BASEMENT FLOOR PLAN

(SCALE-1:100)
BASEMENT PARKING SPACE =50 Nos.
R
O
A
D
8
8
.5
8
'
PLOT LIMIT
3
5
.9
1
[1
1
7
.8
2
']
50.00 [164.05']
3
5
.9
1
[1
1
7
.8
2
']
50.00 [164.05']
PLOT LIMIT
PLOT LIMIT
PLOT LIMIT
A
D
J
. P
L
O
T
2
6
-
0
8
8
A D J. P L O T 26-084
A D J. P L O T 26-099
1800 4050 8750 5250 2900 2200 2100 4950 3250 4350 6100 6100
1800 4050 8750 5250 2900 2200 2100 4950 3250 4350 6100 6100
6
2
0
5
7
2
5
0
2
0
0
0
4
8
5
0
8
0
0
0
6
2
0
5
6
2
0
4
1
4
0
0
7
2
5
0
2
0
0
0
4
8
5
0
8
0
0
0
6
2
0
6
1
4
0
0
-3.50 m.
S.S.L
-3.25 m.
F.F.L
UPSTAND
-3.25 m.
F.F.L
UPSTAND -3.25 m.
F.F.L
-2.90 m
.
F.F.L
-3.40 m.
F.F.L -3.40 m.
F.F.L
DRIVEWAY
-3.40 m.
F.F.L
UPSTAND
-3.00 m.
F.F.L
UPSTAND
-3.25 m.
F.F.L
RAMP
A-302
B
A-302
B
A-301
A
A-301
A
B-07
UPSTAND
-3.25 m.
F.F.L
B-07
-3.10 m.
F.F.L
GROUND FLOOR SLAB LINE
UPSTAND
-3.25 m.
F.F.L
DRIVEWAY
CAR PARKING
CAR PARKING
UPSTAND
-3.25 m.
F.F.L
-3.40 m
.
F.F.L
-2.90 m.
F.F.L
B-08
DRIVEWAY
-2.90 m
.
F.F.L
-3.40 m
.
F.F.L
-3.25 m.
F.F.L
-3.25 m.
F.F.L
-3.25 m.
B-07 B-07 B-07 B-07 B-07
FORMWORKS & SCAFFOLDING
DECKING BEAM1.15M
LEGEND:
.......... UNIVERSAL HEAD(U-HEAD)
.......... DROPHEADSHOWN IN PLAN
.......... STEELPROPS SHOWN IN PLAN
.......... HORIZONTAL LEDGERS (SOLID
.......... SCAFFOLDTUBES (HIDDEN
.......... H20 TIMBER BEAM
.......... ADJ USTABLE U-HEAD
.......... ADJ USTABLE DROPHEAD
.......... ADJ USTABLE BASE J ACK
.......... CUPLOCK FOR STD&LEDGER
.......... CANTILEVER FRAME
.......... BEAMBRACKET
.......... VERTICAL STANDARD
.......... STEEL PROP ELEVATION
(RAISEDPOSITION)
(STRUCK POSITION)
.......... ADJ USTABLE DROPHEAD
SHOWN IN PLAN
LINE) SHOWN IN PLAN
LINE) SHOWN IN PLAN
REV. DESCRIPTION DATE DESIGNED CHKD
DRAWINGSTATUS
FOR APPROVAL
CONSULTANT:
DRAWINGTITLE:
CLIENT:
BSC Contracting
PROJ ECT TITLE:
DRAWN
DRAWINGNUMBER
DESIGNED
REV.
TECHNICAL
GENERAL NOTES
SCAFFOLDING LEGEND:
1 ) All Dimensions are in millimeters (mm) unless otherwise mentioned:
2 ) Bay sizes for Scaffolding not to exceed ________ , Unless otherwise mentioned:
3 ) Portions /Areas not covered by Scaffolding should be supported by the
Contractor as per site condition.
4) Bracing &Tying :
The Customer is responsible for ensuring that all structures are adequately braced
and/or tied to carry the load and ensure stability as indicated on the drawing. No braces
or ties are to be removed with Manar concern
5) TEMPORARY WORKING PLATFORMS :
Temporary working platforms for erection or Dismantling purpose will be designed,
Supplied and fitted by customer. Customer is responsible to ensure that working
platformor means of access necessary for safe access are provided whether shown
on this drawing or not
6) SCAFFOLDING GENERAL NOTES
A) ERECTION :
a . Erection of Scaffolding should be as per the Drawing .
b . Max distance ( Spacing ) Between Ledger to Ledger is 1.5m .
c . Manar does not supply labours or technical supervision . The responsibility of
Customer includes the method ,control and suitability of all sequencing, the time
checking, loading , striking, movement , lifting and Stripping of the temporary work and the
design , supply and erection of any temporary working platform for erection & dismantling.
B) RE - SHORING :
a . Back propping may be required . Back propping is the responsibility of the
Customer. .
7) CONCRETE GENERAL NOTES
A) GENERAL NOTE :
a . Loads on forms and falsework have been analyzed in accordance with the Guide for Formwork
and BS 5975 & 5973 , Code of practice for False Work :
b . Loads are assumed as Uniformly Distributed.
c . Dead Load of structure has been considered in designing of Scaffolding, excluding of Finishing
loads.
d . For Removing (dismantling /unfixing) of Scaffolding, the contractor must check for cube
strength. This is the responsibility of contractor.
e .This drawing is prepared based on the information Provided to us by the customer.
However, it is the responsibility of client to verify and check the requirements of loading
assumptions,details, dimensions, erection sequences etc. as as required.
B) DESIGN LOADS :
8) SPECIFICATIONS
Raw-material properties used for fabrication of our Falsework are ,
I . Plywood
Thickness of plywood : 18 mm
Allowable Stresses :
Fb=1200 PSI= 8.27 N/mm2 , Fv= 53 PSI= 0.365 N/mm2
Fc =1.200,000 PSI or 8273.76 N/mm2, L/ 360 ( As per ACI )
II . Manar Alluminium Beam
Allowable Bending Moment 8.75 N/Sqm
Allowable Shear Force 45.11 N/Sqm
A) MATERIAL PROPERTIES :
9 ) NOTE :
Quality,Satisfaction, Economy and safety are our main objectives. Therefore, if any
inconvenient with our offered design , our highly qualified and experienced design team
will work with you to reach your target and goal .
This drawing is the property of MANAR AL OMRAN. Any unauthorized use of this
drawing is considered illegal and subject to legal action by MANAR. This drawing is
NOT VALID UNLESS SIGNED AND STAMPED BY MANAR DESIGN DEPT.
1. For Slabs & Beams
Density Of Concrete 25.00 KN/m^3
Weight of Formwork 0.48 KN/m^2
Live Load ( BS 5975 ) _____ KN/m^2
Total Load _____ KN/m^2
2. For Walls & Columns
Max Allow Load For Walls _____ KN/m^2
Max Allow Load For Columns _____ KN/m^2
Max Design Wind Pressure _____KN/m^2
This Drawing has been
issued for construction
with acceptance of
client with respect to
design.
By______________
DATE ____________
This Drawing is for
Technical Discussion ,
Pricing and Approval
by the Client. Unless
issued and signed in
Construction Status,
this drawing forms
no part of Agreement.
By ______________
DATE ____________
DATE SCALE
MANAGER
ENG,SHAHID
Basement SLAB
ENG.MODAWAR
A
12/06/14 ASSHOWN
DS-006-MOHD
DECKING BEAM1.75M
DECKING BEAM2.45M
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
P
R
O
D
U
C
E
D

B
Y

A
N

A
U
T
O
D
E
S
K

E
D
U
C
A
T
I
O
N
A
L

P
R
O
D
U
C
T
P R O D U C E D B Y A N A U T O D E S K E D U C A T I O N A L P R O D U C T
P
R
O
D
U
C
E
D

B
Y

A
N

A
U
T
O
D
E
S
K

E
D
U
C
A
T
I
O
N
A
L

P
R
O
D
U
C
T

Você também pode gostar