute February 2009
Model Water Quality? YES (check the box)
Temperature 15C
BOD concentration 5mg/l
DO Concentration 8mg/l
TSS concentration 20mg/l
Salt concentration 2mg/l



2.
Ingrese las Caractersticas Geomtricas del Ro
Las caractersticas geomtricas del ro se necesitan para los diversos modelos
de calidad del agua. Estas son usadas principalmente para calcular
Calidad del Agua 158
Stockholm Environment Institute February 2009
velocidad/tiempo de residencia del agua en cada tramo del ro. En la vista de
Datos, selecciones la rama Reaches (Tramos) del Main River e ingrese la
siguiente informacin bajo la lengeta Water Quality.
Headflow Distance Marker 0 km
Tailflow Distance Marker 300 km
Nota: largos de tramos intermedios sern estimados por WEAP basado
en el esquema.



Flow Stage Width (Caudal-Alto-Ancho) para el tramo Below Main
River Headflow (use el Wizard hacienda clic en la flecha que baja)
Flow Stage Width
0 0.00 0.00
10 2.00 15.00
50 6.00 20.00
100 8.00 25.00
200 10.00 30.00
Su formula debera leer:
FlowStageWidthCurve( 0, 0, 0, 10, 2, 15, 50, 6, 20, 100, 8, 25, 200, 10, 30 )
Asumiremos que esta seccin de ro se mantiene constante y dejaremos
los otros tramos vacos.
Calidad del Agua 159
Stockholm Environment Institute February 2009



Calidad del Agua 160
Stockholm Environment Institute February 2009

The Reach Length tab displayed under the Inflows and Outflows screen is used
only for groundwater-surface water interaction modeling. Since this interaction can
occur along segments of the total reach length, it can differ from the total reach length.
Note that the reach length data input here is not used for water quality modeling.
3.
Ingresando los datos Climatolgicos
Los Datos Climatolgicos se necesitan para calcular la temperatura del
agua. Haga clic en el botn Climate y seleccione nuevamente el tramo
Below Main River Headflow. Ingrese la siguiente informacin
climatolgica:
Air Temperature
Month Value (C)
Jan 10
Feb 11
Mar 13
Apr 15
May 21
Jun 24
Jul 29
Aug 31
Set 28
Oct 20
Nov 16
Dec 12
Calidad del Agua 161
Stockholm Environment Institute February 2009


Humidity 65%
Wind 1 m/s
Latitude 30
Nota: usted puede ingresar estos datos para el primer tramo del ro y
dejar los otros tramos vacos si es que quiere que estos valores apliquen
para todos los tramos.


Calidad del Agua 162
Stockholm Environment Institute February 2009
Considerando restricciones de Calidad del
Agua en un Sitio de Demanda
1.
Ingresando las Restricciones
Un sitio de demanda puede requerir que su suministro de agua cumpla con
ciertos criterios de calidad del agua. Cree un nuevo eescenario heredado del
eescenario de Reference y llmelo Restricciones de Calidad de Agua Hacia
Big City. En la vista de Datos (asegrese de que este en el nuevo eescenario),
seleccione la rama de Big City en el rbol de datos, y haga clic en el botn de
Water Quality. Bajo la pestaa BOD Inflow, ingrese la siguiente
concentracin mxima de BOD:
BOD inflow 2 mg/L


2.
Compare los Resultados
Acurdese de que antes usted haba ingresado una concentracin de BOD (5
mg/L) para las aguas a la cabecera del Main River (bajo las Current
Accounts), por lo que puede usted ahora correr el modelo y comparar la
Cobertura de Demanda para Big City, con y sin la restriccin en la calidad
del agua en el suministro de Big City. Para el periodo 2000 y 2001, una
comparacin del Big City Demand Site Coverage para los eescenarios de
Referencia y Restricciones de Calidad de Agua Hacia Big City debera
verse como a continuacin:

Calidad del Agua 163
Stockholm Environment Institute February 2009


Por que la Cobertura de Big City baja a cero durante Junio, 2001, en el
eescenario con restriccin en la calidad del agua?

If you look at the BOD concentration in the Below Main River Headflow reach
(pictured below), you will see that BOD rises above the constraint (2 mg/L) for Big City
intake during the month of June for both 2000 and 2001. Since the constraint is activated
during the escenario period (starting in 2001), coverage for Big City decreases during
June, 2001, because this demand site will not accept water that falls below the BOD
constraint, and no other sources of water other than the Main River have been
designated as supplies for Big City.


Calidad del Agua 164
Stockholm Environment Institute February 2009

The simulated temporal pattern of the BOD concentration along this reach of the Main
River is a function of degradation, the extent of which is controlled by the residence
time of the water in the Headflow reach. The longer the residence time in this reach,
the more degradation that occurs. The pattern for BOD thus mirrors that of the flow
velocity, and streamflow, for the reach (both pictured below).





Calidad del Agua 165
Stockholm Environment Institute February 2009
Ingresando Actividades Generadoras de
Contaminacin en un Sitio de Demanda
1.
Ingresando Datos
Vamos a asumir que sabemos la concentracin de contaminantes en los flujos
de salidas (Flujo de Retorno) de Big City. Entonces, usaremos la serie de
pestaa de Concentration en la rama Demand Sites\Big City del rbol
de Datos. Haga clic en el botn de Water Quality e ingrese los siguientes
datos (en Current Accounts):
Temperature 16 C
BOD Concentration 60 mg/l
DO Concentration 3 mg/l
TSS Concentration 5 mg/l
Salt Concentration 10 mg/l




Para el sitio de demanda Agrcola, vamos a admitir que no sabemos la
concentracin en los flujos de salida, pero sabemos la intensidad de
generacin de contaminantes. Ingrese la siguiente informacin:

BOD intensity 50 kg/ha
Calidad del Agua 166
Stockholm Environment Institute February 2009
DO Intensity 30 kg/ha
TSS Intensity 20 kg/ha
Salt Intensity 2 kg/ha
Temperature 15C



Inputting data for Pollutant Generation, using either method, will cause WEAP to
disregard any pollutant concentration specified or simulated in the inflow to the
demand site.
2.
Evalue los Resultados
Corra el modelo y mire a los siguientes resultados para varios constituyentes
de calidad del agua. Seleccione Pollution Generation del menu de
variables principal (bajo Water Quality):
Demand Site Pollution Generation
Surface Water Quality

Calidad del Agua 167
Stockholm Environment Institute February 2009

Note que la Generacin de Contaminacin para la Agricultura se restringe a
los meses de primavera y verano que es cuando las actividades agrcolas
estn activas.

Modelando una Planta de Tratamiento de
Aguas Servidas
1.
Cree una Planta de Tratamiento de Aguas Servidas
Cree un eescenario llamado Nueva Planta de Tratamiento de Aguas
Servidas- este eescenario se hereda del Reference. Despus, agregue una
Planta de Tratamiento de Aguas Servidas (Wastewater Treatment Plant)
para Big City, llmela Big City WWTP y djela inactiva en las Cuentas
Actuales, y cree otro enlace de flujo de retorno desde Big City a la WWTP.
Mantenga el enlace de Flujo de Retorno existente entre Big City y el ro.
Tambin cree un flujo de retorno entre la WWTP y el ro. Su modelo debera
verse similar a la figura de abajo:

Calidad del Agua 168
Stockholm Environment Institute February 2009


Usted tiene que establecer las variables de Return Flow Routing (Ruteo de
los Flujos de Retorno) para ambos enlaces.
For Para el Flujo de Retorno desde Big City a Main River (Return Flow
Node 1), deje el Routing en un 100% para las Cuentas Actuales y 0%
para los aos 2001-2015 en el eescenario Nueva Planta de Tratamiento
de Aguas Servidas recin creado.



Para los Flujos de Retorno desde Big City a la WWTP de Big City
establzcalo a un 100% para los aos 2001-2015 en el mismo eescenario.
Calidad del Agua 169
Stockholm Environment Institute February 2009



Tambin establezca el Routing a un 100% para el Flujo de Retorno desde
la WWTP Big City al Main River (Return Flow Node 3).



You also have the possibility to set removal rates in the various return flows. This
would be useful if, for example, a given pollutant is decomposed by bacteria in the
sewer system. These data can be entered under the Water Quality\Pollutant Decrease
in Return Flow branches for the appropriate return flows (see figure below for
example).
Calidad del Agua 170
Stockholm Environment Institute February 2009


2.
Ingrese la informacin para la WWTP
Primero, ingrese el Start Year (ao de inicio) haciendo clic en el botn
Start Year bajo la rama Water Quality\Wastewater Treatment del rbol
de datos para Big City WWTP.
Start Year 2001

Tambin ingrese la siguiente informacin en la ventana de Treatment
(Tratamiento) (con el eescenario Nueva Planta de Tratamiento de Aguas
Servidas seleccionado):

Calidad del Agua 171
Stockholm Environment Institute February 2009
Consumption 5%
Daily Capacity 2M m
3

BOD Removal 90%
DO Concentration 5mg/l
TSS Removal 80%
Salt Removal 20%
Temperature 15C




If only part of the wastewater is treated through the WWTP, there are two modeling
possibilities. One is to limit the Daily Capacity to whatever amount can actually be
treated. In this case the wastewater in excess will be discharged without treatment. In
this case, the share of untreated wastewater is not constant, but depends on the total
flow.
Another solution is to create an additional return flow going from the demand site
straight to the river, by-passing the WWTP. In this case, a constant share can be set to
by-pass the WWTP by setting the return flow routing shares accordingly. A
combination of both methods is also possible.
3.
Evalu los Resultados
Corra el modelo y mire a los siguientes resultados para BOD en el eescenario
Nueva Planta de Tratamiento de Aguas Servidas, comparndolos con los
valores del eescenario Referencia (sin la planta de tratamiento de aguas
servidas).
Calidad del Agua 172
Stockholm Environment Institute February 2009

-Surface Water Quality (BOD en el ro aguas debajo del retorno de agua
desde Big City).

Para ver estos resultados, primero selecciones Surface Water Quality bajo
Water Quality en el men desplegable principal. Despus elija Selected
Escenarios en el men desplegable arriba de la leyenda del grfico y
seleccione los eescenarios Referencia y Nueva Planta de Tratamiento de
Aguas Servidas.

Usando el men desplegable abajo del grfico, selecciones los aos 2000 y
2001 para ver. Seleccione Below Return Flow Node 3 (Return Flow Node 3
es el flujo de retorno desde la WWTP, por lo que va a estar mirando a la
calidad del agua en el ro justo abajo del influjo desde la WWTP) como el
tramo en Main River para ver. Seleccione BOD como el componente de
calidad de agua desde el men desplegable arriba del grfico, y desmarque el
botn Monthly Average a la extrema derecha. Su pantalla debera verse
como la que se presenta a continuacin:



Note that BOD levels decrease substantially in 2001 compared to 2000 in the reach
below the return flow from the treatment plant because the plant becomes active that
year.
Calidad del Agua 173
Stockholm Environment Institute February 2009


-WEAP tambin puede mostrar los valores de calidad del agua a lo largo
del ro.

Desde el men al fondo de la pantalla, elija All Main River Nodes and
Reaches y haga marque Represent true relative distance? Esto mostrara
todo los nodos y tramos a lo largo del eje-X, con su distanciamiento
proporcional a su distancia aguas abajo (las distancias se muestran en
parntesis). Seleccione July, 2010, como el mes y ao. Para el tipo de grfico
(chart type), seleccione Line.
El grfico muestra como los niveles de BOD aumentan cuando los flujos de
retorno cargados de BOD entran al ro, y disminuyen a medida que el BOD
decae aguas abajo. El efecto de la planta de tratamiento de aguas servidas se
puede ver claramente. Su grfico debera parecerse al siguiente:


-Influjos y Descargas de la Planta de Tratamiento de Aguas Servidas.

Para ver estos resultados, seleccione Wastewater Treatment Plant Inflows
and Outflows (bajo Water Quality) desde el men desplegable principal.
Tambin seleccione el eescenario Nueva Planta de Tratamiento de Aguas
Servidas desde el men arriba a la izquierda.
Calidad del Agua 174
Stockholm Environment Institute February 2009


In this type of chart, the outflows are represented as negative values and inflows are
positive values. Note also that the Lost in Treatment category represents the flow
that is consumed - a consumption rate of 5% was input in the data view for the
treatment plant.










WEAP
Water Evaluation And Planning System

Anlisis
Financiero
UN TUTORIAL EN
Preparando el Modelo de Costos e Ingresos ............ 176
Modelando Costos ................................................... 178
Modelando Ingresos ................................................ 184



febrero 2009




The Rainfall Runoff (Soil Moisture) Model 176
Stockholm Environment Institute February 2009
Note:
For this module you will need to have completed the previous modules (WEAP in
One Hour, Basic Tools, and Escenarios) or have a fair knowledge of WEAP (data
structure, Key Assumptions, Expression Builder, creating escenarios). To begin this
module, go to the Main Menu, select Revert to Version and choose the version
named Starting Point for all modules after Escenarios module.
Preparando el Modelo de Costos e
Ingresos

1.
Entendiendo la modelacin de Costos e Ingresos en WEAP
WEAP modela tres tipos de costos: Costos de Capital, Costos Fijos de
Operacin & Mantencin (O&M), Y Costos Variables O&M. Tambin
modela tres tipos de ingresos: ingresos fijos, ingresos variables e ingresos
por electricidad. Los Costos e Ingresos pueden ser asignados a cualquier
objeto (ej, un sitio de demanda, un tramo de ro, un nodo de aguas
subterrneas, un embalse o planta hidroelctrica).
Para una mayor informacin en la modelacin de Costos e Ingresos,
remtase al tpico de Ayuda Entering Item Cost and Revenues.
2.
Estableciendo la Tasa de Descuento
En el men General, Units seleccione la pestaa Monetary e ingrese
la Tasa de Descuento.
Discount Rate 7%

The Rainfall Runoff (Soil Moisture) Model 177
Stockholm Environment Institute February 2009



The Discount Rate is used to compute net present value and accrue monetary quantities
over time. It is different from the interest rate, which must be entered manually for each
loan payment computation.
One needs to decide upfront whether the analysis will be done in real or in nominal
dollars (with or without considering inflation) since this will have an effect on the
discount rate, interest rates and cost & revenue growth.
Determination of the Discount Rate is an important matter in economic analyses.
Guidelines exist that are based on different methods such as the Weighted Average Cost
of Capital (WACC) or Capital Asset Pricing Model (CAP-M). The US government
currently recommends a discount rate of 7% for public sector projects (including
inflation).
3.
Cambiando la Duracin de la Modelacin
La Modelacin de Costos tiene sentido solo si un largo periodo esta siendo
considerado. Extienda el periodo de tiempo simulado en WEAP abriendo la
caja de dialogo General, Years and Time Steps. Cambie la variable
Last Year of Escenarios (Ultimo Ao para los Eescenarios):
Last Year of Escenarios 2025
The Rainfall Runoff (Soil Moisture) Model 178
Stockholm Environment Institute February 2009



Changing the Last Year of Escenarios will not affect the Current Accounts, the base
year for all escenarios. It will only affect all the escenarios, including the Reference
escenario. For more details about WEAP and escenarios, refer to the Escenarios
module of the tutorial.
Modelando Costos
1.
Ingrese Datos de Costo para el Sitio de Demanda
Para el sitio de demanda Big City, ingrese la siguiente informacin (en
Current Accounts) en la rama Demand Sites del rbol de datos de la vista
de Datos. Haga clic en el botn Cost e ingrese bajo la pestaa Capital
Costs:
Capital Costs: un prstamo de 120M$, en el ao 2000, por un
periodo de 15 aos, con tasa de inters del 5%
Use el Constructor de Expresiones (Expression Builder) para seleccionar
la funcin ya predefinida LoanPayment; arrastre esta funcin dentro
de la ventana de la expresin e ingrese ah los parmetros 120000000,
2000, 15, 5% dentro del parntesis. La expresin debera verse as:
LoanPayment(120000000,2000,15, 5%)
The Rainfall Runoff (Soil Moisture) Model 179
Stockholm Environment Institute February 2009






The Rainfall Runoff (Soil Moisture) Model 180
Stockholm Environment Institute February 2009
Variable Operating Costs 0.12$/m3

Fixed Operating Costs un valor anual de 5M$, creciendo
a una tasa del 3% comenzando el
1995

Use el Constructor de Expresiones de nuevo, seleccionando la funcin
predefinida GrowthFrom e ingresando los parmetros correspondientes
dentro de los parntesis. La formula debera aparecer:
GrowthFrom(3%,1995,5000000)


The Rainfall Runoff (Soil Moisture) Model 181
Stockholm Environment Institute February 2009
2.
Ingresando Datos de Costo para todo el Sistema
Asumiremos que hubo un prstamo hecho aos antes que el ao base de
las Cuentas Actuales (Current Account) que todava se esta pagando. Le
vamos a asignar este costo a todo el sistema, en vez de a un objeto en
particular. Ingrese los siguientes datos en la rama Supply and Resources
del rbol de datos de la vista de Datos.
Capital Costs un prstamo de 300M$, hecho en 1989, por un
periodo de 20 aos, tasa de inters del 6%
Nuevamente, use el Constructor de Expresiones (Expression Builder) y la
funcin LoanPayment. La formula debera verse as
LoanPayment(300000000,1989,20,6%)

3.
Evalu los Resultados
Corra el modelo y mire los siguientes resultados:
Financial/Net Cost:
Cual es la diferencia entre los valores para Big City en dlar real o
descontados?
The Rainfall Runoff (Soil Moisture) Model 182
Stockholm Environment Institute February 2009
Seleccione Financial\Net Cost desde el men desplegable principal y
elija Big City desde la lista de tems en el men arriba a la izquierda del
grfico. Seleccione Capital Cost desde el men arriba a al derecha.
Asegrese de que el eescenario Reference este seleccionado desde el
men arriba del grfico. Alterne ente las opciones Real y
Discounted usando el men justo a la izquierda del men de unidades
(fijo a U.S. dollars).


The Rainfall Runoff (Soil Moisture) Model 183
Stockholm Environment Institute February 2009




While real dollar are actual dollar values, discounted dollar values have been brought
back to their present value using the discount rate. The further in the future the cost
occurs, the lower its present value.

Costo Promedio del Agua
Que hace variar el costo mes a mes? Para diferentes aos?
Seleccione Financial\Average Cost of Water desde el men
desplegable principal. Mantenga el eescenario Reference seleccionado
y haga clic en Monthly Average. Debera ver un grfico como el
siguiente:
The Rainfall Runoff (Soil Moisture) Model 184
Stockholm Environment Institute February 2009



Monthly variations in average cost of water occur because of the largely varying
consumption of water (especially in the Agriculture area), while fixed costs remain
constant. Annual variations are mainly driven by changes in the capital costs (loans are
paid back, new loans occur).
Modelando Ingresos
1.
Ingrese Datos de Ingresos en el Sitio de Demanda
En la pantalla de Cost para el Sitio de Demanda Big City (Vista de
Datos), ingrese los siguientes datos, que pueden, por ejemplo, corresponder
al precio al que se vende el agua.
The Rainfall Runoff (Soil Moisture) Model 185
Stockholm Environment Institute February 2009
Variable Revenue 0.26$/m
3



When modeling hydropower reservoirs (refer to the Reservoir and Hydropower
WEAP tutorial module), one can also enter revenues from electricity generation. The
related data-entry tab exists only when pertinent.
2.
Compare los Costos e Ingresos Netos Presente
Muestre el Valor Presente Neto del proyecto.
Como se comparan el Valor Presente Neto de los Ingresos con el Valor
Presente Neto de los Costos?
Seleccione Financial\Net Present Value desde el men desplegable
principal, y elija Big City como el tem a visualizar. Usted debera tener
un grfico como el siguiente:
The Rainfall Runoff (Soil Moisture) Model 186
Stockholm Environment Institute February 2009


Que le dice esta comparacin?

The Net Present Value of the costs can be compared to that of the revenue to obtain a
sense of the economic viability of the system. If the NPV of the costs exceeds the NPV of
the revenues, then the system is returning a lower profit than average projects (as
defined by the discount rate). If the NPV of the revenues exceed that of the costs, then
the systems is generating a profit higher than average projects.


The Rainfall Runoff (Soil Moisture) Model 187
Stockholm Environment Institute February 2009
The WEAP/
QUAL2K Interface
A TUTORIAL ON
Linking to QUAL2K ............................................... 188
Running Escenarios ................................................ 193



February 2009


The Rainfall Runoff (Soil Moisture) Model 188
Stockholm Environment Institute February 2009

Note:
For this module you will need to have completed the previous modules (WEAP in
One Hour, Basic Tools, Escenarios, and Water Quality) or have a fair knowledge of
WEAP (data structure, Key Assumptions, Expression Builder, creating escenarios). To
begin this module, go to the Main Menu, select Revert to Version and choose the
version named Answer Key for Water Quality Module.
Linking to QUAL2K
1.
Using QUAL2K for Water Quality Modeling in WEAP
In addition to using WEAPs in-built capacity for water quality modeling, it
is possible to use the US EPA QUAL2K modeling framework. This module
demonstrates how to use the WEAP/QUAL2K interface, taking the Water
Quality module as a starting point. This module is not an introduction to
QUAL2K, which requires specialized knowledge, but if you are already using
QUAL2K, you should be able to link your QUAL2K file to WEAP after this
module.


This module is not an introduction to QUAL2K. Considerable work is required outside
of WEAP to calibrate and prepare a QUAL2K file. Refer to the QUAL2K manual for
more information. Visit http://www.epa.gov/athens/wwqtsc/html/qual2k.html is the
location to download or for more information.

2.
Differences Between QUAL2K and WEAP
QUAL2K and WEAP are compatible in their general approach to water
quality modeling, but they do some things differently. The important
differences are:
QUAL2K measures distance along a reach from the tail of the reach,
while WEAP measures distance from the head.
QUAL2K allows for diurnal variations in water quality and climate,
while WEAP applies the same value to all times of day.
The Rainfall Runoff (Soil Moisture) Model 189
Stockholm Environment Institute February 2009
WEAP is more tolerant of zero or missing values than is QUAL2K.
QUAL2K and WEAP use different climate parameters. For example,
QUAL2K uses dew point, while WEAP uses humidity.
QUAL2K models many more constituents in much more detail,
including two separate CBOD constituents, ammonia, nitrate, organic
and inorganic phosphorous, algae, sediment, pH and pathogens (see
http://www.epa.gov/athens/wwqtsc/html/qual2k.html for more
details).
QUAL2K and WEAP are similar in that each treats a river as a sequence of
reaches, not necessarily of equal lengths. However, the reach boundaries as
defined in QUAL2K and in WEAP need not match. Where reach boundaries
do not match, WEAP handles the task of mapping water quality and climate
variables, based on distance markers.
Reservoirs present special challenges for water quality modeling. WEAP
includes reservoirs, but not for water quality, while QUAL2K includes weirs,
but they are not operated. It is recommended that rivers with reservoirs not
be linked to QUAL2K, or that they be modeled in two sectionsabove the
reservoir and below the reservoir.
3.
Link Pollutants to QUAL2K
This module uses the final result from the previous Water Quality module as
a starting point. Open the WEAP tutorial (by selecting Area | Open |
Tutorial from the menu), then selecting Area | Revert to Version | Answer
Key for "Water Quality" module from the menu.
Once the file is ready, change the water quality constituents to point to
QUAL2K.
From the menu, select General | Water Quality Constituents.
For each constituent, select Modeled in QUAL2K in the Calculated
By drop-down.
Link each constituent in WEAP (except salt) to a corresponding
QUAL2K constituent: Temperature Temperature, BOD
CBOD fast, DO Dissolved Oxygen, TSS Inorganic
Solids.
Salinity is not directly modeled in QUAL2K, so it is not linked to a QUAL2K
constituent in this example. QUAL2K instead models conductivity, which is
an easily measured indicator of salinity.
The Rainfall Runoff (Soil Moisture) Model 190
Stockholm Environment Institute February 2009
Next, search for a QUAL2K data file (a file ending in .q2k).
Look for the new drop-down labeled QUAL2K Data File (.q2k) that
has appeared at the bottom left of the Water Quality Constituents
dialog.
Select < Copy file from another directory > from the drop-down.
Search the Tutorial\Additonal Files for the file
Main_River_Tutorial.q2k.
The Water Quality Constituents Dialog should now look like the following:




The QUAL2K file must initially be developed and edited outside of WEAP. WEAP will
then modify some of the values, and extract values from QUAL2K after it is run. To
view or edit the QUAL2K file, clic on the View button next to the QUAL2K Data File
(.q2k) drop-down on the Water Quality Constituents dialog.

The Rainfall Runoff (Soil Moisture) Model 191
Stockholm Environment Institute February 2009
4.
Change Reach Distance Markers
For marking reach distances, QUAL2K assigns the tail of the river a distance
of 0, and distance increases upstream. WEAP can measure reach distances
either downstream or upstream, but in the previous module distance was
measured downstream, opposite the convention for QUAL2K, so the reach
distance markers must be changed when linking to QUAL2K.
To set the reach distance markers:
Go to Data View
Navigate to the branch Supply and Resources\River\Main
River\Reaches\Below Main River Headflow.
Clic on the Water Quality button.
Select the Distance Marker tab. (This will only show up in Current
Accounts: if you do not see it, switch to Current Accounts in the drop-
down at the top of the page.)
Set the distance for Below Main River Headflow to 300 km, and the
distance for Tailflow Point to 0 km.


5.
Set Dew Point and Cloud Cover
QUAL2K and WEAP use different climate parameters, so some additional
climate parameters must be set for QUAL2K. When using QUAL2K for water
The Rainfall Runoff (Soil Moisture) Model 192
Stockholm Environment Institute February 2009
quality calculations, WEAP changes the list of climate parameters
automatically.
While each reach in QUAL2K can have a different climate, for most WEAP
applications it is reasonable to assume that the climate is the same on all
reaches. In this case, climate parameters only need to be set for the top reach,
since for downstream reaches, upstream values are used by default. For this
example, two climate parameters will be set: cloud cover and dew point.
Cloud cover is not a climate parameter in WEAP, so there is no
corresponding value already in WEAP. For this example assume that average
cloud cover is 30% along the river. To set this:
Navigate to the branch Supply and Resources\River\Main
River\Reaches\Below Main River Headflow, if you are not already
there.
Clic on the Climate button.
Select the Cloud Cover tab.
Type 30 for the value.
Dew point is used by QUAL2K instead of WEAPs relative humidity
parameter. Dew point, Td, can be calculated from the air temperature, T, and
relative humidity, hr doing the following calculation. First, instead of using
air temperature T directly, use x = T/237.7. Then calculate dew point using:
Td=237.7 [17.3 x + (1 + x) ln hr]/[17.3 (1 + x) ln hr]
Using this formula, and the values for air temperature (which are different
for each month) and relative humidity (65% for every month) in the Water
Quality module file, it turns out that dew point is about 6.5C below air
temperature for all months. So, to set dew point:
Navigate to the branch Supply and Resources\River\Main
River\Reaches\Below Main River Headflow, if you are not already
there.
Clic on the Climate button.
Select the Dew Point tab.
Either use the Expression Builder or directly type in the formula Air
Temperature - 6.5, and make sure the units are C.
The Rainfall Runoff (Soil Moisture) Model 193
Stockholm Environment Institute February 2009

Running Escenarios
6.
Run Escenarios
Run the escenario by going to Results View and answering Yes to the
dialog asking whether to recalculate.
Note that when using QUAL2K, running escenarios can take a long time.
Consider reducing the number of escenarios that you calculate at any
time.
QUAL2K will not run for months in which streamflow is zero. If this
situation occurs in one or more escenarios, add a (small) minimum flow
requirement on reaches for which QUAL2K is used.
7.
Compare Results
When you have finished running your selected escenarios, compare the
results with the results from the previous module. They should be similar,
but not identical, because the built-in water quality calculations in WEAP
make slightly different assumptions and use different approximations than
QUAL2K.

The Rainfall Runoff (Soil Moisture) Model 194
Stockholm Environment Institute February 2009








WEAP
Water Evaluation And Planning System

Linking WEAP
to MODFLOW
A TUTORIAL ON
Linking to MODFLOW ......................................... 196
Running MODFLOW and Viewing
Results .................................................................... 207
Scenario: Increased Population .............................. 209
Scenario: Irrigation................................................. 211
Scenario: Artificial Recharge .................................. 216



February 2009


The Rainfall Runoff (Soil Moisture) Model 196
Stockholm Environment Institute February 2009


Note:
For this module you will need to have completed the previous modules
(WEAP in One Hour, Basic Tools, and Scenarios) or have a fair knowledge
of WEAP (data structure, Key Assumptions, Expression Builder, creating
scenarios). To begin this module, go to the Main Menu, select Revert to
Version and choose the version named Starting Point for 'Linking WEAP
to MODFLOW module'.
Linking to MODFLOW
1.
Using MODFLOW for Groundwater Modeling in WEAP
For situations where the built-in WEAP groundwater model is not
sufficiently complex, there is the option to link a WEAP model to a
MODFLOW model. MODFLOW is a three-dimensional finite-
difference groundwater model created by the U.S. Geological Survey
(USGS). When properly linked, data and results flow back and forth
between WEAP and MODFLOW for each calculation timestep. With
this tight coupling between the models, it is possible to study how
changes in local groundwater levels affect the overall system (e.g.,
groundwater-stream interactions, pumping problems due to
drawdown, lateral groundwater recharge) and vice versa (e.g.,
infiltration and abstraction). However, be advised that building and
calibrating a MODFLOW model is not a simple task. The version of
MODFLOW that WEAP is designed to link to is MODFLOW 2000.


This module is not an introduction to MODFLOW, which requires specialized
knowledge, but if you are already using MODFLOW, you should be able to link your
MODFLOW model to WEAP after this module. Considerable work is required outside
of WEAP to calibrate and prepare a MODFLOW model. Refer to the MODFLOW 2000
website for more information:
http://water.usgs.gov/nrp/gwsoftware/modflow2000/modflow2000.html.

The Rainfall Runoff (Soil Moisture) Model 197
Stockholm Environment Institute February 2009
The groundwater models in MODFLOW and WEAP are very different.
Whereas a WEAP groundwater node is represented as one large
"bucket" with no parameters to describe internal flows, MODFLOW
represents groundwater as a multilayered grid of independent cells,
each with their own flow parameters and equations that are used to
model flows between cells, and across the aquifer boundaries.
Once you have WEAP and MODFLOW models linked, WEAP values
for groundwater infiltration (recharge) and abstraction (pumping),
river stage, and surface water runoff will be sent to MODFLOW as
inputs for its calculations, and MODFLOW results for groundwater
level (head), lateral flow between aquifers, and surface water-
groundwater flows will come back to WEAP as inputs for its
calculations. This feedback between WEAP and MODFLOW happens
at each calculation timestep.
2.
Example WEAP model
The sample area used for this module differs from those in previous
modules. It includes a city whose supply comes entirely from
groundwater, rainfed agriculture, a spring-fed river that receives
surface runoff from the catchment and is hydraulically connected to
groundwater. The catchment includes forests and grassland, in
addition to agriculture and the city.

The Rainfall Runoff (Soil Moisture) Model 198
Stockholm Environment Institute February 2009
Note that because WEAP does not spatially disaggregate catchments
or groundwater nodes, the one catchment node in this example
represents the entire area inside the red outline without any
information about where in the catchment the various land classes
are. The one groundwater node represents the entire aquifer, which
extends over the same area as the catchment, and does not include
information about where the well field for the city is (the red squares
labeled Big City Wellfield). (For your own applications, you are free
to create multiple catchments and groundwater nodes, and link them
to different groups of MODFLOW cells.)
3.
Loading a MODFLOW model
To load a MODFLOW model, go to General\ MODFLOW Link on
the Main menu. Check the "Link to MODFLOW" checkbox and then
type in or browse for the "MODFLOW Name File." Typically the
"Name" file has an extension of .NAM or .MFN. For this example, all
the MODFLOW files are contained in a subdirectory named
MODFLOW underneath the Tutorial area subdirectory. (Keeping the
MODFLOW files in a subdirectory of the WEAP area is a good
practice.) The name file for this example is called tutorial.mfn. After
you have specified the name file, WEAP will read in the MODFLOW
model and display information about it.

The Rainfall Runoff (Soil Moisture) Model 199
Stockholm Environment Institute February 2009
The name file lists the other files that contain data for the various
aspects of the MODFLOW model, such as recharge, pumping and river
interactions. These files are called "packages." Take a look at some
of the packages for this modelclick on the "View/Edit Packages"
button to and choose "MODFLOW Name file: tutorial.mfn." You will
see the list of files/packages. Click the cancel button to close the
name file and look at another package, such as the "MODFLOW
Discretization file: tutorial.dis." The discretization file contains
basic information about the model, such as the number of layers, row
and columns, and the width of each row and column. As you can see
in the screen above, WEAP has read in this information already: 20
rows, 20 columns, 1 layer, and 1000 meters width for both rows and
columns.
Note that initially WEAP does not know how to link the MODFLOW
model to the WEAP model, as can be seen in the screen above, e.g.,
"WARNING: Active cells linked to WEAP groundwater node:
None are linked" and "1 groundwater nodes (0 are linked to
MODFLOW cells)." The next step is to make this linkage.
4.
Linking WEAP elements (groundwater nodes, demand sites,
catchments, rivers) to MODFLOW cells
Each active MODFLOW cell is linked to one and only one WEAP
groundwater node. (For a given row and column, every layer will be
linked to the same groundwater node.) The linkage is established by a
GIS shape file (.shp) that relates MODFLOW cells (by row and
column number) with WEAP groundwater nodes (by name). The
polygon shape file has one rectangular feature for each MODFLOW
cell (row, column) and must be loaded as a background layer on the
Schematic. For example, for a MODFLOW model with 20 rows, 20
columns and 3 layers, there would be 400 features in the shape file.
The shape file's attribute table file (.dbf) must have fields for row
number, column number and WEAP groundwater node name. Other
optional fields are described below. This shape file will also be used
to display MODFLOW results in WEAP.
To create this shape file, either use a GIS program such as ArcGIS, or
WEAP's built-in tool that can create a shape file corresponding to a
MODFLOW model as explained in the following section.
The Rainfall Runoff (Soil Moisture) Model 200
Stockholm Environment Institute February 2009
5.
Creating a new linkage shape file
On the MODFLOW Link screen (shown above), click the "Choose
shape file that has MODFLOW linkage information" button. On
the next window, for "Background Shape File with MODFLOW
Linkage Information," choose "< Create New Shape File >". The
following window will appear:

WEAP automatically fills in the number of rows and columns, and
the row height and column width, which it read from the MODFLOW
discretization file. However, the MODFLOW model does not contain
information about the X,Y position (latitude and longitude) or the
rotation angle of the cells. Therefore, you will need to enter this
information yourself.
If you know the values for latitude, longitude and rotation, you can
enter the numbers directly. If you do not know the values, you can
click on the map to set the origin (lower left corner). You will see a
purple box on the map that indicates the area of all the cells. As long
as you hold down the left mouse key, the purple box will move with
the mouse; release when the box is correctly positioned. You can zoom
in on the map (using the zoom slider below the inset map on the left,
the mouse wheel, or control-click and drag on the map) to help
achieve greater precision in placement of the area.
The File Name box contains the filename for the new shape file.
Either use the default filename ("MODFLOW Linkage.shp") or enter
another name. Shape files always have a .shp extension.
Click the Create button to create it.
The Rainfall Runoff (Soil Moisture) Model 201
Stockholm Environment Institute February 2009
After the shape file has been created, WEAP will display it and allow
you to customize its appearance on the schematic. As you can see
from the screen below, the new shape file is a 20x20 grid of 400 cells.

The associated attribute table has fields for row, column, and for
linking various WEAP elements to each cellGW, Catchment,
Land_Use, DemandSite and RiverReach. You will need to fill in this
table, specifying which cells are linked to which WEAP elements. For
example, the name of the WEAP groundwater node (in the Tutorial,
the node is named "Groundwater") must be entered in the table in the
column labeled GW for each cell that corresponds to the WEAP
groundwater node. For example, in row 1, columns 6 through 17
correspond to the WEAP groundwater node, so you would enter
"Groundwater" in table column GW for those cells.
You may edit this table in several different ways. To edit inside
WEAP, click the Edit button (shown above) and type the values
directly into the table. You can also edit the table in Microsoft Excel
(the attribute table has the extension .dbf, e.g., MODFLOW
Linkage.dbf) or in any GIS program, such as ArcGIS. If you do have
access to GIS software, this will be the easiest way to edit the table,
but it can be done in WEAP.
After customizing its appearance, click the OK button. WEAP will
add this layer to your Schematic and return you to the "Choose shape
file that has MODFLOW linkage information" window.
The Rainfall Runoff (Soil Moisture) Model 202
Stockholm Environment Institute February 2009
6.
Use an existing shape file
Rather than spending the time now to fill in all the information in the
attribute table, we will use an existing shape file with all this
information already filled in. On the "Choose shape file that has
MODFLOW linkage information" window, select "< Add existing
shape file as new map layer >" for the "Background Shape File
with MODFLOW Linkage Information." A dialog box will appear,
asking you to select the ArcView Shape File to use. Choose
Linkage.shp (in the Tutorial directory) and click Open.

The Rainfall Runoff (Soil Moisture) Model 203
Stockholm Environment Institute February 2009
On the "Map Layer" screen, change the name to "MODFLOW
Linkage." On the "Label" tab, choose "R_C" for the Field and set the
Size to 40%.

Click OK. Now we need to specify which of the fields in the Linkage
attribute table will be used for the linkage, and to which MODFLOW
and WEAP items they correspond. The fields which are required are
MODFLOW Cell Row, MODFLOW Cell Column and Groundwater
Name. Depending on your model, you may or may not also match
some or all of the following: Catchment Name, Land Use Name,
Demand Site Name and River Reach Name. Based on the attribute
file column names, WEAP will try to guess which fields are used for
what. For example, if it finds fields containing the names "Row" and
"Col", it will assume these contain the MODFLOW row and column
values. In this example, WEAP is able to correctly guess all the fields:
The Rainfall Runoff (Soil Moisture) Model 204
Stockholm Environment Institute February 2009

If it didn't correctly guess, you would select the appropriate field for
each item (e.g., Groundwater Name Field). WEAP will also attempt
to guess which WEAP rivers and reaches correspond to the
MODFLOW river and drain cells. Click OK to close this window.
The Rainfall Runoff (Soil Moisture) Model 205
Stockholm Environment Institute February 2009
Note that WEAP now reports the linkage shape file and how many of
the WEAP and MODFLOW items are linked together, e.g., "1
groundwater nodes (1 are linked to MODFLOW cells)" and "Active
cells linked to WEAP groundwater node: All are linked." Click Close
to return to the WEAP Schematic.


The layer "MODFLOW Linkage" is now in
the list of background layers. Because it is at
the bottom, some of the cells will be hidden
by the layers above, such as the yellow "Big
City" layer. In order to see all the
row_column labels, move "MODFLOW
Linkage" to the top of the layersright click
on the name "MODFLOW Linkage" and
choose "Move to top."

Take a moment now to view the other
information contained in this linkage file.
Right click on the name "MODFLOW
Linkage," choose "Set label to" and choose one of the other fields,
such as "LAND_CLASS." This will show you which of the four land
The Rainfall Runoff (Soil Moisture) Model 206
Stockholm Environment Institute February 2009
classes (Grassland, City, Forest, Farm) each cell corresponds to.
Choose the field "DEMANDSITE" to see from which cells the Big City
demand site will pump from. Choose the field "GW_NODE" to see
which MODFLOW cells are linked to the WEAP groundwater node
named "Groundwater." Finally, choose the field "RIVERREACH" to
see which cells are linked to the WEAP river "Blue River."
7.
Set Pump Layer
One final step to link the WEAP model to the MODFLOW model is to
specify from which MODFLOW layer the Big City demand site will
pump. In general, a demand site or catchment node can pump from a
single layer, from many layers (in equal or different proportions), or
have pumping be handled as negative recharge in the MODFLOW
recharge file.
Since our example only has one layer, the choices are from layer 1, or
as negative recharge (enter pump layer = 0 for negative recharge). We
want to pump from layer 1. Go to the Data View, select "Big City" on
the data tree, then click on the "Pumping" category at the top and
enter "1" for the expression.

You have now linked the WEAP model to the MODFLOW model.
The Rainfall Runoff (Soil Moisture) Model 207
Stockholm Environment Institute February 2009
Running MODFLOW and Viewing
Results
8.
View Results
Click the Results button to calculate and view results. Notice that at
each calculation timestep, WEAP runs MODFLOW.
Results for MODFLOW are located in the Supply and Resources /
Groundwater / MODFLOW category in the primary variable pull-
down menu.
Look at the results for Supply and Resources / Groundwater /
MODFLOW / Cell Head. This report shows the vertical head for each
MODFLOW cell. MODFLOW results utilize a new type of graph
the 3-dimensional surface chart. Make sure that "Surface" is selected
as the chart type, and that the "Y=0"button is not down. The cell head
for one timestep is shown. Experiment with the sliders below the
surface chart to rotate or tilt the surface. Click the "Rotate" button
to animate the chart. Click the "3-D" button to switch between 3-D
surface and 2-D plan views.

Can you see the impact of pumping from the Big City Wellfield?
(This view exaggerates the variation in headclick the "Y=0"
The Rainfall Runoff (Soil Moisture) Model 208
Stockholm Environment Institute February 2009
button to see a more realistic view. However, it is usually better
to turn off Y=0 in order to see the differences clearly.)
Click on the Map tab to see the head values on the map, with a graph
below. When you click on a grid cell, its value over time will be
graphed below the map. Click on some of the cells at the Big City
Wellfield to see how they vary. There is a seasonal fluctuation in cell
head (higher in winter, lower in summer, due to increased pumping in
the summer and lower rainfall in the summer), and an overall trend
downward from 2000 to 2010. You can click and drag the mouse over
many cells and the graph will update in real-time as you move the
mouse. This is a good way to get a quick understanding of how cells
in different areas of the model behave differently over time.

Look at a few other MODFLOW results, such as Recharge, Pumping,
Drain Flow, and Leakage to River.
The Rainfall Runoff (Soil Moisture) Model 209
Stockholm Environment Institute February 2009
Scenario: Increased Population
Now that we have a MODFLOW model linked to our WEAP model,
we can create some WEAP scenarios and explore how they might
affect groundwater.
9.
Create scenario
Switch to the Data View and create a new scenario underneath
"Reference," call it "Increased Population" (Main menu: Area,
Manage Scenarios).

Change the expression for the Annual Activity Level for Big City from
"Growth(1%)" to "Growth(5%)"

The Rainfall Runoff (Soil Moisture) Model 210
Stockholm Environment Institute February 2009
10.
Evaluate results
Go to Results and look for the impact of the increased pumping from
Big City on the groundwater levels. As you can see, the slow
downward trend of the Reference scenario has now accelerated in the
Increased Population scenario. This is especially evident in the cells
on or near the Big City Wellfield

but an effect, although smaller, can even be seen far away from the
wellfield, e.g., in Row 16, Column 6 (in the lower left corner of the
model).
The Rainfall Runoff (Soil Moisture) Model 211
Stockholm Environment Institute February 2009

Scenario: Irrigation
The crops on this Farm are currently rainfed, but there is not enough
rainfall in the summer to meet their evapotranspirative demand.
Look at the results for Catchments / ET shortfall:

The Rainfall Runoff (Soil Moisture) Model 212
Stockholm Environment Institute February 2009
11.
Create scenario
Let's investigate the impact of adding irrigation from groundwater
pumping, both on the groundwater levels and on crop yields. Switch
to the Schematic View and create a new scenario underneath
"Reference," call it "Irrigation."
There are several steps to take to turn on irrigation for the Farm land
class and for the MODFLOW cells associated with the Farm.
12.
Add transmission link
Add a transmission link from the
groundwater node to the catchment,
and uncheck "Active in Base Year?"
When you add this link, WEAP will
automatically set the catchment as
having irrigation.

You can leave the priority as 1.
13.
Set land class as irrigated
Go to the Data View and change "Irrigated" to 1 for the Farm, and
"Irrigation Fraction" to 50 (50% irrigation efficiency). Make sure that
the Irrigation scenario is selected in the "Data for" dropdown box.
The Rainfall Runoff (Soil Moisture) Model 213
Stockholm Environment Institute February 2009

For the transmission link, set the Startup Year to 2003.

14.
Set MODFLOW layer for irrigation
We want MODFLOW to pump the irrigation water from layer 1. Go
to the Data View, click on the "Catchment" branch in the data tree,
then click on the "Irrigation" category at the top and the Pump
Layer variable tab. Enter a value of 1.
The Rainfall Runoff (Soil Moisture) Model 214
Stockholm Environment Institute February 2009


15.
Evaluate results
Go to the Results View. First, verify that irrigation begins in 2003,
reducing the ET Shortfall to zero.

What happens to crops yields, now that they receive all the
water they need? Look at the Catchment report for yields,
comparing the yield across scenarios.
The Rainfall Runoff (Soil Moisture) Model 215
Stockholm Environment Institute February 2009
Now look at the impact of irrigation on groundwater. Click on a cell
in the map in the Farm too see the largest effect, or a cell far away
from the Farm to see the smaller effect.

Compare the pumping rates for the Farm and for Big City:

The Rainfall Runoff (Soil Moisture) Model 216
Stockholm Environment Institute February 2009
Scenario: Artificial Recharge
For a final scenario, let's explore the impact of artificial recharge to
groundwater.


Artificial recharge, or "Aquifer Storage and Recovery" (ASR), involves injecting water
into an aquifer through wells or by surface spreading and infiltration and then pumping
it out when needed. The aquifer essentially functions as a water bank. Deposits are
made in times of surplus, typically during the rainy season, and withdrawals occur
when available water falls short of demand.

In this example, the water will come from outside the catchment
area and not vary seasonally.
16.
Create scenario
Switch to the Schematic View and create a new scenario underneath
"Reference," call it "Artificial Recharge."
17.
Load shape file layer
On the Main Menu, select Schematic, Add Vector Layer. Choose the
file artificial_recharge.shp. Give it the name "Artificial Recharge",
and change its appearance so that the Style is "Solid" and the "Fill
color" is light blue. Note that the cells are in column 6, rows 13-15.

The Rainfall Runoff (Soil Moisture) Model 217
Stockholm Environment Institute February 2009
18.
Edit linkage shape file
So that WEAP can tell MODFLOW which cells will receive the
artificial recharge, we need to edit the linkage shape file. Double-
click on "MODFLOW Linkage", select the Table tab and click the Edit
button. Scroll down to find the artificial recharge cells: column 6,
rows 13, 14 and 15. For these three cells, type into the field labeled
DEMANDSITE the name of the artificial recharge demand site:
"Artificial Recharge."

The Rainfall Runoff (Soil Moisture) Model 218
Stockholm Environment Institute February 2009
To verify this new linkage information, set the label for the
MODFLOW Linkage layer to DEMANDSITE. You should see the
artificial recharge cells labeled, as well as those for Big City
Wellfield:

19.
Create Other Supply and Demand Site
Create an "other supply" node called "Other Supply." Create a new
demand siteplace it on top of one of the blue artificial recharge
cells. Call it "Artificial Recharge" and uncheck "Active in Base
Year?"

The Rainfall Runoff (Soil Moisture) Model 219
Stockholm Environment Institute February 2009
Add a transmission link from Other Supply to Artificial Recharge,
and a Return Flow link from Artificial Recharge to the Groundwater
node.

20.
Enter supply and demand data
Go to the Data View, select scenario "Artificial Recharge," and then
click on the branch for demand site Artificial Recharge in the tree. Set
the Startup Year to 2005.

The Rainfall Runoff (Soil Moisture) Model 220
Stockholm Environment Institute February 2009
For Water Use, set the Annual Water Use Rate to 25 Million cubic
meters (the annual capacity of the injection wells) and the
Consumption to 0%.

Click on the branch for the other supply, and then enter 1 CMS for the
inflow.

21.
Evaluate Results
Run the model and look at results for recharge and cell head.
The Rainfall Runoff (Soil Moisture) Model 221
Stockholm Environment Institute February 2009
Does the artificial recharge have much impact on groundwater levels
at the recharge site? Is there much of an impact closer to the Big City
Wellfield or irrigation? Can you think of another site for the
artificial recharge that would better alleviate the drawdown from
pumping?

Groundwater levels at the recharge site are much higher than
Reference:

The Rainfall Runoff (Soil Moisture) Model 222
Stockholm Environment Institute February 2009
Groundwater levels by the Wellfield are almost the same as in
Reference:

Você também pode gostar