Você está na página 1de 4

Client's

LOGO
Client: Huntsman Malaysia Order No.: 63T84087 Sub.: 20
Project: PSP1 Document No.: 3182002 Sheet: xx of xx
P1
1 Tag No. LS - 1051
2 Quantity 1
3 Service Chilled water (hot side)
4 Line No. -
5 Equipment
6 P&ID MA/A0/t0006
7 Fluid Chilled water (hot side)
8 Phase
9 Properties
10 - Density (kg/m
3
) 998
11 - Viscosity (cP) 1
12
13 Press. - min. (barg) -
14 - norm. (barg) atm
15 - max. (barg) -
16
17 Temp. - min. (
0
C) 5
18 - norm. (
0
C) 20
19 - max. (
0
C) 60
20
21 Process - type
22 - size / rating
23 - position
24
25 Maximum (m)
26 Minimum (m)
27 Tangent line (m)
28 High high (m) 4.5
29 High (m) 4(Hold)
30 Low (m) 1(hold)
31 Low low (m) 0.5(hold)
32 NOTES:
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
8-Sep-12 Issue for review T.T.H D.N.S S.J.W
S
E
R
V
I
C
E

C
O
N
D
.
4
1
0.5
4.5
4
1
0.5
C
O
N
N
.
L
E
V
E
L

O
F

L
I
Q
U
I
D
L
E
V
E
L

A
L
A
R
M
Approved
Process data sheet for
I
D
E
N
T
I
F
I
C
A
T
I
O
N
Level Gauge/Switch/Transmitter (LG/LS/LT)
REDUCTION UNIT
Existing hot water
tank(nozzle C10)
Liquid
4.5
Rev. Date Description/Issued for Author Checked
Approved
Client's
LOGO
Client: Huntsman Malaysia Order No.: 63T84087 Sub.: 20
Project: PSP1 Document No.: 3182002 Sheet: xx of xx
P1
1 Tag No. LS - 1051 LIT - 1053 LIT-1056 LIT 1057
2 Quantity 1 1 1 1
3 Service Chilled water (hot side) Chilled water (hot side) Chilled water (cold side) Chilled water (cold side)
4 Line No. - - - -
5 Equipment
6 P&ID MA/A0/t0006 MA/A0/t0006 MA/A0/t0006
7 Fluid Chilled water (hot side) Chilled water (hot side) Chilled water (cold side) Chilled water (cold side)
8 Phase
9 Properties
10 - Density (kg/m
3
) 998 998 999 999
11 - Viscosity (cP) 1 1 1 1
12
13 Press. - min. (barg) - - - -
14 - norm. (barg) atm atm atm atm
15 - max. (barg) - 0.1 - -
16
17 Temp. - min. (
0
C) 5 5 5 5
18 - norm. (
0
C) 20 20 7 7
19 - max. (
0
C) 60 60 60 60
20
21 Process - type
22 - size / rating
23 - position
24
25 Maximum (m)
26 Minimum (m)
27 Tangent line (m)
28 High high (m) 4.5
29 High (m) 4(Hold)
30 Low (m) 1(hold)
31 Low low (m) 0.5(hold)
32 NOTES:
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
0.5
C
O
N
N
.
L
E
V
E
L

O
F

L
I
Q
U
I
D
L
E
V
E
L

A
L
A
R
M
4.5 4.5
4 4
1 1
0.5
I
D
E
N
T
I
F
I
C
A
T
I
O
N
Existing hot water
tank(nozzle C10)
Existing hot water tank
(nozzle C6)
Cold water buffer tank
(nozzle C7)
Cold water buffer tank
(nozzle C4)
S
E
R
V
I
C
E

C
O
N
D
.
Liquid Liquid Liquid Liquid
Rev. Date Description/Issued for Author Checked Approved
Process data sheet for
Level Gauge/Switch/Transmitter (LG/LS/LT)
TETRACHLORIDE DILUTION
8-Sep-12 Issue for review T.T.H D.N.S S.J.W
Approved

Você também pode gostar