Tutorial A collection of stand-alone modules to aid in learning the WEAP software
February 2009
WEAP Water Evaluation And Planning System
Tutorial Modules WEAP en una hora .................................................................................................... 1 Herramientas Basicas .............................................................................................. 29 Eescenarios ............................................................................................................... 39 Datos, Resultados y Formato ................................................................................. 61 Conectando Recursos y Demandas ....................................................................... 81 Refinando el analisis de Demanda ........................................................................ 87 Hidrologa ............................................................................................................... 109 Refinando el Suministro ....................................................................................... 127 Embalses y Generacin Hidroelctrica ............................................................... 141 Calidad del Agua ................................................................................................... 153 Anlisis Financiero ................................................................................................ 175 The WEAP/ QUAL2K Interface ........................................................................... 187 Linking WEAP to MODFLOW ............................................................................ 195
WEAP Water Evaluation And Planning System
WEAP en una hora Un tutorial para Crear una nueva area de estudio ............................................................................ 2 Definiendo Parametros Generales .......................................................................... 7 Ingresando Elementos al Esquema ....................................................................... 10 Los Primeros Resultados ........................................................................................ 25
February 2009
WEAP en una hora 2 Stockholm Environment Institute February 2009
Crear una nueva area de estudio
1. ESTABLECIENDO UNA NUEVA AREA EN BLANCO
Al abrir el programa WEAP por primera vez, un rea proyecto llamado Weaping River basin aparecer. En el menu vaya a Area y luego a Create area para formalizar la creacin del rea nueva.
Una ventana como la que ve a continuacin aparecer. Haga clic en el botn de la opcin Initially blank. Aqu Ud. puede nombrar su rea de estudio (en el ejemplo My Ghana Area).
WEAP en una hora 3 Stockholm Environment Institute February 2009
Al hacer clic en OK aparecera otra ventana,
Presionar OK de nuevo. Ahora deber escoger el rea general de estudio, esto es, del mapa del mundo, Ud. deber establecer un rea general en donde estar su estudio. Con la flecha/cursor, presionar el botn izquierdo del mouse y definir un rectangulo (que aparece de color verde) sobre el rea general de su proyecto de estudio.
WEAP en una hora 4 Stockholm Environment Institute February 2009
En esta ventana ud. puede utilizar la barra de zoom en la esquina inferior izquierdo para aumentar la zona definida anterior.
Haga clic en OK cuando este satisfecho con la zona definida por el rectangulo. Puede redefinirla si no esta bien. Tambin puede corregirlo usando la funcion Set Area Boundaries del men Schematic en la barra de men. WEAP en una hora 5 Stockholm Environment Institute February 2009
2. AGREGAR UNA CAPA o ESTRATO DESDE GIS AL AREA
Se puede agregar un estrato vector o un estrato raster desde una base de datos GIS en su rea de proyecto. De este modo se refinan los lmites del rea de estudio. Para hacer esto, presione el botn derecho del mouse sobre la ventana del medio en su pantalla y seleccione la opcin Add Raster Layer o Add Vector Layer. WEAP en una hora 6 Stockholm Environment Institute February 2009
Aparecer una ventana en la cual ud. puede escoger el archivo desde cualquier directorio o desde la internet.
3. SALVANDO Y GUARDANDO UN AREA
Para salvar y guardar el rea para usarlo posteriormente, vaya a Area en la barra principal de men y escoja Save o presione las teclas Ctrl + S simultneamente.
WEAP en una hora 7 Stockholm Environment Institute February 2009
Definiendo Parametros Generales
Vamos a aprender ahora a navegar por WEAP y descubrir sus cualidades y funciones. Para lo que resta del ejercicio, usaremos una rea predefinida llamada tutorial. Para abrir esa rea, en el men principal vaya a Area y haga clic, luego en Open al fijar la flecha/cursor sobre esta opcin, deber ver una lista de reas incluyendo tutorial. Seleccione tutorial.
1. Definiendo los parametros generales
WEAP en una hora 8 Stockholm Environment Institute February 2009 Una vez que el rea abra, en el menu principal vaya a General para definir los aos e incrementos de tiempo, Years and Time Steps y las unidades Units.
Se modelara el ao 2000 con 12 incrementos (meses) comenzando en Enero (January). Mantenga las unidades en SI.
Nota: Los incremetos de tiempo deben ser escogidos para reflejar el nivel de precisin de los datos que se tengan.
WEAP en una hora 9 Stockholm Environment Institute February 2009
2. GUARDANDO DIFERENTES VERSIONES DEL AREA
Seleccione Save Version bajo la opcin Area del men principal. Una ventana aparecer para anotar un comentario que describa la versin que ir a guardar. Escriba general parameters set.
WEAP en una hora 10 Stockholm Environment Institute February 2009
Ingresando Elementos al Esquema
1. DIBUJE UN RIO
En la pantalla principal, vaya a la ventana que contiene diferentes objetos. Escoja la opcin River. Haga clic en esta opcin. Ahora presione nuevamente el botn izquierdo sobre la opcin River y mantngalo presionado. Arrastre el cursor hasta el comienzo del ro que nace en la parte superior derecha del mapa. Cuando este en ese punto suelte el botn. Mueva el cursor siguiendo el contorno del ro. Se dara cuenta que una lnea se va creando desde el cursor. Haga clic en cada vuelta del ro de manera de ir creando un seguimiento de este. Para finalizar este procedimiento haga doble clic en el botn izquierdo.
WEAP en una hora 11 Stockholm Environment Institute February 2009
Nota: La direccin del trazado si importa. El primer punto ser la cabeza del ro o su nacimiento desde donde fluira el agua. El ro se puede editar para corregirlo si es necesario.
Al efectuar el doble clic aparecer una ventana que preguntara por un nobre para el ro.
WEAP en una hora 12 Stockholm Environment Institute February 2009
Nombrelo main river
El nombre del ro puede moverse si se desea, para ello, presione el botn derecho del mouse con el cursor sobre cualquier parte del ro. Aparecer una ventana, escoja Move Label. Al hacer clic en esta opcin permite mover el nombre.
WEAP en una hora 13 Stockholm Environment Institute February 2009
2. INGRESAR DATOS PARA EL RIO PRINCIPAL (MAIN RIVER)
Para editar o ingresar datos para el Main River, hay dos mtodos. Presionar el botn derecho del mouse estando sobre el ro y luego ir a la opcin Edit Data y escoger cualquier funcin dentro de la lista. La otra forma es ir a la barra de la derecha y presionar sobre el smbolo Data. Seleccionar Supply and Resources del rbol de opciones que aparecer. Luego ir a river y dentro de este ir a Main River. Para abrir y cerrar las ramas se debe presionar sobre el smbolo +.
WEAP en una hora 14 Stockholm Environment Institute February 2009
Altenativamente se puede usar la opcin Tree de la barra de men en la parte superior de la pantalla que se genera al ir a Data y escoger Expand All para ver todas las ramas.
WEAP en una hora 15 Stockholm Environment Institute February 2009 A la derecha de la pantalla debe aparecer la opcin Inflows and Outflows, si no aparece, presione ese botn de manera de abrirlo. Presione Headflow. En la fila con el nombre River vaya hasta el numero 2000. Justo debajo de este numero aparece un botn, presinelo. Debern aparecer dos opciones, escoja Monthly Time Series Wizard. Aparecer una ventana.
Utilice esta ventana para ingresar los siguientes datos:
Month Flow (CMS) Jan 12 Feb 7 Mar 11 Apr 17 May 80 Jun 136 Jul 45 Aug 32 Sep 38 Oct 18 Nov 9 Dec 7 WEAP en una hora 16 Stockholm Environment Institute February 2009
Al ingresar cada dato se ira generando el grfico . No modifique otros datos aun .
3. CREANDO UN NODO DE DEMANDA URBANO E INGRESANDO DATOS RELACIONADOS
Creando este nodo de demanda es similar a crear un ro. Regrese al modo esquema o Schematic. De las opciones en la ventana haga clic en Demand Site. Ahora presione de nuevo el botn izquierdo y mantngalo presionado y arrastre el nodo desde esta ventana de elementos y suelte dentro del rea en amarillo a la izquierda del ro. Aparecer una ventana solicitando nombrar este nodo. Nmbrelo Big City y fije su prioridad como 1.
Haga clic en el botn derecho sobre el nodo. Aparecern unas opciones. Vaya a Edit Data. Ah, seleccione Annual Activity Level.
WEAP en una hora 17 Stockholm Environment Institute February 2009
Se debe seleccionar las unidades antes de ingresar cualquier otro dato. Dentro de la carpeta Annual Activity Level vaya a Unit. Haga clic en N/A. Aparecern una serie de opciones. Escoja People. De clic en OK.
Bajo el numero 2000 (ao 2000), ingrese 800000.
WEAP en una hora 18 Stockholm Environment Institute February 2009
Vaya a la carpeta Annual Water Use Rate. Bajo el numero 2000 haga clic en la celda en blanco y anote 300.
WEAP en una hora 19 Stockholm Environment Institute February 2009 Finalmente abra la carpeta Consumption. Nuevamente bajo el numero 2000 anote el numero 15. Las unidades deben ser en porcentajes, unidad que esta prefijada.
4. CREAR UN NODO DE DEMANDA AGRICOLA
En el formato Schematic, haga clic nuevamente en la opcin Demand Site. Arraste el cursor presionando el botn izquierdo y ubquelo debajo del rea amarilla al otro lado de la ubicacin de Big City respecto del ro. Nmbrelo Agriculture y fije su prioridad en 1.
WEAP en una hora 20 Stockholm Environment Institute February 2009
De igual manera que como se hizo para Big City, ingrese los datos en Annual Activity Level y Annual Water Use Rate en las carpetas correspondientes dentro del formato Data (primero presione sobre el smbolo Data). Dentro de las unidades en la carpeta Annual Activity Level seleccione hectares.
Bajo el nmero 2000 ingrese:
En annual activity level 100000 En Annual water use rate 3500
WEAP en una hora 21 Stockholm Environment Institute February 2009
Seleccione la carpeta Monthly Variation, bajo el nmero 2000 haga clic y escoja Monthly Time Series Wizard, luego ingrese los siguientes datos:
Monthly Variation: - 5% in April - 10% in May and June - 20% in July - 30% in August - 25% in September - 0% for the rest of the year
Finalmente en la carpeta de Consumption anote 90. WEAP en una hora 22 Stockholm Environment Institute February 2009
5. CONECTAR LA DEMANDA CON EL SUMINISTRO
Ahora debemos decirle a WEAP cuanta demanda es satisfecha; esto se lleva a cabo conectando o relacionando el suministro del recurso a cada nodo de demanda. Regrese al formato Schematic y cree un eslabn o una conexin de transmisin desde el ro hasta Big City y otro a Agriculture. Haga esto arrastrando el cursor seleccionando Transmission Link primero posicionandolo sobre el ro y luego soltandolo sobre el nodo. Hgalo primero para Big City. Haga doble clic para finalizar la conexin. Lo mismo para Agriculture. Defina las preferencias como 1 para ambos.
6. CREAR UN FLUJO DE RETORNO
WEAP en una hora 23 Stockholm Environment Institute February 2009 Ahora crearemos una conexin de flujo de retorno desde la ciudad y desde el rea de agricultura. Haga lo mismo que se realiz antes con la opcin Transmission Link, pero escogiendo Return Flow.
El retorno de la demanda urbana debe estar aguas abajo del punto de extraccin de agua del nodo de agricultura. En la direccin del flujo de agua del ro la secuencia debe ser: extraccin de agua para la ciudad, extraccin para la agricultura, retorno de agua de la ciudad, retorno del nodo de agricultura.
Lo siguiente es definir el Return Flow Routing para la ciudad y su flujo de retorno (Return Flow). Haga esto presionando el botn derecho del mouse con el cursor sobre la lnea de retorno y seleccionando Edit Data y luego Return Flow Routing. Lo mismo se hace para el nodo de agricultura.
Defina en la carpeta de Return Flow Routing a 100 %.
WEAP en una hora 24 Stockholm Environment Institute February 2009
7. REVISANDO NUESTRO MODELO
A esta altura, nuestro modelo deberia verse similar a la figura siguiente:
WEAP en una hora 25 Stockholm Environment Institute February 2009
Los Primeros Resultados
1. CORRIENDO EL MODELO
En la barra vertical a la izquierda de la pantalla, presione sobre el smbolo de resultados (Results) para comenzar a computar los datos. Cuando aparezca la ventana consultando si se quiere re-calcular, clic en Yes. Esto permite computar todo el modelo. Cuando este listo una tabla de resultados aparecer en pantalla.
WEAP en una hora 26 Stockholm Environment Institute February 2009 2. REVISANDO RESULTADOS
Clic en Table y seleccione Demand y en este seleccione Water Demand. Tambin presione sobre Annual total.
Si se ingresaron todos los datos correctamente, ud. deber ver los siguientes datos iguales para el periodo 2000 2005:
Annual demand for agriculture 350 M m3 Annual demand for urban area 240 M m3
WEAP en una hora 27 Stockholm Environment Institute February 2009
Nota: si no tiene los mismos resultados, vuelva atrs y revise que todos los datos estn correctos. Si al correr los resultados el programa le muestra una ventana con advertencia, lea cuidadosamente el mensaje pues en el puede estar indicado el lugar del error.
3. VER RESULTADOS ADICIONALES
Veamos la demanda mensual o Monthly Demand Coverage Rates en forma grfica. Haga clic en Chart. Seleccione Demand y luego Coverage desde el men en dicha carpeta.
WEAP en una hora 28 Stockholm Environment Institute February 2009
Elija el formato del grfico seleccionando la opcin 3-D al lado derecho de la pantalla y asegrese que All months esta seleccionado del men. Mantenga la opcin Monthly Average seleccionado. El grfico debera verse como el siguiente:
Herramientas Basicas 29 Stockholm Environment Institute February 2009 WEAP Water Evaluation And Planning System
Herramientas Basicas Un tutorial para Creando y Usando Suposiciones Claves ............................................................. 30 UTILIZANDO EXPRESION BUILDER ........................................................... 33
February 2009
Herramientas Basicas 30 Stockholm Environment Institute February 2009 Creando y Usando Suposiciones Claves Note: Para comenzar esta leccin vaya al men principal y seleccin Revert to Version y escoja la versin llamada Starting Point for Basic Tools module.
La creacin de suposiciones se hace presionando sobre el smbolo Data y luego presionando el botn derecho del mouse en la opcin Key Assumption localizado en el rbol de opciones correspondiente.
Cree y nombre la siguiente suposicin. Asegurese de que las unidades estn correctas: Herramientas Basicas 31 Stockholm Environment Institute February 2009
Unit domestic water use 300 m3 Unit irrigation water needs 3500 m3
Con Key Assumptions es importante que las unidades designadas a cada suposicin clave (cada Key Assumption) sea la misma que las definidas a lo largo del rbol de datos.
Herramientas Basicas 32 Stockholm Environment Institute February 2009 Cree otra suposicin, Domestic Variation. Esta es sin unidades. Utilice la opcin Monthly Time Series Wizard para ingresar los datos:
Domestic Variation - Jan to Feb & Nov. to Dec.: 0.9 - Mar. to May & Sept. to Oct. 1.0 - June 1.1 - Jul, Aug 1.15
2. CREANDO REFERNCIAS A LAS SUPOSICIONES CLAVES
Crear una referencia a las suposiciones claves para Big City Annual Water Use Rate. Para hacer esto, vaya a Annual Water Use Rate y debajo del ao 2000 haga clic y seleccione Expression Builder.
Dentro de este, haga clic sobre la carpeta branches. Aparecer un rbol de opciones en la parte superior. Expanda todo si es necesario. En la opcin Herramientas Basicas 33 Stockholm Environment Institute February 2009 Key Assumption arrastre la suposicin Unit Domestic Water Use y llvela hasta el cuadro inferior. Si el numero 300 sigue ah, brrelo. Solo debe quedar Key/Unit Domestic Water Use. Clic en Finish
Repita para la rama de Agriculture. Remplace el valor 3500 con Key/Unit Irrigation Water Needs. Clic Finish. Presione en el smbolo Results y escoja Yes en la ventana que aparezca. Deber tener los mismos resultados que antes:
Annual demand for agriculture 350 M m3 Annual demand for urban area 240 M m3
Utilizando EXPRESION BUILDER
1. CREANDO EXPRESIONES MATEMATICAS
Herramientas Basicas 34 Stockholm Environment Institute February 2009 Ahora alteraremos la variacin mensual Monthly Variation en la demanda de agua para Big City usando una expresin matemtica. Haga clic en Monthlty Variation dentro de Big City y escoja la opcin Expression Builder en la celda debajo del numero 2000.
En la ventana de Expression Builder clic en la carpeta Branches, expanda, clic y arrastre la opcin Domestic Variation hasta el recuadro inferior y agregue a continuacin *100/12. El recuadro deber contener la siguiente expresin: Domestic Variation * 100 / 12 Si aparece un error, vuelva a teclear lo mismo, pero ahora escoja Verify y luego Finish.
Herramientas Basicas 35 Stockholm Environment Institute February 2009
Vea los nuevos resultados despus de efectuar estos cambios. Clic en el smbolo Results y Yes para re-calcular. Deber tener los siguientes resultados:
Note que ahora no hay demandas no cumplidas en diciembre para Big City porque la fraccin para demanda en diciembre decreci de 8.5 % a 7.5%. Ud Herramientas Basicas 36 Stockholm Environment Institute February 2009 puede revisar valores numricos calculados en Monthly Variation en la expresin matemtica seleccionando Table en la entrada de datos en la parte inferior de la ventana.
2. UTILIZANDO FUNCIONES INTEGRADAS AL PROGRAMA
Asumiremos que la poblacin de Big City no es conocida (en el ao 2000), pero si para el ltimo censo y su crecimiento estimado. Usando una funcin predefinida, tal como GrowthFrom, se puede calcular la poblacin actual. Se hace esto seleccionando Big City y luego Annual Activity Level y dentro de esta, escoger Expression Builder bajo el numero 2000 (Deber aparecer un valor fijo 800000) y en la carpeta Functions escoger GrowtFrom. Aqu aparecern una descripcin y ejemplos. Elimine el valor 800000 y de clic en GrowthFrom y arrstrelo hasta el recuadro inferior.
Herramientas Basicas 37 Stockholm Environment Institute February 2009
Ingrese los siguientes datos en la expresin utilizando el formato definido en la descripcin: Date of last Census 1990 Population at last census 733,530 Estimated growth rate 1.75% Teclee los datos siguiendo el formato de la expresin: Herramientas Basicas 38 Stockholm Environment Institute February 2009 GrowthFrom(1.75%, 1990, 733530)
..//
Eescenarios 39 Stockholm Environment Institute February 2009
WEAP Water Evaluation And Planning System
Eescenarios Un tutorial para Preparando el Terreno Para los Eescenarios ....................................................... 40 Creando Eescenarios de Referencia ...................................................................... 41 Creando y Corriendo Eescenarios ........................................................................ 47 Usando el Metodo WATER YEAR ................................................................... 51
February 2009
Eescenarios 40 Stockholm Environment Institute February 2009 Preparando el Terreno Para los Eescenarios Note: Para comenzar esta leccin vaya al men principal y seleccione Revert to Version y escoja la versin llamada Starting Point for Escenarios' module.
1. ENTENDIENDO LA ESTRUCTURA DE EESCENARIOS EN WEAP
En WEAP el tpico eescenario de modelacin consiste en tres pasos. Primero, Current Accounts o aos concurrentes son escogidos para servir de ao base del modelo; los aos actuales son los que se han ingresado en las lecciones anteriores en los modelos previos. Una Reference o escenario de referencia, es establecida de Current Accounts para similar evoluciones del sistema sin intervenir. Finalmente, what if o escenarios si ocurre esto pueden ser creados para alterar los eescenarios de referencia y evaluar los efectos de los cambios en polticas y tecnologas.
2. CAMBIOS EN EL HORIZONTE DE TIEMPO PARA EL AREA
Bajo el menu General/Years and Time Steps, cambie Time Horizon es decir, el horizonte de tiempo del rea:
Current Accounts Year 2000 (sin cambio) Last Year of Escenarios 2015 Eescenarios 41 Stockholm Environment Institute February 2009 3. CREAR UNA SUPOSICION CLAVE ADDICIONAL
Creemos la siguiente suposicin clave:
Population Growth Rate 2.2% Esta suposicin no tiene unidades, pero no olvide modificar en la columna Scale y definirla como porcentaje.
Creando Eescenarios de Referencia
1. DESCRIBIR EL EESCENARIO DE REFERENCIA
El escenario de referencia siempre existe. Se debe cambiar la descripcin en Area luego ir a Manage Escenarios para reflejar su rol actual. Se puede notar que se debe estar en el modo Data o en schematic para ver y acceder a Manage Escenario en la opcin dentro de Area.
Por ejemplo, Base Case Escenario with population growth continuing at the 1960-1995 rate and slight irrigation technology improvement.
Eescenarios 42 Stockholm Environment Institute February 2009
2. CAMBIAR LA UNIDAD DE USO DE AGUA EN IRRIGACION
Dentro del modo Data, se debe cambiar la suposicin Unit Irrigation Water Needs a un nuevo patrn anual para el periodo 2000 2015 de acuerdo a Current Account Years. Para hacer esto, hay que seleccionar reference eescenario desde el men se encuentra en la parte superior de la pantalla. Use Yearly Time Series Wizard para construir la serie de tiempo. Eescenarios 43 Stockholm Environment Institute February 2009
Primero escoja la funcin Interpolate, luego presione Next
Eescenarios 44 Stockholm Environment Institute February 2009
Clic en Enter Data en la ventana que aparezca. Presione next. Ahora clic en Add para agregar lo siguiente a la serie de tiempo:
Type of Time Series: Interpolate
Data: 2000 3500 2005 3300 2010 3200 2015 3150 Growth after last year: 0%
Note que el primer punto, para el ao 2000, deber estar ya listado porque ya ha sido ingresado cuando Unit Irrigation Water Needs fue creado.
Eescenarios 45 Stockholm Environment Institute February 2009
3. DEFINIR EL CRECIMIENTO DE POBLACION
Se debe definir el crecimiento con un porcentaje o tasa definido por Population Growth Rate lo que se hizo al comienzo del ejercicio. Aqu de nuevo ud. deber seleccionar Reference Escenario desde el men principal estando en modo Data.
Asegurese de tener seleccionado Big City y Annual Activity Level. Elimine la expresin y seleccione la funcin Growth dentro del Expression Builder debajo del periodo 2001 2015. Haga clic en Branches. Aqu arrastre la opcin Population Growth Rate al cuadro inferior. La funcin final deber verse de la siguiente forma:
Growth(key\population growth rate/100)
Eescenarios 46 Stockholm Environment Institute February 2009
4. CORRER EL EESCENARIO DE REFERENCIA
Correr el eescenario haciendo clic en el smbolo Results. Vea el grfico Unmet Demand (seleccionando Annual Total) para ambos sitios o nodos. Debera verse similar a las figuras que siguen,
Como evoluciona la demanda comparados en el grfico Unmet Demand? Porque el total de Unmet Demand decrece primero y luego crece?
Eescenarios 47 Stockholm Environment Institute February 2009
Creando y Corriendo Eescenarios
1. CREACION DE UN NUEVO EESCENARIO PARA MODELAR UNA MAYOR TASA DE CRECIMIENTO POBLACIONAL
Eescenarios 48 Stockholm Environment Institute February 2009 Crear un nuevo eescenario para evaluar el impacto del crecimiento de la poblacin para la ciudad Big City mayor que 2% para el periodo 2001 2015.
Vaya a Area\Manage Escenario y haga clic en el botn derecho estando sobre Refence y luego de las opciones escoja Add. Nombre este eescenario Higher Population Growth y escriba el siguiente comentario: This escenario looks at the impact of increasing the population growth rate for Big City from a value of 2.2% to 5.0%.
Eescenarios 49 Stockholm Environment Institute February 2009
2. INGRESAR DATOS PASA ESTE EESCENARIO
Haga los siguientes cambios dentro de la pantalla Data una vez que haya escogido el eescenario nuevo, Higher Population Growth,
Seleccione dentro de los Key Assumption el con nombre Population Growth Rate y cambie el valor bajo el periodo 2001 2015 a 5.0. Notara que el color del texto en los campos cambiara de color a rojo. Esto ocurre para cualquier valor que cambia o se desvi del eescenario de referencia.
3. COMPARE RESULTADOS PARA LA REFERENCIA Y UN CRECIMIENTO DE POBLACION MAYOR
Comparemos grficamente los resultados de estos dos eescenarios, el de Referencia y el de Mayor tasa de crecimiento de poblacin.
Eescenarios 50 Stockholm Environment Institute February 2009 Por ejemplo, seleccione Water Demand del men principal. Seleccione All Escenarios en el men a la derecha del grfico. Escoja Big City en el men donde se lee Branches: Demand Sites. El grfico deber verse como el siguiente:
Note la mayor demanda de agua para la ciudad en el escenario Higher Population Growth, que en el de referencia.
Ahora comparemos Unmet Demand. Solo debe cambiar en el men principal y escoger Unmet Demand.
Eescenarios 51 Stockholm Environment Institute February 2009
Nuevamente se presento mas falta de agua para el segundo caso, Higher Population Growth.
Usando el Metodo WATER YEAR
1. DEFINICION DE LA CONDICIONES CLIMATICAS O HIDROLOGICAS
En el ejercicio previo, se vario la demanda de agua; ahora variaremos suministro. Queremos ver como la variacion natural en el clima se puede ingresar a WEAP a travs de escenarios. Utilizaremos Water Year Method como ejemplo. Este es un simple mtodo para representar variaciones de clima tales como flujos de agua, lluvia y agua subterrneas. El mtodo primero define como cambia el clima. Un ao normal tiene un valor 1; un ao seco menor a 1 y una ao lluvioso mayor a 1.
Con el escenario de referencia escogido, expanda el rbol y haga clic sobre Water Year Method la que est bajo la rama Hydrology. Eescenarios 52 Stockholm Environment Institute February 2009
Seleccione Definitions e ingrese lo siguiente:
Very Dry 0.7 Dry 0.8 Normal 1.0 Wet 1.3 Very wet 1.45 Eescenarios 53 Stockholm Environment Institute February 2009
2. CREAR SECUENCIAS DE AOS
El siguiente paso en el uso del mtodo Water Year Method es crear una secuencia climtica para el periodo. Primero seleccione dentro de Data For: Current Accounts (2000) y asegrese de que el ao 2000 este fijado como Normal. Luego seleccione Reference e ingrese:
2001-2003 normal 2004 very dry 2005 wet 2006-2008 normal 2009-2010 dry 2011 very wet 2012 normal 2013 wet 2014 normal 2015 dry
Eescenarios 54 Stockholm Environment Institute February 2009
Eescenarios 55 Stockholm Environment Institute February 2009 3. DEFINIR EL MODELO PARA USAR EL METODO WATER YEAR METHOD
En el rbol, cambie Headflow dentro de River y bajo Main River (haga clic sobre este ltimo). Dentro de la carpeta Headflow debajo de Get Values from, seleccione del men Water Year Method.
4. VOLVER A CORRER EL MODELO
Presione sobre Results a la izquierda de la pantalla y seleccione Yes. Observe el grfico y compare para Reference y para Higher Population Growth.
Eescenarios 56 Stockholm Environment Institute February 2009
Note que el caso de la demanda no satisfecha, Unmet Demand, es mucho mas errtica usando este mtodo que el caso anterior, asumiendo un flujo constante en el ro.
Si hubiera querido comparar en el mismo grfico los resultados para Water Year Method para aquellos asumiendo clima constante para el periodo de tiempo, ud. puede crear un nuevo escenario que use el mtodo en vez de cambiar informacin dentro del de referencia (Reference escenario). El nuevo escenario se vera de la siguiente forma:
Eescenarios 57 Stockholm Environment Institute February 2009
Note que el caso de Referencia (clima constante) y el Water Year Method (clima variable) usaran el dato de crecimiento de 2.2 % de la suposicin Population Growth Rate para la ciudad.
5. CAMBIOS EN LA HERENCIA DEL ESCENARIO
El siguiente ejemplo mostrara la utilidad de cambiar la herencia del escenario dentro de WEAP.
Crear un nuevo escenario heredado de Reference y nombrelo Extended Dry Climate Sequence. El rbol de escenarios se deber ver as,
En el ambiente Data seleccione este nuevo escenario para editarlo. Bajo Hydrology haga clic en Water Year Method y edite lo siguiente:
2001-2003 normal 2004 wet 2005 normal 2006-2008 normal Eescenarios 58 Stockholm Environment Institute February 2009 2009-2010 very dry 2011 normal 2012 dry 2013 normal 2014 normal 2015 dry Ingrese esta informacin donde corresponda.
Los siguientes resultados corresponden a correr el programa con esta nueva informacin.
Ahora cambiaremos el lugar del escenario Extended Dry Climate Sequence colocndolo debajo de Higher Population Growth Rate para que herede la tasa de 5% de crecimiento. En el Manage Scenarios, seleccione Extended Dry Climate Sequence, haga clic en el men a la derecha debajo del texto Extended Dry Climate Sequence is based on: y seleccione Higher Population Growth rate como rama madre.
Eescenarios 59 Stockholm Environment Institute February 2009
Re calcule los datos y vea el grfico Unmet Demand para la ciudad.
Que cambios nota en este grfico para Extended Dry Climate Sequence?
Eescenarios 60 Stockholm Environment Institute February 2009
Datos, Resultados y Formato 61 Stockholm Environment Institute February 2009
WEAP Water Evaluation And Planning System
Datos, Resultados y Formato Un tutorial para Intercambiando Datos ............................................................................................ 62 Importando Serias de Tiempo ............................................................................... 66 Trabajando con los Resultados .............................................................................. 69 FORMATING / Defniendo el formato ................................................................. 73
February 2009
Datos, Resultados y Formato 62 Stockholm Environment Institute February 2009
Intercambiando Datos Note: Para comenzar esta leccion vaya al menu principal y seleccione Revert to Version y escoja la version llamada Starting Point for all modules after Escenarios module.
1. EXPORTAR DATOS A EXCEL
Se puede exporter todo el modelo a Excel tan solo estando en el ambiente o modo Data y luego seleccionando edit y luego export to Excel.
Para efectos del ejercicio solo exporte el arbol y todas las ramificaciones y todas las variables de current account (no exporte ninguno de los otros escenarios). Exporte a una nueva hoja de trabajo workbook. Mantenga todas las opciones restantes.
Datos, Resultados y Formato 63 Stockholm Environment Institute February 2009
2. USE LA OPCION DE AUTO FILTRO EN EXCEL
En la hoja de trabajo que se creo en el paso anterior, filter los contenidos para desplegar en pantalla solamente la variable consumption. Probablemente tendra que mover la pantalla hacia la derecha para llegar a la lista de variables.
Use la flecha a la derecha de la palabra variable para obtener el listado y seleccione consumption.
Datos, Resultados y Formato 64 Stockholm Environment Institute February 2009
3. MODIFICANDO DATOS
En la hoja excel que se creo haga los siguientes cambios en la columna amarilla. Puede ser conveniente ocultar varias columnas que no se esten usando de manera de ver variable values y los demand sites a los que corresponden.
Big City Consumption 5% (value was 15 originally) Agriculture Consumption 5% (value was 90 originally) Datos, Resultados y Formato 65 Stockholm Environment Institute February 2009
4. IMPORTAR DATOS DESDE EXCEL
Re-importar los datos modificado en excel.
En WEAP, escoja edit, import from excel Chequear que los datos de consumption han sido cambiados en el modelo.
Datos, Resultados y Formato 66 Stockholm Environment Institute February 2009
Nota: en excel si se tienen mas de una hoja de trabajo abiertos, verifique que se este importando desde la hoja adecuada.
Importando Serias de Tiempo
1. CREANDO UN OBJETO MONITOR DE FLUJOS
Agregue un streamflow gauge al modelo.
Inserte un punto de monitoreo agues abajo de la ciudad big city, debajo del retorno de flujo de ambos la ciudad y del nodo de agricultura.
Datos, Resultados y Formato 67 Stockholm Environment Institute February 2009
2. IMPORTAR DATOS DE TEXTO
Importar datos de flujo desde un archive de texto con separador de coma conteniendo aproximadamente 100 aos de datos sobre flujos de agua medidos hasta el 2003. Para hacer esto utilice read from file en la carpeta streamflow gauge o gauge data. En ambiente Data expanda la rama supply and resources\river\streamflow gauge en el arbol.
Escriba la siguiente funcion, la cual leera el archive desde un directorio llamado additional files localizado en su carpeta de Area:
readfromfile(additional files\river_flow.csv)
Datos, Resultados y Formato 68 Stockholm Environment Institute February 2009
3. COMPARE EL FLUJO ACTUAL-REAL Y EL MODELADO
Recalcular los resultados y comparer los flujos historicos con WEAP y su simulacion. Para hacer esto, haga clic en chart dentro del ambiente results (presionar results a la izquierda de la pantalla principal), seleccione del menu supply and resources\river\streamflow relative to gauge(absolute).
Datos, Resultados y Formato 69 Stockholm Environment Institute February 2009 Escoja selected years y escoja los aos 2000 al 2003 (los datos actuales son en 2000 y no hay mas info mas alla del 2003). El escenario de referencia aparecera automaticamente cuando se selecciona selected years. Debera obtener un grfico como el que sigue:
Trabajando con los Resultados
1. CREANDO UN GRFICO FAVORITO
Creemos un grfico de flujo de agua que muestre ambos, el flujo actual registrado por el monitor y el simulado en el nodo apropiado, en este ejemplo, return flow node 2). Primero seleccione streamflow desde el menu, luego seleccione streamgauge y below return flow node 2 desde la lista que aparece cuando se escoge select nodes and reaches. Esto dentro del menu Supply and Resources\River\Streamflow justo sobre la leyenda del Datos, Resultados y Formato 70 Stockholm Environment Institute February 2009 grfico. Finalmente seleccione los aos 2000 al 2003 para ser represantados en el grfico.
Guarde este grfico como favorite usando favorite y save chart as favorite. Nombrelo simulated and observed streamflow comparison
2. CREAR UNA VISTA GENERAL
Crear una vista general mostrando streamflow, inflow y outflow en grficos.
Seleccione overview. Bajo manage overviews seleccione inflows to area, outflows to area y el grfico favorite recien guardado.
Datos, Resultados y Formato 71 Stockholm Environment Institute February 2009
3. USANDO EL MAPA DINAMICO
Mapas dinamicos y resultados son rapidamente obtenidos desde una vista general. En en el ambiente results seleccione map y juegue con la barra de tiempo para observer los cambios durante el periodo de estudio.
Trate esto seleccionando main river streamflow.
Datos, Resultados y Formato 72 Stockholm Environment Institute February 2009 Note que mientras mueve el cursor un indicador aparecera sobre el grfico. En el mapa, el ancho del ro crecera o decrecera de acuerdo a los datos numericos de cada ao.
4. EXPORTANDO RESULTADOS A EXCEL
Todos los resultados se pueden exporter a Excel desde el ambiente Results. Una nueva hoja de trabajo es creada que contiene la informacion y resultados con la misma estructura que WEAP muestra.
Vuelva a abrir el grfico favorite desde la opcion favorite del menu en results. Exporte la informacion relacionada a Excel cambiando a la carpeta table y presionando en la opcion export table to excel a la derecha de la pantalla
5. CALCULO DE ESTADISTICAS
Ud puede generar estadisticas en el ambiente results para cualquier tabla. Solo haga clic en table y luego clic en stat en la columna de la derecha.
Datos, Resultados y Formato 73 Stockholm Environment Institute February 2009
FORMATING / Defniendo el formato
1. CAMBIANDO LA APARIENCIA DEL FONDO DE UN VECTOR LAYER
En schematic, cambia el color de big city presionando el boton derecho del mouse sobre cities en el recuadro de estratos (layers) justo debajo del reccuadro de elementos y seleccione edit. Haga clic en appearance y luego escoja fill color. Una paleta de colores aparecera.
Cambie el color a naranja.
Datos, Resultados y Formato 74 Stockholm Environment Institute February 2009
Datos, Resultados y Formato 75 Stockholm Environment Institute February 2009
Ud puede mover los estratos hacia arriba o hacia abajo de su posicion relative. Para ello presione el boton derecho del mouse y seleccione move up o move down.
Datos, Resultados y Formato 76 Stockholm Environment Institute February 2009 2. NOMBRE UN ESTRATO VECTOR
Se puede editar nombres para estratos presione el boton derecho con el cursor sobre river polygons, seleccione edit y escoja label. Tambien se puede cambiar el tamao del texto en la parte inferior de esta ventana.
Se pueden ocultar estratos estando en el ambiente schematic hacienda clic en la caja pequea a la izquierda del nombre.
3. AGREGAR UN ESTRATO RASTER
Datos, Resultados y Formato 77 Stockholm Environment Institute February 2009 En el ambiente schematicagregar un fondo en el mapa de la ciudad. Presione el boton derecho con el cursor en el recuadro de layer y escoja add raster layer,
Seleccione map.jpg localizado en el directorio _maps\tutorial\ (C:\program files\WEAP21\_maps\tutorial)
Datos, Resultados y Formato 78 Stockholm Environment Institute February 2009
El modelo deberia verse como el siguiente:
Datos, Resultados y Formato 79 Stockholm Environment Institute February 2009 4. MOVIENDO LOS NOMBRES
Para completar el formato del area, cambiemos el texto del nodo y las designaciones y movamolos de lugar.
Bajo schematic abra el menu Schematic desde las opciones arribe de la pantalla. Escoja set WEAP node size o set WEAP node label size dependiendo de lo que se quiera. Para cada opcion una ventana aparecera y una regla permite modificar el tamao.
Datos, Resultados y Formato 80 Stockholm Environment Institute February 2009 Sobre cualquier objeto haga clic en el boton derecho y se puede seleccionar la opcion move label para mover el nombre de lugar.
Nota: tambien se puede escojer no colocar o eliminar un nombre si se desea.
Conectando Recursos y Demandas 81 Stockholm Environment Institute February 2009 WEAP Water Evaluation And Planning System
Conectando Recursos y Demandas Un tutorial para
Modelando recursos de aguas subterraneas ....................................................... 82
February 2009
Conectando Recursos y Demandas 82 Stockholm Environment Institute February 2009 Modelando recursos de aguas subterraneas Note: Para comenzar la leccion vaya al Menu principal y seleccion Revert to Version y escoja la version llamada Starting Point for all modules after Escenarios module.
1. Crear un recurso de aguas subterranea
Crear un Groundwater node junto a la ciudad y nombrelo Big City Groundwater. Tambien marquelo activo en current Accounts.
Dele a Big City Groundwater las siguientes propiedades (asegurese de este en current accounts para ingresar esta informacin si no lo esta, la carpeta inicial storage no aparecera): Conectando Recursos y Demandas 83 Stockholm Environment Institute February 2009 Storage Capacity Unlimited (default, leave empty) Initial Storage 100M m 3
Natural Recharge (use the Monthly Time Series Window, accessed in the field under "2000") - Nov. to Feb. 0M m 3 /month - Mar. to Oct. 10M m 3 /month
2. Conectando Big City Groundwater con Big City
Use una Transmission Link para conectar Big City Groundwater a Big City demand site, y asignele una prioridad de 2. Su modelo debiera verse como el que esta a continuacion: Conectando Recursos y Demandas 84 Stockholm Environment Institute February 2009
3. Actualizar las caracteristicas de la coneccion de transmision entre the el ro principal y la ciudad Cambie las caracteristicas de Transmission Link conectando Main River (Withdrawal Node 1) y Big City (asegurese de estar en current accounts): Supply Preference 1 (default) Maximum Flow Volume 6 m 3 /sec
Conectando Recursos y Demandas 85 Stockholm Environment Institute February 2009
4. Correr el Model y Evaluar los Resultados Observemos los siguientes resultados y pensemos en preguntas. - Es la extraccion de agua subterranean requerida a cumplir demandas bajo estas condiciones sustentable?
Para ver este resultado, seleccione Groundwater Storage desde el menu de Supply and Resources\Groundwater
- Como el uso relative del agua de Big City Groundwater y del ro principal ( Main River) evoluciona a la demanda deBig City?
Para ver resultados grficos para Big City, primero seleccione "Supply Delivered" bajo Demand usando el men variable primaria. Luego escija "All Sources" dentro de las opciones al lado derecho de la. Luego, seleccione Big City como el sitio de demanda, para verlo, use el menu centrado sobre el grfico y directamente debajo de la variable primaria field. Clic on Annual Total.
El volumen maximo de flujo o Percentaje de Demanda (parametros) representan restrictions en la capacidad de un recurso (due, for example to equipment limits). Conectando Recursos y Demandas 86 Stockholm Environment Institute February 2009
Groundwater recharge and interaction with rainfall and surface water can be modeled rather that entered as inputs. Refer to the Hydrological Modeling tutorial for more details. Other resources can be modeled using the Other Supply object, which is characterized by a monthly production curve. This object can be used to simulate a desalination plant or inter-basin transfers, for example.
/// Refinando el analisis de Demanda 87 Stockholm Environment Institute February 2009 WEAP Water Evaluation And Planning System
Refinando el analisis de Demanda Un tutorial para
Demanda desagregada ........................................................................................... 88 Modelando el manejo de demanda, perdidas y Reuso ..................................... 94 Fijando prioridades de Demanda de distribucion ........................................... 104
February 2009
Refinando el analisis de Demanda 88 Stockholm Environment Institute February 2009 Demanda desagregada Note: Para comenzar esta leccion vaya al Menu principal y seleccione Revert to Version y escoja la version llamada Starting Point for all modules after Escenarios module. 1. Crear un nevo sitio de demanda En current accounts, cree un sitio nuevo de la demanda ro abajo de Big City para simular la demanda rural. Denomine este nodo Rural y dele una Prioridad de Demanda =1. Proporcione una Conexin de Transmisin desde main river posicionadolo ro debajo de los retornos de flujos de la gran Ciudad y de la Agricultura. La Preferencia del Suministro debe ser fijada en 1. Proporcione tambin un Flujo del Regreso para Rural que es posicionado an ms ro abajo. Proporcione un return flor routing igual a 100%. Su area debiera verse asi:
2. Crear una estructura de datos para el nodo de demanda rural Para crear esta estructura, clic derecho en la demanda Rural en el arbol de data, y seleccione Add para implementar la siguiente estructura (no ingrese datos aun):
Refinando el analisis de Demanda 89 Stockholm Environment Institute February 2009
Note que Showers, Toilets, Washing, y Others se agregaron en subramas bajo Single Family Houses.
3. Ingrese datos en Annual Activity Level Ingrese lo siguiente en Rural Demand Site, y en la carpeta Annual Activity Level: Rural 120,000 Households Single Family Houses 70% Share Showers 80% Saturation Toilets 90% Saturation Washing 55% Saturation Others 35% Saturation Apartment Buildings Remainder share (use the Expression Builder) Refinando el analisis de Demanda 90 Stockholm Environment Institute February 2009
Share vs. Saturation: even though both types of percentages are treated mathematically the same by WEAP, they are conceptually different. At a given level of the tree, shares should always sum up to 100%. They also allow the use of the remainder function. Saturation indicates the penetration rate for a particular device and is independent of the penetration rate for other devices (i.e., saturation rates for all sub-branches within a given branch do not have to sum to 100. Refinando el analisis de Demanda 91 Stockholm Environment Institute February 2009 4. Ingrese datos en Annual Water Use Ingrese lo siguiente bajo Rural demand site, y en la carpeta Annual Water Use Rate: Rural Single Family Houses Showers 80 m 3 /household Toilets 120 m 3 /household Washing 60 m 3 /household Others 40 m 3 /household Apartment Buildings 220 m 3 /household Consumption (in consumption tab) 80% Note que valores en Consumptiones ingresado por la totalidad de Rural demand node, y no para las subramas. 5. Chequear los resultados Calcule de nuevo sus resultados. En Results escoge Water demand como la variable primaria del men. Escoja all branches del men justo encima de la leyenda de grfico. Escoja 3 D y el grfico de barras como el (vea el primero y el segundo ejemplo de pantalla abajo). Escoja el nodo Rural de la demanda del men encima del grfico (vea la terera grafica de pantalla abajo).
Refinando el analisis de Demanda 92 Stockholm Environment Institute February 2009
Para ver los resultados de la Demanda de Agua (water demand) para todas las sub-ramas Rurales (por ejemplo, single family houses\showers; apartments), en el campo de levels seleccione 2 (justo encima del centro del grfico). El grfico resultante debe parecerse al uno abajo: Refinando el analisis de Demanda 93 Stockholm Environment Institute February 2009
Entiende por que la dmanda rural varia durante el ao sin que hayamos ingresado alguna variacion?
The variation in Rural demand is due to the fact that WEAP assumes a constant daily demand per day (no monthly demand was specified by the user), so months that have less days (like February) have a lower demand than months that have more days (like January).
Ahora cree un grfico en 3-D de Demand Site Coverage y seleccione all demand sites para la presentacion
Refinando el analisis de Demanda 94 Stockholm Environment Institute February 2009
Entiende porque la cobertura de rural es 100% pero no para la ciudad ni la agricultura, aun cuando estan definidas las prioridades?
Modelando el manejo de demanda, perdidas y Reuso 1. Implementando el manejo de demanda la aproximacion desagregada Ahora crearemos un eescenario nuevo que explora una estrategia de la administracin del lado de la demanda. Llame este eescenario New washing machines DSM; deber ser heredado del Reference y el eescenario tendr el mismo clima y la tasa de crecimiento de poblacin de gran Ciudad como el de Referencia. El rbol del eescenario en Manage escenarios debe parecerse a esto:
The Rural withdrawal point is downstream of the return flow point for the Big City, which means there is an additional volume of water available in the river; this return flow can easily cover the rather small Rural demand. Refinando el analisis de Demanda 95 Stockholm Environment Institute February 2009
Asumiremos que un tipo nuevo de lavadoras permite un 2/3 en reduccin (66.7 %) al lavar en el consumo de agua. Este eescenario nuevo evaluar el impacto de esta medida de la Administracin del Lado de la Demanda si 50% de las casas se puede convencer a comprar la mquina que ahorra agua.
Primero, vuelve a current accounts en Data, donde usted crear dos nueva ramas (old machines y New machines) en la estructura de datos Rurales. Efectivamente, usted esta desagregando washing la variable que ahora incluira dos subcategora nuevas. Note que usted debe volver a current accounts porque todas estructuras nuevas de datos se tiene que entrar en esta, incluso si la variable no deber ser activada (es decir, los niveles no cero de la actividad) en current accounts y en el eescenario reference.
Cuando vaya a agregar la primera subrama en Washing, aparecera el siguiente mensaje: Refinando el analisis de Demanda 96 Stockholm Environment Institute February 2009
Clic yes, agregue la estructura siguiente:
Cambie las unidades para Mquinas Viejas y Mquinas Nuevas a shares. Vuelva a entrar a water use rate for old machines (60 m3/household), como era el valor para la variable original ms alto en washing.
Refinando el analisis de Demanda 97 Stockholm Environment Institute February 2009
Ingrese un valor de 100% para el old machines activity level. Deje en blanco el Nivel de la Actividad para new machines - esto es igual que entrando un cero. Recuerde, usted entra stos en current accounts, as usted quiere slo Mquinas Viejas a ser activo en el eescenario de Referencia. Esto recrea el mismo efecto teniendo como la variable agregada washing en las Cuentas Actuales originales y en la Referencia. La variable Mquinas Nuevas se activar en el eescenario new washing machines DSM (ver abajo).
Ahora, cambia a New Washing Machines DSM. Ingrese el valo de 50 para New Machines (50% de todas las maquinas seran de esta nueva variedad) el resto (100) para Old Machines (usaremo expression builder mas tarde). Refinando el analisis de Demanda 98 Stockholm Environment Institute February 2009
Tendra que ingresar el original de Water Use Rate for the Old Machines (60 m 3 /household) como tambien la nueva Water Use Rate for the New Machines: Old Machines 60 m 3 /household New Machines 60*0.667 m 3 /household
Ahora compare los resultados numricos de la Demanda de Agua (water demand) para la rama washing Branch del sitio Rural de la demanda para Refinando el analisis de Demanda 99 Stockholm Environment Institute February 2009 el la Referencia y los eescenarios new washing machines DSM. En la vista de Resultados, clic sobre la tabla y escoge la variable de la Demanda de Agua. Escoja tambin Annual total en vez de monthly average y escoja 2001 (usted puede slo ve los resultados numricos por un ao individual al comparar a la vez los eescenarios en la carpeta table, pero en esto no presenta una dificultad para este ejemplo, como nosotros no tratamos de modelar ningn crecimiento con tiempo para la variable washing). Escoja demand site\Rural\washing\single family houses \washing de la izquierda superior en el men y all branches a la derecha y arriba. Escoja el Reference y new washing machines DSM del men en el fondo de la ventana. La tabla debe parecerse a lo Siguiente:
Note que el uso de nuevas maquinas in 2001 (y asubsecuentes en New Washing Machines DSM) resulta en alrededor de 460000 m 3 de agua menos demandada que si solo se tienen Old Machines (el eescenario de Referencia (referente)).
Demand-side management (DSM) refers to measures that can be taken on the consumers side of the meter to change the amount or timing of water consumption (as compared to the utility company's, or supply, side of the meter). Another way of modeling disaggregated DSM is to reduce the unit consumption for the affected category (in this case washing). There is no right or wrong way to model DSM. Refinando el analisis de Demanda 100 Stockholm Environment Institute February 2009 2. Implementar el manejo de la demanda la aproximacion agregada Si los datos de desagregados no estn disponibles, un valor equivalente de DSM (manejo de demanda) se puede computar. En este ejemplo, asumiendo que tuvimos ningun demanda desagregada Rural de agua, nosotros podramos llegar al mismo resultado utilizando el la Administracin de la Demanda (demanda management) la opcin para este Sitio de la Demanda en los Datos. En este caso la reduccin ascendera a: Original contribution of washing to rural water use 2,772/26,316 = 10.5% Share of New Machines 50% Reduction of New Machines 66.6% Multiplying all of these percentages together = 3.5%
Este valor puede ser ingresado a Demand Management/Demand Savings tab para la rama Rural en el Demand Side Management escenario.
Demand Side Management (DSM) measures are not taken into account in the demand view. To see the effect of a DSM measure, look at the change in Supply Requirement rather than Water Demand. Refinando el analisis de Demanda 101 Stockholm Environment Institute February 2009 3. Modelando Reuso Otra estrategia de la conservacin del agua que se podra estudiar con eescenarios es agua re empleada. Cree un eescenario nuevo heredado del Referencia y denominelo big city reuse. Cercirese est en este eescenario y el clic en la rama big city. Haga clic en loss and reuse y haga clic la carpeta reuse.
Ingrese la siguiente expression en el campo 2001-2015 usando el Expression Builder: Smooth(2001,5, 2005,18, 2015,25)
Primero seleccione la funcion Smooth dentro del texto de Expression builder. Clic Next y entre los datos y valores. Deberia tener un grfico como el de mas abajo. Note que Reuse en Current Accounts (2000) se mantiene cero. Clic Finish. Refinando el analisis de Demanda 102 Stockholm Environment Institute February 2009
Compare Unmet Demand para Big City antes (Reference) y despues (Big City Reuse) de introducer esta conservacion de agua. Deberia tener el grfico de abajo, el cual muestra reducciones substanciales en Big City Unmet Demand cuando se usa la estrategia de reuso de agua.
4. Modelando perdidas Reedite el modelo para tener en cuenta el hecho que hay un 20% de tasa de prdida en la red de gran Ciudad. Haga este cambio para las Cuentas Actuales (current accounts) para que se llevara con el eescenario reference, y como resultado de la caracterstica de herencia, a travs de todos eescenarios. Refinando el analisis de Demanda 103 Stockholm Environment Institute February 2009
What happens to the unmet demand for the Big City, both in the Reference escenario and the Big City Reuse escenario compared to the earlier exercise without losses?
Losses can happen in Transmission Link, in the Demand Site itself or in the Return flow. Losses in the Transmission Link will affect the supply to the Demand Site. Losses in the Demand Site will affect the required Supply Requirements of this Demand Site. Losses in the Return Flow will only affect the flow returned. Refinando el analisis de Demanda 104 Stockholm Environment Institute February 2009 Fijando prioridades de Demanda de distribucion 1. Edit Demand Site Priority Cree un eescenario nuevo, heredado del la Referencia ydenominelo Changing demand priorities. Cambie la Prioridad de la Demanda del Sitio de la Demanda de la Agricultura en data haciendo clic en la rama de la Agricultura y entonces haciendo clic en el botn de la Prioridad, o haciendo clic en el nodo en la Vista Esquemtica (schematic) y escogiendo "general info".
Cambie la Prioridad de la Demanda de 1 a 2.
Refinando el analisis de Demanda 105 Stockholm Environment Institute February 2009
A demand priority can be any whole number between 1 and 99 (99 is the default) and allows the user to specify the order in which the water requirements of demand sites are satisfied. WEAP will attempt to satisfy the water requirement of a demand site with a demand priority of 1 before a demand site with a demand priority of 2 or greater. If two demand sites have the same priority, WEAP will attempt to satisfy their water requirements equally. Absolute values have no significance for the priority levels; only the relative order matters. For example, if there are two demand sites, the same result will occur if demand priorities are set to 1 and 2 or 1 and 99. Demand Priorities allow the user to represent in WEAP water allocation as it actually occurs in their system. For example, a downstream farmer may have historical water rights to river water, even though another demand site positioned upstream could extract as much river water as it desired, leaving the farmer with little water in the absence of such water rights. The Demand Priority setting allows the user to set the farmer's priority for water above that of the upstream demand site. Demand Priorities can also change with time or change in a escenario - more advanced subject matter to be dealt with later in the tutorial. You can also change the Demand Priority in the Data View\Priority screen\Demand Priority tab.
2. Compare Resultados Despliegue graficamente Unmet Demand para la Agriculture para Reference y eescenarios Changing Demand Priorities. Deberia ser como el de a continuacion:
Refinando el analisis de Demanda 106 Stockholm Environment Institute February 2009 Note que Unmet Demand para Agriculture se incrementa cuando la prioridad es aumentada a 2. Esto porque Big City ahora tiene preferencia por tener sus demandas que ser satisfechas primero. Evidencia de esto puede verse generando un grfico de monthly average Demand Coverage for Big City y Agriculture a traves de los aos del eescenario de referencia.
Ahora compare los resultados al mismo grfico generado por Changing Demand Priorities.
Refinando el analisis de Demanda 107 Stockholm Environment Institute February 2009 Advierta que en el la Referencia, para la primavera y tarde meses de verano, tanto la gran Ciudad como la Agricultura no obtienen el alcance repleto de su demanda porque los dos compiten igualmente para flujo Principal de Ro. Cundo gran Ciudad se da la preferencia para satisfacer su demanda (Cambiando el guin de Prioridades de Demanda), sin embargo, su alcance mejora relativo a la Agricultura. A veces, el alcance es 100% para la Agricultura, pero no para gran Ciudad - eso es porque no hay la demanda de la Agricultura (principalmente observado para los meses de invierno). Note que el Alcance de la Demanda para el sitio Rural de la demanda es siempre 100% - esto es porque los flujos del regreso para la gran Ciudad y la Agricultura satisfacen la demanda de agua creada por el sitio Rural de la demanda. Refinando el analisis de Demanda 108 Stockholm Environment Institute February 2009 Hidrologa 109 Stockholm Environment Institute February 2009
WEAP Water Evaluation And Planning System
Hidrologa Un tutorial para Modelando Captaciones: modelo aguas lluvias y " Runoff" ....................................... 110 Modelando Captaciones: modelo de humedad del suelol ................................................. 115 Simulando interaccion superficie y aguas subterraneas ................................................. 121
February 2009
Hidrologa 110 Stockholm Environment Institute February 2009 Modeando Captaciones: modelo aguas lluvias y Runoff Note: Para comenzar la leccion vaya al Menu principal y seleccione Revert to Version y escoja la version llamada Starting Point for all modules after Escenarios module. 1. Crear una nueva captacion Cree un Captacin se opone en la vista Esquemtica para simular headflow para el Ro Principal. Haga esto tirando sobre un nodo de Captacin y lo localizando cerca del punto de partida del Ro Principal. Denomnelo el Ro Principal Headflow. Una vez que posicionado, un cuadro de dilogo abrir y solicitar los datos siguientes: Runoff to Main River Represents Headflow Yes (check box) Infiltration to No inflow to GW Includes Irrigated Areas No (Default) Demand Priority 1 (default)
Note that when you have finished creating the Catchment node, a dashed blue line will automatically appear in the schematic linking the node to the Main River.
Hidrologa 111 Stockholm Environment Institute February 2009
2. Crear la apropiada subestrutura para la cuenca Primero clic en boton derecho del mouse en Catchment oseleccione de Data, aparece una ventana preguntando metodo de Captacion: Hidrologa 112 Stockholm Environment Institute February 2009
Tambin se puede hacer en la ventana (boton) advance:
En Data haga clic en el boton Land Use e ingrese: Area 10M ha (you will have to choose the units first) Effective Prec. 98%
Crop Coefficients (use the Monthly Time Series Wizard to input these data)
Sep to Feb 0.9 March 1.0 April 1.1 May 1.4 Jun to Aug 1.1 Hidrologa 113 Stockholm Environment Institute February 2009
Note que si usted haba hecho clic s cuando pregunt si reas irrigadas deban ser incluidas en esta captacin (bajo Informacin General al crear captacin), otro botn la Irrigacin habra aparecido bajo la captacin en los Datos ve. Este botn tendra dos etiquetas bajo lo: (1) Irrig, donde usted hace la entrada o un 0 para no irrigado, o un 1 para irrigado para una clase particular de la tierra; y (2) Irrig la fraccin donde usted especificara la fraccin de agua de irrigacin suministr al rea que est disponible para el evapotranspiration.
The Rainfall Runoff method is a simple method that computes runoff as the difference between precipitation and a plants evapotranspiration. A portion of the precipitation can be set to bypass the evapotranspiration process and go straight into runoff to ensure a base flow (through the effective precipitation parameter). The evapotranspiration is estimated by first entering the reference evapotranspiration, then defining crop coefficients for each type of land use (Kcs) that multiply the reference evapotranspiration to reflect differences occurring from plant to plant. More information about this method can be obtained from the FAO Irrigation and Drainage Paper 56, called Crop Evapotranspiration and available from the FAOs website (www.fao.org). Entering an effective precipitation other than 100% is one way of acknowledging the fact that part of the rainfall is not submitted to evapotranspiration during high intensity rainfall events, hence generating a minimal runoff to the river even when the rainfall is lower than the potential evapotranspiration. Another solution is to move to more developed models such as the 2-buckets soil moisture model coupled with Surface Water Groundwater interaction modeling, as presented later in this module. Hidrologa 114 Stockholm Environment Institute February 2009
3. Ingrese datos climaticos Climatic Data se ingresan a nivel de catchment. En Data View, seleccione la nueva captacion bajo Demand Sites and Catchmentsen el arbol de data e ingrese la siguiente tabla a Climate usando Monthly Time Series Wizard: Month Precip. ETref J an 21 42 Feb 37 47 Mar 56 78 Apr 78 86 May 141 131 J un 114 122 J ul 116 158 Aug 85 140 Sep 69 104 Oct 36 79 Nov 22 43 Dec 13 37
If not available from on-site stations, precipitation data can sometimes be derived from world-wide climate models such as the one developed by Tim Mitchell at the University of East Anglia (http://www.cru.uea.ac.uk/~timm/data/index.html). The use of GIS software to extract the appropriate data is required. Such models provide average data in opposition to actual data, implying that the calibration is much more delicate. The Reference Evapotranspiration can be determined from a set of climatic and topographic parameters using the Penman-Monteith equation. More details are provided in the FAO publication mentioned earlier. Also, there exist global models of monthly reference evapotranspiration put together by the FAO, available from the FAOs website.
4. Miremos los Resultados Results for Catchments are located in the Catchment category in the primary variable pull-down menu. Prdidas de la Precipitacin al Ro Principal debe parecer semejante al grfico abajo. Escoja el la Referencia el guin del baja men encima de la leyenda de grfico, el Ro Principal Headflow como la sitio/rama de Demanda del men a la izquierda superior del grfico, y del ao 2000 del Aos Escogidos la opcin que utiliza el men en el fondo del grfico Hidrologa 115 Stockholm Environment Institute February 2009 .
Modelando Captaciones: modelo de humedad de suelo 1. Reemplazando la demanda de agricultura por un sitio de captacion Borre Agriculture demand site y cree una captacion en su lugar. NombreloAgriculture Catchment y anote: Runoff to Main River Represents Headflow No (check box) Infiltration to No inflow to GW Includes Irrigated Areas Yes (check box) Demand Priority 1 (default) Note que la prioridad de demanda aparece en la ventana solo despues de seleccionar Yes para Includes Irrigated Areas. Hidrologa 116 Stockholm Environment Institute February 2009
2. Connectar la nueva captacion La captacin nueva ahora ya debe ser conectada al Ro Principal con una Conexin de la Prdidas/Infiltracin. Agregue una Conexin de la Transmisin del Ro Principal (mismo punto de partida como el sitio anterior de demanda de Agricultura), con una Preferencia del Suministro de 1. Su modelo ahora debe parecer semejante a la figura abajo:
The purpose of this transmission link is to allow supplying irrigated areas with water from the river in case rainfall is insufficient. Hidrologa 117 Stockholm Environment Institute February 2009 3. Crear una subestructura en la captacion Asumiremos que esta captacin tiene tres tipos de utilizacin de la tierra. En los Datos Ve, agrega las ramas siguientes a su captacin nueva derecho hacer cliclo en el rbol de datos y escogiendo Agrega. (Si usted escoge la captacin para redactar por hacer clic de derecho en el nodo en la vista esquemtica antes que atravesando los Datos ven, usted ser preguntado escoger de antemano un mtodo de simulacin - escoge el la Lluvia Prdidas (el modelo de la humedad de tierra) el mtodo). Agregue las ramas siguientes: Irrigated Forest Grasslands 4. Entre los datos apropiados de uso de suelo Si usted no ha hecho as ya, escoge la Captacin nuevamente creada en los Datos ve y escoge el la Lluvia Prdidas (el modelo de la humedad de tierra) el mtodo haciendo clic en el Avanzado el botn. Entonces entre los datos siguientes despus de hacer clic en el utilizacin De la tierra el botn: Total Land Area 300,000 ha (you will have to select units first) Irrigated Forest Grasslands Share of Land Area 33% 25% remainder(100) Hidrologa 118 Stockholm Environment Institute February 2009
Irrigated Forest Grasslands Leaf Area Index 3.6 3.0 1.7 Root Zone Conductivity 60 35 45 mm/month Preferred Flow Dir. 0.15 0.15 0.15 Initial Z1 50% 20% 20% Las restantes variables son las mismas:
Initial Z2 20% Root Zone Water Capacity 900 mm Deep Water Capacity 35,000 mm Deep Conductivity 240 mm/month Kc Use the same values as input for the Main River Headflow catchment in the previous exercise. You can simply copy and paste that expression into the Kc field for the Agriculture Catchment land classes.
The Rainfall Runoff (soil moisture model) method has been developed to provide a simple yet realistic way of modeling hydrological processes with a semi-physical representation. Details about the method and its parameters, as well as calibration procedures, can be found in the appendix to this tutorial as well as in articles posted to the publication section of WEAPs website (www.weap21.org). The related WEAP help topic provides a description of each parameter and an overview of the model as well. The parameter values displayed above are for illustration purposes only. 5. Ingrese los datos apropiados de clima En la misma ventana, seleccione Climate e ingrese lo siguientes data: Hidrologa 119 Stockholm Environment Institute February 2009 Precipitation Use the same values as input for the Main River Headflow catchment in the previous exercise. Temperature MonthlyValues( J an, 9, Feb, 12, Mar, 16, Apr, 21, May, 24, J un, 27, J ul, 29, Aug, 29, Sep, 27, Oct, 22, Nov, 16, Dec, 11 ) Humidity 65% Wind 1m/s Latitude 30
Data about snow coverage are not needed if the basin is not exposed to snow. WEAP determines the appearance of snow based on the temperature and the melting and freezing points parameters. If the last two are left empty, no snow will be allowed to accumulate. 6. Defina las areas de riego En la misma ventana (o ambiente), seleccione Irrigation e ingrese lo siguiente Irrigated Forest Grasslands Irrigated Area 100% 0% 0% Lower Threshold 45% Upper Threshold 55%
Hidrologa 120 Stockholm Environment Institute February 2009 7. Miremos los Resultados Mire los resultados siguientes. Aqu otra vez, los resultados se localizan en el Captacin la categora del los Resultados la vista. Escoja Afluencias de Clase de Tierra y Desages bajo la variable primaria baja men. Escoja Todo Srcs/Dests (corto para Todas Fuentes y los Destino) del baja men encima de la leyenda del grfico. Para ver el Irrigado el segmento de la captacin de la Agricultura, escoge Rama: los Sitios de la Demanda y Captaciones\Captacin de Agricultura\Irrigado del baja men a la izquierda superior del grfico. Escoja el ao 2000 del Aos Escogidos la opcin que utiliza el baja men en el fondo, y el clic en el Promedio Mensual en la extrema derecha superior. Afluencias de Clase de tierra y Desages representa en una manera muy detallada el equilibrio de agua para cada clase de utilizacin de la tierra. Usted debe obtener un grfico semejante a la figura abajo para el Irrig afluencias de clase de tierra y grfico de desages:
Usted puede mirar tambin tales parmetros como la Humedad de Tierra en el cubo superior (la Humedad Relativa de Tierra 1 (%)), o el Flujo al Ro la Irrigacin Repleta, que demuestra el agua que fluye al ro, inclusive el agua del irrigacin en el exceso. Hidrologa 121 Stockholm Environment Institute February 2009
As you can see from the series of graphs, irrigation only happens from April to September. Soil Moisture in the first bucket is rather constant throughout the year at 45% to 50%, which is consistent with the lower threshold we set. Simulando interaccion superficie y aguas subterraneas 1. Crear un objeto agues subterranes Crear nuevo node de groundwater. Localice el objeto Groundwater junto a la captacion de Agriculture que ud creo previamente. Nombrelo Agriculture Groundwater.
2. Connecte el objeto Groundwater con la captacion Crear las siguientes conecciones: Transmission Link from Agriculture Groundwater to Agriculture Catchment (Supply Preference 1)
Infiltration/Runoff Link from Agriculture Catchment to Agriculture Groundwater.
Su modelo deberia verse como este:
Hidrologa 122 Stockholm Environment Institute February 2009
You can also create the Infiltration/Runoff Link between the catchment and the groundwater node by right-clicing the catchment in the Schematic View, selecting General Info and then choosing the groundwater field in the Infiltration to drop- down menu. 3. Ingrese los datos apropiados En el ambiente Data seleccione Agriculture Groundwater, cambia a Physical y seleccione Model GW-SW flows methodo de la carpeta de metodos.
Hidrologa 123 Stockholm Environment Institute February 2009 Cambie al water quality yentonces regrese a physical ventana para el cambio para que surta efecto (usted ahora ver varias etiquetas nuevas en la ventana Fsico). Entre los datos siguientes (blanco de hoja si nada se especifica) bajo las etiquetas o carpetas apropiadas: Initial storage 50M m 3
Hydraulic Conductivity 10m/day Specific Yield 0.1 Horizontal Distance 5000m (the extent of the aquifer perpendicular to the river ) Wetted Depth 5m Storage at River Level 50Mm 3
4. Select the Reaches that Interact with the Aquifer En el rbol de Data, ensanche todos los alcances del Ro Principal (main river) haciendo clic en el + luego a en supply and resources\river. Escoja el alcance que est debajo del nodo del flujo del regreso de la gran Ciudad (Return flow node 1; usted quizs tenga que cambiar a schematics y hacer clic en el boton derecho para encontrar el nombre de ese nodo en su modelo). Entonces entre los datos siguientes en el reach length la etiqueta para este alcance:
From Groundwater Select Agriculture Groundwater Hidrologa 124 Stockholm Environment Institute February 2009
Reach Length 30,000 m
5. Miremos los resultados Mire a la Demand Site Inflows and Outflows para Agriculture catchment, y select All Srcs/Dests para el ano 2000. Clic en Monthly Average. Hidrologa 125 Stockholm Environment Institute February 2009
Note that these results include Inflow from Agriculture Groundwater (due to the designation of the Agriculture Groundwater node as a source to supply irrigation water for the Agriculture Catchment) and Outflow to Agriculture Groundwater (due to the creation of a runoff/infiltration link between the two nodes).
Miremos tambien en Groundwater Inflows and Outflows (under Supply and Resources\Groundwater) para el ao 2000 (monthly averages).
Hidrologa 126 Stockholm Environment Institute February 2009
Note that the Inflow from Upstream category indicates infiltration of Main River water to Agriculture Groundwater along the river reach you selected earlier. Likewise, Outflow to Downstream represents groundwater seepage into the Main River.
Mire tambin en la altura de agua subterrnea encima de la etapa del ro. Esto puede ser visto escogiendo supply and resources\groundwater\height above river de la variable primaria en el men. Escoja agricultura groundwater del selected aquifers la opcin en el men encima de la leyenda del grfico.
Note that in the month where groundwater seepage to the Main River occurs (February), the groundwater elevation is higher than the wetted depth of the river as designated in the data (i.e., the difference in elevations is positive). Likewise, when Main River infiltration to groundwater is occurring, the elevation difference is negative.
/// Refinando el Suministro 127 Stockholm Environment Institute February 2009
WEAP Water Evaluation And Planning System
Refinando el Suministro
Un turorial para Cambiando las prioridades de suminstro ................................................................ 128 Modelando reservas ................................................ 131 Agregando requerimientos de caudal o flujos .................................................................... 137
February 2009
Refinando el Suministro 128 Stockholm Environment Institute February 2009 Cambiando las prioridades de suministro Note: Para comenzar esta leccion vaya al Menu principal y seleccione Revert to Version y escoja la version llamada Starting Point for all modules after Escenarios module. 6. Crear una nueva transmission para el reuso de agua Crear una nueva transmission comenzando en Big City Demand Site y terminando en Agriculture Demand Site. Este es un modelo conceptual de reuso de aguas servidas de una zona urbana para propositos agricolas. Fije el supply Preference en esta Transmission en 2. Supply Preference 2
If water quality were a concern, a wastewater treatment plant could have been added to treat the water from Big City before Agriculture received it. Having the treatment plant in the schematic would make it possible to simulate the changes in water quality before and after treatment. 7. Resultados cuando se cambian las preferencias de suministro Trate de cambiar las preferencias de suministros en las nuevas conecciones qu ahora suministran a la agricultura y vea los resultados para Demand Site Refinando el Suministro 129 Stockholm Environment Institute February 2009 Coverage. Para cambiar las prioridades haga clic en el boton derecho sobre el transmission link en el ambiente schematics.
Trate las siguientes combinaciones:
Supply Preferences =1 from the Main River, 2 from Big City
Supply Preferences =2 from the Main River, 1 from Big City Refinando el Suministro 130 Stockholm Environment Institute February 2009
Supply Preferences =1 from the Main River and 1 from Big City
Entiende porque cambian las demandas cuando las preferencias cambian?
You can modify the display of preferences on the schematic by using the Schematic\Change the Priority View menu. The View Allocation Order option will display the actual priority order in which WEAP computes supply. This is a function of the Supply Preference of the link as well as the Demand Priority of the demand site. Note that you can study the impact of changing Supply Preferences, like Demand Priorities, by creating alternative escenarios. Refinando el Suministro 131 Stockholm Environment Institute February 2009 8. Regresar al modelo original Puede hacer esto escogiendo Revert to Version dentro de Area en el men principal. Escoja Starting Point for all modules after Escenarios module como lo hizo para comenzar este exercise.
Modelando Reservas 1. Create a Reservoir and enter the related data Primero cree un nuevo eescenario heredado de Reference y nombrelo Reservoir Added. Entonces agregue al objeto reservoir en Main River ro arriba de Big City, y llamelo "Main River Reservoir" asegurese de desbloquear la opcion donde pregunta si es active in Current Accounts. Deje Demand Priority en 99 (default).
Refinando el Suministro 132 Stockholm Environment Institute February 2009
Clic en boton derecho sobre Main River Reservoir y select "Edit Data". Seleccione la variable Storage Capacity y ingrese al ambiente Data (asegurese de queReservoir Added este seleccionado). Clic en Startup Year antes de alterar otros parametros.
escoja 2002 como punto de partida para Main River Reservoir
Clic en el boton Physical y cambia lo siguiente: Storage Capacity 70 M m 3
Note que la escala (Scale) se fija en "Million" Refinando el Suministro 133 Stockholm Environment Institute February 2009
More details about reservoirs operation and hydropower production are provided in the Reservoirs and Power Production module of the WEAP tutorial. 2. Run the Model and Evaluate the Results Compare Demand Site Coverage paraAgriculture en los eescenarios Reference y Reservoir Added. - Demand Coverage: porque la agricultura posee mayor covertura con la reserva en el lugar?
Refinando el Suministro 134 Stockholm Environment Institute February 2009
- Reservoir Storage Volume: Aparenta ser sustentable la construccion de una reserva? Use el menu principal en chartpara seleccionar Reservoir Storage Volume (bajo Supply and Resources\Reservoir), y seleccione All Years a los pies del graphico.
Refinando el Suministro 135 Stockholm Environment Institute February 2009 - Flow in the River: Como cambia los flujos o caudales ro abajo de la reserve en el ro principal? Seleccione Streamflow (bajo Supply and Resources\River) del menu principal y clic en Monthly Average. Escoja 2002 desde Selected Years y escoja Withdrawal Node 2 para comparasion.
Escojamos escala logaritmica (opcion ubicada en la barra vertical a la derecha) par aver mas claramente las diferencias ro arriba y ro debajo de Main River Reservoir. Refinando el Suministro 136 Stockholm Environment Institute February 2009
Seleccione debajo de Return Flow Node 1 para comparasion. Porque es que streamflow en este alcance es mas parecido en ambos eescenarios?
The creation of a large reservoir allows storage of excess water during high flow periods to cover water demand during low flow periods. The price to pay is, however, a potentially large impact on the hydrological regime of the river downstream of the reservoir. The Return Flows from Big City and Agriculture provide the flow in the Main River during the spring and winter months. A reservoirs operation variables and flow requirements can be used to mitigate the reservoirs downstream impact. Refinando el Suministro 137 Stockholm Environment Institute February 2009 Agregando requerimientos de caudal o flujo 1. Crear requerimientos de Caudal Crer un nuevo eescenario: Flow Requirement Added. Este es heredado de Reservoir Added. El arbol de eescenarios debe verse asi:
Ahora agregue Flow Requirement a Schematic debajo de withdrawal node para Big City, pero agues arriba de withdrawal node para Agriculture. Demand Priority 1 (default)
Refinando el Suministro 138 Stockholm Environment Institute February 2009
Clic derecho en Flow Requirement y seleccione Edit Data\Minimal Flow Requirement. Agregue el valor (asegurese de que aun esta en el eescenario Reservoir Added):
Minimal Flow Requirement 5 CMS
2. Correr el Modelo y evalue los Resultados Miremos los resultados y pensemos en las preguntas relacionadas. - Como agregando un requerimiento de caudal cambia a flujo (streamflow) en el alcance del flujo mas abajo de flujo requerido? Compare streamflow debajo del requirement para Reference, Reservoir Added, y Flow Requirement Added para el mismo ao (2002). DEberia obtener el siguiente grfico:
Refinando el Suministro 139 Stockholm Environment Institute February 2009
- Cual es la covertura del caudal? Se puede saber seleccionando "Instream Flow Requirement Coverage" bajo Demand. (Cambie logaritmo por eje Y, y seleccione solo Flow Requirement Added).
- Porque la covertura ha cambiado para la ciudad? Seleccione Demand Coverage desde el menu principal, seleccione Big City demand site, y seleccione Reference, Reservoir Added, and Flow Requirement Added como eescenarios. Refinando el Suministro 140 Stockholm Environment Institute February 2009
- Asumiendo que este requerimiento de flujo es mas importante que suministrar a la ciudad Big City, Como dberia cambiar el modelo para asegurar que los requerimientos de caudal se cumplan?
The relative level of Demand Priority for Big City, Agriculture and the Flow Requirement will determine which demand is covered first. To ensure that the Flow Requirement is covered first, change the Demand Priority of Big City to a value higher than for the Flow Requirement, since it is upstream of the Flow Requirement.
Embalses y Generacin Hidroelctrica 141 Stockholm Environment Institute February 2009
WEAP Water Evaluation And Planning System
Embalses y Generacin Hidroelctrica UN TUTORIAL EN Modelando Embalses .............................................. 142 Agregando Generacin Hidroelctrica ......................................................... 146 Modelando Centrales de Pasada ............................. 149
febrero 2009
Embalses y Generacin Hidroelctrica 142 Stockholm Environment Institute February 2009 Modelando Embalses Note: For this module you will need to have completed the previous modules (WEAP in One Hour, Basic Tools, and Escenarios) or have a fair knowledge of WEAP (data structure, Key Assumptions, Expression Builder, creating escenarios). To begin this module, go to the Main Menu, select Revert to Version and choose the version named Starting Point for all modules after Escenarios module. 3. Creando un Embalse Cree un Embalses en el Lago localizado aguas arriba de Big City. Llmelo Embalse Big City. Demand Priority 99 (default)
Entering a Demand Priority of 99 ensures that the reservoir will only fill if all other needs are fulfilled, including downstream demand. 4. Ingresando los Datos Fsicos Haga clic en el botn derecho en Embalse Big City para modificar los datos. Ingrese los siguientes datos en la ventana Physical (asegrese de que este en Current Accounts). Storage Capacity 70 M m 3
Initial Storage 25 M m 3
Volume Elevation Curve Volume Elevation M m 3 m 0.0 190 30.0 210 70.0 216 Net Evaporation 25 mm/month. Embalses y Generacin Hidroelctrica 143 Stockholm Environment Institute February 2009
The Volume Elevation Curve is used both to model the surface for evaporation and to compute the head in case hydropower production is simulated. A cylindrical shape is assumed in converting volume and elevation into area. Net evaporation needs to account for both rainfall and evaporation. It can therefore be a positive or a negative number; monthly variations can be modeled using the Monthly Time Series Wizard. Embalses y Generacin Hidroelctrica 144 Stockholm Environment Institute February 2009 5. Ingrese los Datos Operacionales En la misma vista, ingrese los siguientes datos en la ventana Operation. Top of Conservation 60 Top of Buffer 40 Top of Inactive 5 Buffer Coefficient 1.0
As illustrated by the figure to the left, WEAP allows the modeling of advanced reservoir operation through the definition of several zones that have different operational constraints. More can be learned through the Help files Reservoir Zones and Operation screen or by clicing on the help button when in the Reservoirs Operation tab. 6. Entendiendo los impactos del Buffer Coefficient (Coeficiente de Amortiguamiento) Ahora cree un nuevo eescenario heredado del eescenario Referencia. Llame a este eescenario Cambios en el Buffer Coefficient. Despus Embalses y Generacin Hidroelctrica 145 Stockholm Environment Institute February 2009 vuelva a la vista de Datos (asegrese de que este en el Nuevo eescenario que acaba de crear) y cambia el buffer coefficient a 0.1. Haga clic en los resultados para correr el nuevo modelo.
Compare, para los eescenarios de Referencia y Cambios en el Buffer Coefficient, los resultados para el Reservoir Storage Volume (volumen almacenado en embalse), que se encuentra bajo la rama Supply and Resources\Reservoirs de la primera variable del men. Seleccione All Years desde el men desplegable al fondo de la pantalla, y haga clic en Monthly Average arriba del grfico. Elija los eescenarios Referencia y Cambios en el Buffer Coefficient para ver desde el men desplegable arriba de la leyenda. Usted puede elegir Embalse Big City desde el men desplegable justo arriba del grfico.
Tambin compare los resultados para Demand Coverage (Cobertura de Demanda) (bajo la rama de Demand). Seleccione los eescenarios de Referencia y Cambio en el Buffer Coefficient desde el men desplegable arriba de la leyenda del grfico. Seleccione Big City como el sitio de demanda para ver desde el men desplegable que falta arriba del grfico.
Embalses y Generacin Hidroelctrica 146 Stockholm Environment Institute February 2009
The Buffer Coefficient provides a way to regulate water releases when the water level in the reservoir is within the buffer zone (see figure in the information box of the previous step). The downstream demand is multiplied by the Buffer Coefficient to obtain actual water release. Thus a Buffer Coefficient of 1 means that as much water is released as is needed to cover downstream demand (in other terms, the buffer zone is a mere extension of the conservation zone). A Buffer Coefficient of 0 means no water is released. This is why lower Demand Site Coverage is observed for results in the Buffer Coefficient Changes escenario above. Agregando Generacin Hidroelctrica 1. Entendiendo la manera en que WEAP modela las Produccin de Energa WEAP puede modelar Produccin de Energa de tras maneras diferentes: a travs de embalses en lnea, a travs de embalses fuera de lnea y a travs de centrales de pasadas. Refer to the help for more information on each category. Embalses y Generacin Hidroelctrica 147 Stockholm Environment Institute February 2009 2. Agregue Capacidades de Generacin de Energa al Embalse Big City En este ejemplo vamos a modelar la estacin hidroelctrica de un embalse en lnea. Ingrese los siguientes datos bajo la ventana Hydropower para el Embalse Big City en las Cuentas Actuales (Current Accounts). Min Turbine Flow 5 CMS Max Turbine Flow 80 CMS Tailwater Elevation 195m Plant Factor 100% Generating Efficiency 60%
Look at the Hydropower Calculations help topic for more information about how WEAP computes power production. 3. Compute la Produccin Hidroelctrica y Entienda los Resultados Corra el modelo y mire a los resultados del modelo de referencias para la produccin hidroelctrica para el ao 2000. Los resultados pueden ser accedidos bajo el men desplegable principal bajo Supply and Resources/Reservoir/Hydropower.
Embalses y Generacin Hidroelctrica 148 Stockholm Environment Institute February 2009
Entiende por que los niveles de produccin entre Mayo y Junio son tan similares, a pesar de que los flujos en el Ro Principal (Main River) y la descarga aguas abajo es mucho mas grande en Junio? Para confirmar esto, mire los resultados de Streamflow en el tramo arriba del Embalse Big City (Main River Headflow).
Embalses y Generacin Hidroelctrica 149 Stockholm Environment Institute February 2009
The streamflow that can be processed by the turbine has been capped to 80CMS (see previous step), meaning that even though there is a higher discharge in June, the excess quantity flows downstream without going through the turbine. Hydropower in June would be the same for May and June if not for the fact that the Storage Elevation in Big City Reservoir was slightly lower at the end of April than it was at the end of May (look at the Storage Elevation results to confirm this - these numbers represent the status at the end of each month indicated). This effect was slightly offset by the fact that May has 31 days to produce power, whereas June has 30 days, but June still ended up having slightly higher total production. Off-line, local reservoirs hydropower production can be modeled in the same way. Modelando Centrales de Pasada 1. Cree un objeto de Central de Pasada Cree un Objeto de Central de Pasada en el Ro Principal (Main River) aguas arriba del Embalse Big City creado en el ejercicio anterior. Llmelo Central de Pasada Big City.
Ingrese los siguientes datos en la rama Supply and Resources\River\Run of River Hydro del rbol de Datos en la Vista de Datos: Min Turbine Flow 5 CMS Max Turbine Flow 80 CMS Plant Factor 100% Embalses y Generacin Hidroelctrica 150 Stockholm Environment Institute February 2009 Generating Efficiency 60% Fixed Head 19.5 m
2. Corra y Compare los Resultados Corra su modelo y cree un grfico comparando la produccin de energa para la central de pasada y para la estacin generadora en el embalse. Haga esto seleccionado All Hydropower del men desplegable arriba de la leyenda.
Cuales son las razones de las diferencias entre ambas curvas?
Embalses y Generacin Hidroelctrica 151 Stockholm Environment Institute February 2009
Note that the Run of River hydropower is slightly higher in May than June, in contrast to Big City Reservoir power production. This is due to the additional day available in May compared to June. Run of River hydropower production does not have Storage Elevation as limiting effect, whereas the Reservoir was still filling in May, which decrease the Reservoir production for that month compared to June.
Como afecta la central de pasada el flujo en el ro, en comparacin con la estacin en el Embalse Big City?
Para ver esto en el grfico, seleccione Streamflow del men desplegable principal y elija Selected Main River Nodes and Reaches del men desplegables arriba de la leyenda. Seleccione los siguientes tramos: Headflow, Central de Pasada Big City, Below Central de Pasada Big City, Embalse Big City, y Below Embalse Big City de la lista.
Embalses y Generacin Hidroelctrica 152 Stockholm Environment Institute February 2009
A reservoir can store water during high flows and release during low flow, thus having a smoothing effect. A run-of-river operation, however, processes whatever water flows in the river at any given point in time. Therefore, it does not affect the shape of the streamflow curve.
WEAP Water Evaluation And Planning System
Calidad del Agua UN TUTORIAL EN Preparando la modelacin de Calidad ..................... 154 Ingresando Datos de Calidad de Agua .................... 156 Considerando restricciones de Calidad del Agua en un Sitio de Demanda ............................... 162 Ingresando Actividades Generadoras de Contaminacin en un Sitio de Demanda ................ 165 Modelando una Planta de Tratamiento de Aguas Servidas ....................................................... 167
febrero 2009
Calidad del Agua 154 Stockholm Environment Institute February 2009 Note: For this module you will need to have completed the previous modules (WEAP in One Hour, Basic Tools, and Escenarios) or have a fair knowledge of WEAP (data structure, Key Assumptions, Expression Builder, creating escenarios). To begin this module, go to the Main Menu, select Revert to Version and choose the version named Starting Point for all modules after Escenarios module. Preparando la modelacin de Calidad 1. Entendiendo la Modelacin de Calidad del Agua en WEAP WEAP puede modelar tanto contaminantes conservativos como no- conservativos. Contaminantes conservativos son modelados a travs de un simple balance de masas. Una serie de modelos se ofrecen para contaminantes no-conservativos. Lea el tpico de ayuda Environment Overview para una descripcin ms detallada de las capacidades de WEAP. 2. Cree un set de Contaminantes Cree el set de contaminantes que va a ser modelado en el men General\Water Quality Constituents. En la caja de dialogo, haga el siguiente cambio para Temperature (ya parte de la lista) y agregue TSS (Total Suspended Solids, Solidos Suspendidos Totales) y Sal a la lista de constituyentes (BOD y DO deberan tambin aparecer listados): Name Calculate by Decay Rate Temperature Change to modeled TSS Decay 0.25 per day Salt Conservative Calidad del Agua 155 Stockholm Environment Institute February 2009
Calidad del Agua 156 Stockholm Environment Institute February 2009
More details are provided on the different models used for BOD and DO models in the Dissolved Oxygen and Biochemical Oxygen Demand help topic. Ingresando Datos de Calidad de Agua 1. Ingrese datos de Calidad del Agua de Rios En el rbol de las vista de Datos, seleccione Supply and Resources\River y haga clic en el Main River (Ro Principal). Despus abra la pantalla de Water Quality e ingrese los siguientes datos, que representan la calidad del agua en la cabecera del ro: Calidad del Agua 157 Stockholm Environment Institute February 2009 Model Water Quality? YES (check the box) Temperature 15C BOD concentration 5mg/l DO Concentration 8mg/l TSS concentration 20mg/l Salt concentration 2mg/l
2. Ingrese las Caractersticas Geomtricas del Ro Las caractersticas geomtricas del ro se necesitan para los diversos modelos de calidad del agua. Estas son usadas principalmente para calcular Calidad del Agua 158 Stockholm Environment Institute February 2009 velocidad/tiempo de residencia del agua en cada tramo del ro. En la vista de Datos, selecciones la rama Reaches (Tramos) del Main River e ingrese la siguiente informacin bajo la lengeta Water Quality. Headflow Distance Marker 0 km Tailflow Distance Marker 300 km Nota: largos de tramos intermedios sern estimados por WEAP basado en el esquema.
Flow Stage Width (Caudal-Alto-Ancho) para el tramo Below Main River Headflow (use el Wizard hacienda clic en la flecha que baja) Flow Stage Width 0 0.00 0.00 10 2.00 15.00 50 6.00 20.00 100 8.00 25.00 200 10.00 30.00 Su formula debera leer: FlowStageWidthCurve( 0, 0, 0, 10, 2, 15, 50, 6, 20, 100, 8, 25, 200, 10, 30 ) Asumiremos que esta seccin de ro se mantiene constante y dejaremos los otros tramos vacos. Calidad del Agua 159 Stockholm Environment Institute February 2009
Calidad del Agua 160 Stockholm Environment Institute February 2009
The Reach Length tab displayed under the Inflows and Outflows screen is used only for groundwater-surface water interaction modeling. Since this interaction can occur along segments of the total reach length, it can differ from the total reach length. Note that the reach length data input here is not used for water quality modeling. 3. Ingresando los datos Climatolgicos Los Datos Climatolgicos se necesitan para calcular la temperatura del agua. Haga clic en el botn Climate y seleccione nuevamente el tramo Below Main River Headflow. Ingrese la siguiente informacin climatolgica: Air Temperature Month Value (C) Jan 10 Feb 11 Mar 13 Apr 15 May 21 Jun 24 Jul 29 Aug 31 Set 28 Oct 20 Nov 16 Dec 12 Calidad del Agua 161 Stockholm Environment Institute February 2009
Humidity 65% Wind 1 m/s Latitude 30 Nota: usted puede ingresar estos datos para el primer tramo del ro y dejar los otros tramos vacos si es que quiere que estos valores apliquen para todos los tramos.
Calidad del Agua 162 Stockholm Environment Institute February 2009 Considerando restricciones de Calidad del Agua en un Sitio de Demanda 1. Ingresando las Restricciones Un sitio de demanda puede requerir que su suministro de agua cumpla con ciertos criterios de calidad del agua. Cree un nuevo eescenario heredado del eescenario de Reference y llmelo Restricciones de Calidad de Agua Hacia Big City. En la vista de Datos (asegrese de que este en el nuevo eescenario), seleccione la rama de Big City en el rbol de datos, y haga clic en el botn de Water Quality. Bajo la pestaa BOD Inflow, ingrese la siguiente concentracin mxima de BOD: BOD inflow 2 mg/L
2. Compare los Resultados Acurdese de que antes usted haba ingresado una concentracin de BOD (5 mg/L) para las aguas a la cabecera del Main River (bajo las Current Accounts), por lo que puede usted ahora correr el modelo y comparar la Cobertura de Demanda para Big City, con y sin la restriccin en la calidad del agua en el suministro de Big City. Para el periodo 2000 y 2001, una comparacin del Big City Demand Site Coverage para los eescenarios de Referencia y Restricciones de Calidad de Agua Hacia Big City debera verse como a continuacin:
Calidad del Agua 163 Stockholm Environment Institute February 2009
Por que la Cobertura de Big City baja a cero durante Junio, 2001, en el eescenario con restriccin en la calidad del agua?
If you look at the BOD concentration in the Below Main River Headflow reach (pictured below), you will see that BOD rises above the constraint (2 mg/L) for Big City intake during the month of June for both 2000 and 2001. Since the constraint is activated during the escenario period (starting in 2001), coverage for Big City decreases during June, 2001, because this demand site will not accept water that falls below the BOD constraint, and no other sources of water other than the Main River have been designated as supplies for Big City.
Calidad del Agua 164 Stockholm Environment Institute February 2009
The simulated temporal pattern of the BOD concentration along this reach of the Main River is a function of degradation, the extent of which is controlled by the residence time of the water in the Headflow reach. The longer the residence time in this reach, the more degradation that occurs. The pattern for BOD thus mirrors that of the flow velocity, and streamflow, for the reach (both pictured below).
Calidad del Agua 165 Stockholm Environment Institute February 2009 Ingresando Actividades Generadoras de Contaminacin en un Sitio de Demanda 1. Ingresando Datos Vamos a asumir que sabemos la concentracin de contaminantes en los flujos de salidas (Flujo de Retorno) de Big City. Entonces, usaremos la serie de pestaa de Concentration en la rama Demand Sites\Big City del rbol de Datos. Haga clic en el botn de Water Quality e ingrese los siguientes datos (en Current Accounts): Temperature 16 C BOD Concentration 60 mg/l DO Concentration 3 mg/l TSS Concentration 5 mg/l Salt Concentration 10 mg/l
Para el sitio de demanda Agrcola, vamos a admitir que no sabemos la concentracin en los flujos de salida, pero sabemos la intensidad de generacin de contaminantes. Ingrese la siguiente informacin:
BOD intensity 50 kg/ha Calidad del Agua 166 Stockholm Environment Institute February 2009 DO Intensity 30 kg/ha TSS Intensity 20 kg/ha Salt Intensity 2 kg/ha Temperature 15C
Inputting data for Pollutant Generation, using either method, will cause WEAP to disregard any pollutant concentration specified or simulated in the inflow to the demand site. 2. Evalue los Resultados Corra el modelo y mire a los siguientes resultados para varios constituyentes de calidad del agua. Seleccione Pollution Generation del menu de variables principal (bajo Water Quality): Demand Site Pollution Generation Surface Water Quality
Calidad del Agua 167 Stockholm Environment Institute February 2009
Note que la Generacin de Contaminacin para la Agricultura se restringe a los meses de primavera y verano que es cuando las actividades agrcolas estn activas.
Modelando una Planta de Tratamiento de Aguas Servidas 1. Cree una Planta de Tratamiento de Aguas Servidas Cree un eescenario llamado Nueva Planta de Tratamiento de Aguas Servidas- este eescenario se hereda del Reference. Despus, agregue una Planta de Tratamiento de Aguas Servidas (Wastewater Treatment Plant) para Big City, llmela Big City WWTP y djela inactiva en las Cuentas Actuales, y cree otro enlace de flujo de retorno desde Big City a la WWTP. Mantenga el enlace de Flujo de Retorno existente entre Big City y el ro. Tambin cree un flujo de retorno entre la WWTP y el ro. Su modelo debera verse similar a la figura de abajo:
Calidad del Agua 168 Stockholm Environment Institute February 2009
Usted tiene que establecer las variables de Return Flow Routing (Ruteo de los Flujos de Retorno) para ambos enlaces. For Para el Flujo de Retorno desde Big City a Main River (Return Flow Node 1), deje el Routing en un 100% para las Cuentas Actuales y 0% para los aos 2001-2015 en el eescenario Nueva Planta de Tratamiento de Aguas Servidas recin creado.
Para los Flujos de Retorno desde Big City a la WWTP de Big City establzcalo a un 100% para los aos 2001-2015 en el mismo eescenario. Calidad del Agua 169 Stockholm Environment Institute February 2009
Tambin establezca el Routing a un 100% para el Flujo de Retorno desde la WWTP Big City al Main River (Return Flow Node 3).
You also have the possibility to set removal rates in the various return flows. This would be useful if, for example, a given pollutant is decomposed by bacteria in the sewer system. These data can be entered under the Water Quality\Pollutant Decrease in Return Flow branches for the appropriate return flows (see figure below for example). Calidad del Agua 170 Stockholm Environment Institute February 2009
2. Ingrese la informacin para la WWTP Primero, ingrese el Start Year (ao de inicio) haciendo clic en el botn Start Year bajo la rama Water Quality\Wastewater Treatment del rbol de datos para Big City WWTP. Start Year 2001
Tambin ingrese la siguiente informacin en la ventana de Treatment (Tratamiento) (con el eescenario Nueva Planta de Tratamiento de Aguas Servidas seleccionado):
Calidad del Agua 171 Stockholm Environment Institute February 2009 Consumption 5% Daily Capacity 2M m 3
BOD Removal 90% DO Concentration 5mg/l TSS Removal 80% Salt Removal 20% Temperature 15C
If only part of the wastewater is treated through the WWTP, there are two modeling possibilities. One is to limit the Daily Capacity to whatever amount can actually be treated. In this case the wastewater in excess will be discharged without treatment. In this case, the share of untreated wastewater is not constant, but depends on the total flow. Another solution is to create an additional return flow going from the demand site straight to the river, by-passing the WWTP. In this case, a constant share can be set to by-pass the WWTP by setting the return flow routing shares accordingly. A combination of both methods is also possible. 3. Evalu los Resultados Corra el modelo y mire a los siguientes resultados para BOD en el eescenario Nueva Planta de Tratamiento de Aguas Servidas, comparndolos con los valores del eescenario Referencia (sin la planta de tratamiento de aguas servidas). Calidad del Agua 172 Stockholm Environment Institute February 2009
-Surface Water Quality (BOD en el ro aguas debajo del retorno de agua desde Big City).
Para ver estos resultados, primero selecciones Surface Water Quality bajo Water Quality en el men desplegable principal. Despus elija Selected Escenarios en el men desplegable arriba de la leyenda del grfico y seleccione los eescenarios Referencia y Nueva Planta de Tratamiento de Aguas Servidas.
Usando el men desplegable abajo del grfico, selecciones los aos 2000 y 2001 para ver. Seleccione Below Return Flow Node 3 (Return Flow Node 3 es el flujo de retorno desde la WWTP, por lo que va a estar mirando a la calidad del agua en el ro justo abajo del influjo desde la WWTP) como el tramo en Main River para ver. Seleccione BOD como el componente de calidad de agua desde el men desplegable arriba del grfico, y desmarque el botn Monthly Average a la extrema derecha. Su pantalla debera verse como la que se presenta a continuacin:
Note that BOD levels decrease substantially in 2001 compared to 2000 in the reach below the return flow from the treatment plant because the plant becomes active that year. Calidad del Agua 173 Stockholm Environment Institute February 2009
-WEAP tambin puede mostrar los valores de calidad del agua a lo largo del ro.
Desde el men al fondo de la pantalla, elija All Main River Nodes and Reaches y haga marque Represent true relative distance? Esto mostrara todo los nodos y tramos a lo largo del eje-X, con su distanciamiento proporcional a su distancia aguas abajo (las distancias se muestran en parntesis). Seleccione July, 2010, como el mes y ao. Para el tipo de grfico (chart type), seleccione Line. El grfico muestra como los niveles de BOD aumentan cuando los flujos de retorno cargados de BOD entran al ro, y disminuyen a medida que el BOD decae aguas abajo. El efecto de la planta de tratamiento de aguas servidas se puede ver claramente. Su grfico debera parecerse al siguiente:
-Influjos y Descargas de la Planta de Tratamiento de Aguas Servidas.
Para ver estos resultados, seleccione Wastewater Treatment Plant Inflows and Outflows (bajo Water Quality) desde el men desplegable principal. Tambin seleccione el eescenario Nueva Planta de Tratamiento de Aguas Servidas desde el men arriba a la izquierda. Calidad del Agua 174 Stockholm Environment Institute February 2009
In this type of chart, the outflows are represented as negative values and inflows are positive values. Note also that the Lost in Treatment category represents the flow that is consumed - a consumption rate of 5% was input in the data view for the treatment plant.
WEAP Water Evaluation And Planning System
Anlisis Financiero UN TUTORIAL EN Preparando el Modelo de Costos e Ingresos ............ 176 Modelando Costos ................................................... 178 Modelando Ingresos ................................................ 184
febrero 2009
The Rainfall Runoff (Soil Moisture) Model 176 Stockholm Environment Institute February 2009 Note: For this module you will need to have completed the previous modules (WEAP in One Hour, Basic Tools, and Escenarios) or have a fair knowledge of WEAP (data structure, Key Assumptions, Expression Builder, creating escenarios). To begin this module, go to the Main Menu, select Revert to Version and choose the version named Starting Point for all modules after Escenarios module. Preparando el Modelo de Costos e Ingresos
1. Entendiendo la modelacin de Costos e Ingresos en WEAP WEAP modela tres tipos de costos: Costos de Capital, Costos Fijos de Operacin & Mantencin (O&M), Y Costos Variables O&M. Tambin modela tres tipos de ingresos: ingresos fijos, ingresos variables e ingresos por electricidad. Los Costos e Ingresos pueden ser asignados a cualquier objeto (ej, un sitio de demanda, un tramo de ro, un nodo de aguas subterrneas, un embalse o planta hidroelctrica). Para una mayor informacin en la modelacin de Costos e Ingresos, remtase al tpico de Ayuda Entering Item Cost and Revenues. 2. Estableciendo la Tasa de Descuento En el men General, Units seleccione la pestaa Monetary e ingrese la Tasa de Descuento. Discount Rate 7%
The Rainfall Runoff (Soil Moisture) Model 177 Stockholm Environment Institute February 2009
The Discount Rate is used to compute net present value and accrue monetary quantities over time. It is different from the interest rate, which must be entered manually for each loan payment computation. One needs to decide upfront whether the analysis will be done in real or in nominal dollars (with or without considering inflation) since this will have an effect on the discount rate, interest rates and cost & revenue growth. Determination of the Discount Rate is an important matter in economic analyses. Guidelines exist that are based on different methods such as the Weighted Average Cost of Capital (WACC) or Capital Asset Pricing Model (CAP-M). The US government currently recommends a discount rate of 7% for public sector projects (including inflation). 3. Cambiando la Duracin de la Modelacin La Modelacin de Costos tiene sentido solo si un largo periodo esta siendo considerado. Extienda el periodo de tiempo simulado en WEAP abriendo la caja de dialogo General, Years and Time Steps. Cambie la variable Last Year of Escenarios (Ultimo Ao para los Eescenarios): Last Year of Escenarios 2025 The Rainfall Runoff (Soil Moisture) Model 178 Stockholm Environment Institute February 2009
Changing the Last Year of Escenarios will not affect the Current Accounts, the base year for all escenarios. It will only affect all the escenarios, including the Reference escenario. For more details about WEAP and escenarios, refer to the Escenarios module of the tutorial. Modelando Costos 1. Ingrese Datos de Costo para el Sitio de Demanda Para el sitio de demanda Big City, ingrese la siguiente informacin (en Current Accounts) en la rama Demand Sites del rbol de datos de la vista de Datos. Haga clic en el botn Cost e ingrese bajo la pestaa Capital Costs: Capital Costs: un prstamo de 120M$, en el ao 2000, por un periodo de 15 aos, con tasa de inters del 5% Use el Constructor de Expresiones (Expression Builder) para seleccionar la funcin ya predefinida LoanPayment; arrastre esta funcin dentro de la ventana de la expresin e ingrese ah los parmetros 120000000, 2000, 15, 5% dentro del parntesis. La expresin debera verse as: LoanPayment(120000000,2000,15, 5%) The Rainfall Runoff (Soil Moisture) Model 179 Stockholm Environment Institute February 2009
The Rainfall Runoff (Soil Moisture) Model 180 Stockholm Environment Institute February 2009 Variable Operating Costs 0.12$/m3
Fixed Operating Costs un valor anual de 5M$, creciendo a una tasa del 3% comenzando el 1995
Use el Constructor de Expresiones de nuevo, seleccionando la funcin predefinida GrowthFrom e ingresando los parmetros correspondientes dentro de los parntesis. La formula debera aparecer: GrowthFrom(3%,1995,5000000)
The Rainfall Runoff (Soil Moisture) Model 181 Stockholm Environment Institute February 2009 2. Ingresando Datos de Costo para todo el Sistema Asumiremos que hubo un prstamo hecho aos antes que el ao base de las Cuentas Actuales (Current Account) que todava se esta pagando. Le vamos a asignar este costo a todo el sistema, en vez de a un objeto en particular. Ingrese los siguientes datos en la rama Supply and Resources del rbol de datos de la vista de Datos. Capital Costs un prstamo de 300M$, hecho en 1989, por un periodo de 20 aos, tasa de inters del 6% Nuevamente, use el Constructor de Expresiones (Expression Builder) y la funcin LoanPayment. La formula debera verse as LoanPayment(300000000,1989,20,6%)
3. Evalu los Resultados Corra el modelo y mire los siguientes resultados: Financial/Net Cost: Cual es la diferencia entre los valores para Big City en dlar real o descontados? The Rainfall Runoff (Soil Moisture) Model 182 Stockholm Environment Institute February 2009 Seleccione Financial\Net Cost desde el men desplegable principal y elija Big City desde la lista de tems en el men arriba a la izquierda del grfico. Seleccione Capital Cost desde el men arriba a al derecha. Asegrese de que el eescenario Reference este seleccionado desde el men arriba del grfico. Alterne ente las opciones Real y Discounted usando el men justo a la izquierda del men de unidades (fijo a U.S. dollars).
The Rainfall Runoff (Soil Moisture) Model 183 Stockholm Environment Institute February 2009
While real dollar are actual dollar values, discounted dollar values have been brought back to their present value using the discount rate. The further in the future the cost occurs, the lower its present value.
Costo Promedio del Agua Que hace variar el costo mes a mes? Para diferentes aos? Seleccione Financial\Average Cost of Water desde el men desplegable principal. Mantenga el eescenario Reference seleccionado y haga clic en Monthly Average. Debera ver un grfico como el siguiente: The Rainfall Runoff (Soil Moisture) Model 184 Stockholm Environment Institute February 2009
Monthly variations in average cost of water occur because of the largely varying consumption of water (especially in the Agriculture area), while fixed costs remain constant. Annual variations are mainly driven by changes in the capital costs (loans are paid back, new loans occur). Modelando Ingresos 1. Ingrese Datos de Ingresos en el Sitio de Demanda En la pantalla de Cost para el Sitio de Demanda Big City (Vista de Datos), ingrese los siguientes datos, que pueden, por ejemplo, corresponder al precio al que se vende el agua. The Rainfall Runoff (Soil Moisture) Model 185 Stockholm Environment Institute February 2009 Variable Revenue 0.26$/m 3
When modeling hydropower reservoirs (refer to the Reservoir and Hydropower WEAP tutorial module), one can also enter revenues from electricity generation. The related data-entry tab exists only when pertinent. 2. Compare los Costos e Ingresos Netos Presente Muestre el Valor Presente Neto del proyecto. Como se comparan el Valor Presente Neto de los Ingresos con el Valor Presente Neto de los Costos? Seleccione Financial\Net Present Value desde el men desplegable principal, y elija Big City como el tem a visualizar. Usted debera tener un grfico como el siguiente: The Rainfall Runoff (Soil Moisture) Model 186 Stockholm Environment Institute February 2009
Que le dice esta comparacin?
The Net Present Value of the costs can be compared to that of the revenue to obtain a sense of the economic viability of the system. If the NPV of the costs exceeds the NPV of the revenues, then the system is returning a lower profit than average projects (as defined by the discount rate). If the NPV of the revenues exceed that of the costs, then the systems is generating a profit higher than average projects.
The Rainfall Runoff (Soil Moisture) Model 187 Stockholm Environment Institute February 2009 The WEAP/ QUAL2K Interface A TUTORIAL ON Linking to QUAL2K ............................................... 188 Running Escenarios ................................................ 193
February 2009
The Rainfall Runoff (Soil Moisture) Model 188 Stockholm Environment Institute February 2009
Note: For this module you will need to have completed the previous modules (WEAP in One Hour, Basic Tools, Escenarios, and Water Quality) or have a fair knowledge of WEAP (data structure, Key Assumptions, Expression Builder, creating escenarios). To begin this module, go to the Main Menu, select Revert to Version and choose the version named Answer Key for Water Quality Module. Linking to QUAL2K 1. Using QUAL2K for Water Quality Modeling in WEAP In addition to using WEAPs in-built capacity for water quality modeling, it is possible to use the US EPA QUAL2K modeling framework. This module demonstrates how to use the WEAP/QUAL2K interface, taking the Water Quality module as a starting point. This module is not an introduction to QUAL2K, which requires specialized knowledge, but if you are already using QUAL2K, you should be able to link your QUAL2K file to WEAP after this module.
This module is not an introduction to QUAL2K. Considerable work is required outside of WEAP to calibrate and prepare a QUAL2K file. Refer to the QUAL2K manual for more information. Visit http://www.epa.gov/athens/wwqtsc/html/qual2k.html is the location to download or for more information.
2. Differences Between QUAL2K and WEAP QUAL2K and WEAP are compatible in their general approach to water quality modeling, but they do some things differently. The important differences are: QUAL2K measures distance along a reach from the tail of the reach, while WEAP measures distance from the head. QUAL2K allows for diurnal variations in water quality and climate, while WEAP applies the same value to all times of day. The Rainfall Runoff (Soil Moisture) Model 189 Stockholm Environment Institute February 2009 WEAP is more tolerant of zero or missing values than is QUAL2K. QUAL2K and WEAP use different climate parameters. For example, QUAL2K uses dew point, while WEAP uses humidity. QUAL2K models many more constituents in much more detail, including two separate CBOD constituents, ammonia, nitrate, organic and inorganic phosphorous, algae, sediment, pH and pathogens (see http://www.epa.gov/athens/wwqtsc/html/qual2k.html for more details). QUAL2K and WEAP are similar in that each treats a river as a sequence of reaches, not necessarily of equal lengths. However, the reach boundaries as defined in QUAL2K and in WEAP need not match. Where reach boundaries do not match, WEAP handles the task of mapping water quality and climate variables, based on distance markers. Reservoirs present special challenges for water quality modeling. WEAP includes reservoirs, but not for water quality, while QUAL2K includes weirs, but they are not operated. It is recommended that rivers with reservoirs not be linked to QUAL2K, or that they be modeled in two sectionsabove the reservoir and below the reservoir. 3. Link Pollutants to QUAL2K This module uses the final result from the previous Water Quality module as a starting point. Open the WEAP tutorial (by selecting Area | Open | Tutorial from the menu), then selecting Area | Revert to Version | Answer Key for "Water Quality" module from the menu. Once the file is ready, change the water quality constituents to point to QUAL2K. From the menu, select General | Water Quality Constituents. For each constituent, select Modeled in QUAL2K in the Calculated By drop-down. Link each constituent in WEAP (except salt) to a corresponding QUAL2K constituent: Temperature Temperature, BOD CBOD fast, DO Dissolved Oxygen, TSS Inorganic Solids. Salinity is not directly modeled in QUAL2K, so it is not linked to a QUAL2K constituent in this example. QUAL2K instead models conductivity, which is an easily measured indicator of salinity. The Rainfall Runoff (Soil Moisture) Model 190 Stockholm Environment Institute February 2009 Next, search for a QUAL2K data file (a file ending in .q2k). Look for the new drop-down labeled QUAL2K Data File (.q2k) that has appeared at the bottom left of the Water Quality Constituents dialog. Select < Copy file from another directory > from the drop-down. Search the Tutorial\Additonal Files for the file Main_River_Tutorial.q2k. The Water Quality Constituents Dialog should now look like the following:
The QUAL2K file must initially be developed and edited outside of WEAP. WEAP will then modify some of the values, and extract values from QUAL2K after it is run. To view or edit the QUAL2K file, clic on the View button next to the QUAL2K Data File (.q2k) drop-down on the Water Quality Constituents dialog.
The Rainfall Runoff (Soil Moisture) Model 191 Stockholm Environment Institute February 2009 4. Change Reach Distance Markers For marking reach distances, QUAL2K assigns the tail of the river a distance of 0, and distance increases upstream. WEAP can measure reach distances either downstream or upstream, but in the previous module distance was measured downstream, opposite the convention for QUAL2K, so the reach distance markers must be changed when linking to QUAL2K. To set the reach distance markers: Go to Data View Navigate to the branch Supply and Resources\River\Main River\Reaches\Below Main River Headflow. Clic on the Water Quality button. Select the Distance Marker tab. (This will only show up in Current Accounts: if you do not see it, switch to Current Accounts in the drop- down at the top of the page.) Set the distance for Below Main River Headflow to 300 km, and the distance for Tailflow Point to 0 km.
5. Set Dew Point and Cloud Cover QUAL2K and WEAP use different climate parameters, so some additional climate parameters must be set for QUAL2K. When using QUAL2K for water The Rainfall Runoff (Soil Moisture) Model 192 Stockholm Environment Institute February 2009 quality calculations, WEAP changes the list of climate parameters automatically. While each reach in QUAL2K can have a different climate, for most WEAP applications it is reasonable to assume that the climate is the same on all reaches. In this case, climate parameters only need to be set for the top reach, since for downstream reaches, upstream values are used by default. For this example, two climate parameters will be set: cloud cover and dew point. Cloud cover is not a climate parameter in WEAP, so there is no corresponding value already in WEAP. For this example assume that average cloud cover is 30% along the river. To set this: Navigate to the branch Supply and Resources\River\Main River\Reaches\Below Main River Headflow, if you are not already there. Clic on the Climate button. Select the Cloud Cover tab. Type 30 for the value. Dew point is used by QUAL2K instead of WEAPs relative humidity parameter. Dew point, Td, can be calculated from the air temperature, T, and relative humidity, hr doing the following calculation. First, instead of using air temperature T directly, use x = T/237.7. Then calculate dew point using: Td=237.7 [17.3 x + (1 + x) ln hr]/[17.3 (1 + x) ln hr] Using this formula, and the values for air temperature (which are different for each month) and relative humidity (65% for every month) in the Water Quality module file, it turns out that dew point is about 6.5C below air temperature for all months. So, to set dew point: Navigate to the branch Supply and Resources\River\Main River\Reaches\Below Main River Headflow, if you are not already there. Clic on the Climate button. Select the Dew Point tab. Either use the Expression Builder or directly type in the formula Air Temperature - 6.5, and make sure the units are C. The Rainfall Runoff (Soil Moisture) Model 193 Stockholm Environment Institute February 2009
Running Escenarios 6. Run Escenarios Run the escenario by going to Results View and answering Yes to the dialog asking whether to recalculate. Note that when using QUAL2K, running escenarios can take a long time. Consider reducing the number of escenarios that you calculate at any time. QUAL2K will not run for months in which streamflow is zero. If this situation occurs in one or more escenarios, add a (small) minimum flow requirement on reaches for which QUAL2K is used. 7. Compare Results When you have finished running your selected escenarios, compare the results with the results from the previous module. They should be similar, but not identical, because the built-in water quality calculations in WEAP make slightly different assumptions and use different approximations than QUAL2K.
The Rainfall Runoff (Soil Moisture) Model 194 Stockholm Environment Institute February 2009
WEAP Water Evaluation And Planning System
Linking WEAP to MODFLOW A TUTORIAL ON Linking to MODFLOW ......................................... 196 Running MODFLOW and Viewing Results .................................................................... 207 Scenario: Increased Population .............................. 209 Scenario: Irrigation................................................. 211 Scenario: Artificial Recharge .................................. 216
February 2009
The Rainfall Runoff (Soil Moisture) Model 196 Stockholm Environment Institute February 2009
Note: For this module you will need to have completed the previous modules (WEAP in One Hour, Basic Tools, and Scenarios) or have a fair knowledge of WEAP (data structure, Key Assumptions, Expression Builder, creating scenarios). To begin this module, go to the Main Menu, select Revert to Version and choose the version named Starting Point for 'Linking WEAP to MODFLOW module'. Linking to MODFLOW 1. Using MODFLOW for Groundwater Modeling in WEAP For situations where the built-in WEAP groundwater model is not sufficiently complex, there is the option to link a WEAP model to a MODFLOW model. MODFLOW is a three-dimensional finite- difference groundwater model created by the U.S. Geological Survey (USGS). When properly linked, data and results flow back and forth between WEAP and MODFLOW for each calculation timestep. With this tight coupling between the models, it is possible to study how changes in local groundwater levels affect the overall system (e.g., groundwater-stream interactions, pumping problems due to drawdown, lateral groundwater recharge) and vice versa (e.g., infiltration and abstraction). However, be advised that building and calibrating a MODFLOW model is not a simple task. The version of MODFLOW that WEAP is designed to link to is MODFLOW 2000.
This module is not an introduction to MODFLOW, which requires specialized knowledge, but if you are already using MODFLOW, you should be able to link your MODFLOW model to WEAP after this module. Considerable work is required outside of WEAP to calibrate and prepare a MODFLOW model. Refer to the MODFLOW 2000 website for more information: http://water.usgs.gov/nrp/gwsoftware/modflow2000/modflow2000.html.
The Rainfall Runoff (Soil Moisture) Model 197 Stockholm Environment Institute February 2009 The groundwater models in MODFLOW and WEAP are very different. Whereas a WEAP groundwater node is represented as one large "bucket" with no parameters to describe internal flows, MODFLOW represents groundwater as a multilayered grid of independent cells, each with their own flow parameters and equations that are used to model flows between cells, and across the aquifer boundaries. Once you have WEAP and MODFLOW models linked, WEAP values for groundwater infiltration (recharge) and abstraction (pumping), river stage, and surface water runoff will be sent to MODFLOW as inputs for its calculations, and MODFLOW results for groundwater level (head), lateral flow between aquifers, and surface water- groundwater flows will come back to WEAP as inputs for its calculations. This feedback between WEAP and MODFLOW happens at each calculation timestep. 2. Example WEAP model The sample area used for this module differs from those in previous modules. It includes a city whose supply comes entirely from groundwater, rainfed agriculture, a spring-fed river that receives surface runoff from the catchment and is hydraulically connected to groundwater. The catchment includes forests and grassland, in addition to agriculture and the city.
The Rainfall Runoff (Soil Moisture) Model 198 Stockholm Environment Institute February 2009 Note that because WEAP does not spatially disaggregate catchments or groundwater nodes, the one catchment node in this example represents the entire area inside the red outline without any information about where in the catchment the various land classes are. The one groundwater node represents the entire aquifer, which extends over the same area as the catchment, and does not include information about where the well field for the city is (the red squares labeled Big City Wellfield). (For your own applications, you are free to create multiple catchments and groundwater nodes, and link them to different groups of MODFLOW cells.) 3. Loading a MODFLOW model To load a MODFLOW model, go to General\ MODFLOW Link on the Main menu. Check the "Link to MODFLOW" checkbox and then type in or browse for the "MODFLOW Name File." Typically the "Name" file has an extension of .NAM or .MFN. For this example, all the MODFLOW files are contained in a subdirectory named MODFLOW underneath the Tutorial area subdirectory. (Keeping the MODFLOW files in a subdirectory of the WEAP area is a good practice.) The name file for this example is called tutorial.mfn. After you have specified the name file, WEAP will read in the MODFLOW model and display information about it.
The Rainfall Runoff (Soil Moisture) Model 199 Stockholm Environment Institute February 2009 The name file lists the other files that contain data for the various aspects of the MODFLOW model, such as recharge, pumping and river interactions. These files are called "packages." Take a look at some of the packages for this modelclick on the "View/Edit Packages" button to and choose "MODFLOW Name file: tutorial.mfn." You will see the list of files/packages. Click the cancel button to close the name file and look at another package, such as the "MODFLOW Discretization file: tutorial.dis." The discretization file contains basic information about the model, such as the number of layers, row and columns, and the width of each row and column. As you can see in the screen above, WEAP has read in this information already: 20 rows, 20 columns, 1 layer, and 1000 meters width for both rows and columns. Note that initially WEAP does not know how to link the MODFLOW model to the WEAP model, as can be seen in the screen above, e.g., "WARNING: Active cells linked to WEAP groundwater node: None are linked" and "1 groundwater nodes (0 are linked to MODFLOW cells)." The next step is to make this linkage. 4. Linking WEAP elements (groundwater nodes, demand sites, catchments, rivers) to MODFLOW cells Each active MODFLOW cell is linked to one and only one WEAP groundwater node. (For a given row and column, every layer will be linked to the same groundwater node.) The linkage is established by a GIS shape file (.shp) that relates MODFLOW cells (by row and column number) with WEAP groundwater nodes (by name). The polygon shape file has one rectangular feature for each MODFLOW cell (row, column) and must be loaded as a background layer on the Schematic. For example, for a MODFLOW model with 20 rows, 20 columns and 3 layers, there would be 400 features in the shape file. The shape file's attribute table file (.dbf) must have fields for row number, column number and WEAP groundwater node name. Other optional fields are described below. This shape file will also be used to display MODFLOW results in WEAP. To create this shape file, either use a GIS program such as ArcGIS, or WEAP's built-in tool that can create a shape file corresponding to a MODFLOW model as explained in the following section. The Rainfall Runoff (Soil Moisture) Model 200 Stockholm Environment Institute February 2009 5. Creating a new linkage shape file On the MODFLOW Link screen (shown above), click the "Choose shape file that has MODFLOW linkage information" button. On the next window, for "Background Shape File with MODFLOW Linkage Information," choose "< Create New Shape File >". The following window will appear:
WEAP automatically fills in the number of rows and columns, and the row height and column width, which it read from the MODFLOW discretization file. However, the MODFLOW model does not contain information about the X,Y position (latitude and longitude) or the rotation angle of the cells. Therefore, you will need to enter this information yourself. If you know the values for latitude, longitude and rotation, you can enter the numbers directly. If you do not know the values, you can click on the map to set the origin (lower left corner). You will see a purple box on the map that indicates the area of all the cells. As long as you hold down the left mouse key, the purple box will move with the mouse; release when the box is correctly positioned. You can zoom in on the map (using the zoom slider below the inset map on the left, the mouse wheel, or control-click and drag on the map) to help achieve greater precision in placement of the area. The File Name box contains the filename for the new shape file. Either use the default filename ("MODFLOW Linkage.shp") or enter another name. Shape files always have a .shp extension. Click the Create button to create it. The Rainfall Runoff (Soil Moisture) Model 201 Stockholm Environment Institute February 2009 After the shape file has been created, WEAP will display it and allow you to customize its appearance on the schematic. As you can see from the screen below, the new shape file is a 20x20 grid of 400 cells.
The associated attribute table has fields for row, column, and for linking various WEAP elements to each cellGW, Catchment, Land_Use, DemandSite and RiverReach. You will need to fill in this table, specifying which cells are linked to which WEAP elements. For example, the name of the WEAP groundwater node (in the Tutorial, the node is named "Groundwater") must be entered in the table in the column labeled GW for each cell that corresponds to the WEAP groundwater node. For example, in row 1, columns 6 through 17 correspond to the WEAP groundwater node, so you would enter "Groundwater" in table column GW for those cells. You may edit this table in several different ways. To edit inside WEAP, click the Edit button (shown above) and type the values directly into the table. You can also edit the table in Microsoft Excel (the attribute table has the extension .dbf, e.g., MODFLOW Linkage.dbf) or in any GIS program, such as ArcGIS. If you do have access to GIS software, this will be the easiest way to edit the table, but it can be done in WEAP. After customizing its appearance, click the OK button. WEAP will add this layer to your Schematic and return you to the "Choose shape file that has MODFLOW linkage information" window. The Rainfall Runoff (Soil Moisture) Model 202 Stockholm Environment Institute February 2009 6. Use an existing shape file Rather than spending the time now to fill in all the information in the attribute table, we will use an existing shape file with all this information already filled in. On the "Choose shape file that has MODFLOW linkage information" window, select "< Add existing shape file as new map layer >" for the "Background Shape File with MODFLOW Linkage Information." A dialog box will appear, asking you to select the ArcView Shape File to use. Choose Linkage.shp (in the Tutorial directory) and click Open.
The Rainfall Runoff (Soil Moisture) Model 203 Stockholm Environment Institute February 2009 On the "Map Layer" screen, change the name to "MODFLOW Linkage." On the "Label" tab, choose "R_C" for the Field and set the Size to 40%.
Click OK. Now we need to specify which of the fields in the Linkage attribute table will be used for the linkage, and to which MODFLOW and WEAP items they correspond. The fields which are required are MODFLOW Cell Row, MODFLOW Cell Column and Groundwater Name. Depending on your model, you may or may not also match some or all of the following: Catchment Name, Land Use Name, Demand Site Name and River Reach Name. Based on the attribute file column names, WEAP will try to guess which fields are used for what. For example, if it finds fields containing the names "Row" and "Col", it will assume these contain the MODFLOW row and column values. In this example, WEAP is able to correctly guess all the fields: The Rainfall Runoff (Soil Moisture) Model 204 Stockholm Environment Institute February 2009
If it didn't correctly guess, you would select the appropriate field for each item (e.g., Groundwater Name Field). WEAP will also attempt to guess which WEAP rivers and reaches correspond to the MODFLOW river and drain cells. Click OK to close this window. The Rainfall Runoff (Soil Moisture) Model 205 Stockholm Environment Institute February 2009 Note that WEAP now reports the linkage shape file and how many of the WEAP and MODFLOW items are linked together, e.g., "1 groundwater nodes (1 are linked to MODFLOW cells)" and "Active cells linked to WEAP groundwater node: All are linked." Click Close to return to the WEAP Schematic.
The layer "MODFLOW Linkage" is now in the list of background layers. Because it is at the bottom, some of the cells will be hidden by the layers above, such as the yellow "Big City" layer. In order to see all the row_column labels, move "MODFLOW Linkage" to the top of the layersright click on the name "MODFLOW Linkage" and choose "Move to top."
Take a moment now to view the other information contained in this linkage file. Right click on the name "MODFLOW Linkage," choose "Set label to" and choose one of the other fields, such as "LAND_CLASS." This will show you which of the four land The Rainfall Runoff (Soil Moisture) Model 206 Stockholm Environment Institute February 2009 classes (Grassland, City, Forest, Farm) each cell corresponds to. Choose the field "DEMANDSITE" to see from which cells the Big City demand site will pump from. Choose the field "GW_NODE" to see which MODFLOW cells are linked to the WEAP groundwater node named "Groundwater." Finally, choose the field "RIVERREACH" to see which cells are linked to the WEAP river "Blue River." 7. Set Pump Layer One final step to link the WEAP model to the MODFLOW model is to specify from which MODFLOW layer the Big City demand site will pump. In general, a demand site or catchment node can pump from a single layer, from many layers (in equal or different proportions), or have pumping be handled as negative recharge in the MODFLOW recharge file. Since our example only has one layer, the choices are from layer 1, or as negative recharge (enter pump layer = 0 for negative recharge). We want to pump from layer 1. Go to the Data View, select "Big City" on the data tree, then click on the "Pumping" category at the top and enter "1" for the expression.
You have now linked the WEAP model to the MODFLOW model. The Rainfall Runoff (Soil Moisture) Model 207 Stockholm Environment Institute February 2009 Running MODFLOW and Viewing Results 8. View Results Click the Results button to calculate and view results. Notice that at each calculation timestep, WEAP runs MODFLOW. Results for MODFLOW are located in the Supply and Resources / Groundwater / MODFLOW category in the primary variable pull- down menu. Look at the results for Supply and Resources / Groundwater / MODFLOW / Cell Head. This report shows the vertical head for each MODFLOW cell. MODFLOW results utilize a new type of graph the 3-dimensional surface chart. Make sure that "Surface" is selected as the chart type, and that the "Y=0"button is not down. The cell head for one timestep is shown. Experiment with the sliders below the surface chart to rotate or tilt the surface. Click the "Rotate" button to animate the chart. Click the "3-D" button to switch between 3-D surface and 2-D plan views.
Can you see the impact of pumping from the Big City Wellfield? (This view exaggerates the variation in headclick the "Y=0" The Rainfall Runoff (Soil Moisture) Model 208 Stockholm Environment Institute February 2009 button to see a more realistic view. However, it is usually better to turn off Y=0 in order to see the differences clearly.) Click on the Map tab to see the head values on the map, with a graph below. When you click on a grid cell, its value over time will be graphed below the map. Click on some of the cells at the Big City Wellfield to see how they vary. There is a seasonal fluctuation in cell head (higher in winter, lower in summer, due to increased pumping in the summer and lower rainfall in the summer), and an overall trend downward from 2000 to 2010. You can click and drag the mouse over many cells and the graph will update in real-time as you move the mouse. This is a good way to get a quick understanding of how cells in different areas of the model behave differently over time.
Look at a few other MODFLOW results, such as Recharge, Pumping, Drain Flow, and Leakage to River. The Rainfall Runoff (Soil Moisture) Model 209 Stockholm Environment Institute February 2009 Scenario: Increased Population Now that we have a MODFLOW model linked to our WEAP model, we can create some WEAP scenarios and explore how they might affect groundwater. 9. Create scenario Switch to the Data View and create a new scenario underneath "Reference," call it "Increased Population" (Main menu: Area, Manage Scenarios).
Change the expression for the Annual Activity Level for Big City from "Growth(1%)" to "Growth(5%)"
The Rainfall Runoff (Soil Moisture) Model 210 Stockholm Environment Institute February 2009 10. Evaluate results Go to Results and look for the impact of the increased pumping from Big City on the groundwater levels. As you can see, the slow downward trend of the Reference scenario has now accelerated in the Increased Population scenario. This is especially evident in the cells on or near the Big City Wellfield
but an effect, although smaller, can even be seen far away from the wellfield, e.g., in Row 16, Column 6 (in the lower left corner of the model). The Rainfall Runoff (Soil Moisture) Model 211 Stockholm Environment Institute February 2009
Scenario: Irrigation The crops on this Farm are currently rainfed, but there is not enough rainfall in the summer to meet their evapotranspirative demand. Look at the results for Catchments / ET shortfall:
The Rainfall Runoff (Soil Moisture) Model 212 Stockholm Environment Institute February 2009 11. Create scenario Let's investigate the impact of adding irrigation from groundwater pumping, both on the groundwater levels and on crop yields. Switch to the Schematic View and create a new scenario underneath "Reference," call it "Irrigation." There are several steps to take to turn on irrigation for the Farm land class and for the MODFLOW cells associated with the Farm. 12. Add transmission link Add a transmission link from the groundwater node to the catchment, and uncheck "Active in Base Year?" When you add this link, WEAP will automatically set the catchment as having irrigation.
You can leave the priority as 1. 13. Set land class as irrigated Go to the Data View and change "Irrigated" to 1 for the Farm, and "Irrigation Fraction" to 50 (50% irrigation efficiency). Make sure that the Irrigation scenario is selected in the "Data for" dropdown box. The Rainfall Runoff (Soil Moisture) Model 213 Stockholm Environment Institute February 2009
For the transmission link, set the Startup Year to 2003.
14. Set MODFLOW layer for irrigation We want MODFLOW to pump the irrigation water from layer 1. Go to the Data View, click on the "Catchment" branch in the data tree, then click on the "Irrigation" category at the top and the Pump Layer variable tab. Enter a value of 1. The Rainfall Runoff (Soil Moisture) Model 214 Stockholm Environment Institute February 2009
15. Evaluate results Go to the Results View. First, verify that irrigation begins in 2003, reducing the ET Shortfall to zero.
What happens to crops yields, now that they receive all the water they need? Look at the Catchment report for yields, comparing the yield across scenarios. The Rainfall Runoff (Soil Moisture) Model 215 Stockholm Environment Institute February 2009 Now look at the impact of irrigation on groundwater. Click on a cell in the map in the Farm too see the largest effect, or a cell far away from the Farm to see the smaller effect.
Compare the pumping rates for the Farm and for Big City:
The Rainfall Runoff (Soil Moisture) Model 216 Stockholm Environment Institute February 2009 Scenario: Artificial Recharge For a final scenario, let's explore the impact of artificial recharge to groundwater.
Artificial recharge, or "Aquifer Storage and Recovery" (ASR), involves injecting water into an aquifer through wells or by surface spreading and infiltration and then pumping it out when needed. The aquifer essentially functions as a water bank. Deposits are made in times of surplus, typically during the rainy season, and withdrawals occur when available water falls short of demand.
In this example, the water will come from outside the catchment area and not vary seasonally. 16. Create scenario Switch to the Schematic View and create a new scenario underneath "Reference," call it "Artificial Recharge." 17. Load shape file layer On the Main Menu, select Schematic, Add Vector Layer. Choose the file artificial_recharge.shp. Give it the name "Artificial Recharge", and change its appearance so that the Style is "Solid" and the "Fill color" is light blue. Note that the cells are in column 6, rows 13-15.
The Rainfall Runoff (Soil Moisture) Model 217 Stockholm Environment Institute February 2009 18. Edit linkage shape file So that WEAP can tell MODFLOW which cells will receive the artificial recharge, we need to edit the linkage shape file. Double- click on "MODFLOW Linkage", select the Table tab and click the Edit button. Scroll down to find the artificial recharge cells: column 6, rows 13, 14 and 15. For these three cells, type into the field labeled DEMANDSITE the name of the artificial recharge demand site: "Artificial Recharge."
The Rainfall Runoff (Soil Moisture) Model 218 Stockholm Environment Institute February 2009 To verify this new linkage information, set the label for the MODFLOW Linkage layer to DEMANDSITE. You should see the artificial recharge cells labeled, as well as those for Big City Wellfield:
19. Create Other Supply and Demand Site Create an "other supply" node called "Other Supply." Create a new demand siteplace it on top of one of the blue artificial recharge cells. Call it "Artificial Recharge" and uncheck "Active in Base Year?"
The Rainfall Runoff (Soil Moisture) Model 219 Stockholm Environment Institute February 2009 Add a transmission link from Other Supply to Artificial Recharge, and a Return Flow link from Artificial Recharge to the Groundwater node.
20. Enter supply and demand data Go to the Data View, select scenario "Artificial Recharge," and then click on the branch for demand site Artificial Recharge in the tree. Set the Startup Year to 2005.
The Rainfall Runoff (Soil Moisture) Model 220 Stockholm Environment Institute February 2009 For Water Use, set the Annual Water Use Rate to 25 Million cubic meters (the annual capacity of the injection wells) and the Consumption to 0%.
Click on the branch for the other supply, and then enter 1 CMS for the inflow.
21. Evaluate Results Run the model and look at results for recharge and cell head. The Rainfall Runoff (Soil Moisture) Model 221 Stockholm Environment Institute February 2009 Does the artificial recharge have much impact on groundwater levels at the recharge site? Is there much of an impact closer to the Big City Wellfield or irrigation? Can you think of another site for the artificial recharge that would better alleviate the drawdown from pumping?
Groundwater levels at the recharge site are much higher than Reference: