Escolar Documentos
Profissional Documentos
Cultura Documentos
Oblique Force
F
x
Bow Force
F
y
Beam Force
V
c
Current Velocity
F
c
Current Force
C
c
Current Force Coefficient
H
S
Significant Wave Height
V
S
Maximum Surface Current
V
W
Maximum Wind Velocity
T
s
Maximum Spectral Period
S.F. Safety Factor
S() JONSWAP Energy Spectrum
RAO Response Amplitude Operator
E Modulus of Elasticity
f Frequency
f
p
Peak Frequency
sigma
A Amplitude
Angular Frequency
18
INTRODUCTION
Background
Through the late 1950s, offshore oil and gas production was associated with fixed platforms in water depths of 150
feet or less. Going offshore, well production was limited, with post single stage separation liquid production being
sent to shore based treatment and storage facilities through short shallow water submarine pipelines. Ocean going
tankers, generally ranging from 10,000 to 60,000 dwt in size provided the market an economical method of
transporting the stabilized crude and products. These vessels were loaded, and offloaded at fixed shoreside tanker
berthing facilities. Recently in the offshore oil industry, there has been an increasing demand for oil recovery in
increasingly undeveloped areas of the world. A relatively recent answer to this demand has been the Floating
Production Storage Offloading System. Advantages of the FPSO include resilience to a range of environments,
mobility, lifespan, and lack of outside dependence. Areas that FPSOs have been established in include the North
Sea, off the coast of Africa, and in the Indian Ocean. These environments range from calm to the most severe sea
conditions know. As with any oil production system, an FPSO has to be relatively stationary in the area of its wells
for it to be productive; this requires a mooring system that effectively keeps the vessel in a required area, which is
the emphasis of the design.
Purpose
The purpose of this project is to analyze data supplied by ConocoPhillips and come to a practical design conclusion.
Material that will be taken into consideration for the design is the General arrangement of the hull and process
modules, global loading of the structure, wind and current loading, mooring and station keeping, hydrodynamics of
motions and offloading, cost, weight, buoyancy, overall stability, and regulatory compliance. The final design and
report was presented to a panel of judges for critique and actual workability of the design.
Team Organization
Team Indonesia has a class and work schedule for each team member is seen below. All meetings outside of class
were based upon this schedule.
Project Contract
Meetings
Members will attend all stated meetings on time, absences will be addressed prior to meetings
Conversation will be limited to the project material
Meetings will begin with a recap and update on the previous meetings assignments and decisions
Responsibility for the meeting notes will be rotated among members every week
Meeting notes will be typed out following the meeting
Major decisions will not be made unless at least three members are present
Meetings will be limited to half an hour at a time
Discordant issues will be resolved before a meeting is dismissed
Team
Team members will respect the opinions of teammates
Project work load will be distributed evenly
Leadership will be shared throughout team
Team members will be alerted to trouble a member might have with an assignment
Assignments will be finished by agreed deadlines, any possible late assignments and other team members
will be notified well in advance
Critique of work will be constructive
Communication between members is a priority
19
Student Schedules
Table 1: Student Schedules
x - indicates in class
work - indicaties at work
Monday Bobby Dallas Eric Sean Terry Toby Tuesday Bobby Dallas Eric Sean Terry Toby
8:00 AM 8:00 AM X X X
9:00 AM X X X X X X 9:00 AM X X X
10:00 AM 10:00 AM X X X
11:00 AM X 11:00 AM X X X
12:00 PM Work X 12:00 PM X X X X
1:00 PM X X Work Work 1:00 PM X Work
2:00 PM X X Work Work 2:00 PM X X Work
3:00 PM X Work Work 3:00 PM X X Work
4:00 PM X X X X 4:00 PM X X
5:00 PM X X X X 5:00 PM X Work X
6:00 PM 6:00 PM Work
7:00 PM 7:00 PM Work
8:00 PM 8:00 PM Work
9:00 PM 9:00 PM Work
10:00 PM 10:00 PM
11:00 PM 11:00 PM
12:00 AM 12:00 AM
Wednes day Bobby Dallas Eric Sean Terry Toby Thur s day Bobby Dallas Eric Sean Terry Toby
8:00 AM 8:00 AM X X X
9:00 AM X X X X X X 9:00 AM X X
10:00 AM X X X X X X 10:00 AM X X
11:00 AM X X X X X X 11:00 AM X X
12:00 PM Work X 12:00 PM X X X X
1:00 PM X X Work Work 1:00 PM X X X X
2:00 PM X X Work Work 2:00 PM X X X X
3:00 PM X Work Work 3:00 PM X X X X
4:00 PM X X X X 4:00 PM X
5:00 PM X X X X 5:00 PM Work X
6:00 PM 6:00 PM Work
7:00 PM Work 7:00 PM Work Work
8:00 PM Work 8:00 PM Work Work
9:00 PM Work 9:00 PM Work Work
10:00 PM Work 10:00 PM Work
11:00 PM Work 11:00 PM Work
12:00 AM Work 12:00 AM Work
Team Indonesi a Student Schedul es
20
Fr i day Bobby Dallas Eric Sean Terry Toby Sat ur day Bobby Dallas Eric Sean Terry Toby
8:00 AM 8:00 AM
9:00 AM X X X X X X 9:00 AM
10:00 AM X X X X X X 10:00 AM
11:00 AM X X X X X X 11:00 AM
12:00 PM Work X 12:00 PM
1:00 PM X Work X 1:00 PM
2:00 PM X Work 2:00 PM
3:00 PM X Work 3:00 PM
4:00 PM 4:00 PM
5:00 PM Work 5:00 PM Work
6:00 PM Work 6:00 PM Work
7:00 PM Work Work 7:00 PM Work Work
8:00 PM Work Work 8:00 PM Work Work
9:00 PM Work Work 9:00 PM Work Work
10:00 PM Work 10:00 PM Work
11:00 PM Work 11:00 PM Work
12:00 AM Work 12:00 AM Work
Sunday Bobby Dallas Eric Sean Terry Toby
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM Work
6:00 PM Work
7:00 PM Work
8:00 PM Work
9:00 PM Work
10:00 PM
11:00 PM
12:00 AM
21
Gantt Chart
Table 2: Gantt Chart
Eric Allen
Dallas Dees
Sean Hicks
Robert Hollibaugh
Toby Martin
Terry Starling
Group
3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd
Identify Design Topics
Conduct Research
Design Drawing (Solid Works)
Examine Codes and Regulations
Environmental Conditions
Progress Report #1 Due
Weight, Buoyancy
Ballast and Tank Arrangement
Environmental Loads
Progress Report #2 Due
Mooring Analysis (MIMOSA)
Stability Analysis (StabCAD)
Analyze RAO's
Bending Moments & Shear (Visual Analysis)
Progress Report #3 Due
Midterm Report Due
Revised Midterm Report Due
SNAME/MTS Presentation
Cost Analysis
Natural Periods
Vessel Damage Stability
Deflections and Hull Strength
Hydrodynamics of Offloading
Vessel Safety
Draft Report
Revised Draft Report
Final Presentation
Final Report
January February March Apri l May
Field Trip
The field trip to ConocoPhillips headquarters in Houston, Texas was the starting point to the whole design project.
The trip was lead by Rod King who is working with ConocoPhillips as a consultant. As a whole, many different
aspects in designing an FPSO were brought to the teams attention. The individual companies that attended, and
their specialization in the industry include APL Inc., Turret Mooring Systems; InterMoor, Mooring Systems; 2H
Offshore, Riser Systems; Lloyds Register Americas Inc., Classification and Integrity of Permanent Mooring
Systems; Pusnes AS, Offshore Loading Systems; SBM-IMODCO, FPSO Turret Moorings; ConocoPhillips, General
Shipbuilding; ConocoPhillips, FPSO Project Drivers; and the American Bureau Shipping, Class of FPSO Hulls.
Environment
Geographic Location
The environmental data for this design project was provided by ConocoPhillips. The data was taken from the
Indonesian waters of the West Natuna Sea located within the South China Sea, in 100 meters of water. The exact
22
location of the datum can be viewed below, coordinates: 4
o
14 00 North Latitude and 106
o
16 00 East
Longitude.
Figure 1: FPSO Location, West Natuna Sea
www.ict-silat.com/ Indonesia_map1.JPG
Wave Data
The wave conditions appear to display a high probability of occurrence in the North East direction, though a
significant probability lies in the opposite direction. In the North East and South South West directions,
probabilities of occurrence are 30% and 13%, respectively. The probability of wave headings in between the North
East and South South West directions are considerably lower (1% at lowest). A rosette illustrating these findings is
displayed below, in Figure 2.
23
Figure 2: Annual % Occurrence of Significant Wave Height
Like Figure 2 above, Figure 3 below shows predominant wave action to the North East. The highest magnitude of
significant wave heights occurs to the North East with 100 and 1 year return conditions of 5.3 m and 2.9 m,
respectively. Directions orthogonal and opposite of the North East encounter waves in the 2 m and 1 m range for
100 and 1 year return periods. Relatively benign wave conditions should be expected at this location.
Figure 3: 100 and 1 Year Return Significant Wave Height
Wind Data
Similar to the waves, this location experiences a high probability of wind occurring to the North East and the South
South West, ranging from 18% to 16%. Directions orthogonal to the NE and SSW only experience wind 1% to 3%
of the year. Below in Figure 4, an illustration of these findings is displayed.
24
Figure 4: Annual % Occurrence of Wind Direction
Although the probability of occurrence is low in the North West and South East Directions, there are considerable
wind velocities affecting these directions. The highest wind speeds occur in the North North East with magnitudes
of 24 m/s and 16.8 m/s for 100 and 1 year return conditions.
Figure 5: 100 and 1 Year Return Wind Speed
Current Data
Unfortunately, there is no data available explaining the directionality of current conditions. However, there is
enough evidence from the wind and wave data to believe the current will follow the same directional trends. The
largest current velocities occur in the North East and South West directions with magnitudes of 0.9 m/s and 0.8 m/s
25
for 100 and 1year return conditions. Also, the North North West and South South East directions can expect current
velocities of 0.7 m/s and 0.6 m/s and 0.6 m/s and 0.5 m/s during 100 and 1year return conditions, respectively.
Figure 6: 100 and 1 Year Return Current
A summary of the 100 and 1 year return conditions can be seen below, in Table 3.
Table 3: Design Environmental Conditions
Return Wind Current Hs Period
Period (m/s) (m/s) (m) (sec)
1 16.8 0.8 2.9 9.1
100 24 0.9 5.3 11.1
Design Criteria
ConocoPhillips tasked Team Indonesia to design a FPSO to operate off the Indonesian coast and submit the design
as a final report. The design Team Indonesia submits will follow performance criteria established by
ConocoPhillips. The environment where the FPSO operates causes various loads on the vessel and mooring, and
universal codes control the response. Team Indonesias design will follow the ABS codes for vessel displacements
due to environmental loads and API 2SK codes for mooring response. Additionally, cost, safety, and
constructability factor in the final design and should be addressed in the final report. All decisions made during the
design must be explained and validated in the submitted report. ConocoPhillips requires the design to meet specific
performance criteria concerning production and storage. The FPSO must produce 370 kbbls per day under normal
environmental conditions, and, for storage, ConocoPhillips follows a 10 day rule where the vessel stores 10 days
worth of supply. The design will consider several configurations depending on the environmental loads on the
vessel; for example, small storage tanks increase the vessels flexibility under environmental loads. The
environment affects all facets of design; the FPSO design must follow environmental code requirements and
ConocoPhillips requirements. The FPSO must produce during environmental conditions up to a 1 year storm, at
which point ConocoPhillips shuts in the vessel, and the FPSO must survive a 100 year storm. During storms the
vessel will experience bending and twisting; ABS codes limit how much the vessel can displace. Designs may
consider different approaches to mitigate loads and deflections. Weathervaning, for example, allows the vessel to
orient itself in the direction of the least amount of load, and both the hull size and strength limit deflections. Finally,
the turrets location, whether internal or external, depends on environmental loads.
26
REGULATORY COMPLIANCE
There are several sources/publications of regulations that outline the design aspects of FPSO vessels. These sources
include the American Bureau of Ships (ABS), the American Petroleum Institute (API), the Oil Companies Marine
International Forum (OCMIF), and the Protocol of 1978 relating to the International Convention for the Prevention
of Pollution (MARPOL 73/78).
Design Considerations
For the design of the FPSO there are several design criteria that must be met. They are as follows:
Production
o Rate (Total Fluids vs. Stabilized Product = 370 kbbls/day vs. 190 kbbls/day)
o Impact of Shut-ins
Storage
o 10 Day Rule
o More Tanks vs. Larger Tanks
Offloading
o Weather
o Shuttle/Offtake Tankers
Hull Deflections
o Hog (+0.5 m)
o Sag (-0.5 m)
o Rack (+/- 5)
The FPSO must also be able to maintain production in 1 year storm condition and be able to survive 100 year storm
conditions on location. To design this vessel satisfactorily there are regulations that must be met in each design
area.
Mooring
In the area of designing the mooring system, the team has to meet the design criteria outlined by recommended
practice, API RP 2SK. These guidelines state that the minimum Factors of Safety for intact and damaged conditions
for the mooring lines are as follows:
Factor of Safety = MBL/Max Line Tension
o Intact conditions = 1.67
o Damage conditions (1-line broken) = 1.25
The guidelines also define the maximum watch circle offset for both intact and damaged conditions in order to
maintain riser integrity.
The maximum watch circle offset is as follows:
Watch Circle offset
o Max. Intact Offset < 8% of W.D.
o Max. Damaged (1-line broken) Offset < 12% of W.D.
Maximum Offset = Mean + Dynamic
Therefore, for our location with 100 meter water depth, the maximum intact offset is 8 meters and the maximum
damaged offset is 12 meters.
27
Stability
In the area of vessel stability the team must meet criteria from MARPOL 73/78 regulations and ABS Class Rules for
Ships and Mobile Offshore Drilling Unit (MODU) regulations. The MARPOL 73/78 regulations state set the
following limits:
MARPOL 73/78 requirements for tank vessels (damage)
o Limit 1: Right Arm at Max RA (A) > 0.1m
o Limit 2: Angle from Equilibrium (D) to RA
zero
(B) or DF (C) > 20 deg
o Limit 3: Absolute Angle at Equilibrium (D) < 25 deg
o Limit 4: Area from Equilibrium (D) to RA
zero
(B) or DF (C) > 0.0175 M-Rad
The ABS MODU regulations state the following requirements:
ABS/IMO MODU 1989 requirements for drill ships (intact / damage)
o Intact Condition: Wind = 100 knots
o Sufficient residual dynamic stability (measured from righting and heeling curves)
o Damage Condition: Wind = 50 knots
o Final waterline should not submerge any non-watertight openings
o 2nd Intercept must be 7 degrees past 1st intercept
o Within extent of weather tight integrity, righting moment reaches a value 2x healing moment (both
measured at the same angle).
Environmental Loading
In the area of designing to handle the environmental loading on location, the team must meet regulations outlined by
API 2SK (1995), OCMIF (1994), and ABS (2000). These sources outline various equations and coefficients to use
in the calculation of wind, wave, and current forces induced by environmental conditions.
Safety
For floating installations, ABS (2000) gives general guidelines regarding fire protection and personnel safety. Plans
for seven fire protection systems need to be submitted with the design. These plans include a firewater system,
deluge systems (water spray for process equipment), foam systems (for crude storage tanks), fixed fire fighting
systems, paint lockers and flammable material storerooms, fire control and life saving equipment plan, and a fire and
gas detection and alarm system.
Spill containment for open and closed drain systems are to be provided in areas subject to hydrocarbon liquid or
chemical spills. Containment utilizes curbing or drip edges at deck level, recessed drip pans, and containment of
floor gutters, firewalls or protective walls. Open drain piping subjected to rainwater or other liquid accumulation
should be self draining, cleanout or flushing connections are to be provided, and all open drains should lead to one
final disposal location. The sealing of open drains should be permitted except when flammable liquids could be
present in the system, of which a seal is to be provided to prevent vapor release. When an open drain system is
subjected to an applied pressure, a liquid seal is to be provided on each drain header. Finally, when pumping
systems are used to remove liquids from hazardous areas or from drain tanks mentioned above, branch suctions from
safe and hazardous areas are to be arranged so that such areas cannot be pumped simultaneously. For closed drain
systems, the drain vessel is to be provided with pressure relief valves which are sized to handle the maximum flow
of gas or liquid that could occur under a blocked outlet condition. These drains from vessels containing non toxic,
non flammable liquids, can be connected to a open drain piping system is sized to accommodate these additional
drains.
ABS also gives general lifesaving requirements using lifesaving appliances and equipment. First lifeboats of an
approved type are to be provided, with a total capacity to accommodate twice the total number of people on board
28
the subject unit. They are required to be installed on at least two sides of the installation, in safe areas in which there
will be accommodation for 100%, in case one of the stations becomes inoperable. Next, inflatable life rafts of an
approved type are to be provided onboard such that their total capacity is sufficient to accommodate the total
number of people expected onboard the facility. Life rafts are to be placed in or next to areas where personnel might
be working, in sufficient quantity to hold the maximum number of people that might be present in the working are at
any one time. Also at least four life buoys of an approved type, with floating water lights, are to be provided. One
ring life buoy is to be placed in a suitable rack on each side of the structure in an acceptable location. Multi-level
structures may require the placement of additional life buoys. At least one life jacket of an approved type is to be
provided for each person on a manned facility. Life preservers/ work vests are to be stored in readily accessible
locations. In addition, life jackets numbering the same quantity as the maximum aggregate capacity of each life boat
station must be stored next to the life boat station. When personnel baskets are used to transfer personnel from the
facility to work boats, or vice versa, a work vest is to be provided and kept with the personnel basket for each person
riding in the basket.
GENERAL ARRANGEMENT
The general arrangement and specifics of our vessel was supplied by ConocoPhillips, the layout of which can be
seen in Figure 7. Not included in the layout is the specific mooring design to be used.
Figure 7: General Ship Layout
The overall design of the vessel reflects the refining and storage purpose of the vessel. The box shaped hull and
minimum amount of machinery space facilitates the large amount of storage required after processing; optimization
of the large expanse deck space facilitates the room needed for the topside processing modules. General dimensions
29
for the hull can be seen in Table 4. Note that there is 1.5 meters of clearance between the hull and mooring lines in
still water conditions.
Table 4: Vessel Dimensions
Vessel Di mensi ons Di mensi on
LOA (Length Overall)--meters 308.0
LBP (Length Between Perpendiculars)--meters 301.0
Breadth, molded--meters 58.0
Depth at Centerline--meters 30.4
Depth at Side--meters 29.4
Camber--meters 1.0
Double Bottom Depth--meters 3.0
Ballast Wing Tank Width--meters 3.5
Bilge Radius--meters 2.3
In addition to the vessel dimensions, we were given the number of tanks specified for use and the subsequent
volume of the tanks. Table 5 details the tank types and values of the tank specifics. As can be seen, the majority of
the tank space, approx. 1.6 million bbl, is used for final storage of the stabilized product.
Table 5: Vessel Storage Capabilities
Vessel Storage Capaci ti es
Stabilized Product Total for 16 tanks--cu mtrs 263,720
Off-Spec Product Total for 2 tanks--cu mtrs 32,160
Slops Total for 2 tanks--cu mtrs 9,330
Produced Water Total for 2 tanks--cu mtrs 8,640
Diesel Fuel (2 tanks@2100 + 2 tanks@450)--cu mtrs 5,100
Crude Fuel Oil Total for 2 tanks--cu mtrs 5,180
Process Fresh Water Total for 2 tanks--cu mtrs 2,650
Potable Water Total for 2 tanks--cu mtrs 250
Bulk Lube Oil Total for 2 tanks--cu mtrs 40
Bulk Hydraulic Oil Total for 2 tanks 20
Ballast Tank Total for 12L shaped tanks--cu mtrs 123,530
Total s 450620
30
WEIGHT, BUOYANCY, AND STABILITY
Static Stability
Our vessel is statically stable in three states of evaluation, namely at full capacity, fifty percent capacity, and twenty
percent capacity.
Table 6: Loading Conditions
Table 7 details the initial locations of centers of gravity, centers of buoyancy, draft, metacentric height, draft, and
weight factors. At our initial state, no ballast added to any of the three loading states, the vessel was stable in all
three states except the ten percent loading. Although initially stable, an offset of five degrees to either port or
starboard will upset the vessel, thus the full amount of ballast is used for the initial stability analysis. In addition to
the vessel stability characteristics we have included the body ratios in table 7.
Table 7: Vessel Ratios
- L/B B/D L/D
Actual 5.19 1.97 10.24
Ideal 4.5 - 6.0 1.7 - 2.3 8.0 - 13.0
As can be seen, the body ratios of the vessel are within the ideal range of values. Next we look at the lightweight of
the vessel. The lightweight of the vessel includes the topsides, hull weight, and accommodations weight, tandem
offloading system, hull machinery weight, turret weight, electric and electronic weight, and miscellaneous weight.
Table 8 details the weights of the vessel lightweight.
31
Table 8: Vessel Lightship
Vessel Li ghtshi p wei ght (mt) LCG (m) Long Moment (m
4
) VCG (m) Vert Moment (m4)
Hull Steel 40,708 159.86 6,507,581 16.79 683,487
Hull Outfitting 3,380 158.23 534,817 33.13 111,979
Accommodations Weight 800 277.47 221,976 38.33 30,664
Tandem Offload Sys 120 5.00 600 34.40 4,128
Hull Machinery weight 780 203.53 158,753 16.38 12,776
Electric and Electronic Weight 610 154.88 94,477 32.77 19,990
Misc 162 165.80 26,860 30.40 4,925
mooring 13,459 301.00 4,051,159 30.40 409,154
Topsi des (Wet) 24,928 172.81 4,307,808 44.48 1,108,797
FPSO Li ghtshi p 84,947 15,904,030 2,385,900
Weight of Hull
The estimation of the steel weight is scaled from an existing ship in a similar region. The scaled vessel used,
Belanak (shown below), is a similar size FPSO also located in the South Natuna Sea.
Figure 8: Belanak FPSO
http://www.jraymcdermott.com/projects/Belanak-FPSO__90.asp
From class rules, the steel weight of the hull can be estimated by adding the hull weight of the scale vessel with the
topside weight for the scaled version, then divide that by the surface area of the hull to give a weight per unit area.
Then by multiplying this average weight per unit area of by the existing vessels surface area, and then subtracting
the model ships topside weights, the existing vessels hull weight can be found (Heather, 2006).
Websites give the characteristics of the hull, number of bulkheads, weight of the topsides, and hull weight for the
Belanak (Muellar, 2006; ConocoPhillips, 2006; McDermott, 2006). Then using the process described above, the
hull weight was found, as shown below, in Table 9.
32
Table 9: Hull Weight Calculation
Use Currently
Existing Vessel In Region Team Indonesia
Belanak
Doubl e Si de Hul l Confi gurati on Doubl e Si de Hul l Confi gurati on
L = 285 m L = 308.0 m
B = 58 m B = 58.0 m
D = 26 m D = 30.9 m
Bul kheads Bul kheads
transverse 2 transverse 9.0
outer 2 outer 2.0
longitudional 2 longitudional 2.0
SA = 65716 m
2
SA = 76299.7 m
2
Wtopsides = 31000 mt Wtopsides = 24928 mt
Hull Weight = 28085 st = 25531.82 mt
AVG Weight = 0.8602 mt/m
2
Hul l Wei ght = 40708.39 mt
StabCAD analysis was performed on the FPSO design using a draft of 19.66 meters for the fully loaded condition.
The fully loaded displacement is 337,846 metric tons. Analysis was done on intact and damaged models. Damaged
analysis was done with two adjacent ballast tanks compromised. Figure 9 is the complete StabCAD model
including the internal tanks that can not be seen. Figure 10 is the StabCAD model with out the external barge
showing the internal tanks and the top side equipment.
Figure 9: StabCAD Model
33
Figure 10: StabCAD Model Showing Internal Tanks
Regulatory Compliance
Regulatory compliance is required for the FPSO. ABS MODU (2000) regulations were used for intact and damaged
stability. ABS MODU requires that the intact wind velocity be 100 knots and the damaged wind velocity be 50
knots. The second intercept of the righting arm must be at least 7 degrees past the second intercept for damaged
conditions. Additional calculations needed to satisfy ABS MODU were needed for further stability analysis. The
area under the righting arm above the heeling arm to the left of the downflooding angle is called area A. The area
under the heeling arm and between the righting arm and the downflooding angle is area B and the small area
between the zero angle of inclination and the righting arm and the heeling arm is area C. Each respective area can be
seen in figure 11. ABS MODU stability rules require that the sum of area A and B must be greater than the sum of
area B and C multiplied by 1.4. Additionally, area A multiplied by 1.4 needs to be greater than area B.
Figure 11: Stability Curve
34
StabCAD uses ABS MODU as a guide in its stability calculations; other regulations can be considered using
StabCADs results. Load Line and MARPOL regulations are both used for damaged stability and are similar in that
they both require the righting arm at the maximum righting angle be greater than .1 meter and the angle between the
two intercepts of the righting arm and the heeling arm to be at least 20 degrees. Differences in the three regulatory
guidelines is that Load Line is more stringent by requiring the absolute angle of equilibrium to be less than 15
degrees, where MARPOL only requires it to be less than 25 degrees. Load Line also requires that the distance
between the vessels center of gravity and metacenter be greater than zero. MARPOL, however, uses a different
approach by requiring the area from equilibrium to the downflooding angle be greater than 0.0175 meter-radians.
Fully Loaded Condition
Figure 12 shows the intact curve which gives the righting arm, heeling arm, and downflooding angle for a vessel
with fully loaded product tanks. Area A, as described above, is 3.036. Area B is .695 and area C is .022. Area A plus
area B is 3.722 and area B plus area C multiplied by 1.4 is .9534 and is less than 3.722, which is in compliance with
ABS MODU rules. Area A multiplied by 1.4 is 4.288 and is greater than area B which also complies with ABS
MODU rules. The downflooding angle is 20.3 degrees which is less than the maximum allowed 25 degrees.
Figure 12: Intact Curve - Fully Loaded
Figure 13 below has the same information as the intact curve above only for a situation where two adjoining ballast
tanks have been damaged. In a damaged condition the downflooding angle must be greater than the first intercept
between the righting arm and the heeling arm, other wise the ship will sink. The distance from keel to center of
gravity, KG, in a damaged condition must be less than the maximum allowed KG. In this situation the KG is 19.05
meters and the maximum allowable KG is 21.35 meters.
35
Figure 13: Damaged Curve - Fully Loaded
Figure 14, shown below, is a plot of the cross curves of stability for the vessel. The righting arm for the vessel is
plotted against the draft for each angle of heel. The vessels righting arm is positive for 0 to 60 degrees of heel at
drafts from 0 to 19 meters. With a heeling arm of 65 degrees the righting arm becomes less than 0 with drafts less
than 2.5 meters and greater than 18 meters, this is dangerous as it means the vessel will try to flip instead of turning
right side up. In severe environmental conditions where large vessel motions are possible the draft must be kept at
less than 18 meters. The situation where the draft is less than 2.5 meters is highly unlikely as the ship when
completely empty has a draft of more than 12 meters.
36
Figure 14: Cross Curves of Stability - Fully Loaded
50% Loaded Condition
The vessels stability was also determined when the product tanks were 50% and 20% full. The same rules for
stability apply for the 50% and 20% loaded conditions that were used for the fully loaded condition. Figure 15 is the
intact diagram for a 50% loaded condition. BY visually analyzing the graph is apparent that the rules for the ABS-
MODU stability requirements are satisfied. Area A and area B together are much larger than 1.4 times area B and
Area C. Additionally area A is much larger than 1.4 times area B.
37
Figure 15: Intact Diagram - 50% Loaded
Figure 16 is the diagram for the damaged situation at 50% loading. Two adjacent ballast tanks were damaged and
then the stability was analyzed. The two tanks that were chosen were the two tanks that caused the lowest allowable
center of gravity. As with the fully loaded condition the downflooding angle must be larger than the intersection of
the righting arm and the heeling arm.
Figure 16: Damaged Condition - 50% Loaded
38
Figure 17 shows the cross curves of stability for the 50% loading condition. The important point to note is that there
is a positive moment arm until the vessel is at a 50 degree heeling angle. It is doubtful that the vessel will ever be at
a 50 degree angle but at any angle less than 50 degrees the ship will right itself.
Figure 17: Cross Curves of Stability - 50% Loaded
20% Loaded Condition
Stability analysis was also performed when the vessels product tanks were only 20% loaded. The analysis was not
performed when the tanks were empty due to damage that can occur to machinery that is run dry, thus tanks are not
allowed to be completely empted but a small amount of product is left in the bottom of the tanks, 20% in this case.
Figure 18 shows the intact stability curve for the 20% loaded case. Again by visually analyzing the figure the ABS-
MODU rules are satisfied. Areas A and B are much larger than 1.4 times areas B and C and area A is much larger
than 1.4 times area B.
39
Figure 18: Intact Stability Curve for 20% Loaded
Figure 19 shows the damaged stability curve for the 20% loaded situation. The important point is that the down
flooding angle is still greater than the intersection of the righting arm and the heeling arm. Thus, the vessel will stay
afloat when two adjacent ballast tanks are damaged.
Figure 19: Damaged Stability Curve - 20% Loaded
40
Figure 20 shows a plot of the cross curves of stability for the 20% loading condition. As with the fully loaded and
the 50% loaded conditions, the righting arms are all positive to an angle of 50 degrees. As highly improbable as it
may seem, even if the vessel is tilted to 50 degrees under any of the loading situations it will right itself.
Figure 20: Cross Curves of Stability - 20% Loaded
Damaged Stability
An additional stability case to consider would be worst case scenario damage case. In Stab-CAD tanks were
damaged and allowed to flood progressively until in the damaged stability curve the down flooding angle was less
than the intersection of the righting arm and the heeling arm, as seen in Figure 21. All but the two forward ballast
tanks had to be damaged before the vessel would become unstable. The vessel remained stable even when the two
aft ballast tanks were left undamaged and the rest were damaged. Only when the port forward and the starboard
forward tanks are left intact and the rest of the tanks are damaged does the vessel become unstable.
41
Figure 21: Damaged Stability Curve - Unstable Condition
GLOBAL LOADING AND GENERAL STRUCTURAL
STRENGTH
Topsides
The FPSO is subjected to 4 main types of loads. These include the topsides, lightship, tanks, and buoyancy forces.
The first load shown is the wet topside weights, and remains constant.
Figure 22: Topside Loads
These loads were given by ConocoPhilips, shown in Table 10 below. The equipment and structure weights include
module supports, piping, electrical, control, and instrumentation. The longitudinal center of gravity is taken from
the aft of the FPSO with the vector forward. Then the loads with similar longitudinal centers of gravity were added
together, and applied to the beam.
42
Table 10: Topside Loads
Eqpt/Struct** Operate Fluid Total Total
Module Weight Weight Weight LCG Weight
(mt) (mt) (mt) (m) (kN)
P1 241 197 438 249 4297
P2 881 1002 1883 219 18472
P3 2271 734 3005 189 29479
P4 1701 628 2329 159 22847
P5 1078 0 1078 129 10575
P6 1804 0 1804 99 17697
S1 213 0 213 249 2090
S2 1628 0 1628 219 15971
S3 2268 737 3005 189 29479
S4 1683 527 2210 159 21680
S5 2068 565 2633 129 25830
S6 2038 420 2458 99 24113
S7 287 14 301 69 2953
S8 79 0 79 39 775
PR1 54 0 54 249 530
PR2 259 38 297 219 2914
PR3 294 16 310 189 3041
PR4 284 14 298 159 2923
PR5 294 16 310 129 3041
PR6 182 25 207 99 2031
PR7 194 34 228 69 2237
Flare 154 6 160 40 1570
Totals 19955 4973 24928 244544
Next, the lightship values are shown below, in Figure 23.
Lightship
Figure 23: Lightship Loads
The lightship loads consist of a uniformly distributed hull weight across the length of the vessel, hull out fittings,
employee accommodations, tandem offloading system, hull machinery weight, electric and electronics, external
mooring system weights, and other miscellaneous weights. Below in Table 11, these values are listed.
43
Table 11: Lightship Loads
Next, the tank loads were calculated using values given by ConocoPhilips, as shown below, in Table 12.
Tanks
Table 12: Tank Volumes and Weight
Li qui d (100% Full ) Volume (m
3
) SG Density (kg/m
3
) Weight (mt)
Stabilized Product Total for 16 tanks--cu mtrs 263720 0.94 940 247896.8
Off-Spec Product Total for 2 tanks--cu mtrs 32160 0.94 940 30230.4
Slops Total for 2 tanks--cu mtrs 9330 0.94 940 8770.2
Produced Water Total for 2 tanks--cu mtrs 8640 1.032 1032 8916.48
Diesel Fuel (2 tanks@2100 + 2 tanks@450)--cu mtrs 5100 0.9 900 4590
Crude Fuel Oil Total for 2 tanks--cu mtrs 5180 0.9 900 4662
Process Fresh Water Total for 2 tanks--cu mtrs 2650 1 1000 2650
Potable Water Total for 2 tanks--cu mtrs 250 1 1000 250
Bulk Lube Oil Total for 2 tanks--cu mtrs 40 0.9 900 36
Bulk Hydraulic Oil Total for 2 tanks 20 0.9 900 18
Ballast Tank Total for 12L shaped tanks--cu mtrs 123530 1.025 1025 126618.25
Total Fl uid Wei ght: 434638.13
Figures 25, 26, and 27, below, give the weight distribution, as modeled in Visual Analysis, for the 100%, 50%, and
20% loaded conditions.
Figure 24: 100% Load
44
Figure 25: 50% Loaded Tanks
Figure 26: 20% Loaded Tanks
Table 13 below, gives the numbers used for the distributed loads on the hull.
Table 13: Tank Loading
Length from 100% Load 50% Load 20% Load
Aft (m) (kN-m) (kN-m) (kN-m)
289.4 -301 30 30 30
270 - 274.7 5488 5488 5488
227.8 - 267.8 12348 8609 7341
187.2 - 227.8 12449 12367 13292
147.8 - 187.2 12348 8609 7341
107.8 - 147.8 10663 7767 7004
67.8 - 107.8 12555 8713 7382
42.8 - 67.8 12513 8478 6945
32.05 - 42.8 13139 15404 17670
25.6 - 32.05 12093 14811 17530
12.8 - 25.6 2911 5347 7782
45
Still Water Buoyancy
For each of the 100% (Figure 28), 50% (Figure 29), and 20% (Figure 30) buoyancy cases below, the corresponding
drafts are 20, 16, and 15 meters respectively.
Figure 27: 100% Load - Still Water Buoyancy
Figure 28: 50% Load - Still Water Buoyancy
Figure 29: 20% Load Still Water Buoyancy
Hogging/Sagging Buoyancy
Next, these loads are combined with the induced wave corresponding to the loading condition, shown below, in
Figure 31. These waves were modeled as a cosine wave function in both a hog and sag condition. The hog
condition is where the wave crest is in the middle of the ship while a sag condition corresponds to the wave crest
being at both the aft and stern ends of the ship. The wave height used, 5.3 meters, corresponds to the wave height in
the 100 year storm.
46
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
0 50 100 150 200 250 300
Length Along Ship (m)
F
o
r
c
e
(
k
N
-
m
)
100% Load
(sag)
100% Load
(hog)
50% Load
(sag)
50% Load
(hog)
20% Load
(sag)
20% Load
(hog)
Figure 30: Hog/Sag Buoyancy Forces
The loads above were modeled with a wavelength equal to that of the ship. To model the wave condition correctly
the total combined force of the still water buoyancy for each load condition must be equal to the total force for each
hog, and sag loading condition. In each of the cases above this occurs, and was confirmed using a Simpsons Rule
analysis. The analysis for the fully loaded condition in the hog and sag is shown below, in Table 14.
Table 14: Simpson Rule Analysis
Draft (m) Draft (m) Simp
100% Sag 100% Hog Coeff
0 22.7 13209.6 17.4 10118.6 1 13209.6 10118.6
18.8 22.3 12999.6 17.7 10328.6 4 51998.5 41314.2
37.6 21.9 12754.7 18.1 10573.5 2 25509.4 21147
56.4 21.3 12433.9 18.7 10891.3 4 49735.7 43565.4
75.3 20 11664.1 20 11664.1 2 23328.2 23328.2
94.1 18.7 10891.3 21.3 12433.9 4 43565.4 49735.7
112.9 18.1 10573.5 21.9 12754.7 2 21147 25509.4
131.7 17.7 10328.6 22.3 12999.6 4 41314.2 51998.5
150.5 17.4 10118.6 22.7 13209.6 2 20237.2 26419.2
169.3 17.7 10328.6 22.3 12999.6 4 41314.2 51998.5
188.1 18.1 10573.5 21.9 12754.7 2 21147 25509.4
206.9 18.7 10891.3 21.3 12433.9 4 43565.4 49735.7
225.8 20 11664.1 20 11664.1 2 23328.2 23328.2
244.6 21.3 12433.9 18.7 10891.3 4 49735.7 43565.4
263.4 21.9 12754.7 18.1 10573.5 2 25509.4 21147
282.2 22.3 12999.6 17.7 10328.6 4 51998.5 41314.2
301 22.7 13209.6 17.4 10118.6 1 13209.6 10118.6
Sum = 5.60E+05 5.60E+05
TOTAL AREA = 3.51E+06 3.51E+06
SW AREA = 3.51E+06
L (m) FB (kN-m) S.C*FB Sag S.C*FB (Hog) FB (kN-m)
Below, in Table 15, a numerical representation of the hog and sag condition is shown.
47
Table 15: Sag/Hog Wave Model
Length 100% Load 100% Load 50% Load 50% Load 20% Load 20% Load
From Aft Sag Hog Sag Hog Sag Hog
L (m) FB (kN-m) FB (kN-m) FB (kN-m) FB (kN-m) FB (kN-m) FB (kN-m)
0 13210 10119 10877 7786 10294 7203
18.8 13000 10329 10667 7996 10084 7413
37.6 12755 10573 10422 8241 9839 7657
56.4 12434 10891 10101 8559 9518 7975
75.2 11664 11664 9331 9331 8748 8748
94 10891 12434 8559 10101 7975 9518
112.8 10573 12755 8241 10422 7657 9839
131.6 10329 13000 7996 10667 7413 10084
150.5 10119 13210 7786 10877 7203 10294
169.3 10329 13000 7996 10667 7413 10084
188.1 10573 12755 8241 10422 7657 9839
206.9 10891 12434 8559 10101 7975 9518
225.7 11664 11664 9331 9331 8748 8748
244.5 12434 10891 10101 8559 9518 7975
263.3 12755 10573 10422 8241 9839 7657
282.1 13000 10329 10667 7996 10084 7413
301 13210 10119 10877 7786 10294 7203
Visual Analysis Results
Three different loading conditions are analyzed and include fully loaded crude, 50 percent loaded crude, and 20
percent loaded crude. From ABS Rules for Building and Classing Steel Vessels 2005, it is shown that
t sw wave
M M M = +
And
t sw wave
V V V = +
Where, M
t
, the total bending moment, is to be considered as the maximum algebraic sum of the still water bending
moment, M
sw
, and the wave induced bending moment, M
wave
. Additionally V
t
, the total shear force, is the maximum
sum of the still water shear force, V
sw
, and the wave induced shear force V
wave
. From definition, the still water
bending and shear force calculation, determining the bending moment and hull girder shear force values along the
vessels entire length, are to be submitted together with a distribution of the lightship weights. So for each of the
three loading conditions, the total still water moment and still water shear values can be found by combining the
lightship, topsides, tanks, and still water buoyancy loads. Also the total moment and total shear value can be found
by combining the lightship, topsides, and hog or sag buoyancy loads. Then these loads are factored into Visual
Analysis using an equation combination, and then analyzed to get the results below.
48
0
5,000,000
10,000,000
15,000,000
20,000,000
25,000,000
30,000,000
35,000,000
0 50 100 150 200 250 300
Lengt h Al ong Shi p (m)
S
W
B
M
(
k
N
-
M
)
SWBM
100%
SWBM
50%
SWBM
20%
Figure 31: Still Water Bending Moment (SWBM)
-500,000
-400,000
-300,000
-200,000
-100,000
0
100,000
200,000
300,000
400,000
0 50 100 150 200 250 300
Length Al ong Shi p (m)
S
h
e
a
r
F
o
r
c
e
(
k
N
)
SW
100%
SW
50%
SW
20%
Figure 32: Still Water Shear Forces
49
0
5,000,000
10,000,000
15,000,000
20,000,000
25,000,000
30,000,000
35,000,000
40,000,000
0 50 100 150 200 250 300 350
Length Al ong Shi p (m)
T
o
t
a
l
M
o
m
e
n
t
(
k
N
-
m
)
Mt 100%
(hog)
Mt 100%
(sag)
Mt 50%
(hog)
Mt 50%
(sag)
Mt 20%
(hog)
Mt 20%
(sag)
Figure 33: Total Moment
-500,000
-400,000
-300,000
-200,000
-100,000
0
100,000
200,000
300,000
400,000
500,000
0 50 100 150 200 250 300
Length al ong Shi p (m)
T
o
t
a
l
S
h
e
a
r
(
k
N
)
100%
(hog)
100%
(sag)
50%
(hog)
50%
(sag)
20%
(hog)
20%
(sag)
Figure 34: Total Shear Forces
50
Next, in order to find the wave induced moment and shear force, the values for total moment and total shear are
subtracted by the stillwater moment and shear forces. Then these values are applied to the ABS 3.5.1, and 3.5.2
envelopes obtained by the following equations:
2 3
1 1
( 0.7) 10
ws b
M k C L B C x
= + Sagging Moment
2 3
2 1
10
wh b
M k C L BC x
= Hogging Moment
Where k
1
and k
2
are 110 and 190 respectively, C
1
is 10.75 for a ship length of 300 < L <= 350 meters, L is the length
of vessel, B is breadth of vessel, and
1.025
b
wl
C
LB d
= ABS 11.3
Where is the molded displacement, B
wl
is the greatest breadth at the summer load line, and d is the draft. Then the
wave bending moment along the length L, can be obtained by multiplying the midship with the value of the
distribution factor M shown in the figure below.
0.0
0.2
0.4
0.6
0.8
1.0
1.2
0.0 0.2 0.4 0.6 0.8 1.0
Distance From Aft End in terms of L
M
Figure 35: Distribution Factor M
Then the envelopes of maximum shearing forces induced by the waves, may be obtained by the following ABS 3.5.3
equations
2
1 1
( 0.7) 10
wp b
F kFC LB C x
= + Positive Shear
2
2 1
( 0.7) 10
wn b
F kF C LB C x
= = Negative Shear
51
Where k equals 30, F
1
and F
2
are the distribution factors, below in Figures 37 and 38.
0.0
0.2
0.4
0.6
0.8
1.0
1.2
0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0
Distance From Aft in Terms of L
F
1
Figure 36: Distribution Factor, F
1
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0
Distance From Aft in Terms of L
F
2
Figure 37: Distribution Factor, F
2
52
-15,000,000
-10,000,000
-5,000,000
0
5,000,000
10,000,000
15,000,000
0 50 100 150 200 250 300
Length Along Ship (m)
W
I
B
M
(
k
N
-
m
)
ABS WAVE
MOMENT
(sag)
ABS WAVE
MOMENT
(hog)
VISA 100%
(sag)
VISA 100%
(hog)
VISA 50%
(sag)
VISA 50%
(hog)
VISA 20%
(sag)
VISA 20%
(hog)
Figure 38: Wave Induced Moment Envelope (WIBM)
-100,000
-80,000
-60,000
-40,000
-20,000
0
20,000
40,000
60,000
80,000
100,000
120,000
0 50 100 150 200 250 300
Length Along Ship (m)
S
h
e
a
r
(
k
N
)
ABS
SHEAR (+)
ABS
SHEAR (-)
VISA 100%
(sag)
VISA 100%
(hog)
VISA 50%
(sag)
VISA 50%
(hog)
VISA 20%
(sag)
VISA 20%
(hog)
Figure 39: Wave Induced Shear Force Envelope
53
Figures 39 and 40, above, clearly indicate that the wave induced moment, and wave induced shear force for each
case is well within the envelope, meeting the ABS 3.7.1 specifications. Next, the hull girder section modulus and
hull girder moment of inertia must be found. The required hull girder section modulus for 0.4L amidships is to be
greater than the value obtained by the equation below
t
p
M
SM
f
=
Where M
t
stands for the largest total moment seen in the sagging condition for the 100% load and is equivalent to
3.76 x 10
7
kN-m, and f
p
is the nominal permissible bending stress, given by ABS 3.7.1, equaling 17.5 kN/cm
2
.
Therefore the section modulus is to be greater than 215 m
3
. Next the hull girder moment of inertia, is found by ABS
3.7.2 and shown as
*
33.3
L SM
I =
Where L stands for the length of the ship, and the moment of inertia should not be less than the value calculated. In
the case where the sagging condition is combined with a full load, the moment of inertia should be greater than 1942
m
4
. Next the section modulus and moment of inertia were inserted into Visual Analysis to find the deflections of the
hull.
-90
-80
-70
-60
-50
-40
-30
-20
-10
0
0 50 100 150 200 250 300
Length al ong Shi p (m)
D
e
f
l
e
c
t
i
o
n
(
c
m
)
100%
hog
100%
sag
50%
hog
50%
sag
20%
hog
20%
sag
Figure 40: I = 1942 m4 - Hog/Sag Deflections
54
-80
-70
-60
-50
-40
-30
-20
-10
0
0 50 100 150 200 250 300
Length Along Ship (m)
D
e
f
l
e
c
t
i
o
n
(
c
m
)
SW
100%
Load
SW 50%
Load
SW 20%
Load
Figure 41: I = 1942 m
4
- Still Water Deflections
Figures 41 and 42, above, clearly indicate that some of the deflections are greater than the limits of plus or minus 50
centimeters for the hog and sag condition (King 2006). The largest deflection shown is the fully loaded sagging
condition equaling 85 centimeters. Therefore in order to decrease the deflections, the section modulus and moment
of inertia are increased until the deflections get within the limits. After many trials the new section modulus and
moment of inertia equal 376 m
3
, and 3400 m
4
respectively. The new deflection values can be seen below, in Figures
43 and 44.
-60
-50
-40
-30
-20
-10
0
0 50 100 150 200 250 300
Length Along Ship (m)
D
e
f
l
e
c
t
i
o
n
(
c
m
)
100%
hog
100%
sag
50%
hog
50%
sag
20%
hog
20%
hog
20%
sag
Figure 42: I = 3400 m
4
- Hog/Sag Deflections
55
-45
-40
-35
-30
-25
-20
-15
-10
-5
0
0 50 100 150 200 250 300
Length Along Ship (m)
D
e
f
l
e
c
t
i
o
n
(
c
m
)
sw
100%
sw
50%
sw
20%
Figure 43: I = 3400 m
4
- Still Water Deflections
Now all of the deflection, for each load case, in the hog and sag condition, meet the limits. Now the largest
deflection is still the fully loaded sag condition, but the value is 48 centimeters.
WIND AND CURRENT LOADING
The wind loading is based on a 1 hour average wind speed based on another time interval:
t hr
V V =
Where, V
t
is the wind velocity for the average time interval t, is the time factor from Table 16, and V
hr
is the one
hour average wind velocity.
The first step for calculating the wind load was to first find the surface areas of the different components of the
FPSO affected by the bow and beam winds. This includes the projected area of each column. Also a blocked in
projected area was used for the several deck housings instead of calculating each individual unit. However when
this was done a C
s
factor of 1.10 should was used. Isolated structures such derricks and cranes were calculated
individually. In addition the open truss work commonly used for derrick mast and booms was approximated by
using 60 percent of the projected block area from one of the faces. These areas were calculated for the appropriate
hull draft of 24 meters from the given operating conditions. Additionally, areas were separated into smaller areas
based on 15.3 meter increments above sea level. However the areas that were less than 15.3 meters in height used
the height coefficient, C
h
, associated with that bodys centroid. The height and shape coefficients can be found in
Tables 16 and 17.
56
Table 16: Wind Force Height Coefficients
Over not Exceeding (m) C
h
0.0 - 15.3 1.00
15.3 - 30.5 1.23
30.5 - 46.0 1.40
46.0 - 61.0 1.52
61.0 - 76.0 1.62
Table 17: Wind Force Shape Coefficients
Exposed Areas Cs
Cylindrical Shapes 0.5
Hull (surface above waterline) 1
Deck House 1
Isolated Structures 1.5
Under Deck Areas (smooth surfaces) 1
Under Deck Areas (exposed beams and girders) 1.3
Rig Derrick 1.25
Next, the actual wind load calculations for both bow and beam seas were calculated by
2
( )
w w s h w
F C C C AV =
Where F
w
is the wind force in Newtons, C
w
is a predetermined constant of 0.615 N-s
2
/m
4
, C
s
and C
h
are the shape
and height coefficients respectively, A is the surface area of each unit in square meters, and V
w
is the design wind
speed in meters per second. The wind load calculations for oblique seas were calculated using the following
equation.
2 2
2 2
2cos 2sin
1 cos 1 sin
x y
F F F
= +
+ +
Where F
= +
+ +
Where F
Of all the six degrees of freedom the vessel can move, Heave, Pitch, and Roll are the most important, and Heave
most important of the three and is presented below. Heave is the vertical motion the vessel experiences due to an
incoming wave; next of importance is pitch, the longitudinal rotation about the axis perpendicular to heave; and roll
is the transverse rotation about the axis perpendicular to pitch.
The initial calculations considered the waves incoming dead on the bow. This scenario is the most important to
analyze because it is most likely to occur. The single point mooring system allows the vessel to orient itself in the
direction of incoming waves. In this position, the heave and pitch will be at a maximum.
72
Figure 56: RAO's for Heave
According to Figure 57, above, the RAO for heave looks safe; the peak frequency is greater than the peak frequency
of the incoming wave spectrum, and the vessel avoids resonance in the one year storm conditions.
Figure 57: Response Spectrum
73
After the analyzing the dead on bow direction for incoming waves, subsequent analysis rotated the incoming wave
spectrum at 22.5 intervals until 90 degrees. At 90 degrees, heave will be at its lowest values and roll at the
maximum, Figure 59, below, shows.
Figure 58: Response for Roll
Offloading of our vessel is possible by two methods, side by side and tandem. The type chosen is tandem due to the
weathervaning advantages. For tandem offtake, there are limits that have to be met in order to offload. The vessel
can offload product when the significant wave height is 2 meters, and there is a 10 knot wind. However, the vessel
must disconnect when the significant wave height is 2.5 meters combined with a 20 knot wind. One criterion states
that the FPSO must operate through a one year storm 95% of the time. Figure 59, below, demonstrates that the
significant wave height as a cumulative annual probability.
74
0.00
0.10
0.20
0.30
0.40
0.50
0.60
0.70
0.80
0.90
1.00
0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 5.5 6 6.5 7
Hs (m)
C
u
m
u
l
a
t
i
v
e
P
r
o
b
a
b
l
i
t
y
(
%
)
All Years And
Months
Figure 59: Wave Height Probability
Below, Figure 61 below shows that annual wind speed probability.
0.0000
0.0500
0.1000
0.1500
0.2000
0.2500
0.3000
0.3500
0.4000
0.4500
0.5000
0.5500
0.6000
0.6500
0.7000
0.7500
0.8000
0.8500
0.9000
0.9500
1.0000
0 2 4 6 8 10 12 14 16
Wind Speed (m/s)
C
u
m
u
l
a
t
i
v
e
P
r
o
b
a
b
i
l
i
t
y
(
%
)
January
Febuary
March
April
May
June
July
August
September
October
November
Decemeber
Figure 60: Wind Speed Probability
According to our environmental data, the significant wave height in a one year event is 0.75 meters, and the wind
speed equals 16.52 knots. Therefore the design allows offloading during a one year storm condition 100% of the
time, without disconnecting, and this meets the criteria given.
75
COST
Vessel cost calculations were estimated using a spreadsheet supplied by Mr. Rod King. Cost factors were divided up
into twelve areas that can be seen in table 25 in addition to a cost comparison between ship yards in three nations,
namely Japan, Korea, and China.
Table 27: Cost Breakdown
Japan Korea China
Hull Steel 116.11 108.37 73.54
Hull Outfitting 20.79 18.76 13.18
Hull Machinery 1.05 0.94 In outfitting
Outfitting 1.35 1.20 In outfitting
Accomodations 23.2 20.9 15.6
Offloading System 3.50 3.50 3.50
Marine Cost 75 75 75
Mooring System (8 Line) 29.73 29.73 29.73
(12 Line) 29.29 29.29 29.29
Topsides 620 620 620
Contingency 112.80 111.32 105.58
Transportation/Installation 20 20 20
Total(12) 1,023.09 1,009.28 955.69
Total(8) 1,023.53 1,009.72 956.13
Cost ($MM)
Descri pti on
Total cost estimations of the vessel are estimated from 956.13 to 1023.53 millions of dollars. Major cost factors
include the mooring system, hull steel, topsides, and contingency cost. Other major costs are constant across the
three contractors, namely the contingency allowance, transportation\allowance, and offloading system. Included in
table 25 are separate cost cases for twelve and eight line systems, each of which has been accounted for in separate
totals noted by the number of lines. Mooring cost are affected by the cost of both the anchors and chains. Chains for
the twelve line system were 84 mm and 111 mm for the eight line system both of which are R4 grade chains. Cost
for a lower chain grade chain was relatively the same as that of R4 so the higher grade R4 chain was used. Anchor
cost was taken at $42,000 per anchor. The difference between the two systems came to a total of $442,500 which is
relatively negligible considering the overall cost. Yet, the cheaper system was chosen as the final design to be
incorporated.
Common factors between the three contractors include the topsides, transportation (since the three nations are
relatively in the same area), offloading system and marine cost (trials, classification etc.) and thus limiting the
competing amount between the three contractors. Otherwise China is consistently the cheapest contractor available
and our final decision with a total cost of $956.13 million.
76
SUMMARY
This design report for a Floating Production, Storage and Offloading (FPSO) vessel in the West Natuna Sea in
Indonesia looks at several design competencies which include: regulatory compliance (API-2SK, ABS, MODU,
OCMIF, and MARPOL 73/78), mooring, stability, environmental loading, hydrodynamics, cost, and safety. This
vessel was designed through collaboration between the senior design class and ConocoPhillips. The overall vessel
characteristics and general arrangement were given. The vessel has a length 308 meters, a breadth 58 meters, and is
30.4 meters from deck to keel. The FPSO must produce 370 kbbls per day under normal environmental conditions,
and for storage ConocoPhillips follows a 10 day rule where the vessel stores 10 days worth of supply. The
performance constraints of this design were given that the vessel must be able to maintain production on location
under the stresses endured in one year storm conditions and must be able to survive on location in one hundred year
storm conditions. The main focus of this design was on the mooring system. The design will consider several
configurations depending on the environmental loads on the vessel; for example, small storage tanks increase the
vessels flexibility under environmental loads.
The environment this vessel is subjected to is considered benign. The wind wave and current loading has a high
probability of being unidirectional from Northeast to Southwest under normal operating conditions. This would
suggest that a fixed mooring system would be applicable. However, under storm conditions the directionality of
these forces can change enough to cause them to be more prominent on the beam versus the bow, thus leading to the
decision to use a single point mooring system to allow for weathervaning.
The design team has looked at several arrangements of the tanks and of the mooring system. These different
configurations were evaluated under three different loading conditions: full, 50% full, and 20% full. There were also
a few constants throughout the design: the lightship hull weight which was determined to be 40,708 metric tons, and
the draft for each of the loading conditions where the tank fullness was offset by the ballast tanks to keep the
operating draft within a range of 15 to 20 meters.
Two mooring solutions have been analyzed: an 8 line system where the lines are space 45 apart, and a 12 line
system where the lines are grouped into 4 groups spaced 90 apart with the individual lines spaced 15 apart. The 8
line system is comprised of R4 Grade, stud link steel chain. Each line is 814 meters long and 84 millimeters thick.
The 12 line system is comprised of R4 Grade, stud link steel chain as well. Each line is 814 meters long and 111
millimeters thick. The lines in both systems extend 750 meters horizontally from fairleads to anchors. Both systems
were analyzed under conditions where the environmental forces were unidirectional and under conditions where the
environmental forces came from different directions. The decision on which system to use was based on a weighted
objectives table which took several aspects of the design into consideration, especially cost. After this evaluation
the 12 line system was selected for use.
77
REFERENCES
American Bureau of Shipping. Rules for Building and Classing Steel Vessels. 7 vols. Port City Press, Inc.
Baltimore, Maryland, 1981.
American Bureau of Shipping. Guide for Building and Classing Floating Production, Storage and Offloading
Systems. 7 vols. American Bureau of Shipping. New York, NY, 1996.
American Bureau of Shipping. Guide for Building and Classing Facilities on Offshore Installations. 7 vols.
Houston, TX, 2000.
American Bureau of Shipping. Guide for Building and Classing Facilities on Offshore Installations. 7 vols.
Houston, TX, 2000.
American Bureau of Shipping. Rules for Building and Classing Mobile Offshore Drilling Units 2001.. 7 vols.
Houston, TX, 2000.
American Petroleum Institute (API 2SK).Recommended Practice for Design and Analysis of Station keeping
Systems for Floating Structures. First Edition. June, 1995.
American Petroleum Institute. Recommended Practice for Design, Analysis, and Maintenance of Moorings for
Floating Production Systems. American Petroleum Institute. Washington, DC, 1993.
American Petroleum Institute. Analysis of Spread Mooring Systems for Floating Drilling Units. American
Petroleum Institute. Washington, DC, 1987.
American Petroleum Institute. Recommended Practice for Design and Analysis of Station keeping Systems
For Floating Structures. First Edition. American Petroleum Institute. Washington, DC, 1995.
Bauer. Stability Curve. Online posting. 2003
ConocoPhillips. J. Ray McDermott wins contract from Conoco offshore Indonesia. Online Posting. 15 May. 2006.
<http://www.gasandoil.com/goc/contract/cox14158.htm>.
Heather, Nick. Interview. Structure and Weight Estimating. February 2006.
Heather, Nick. Interview. Fundamentals of Global Loading. February 2006.
King, Rod. Interview. Cost Spreadsheet. February 2006.
Marpol 73/78. Requirement for Tanked Vessels. United States, 1973 1978.
McDermott, J. Belanak FPSO. Online Posting. 5 May. 2006.
<http://www.jraymcdermott.com/projects/Belanak-FPSO__90.asp>.
Microsoft Excel. Vers. 2003. 1985 2003
Mimosa. Vers. 5.7-03. 2004.
Mueller, John. Belanak Hull Betokens Gas Breakthrough. Online Posting. 25 Apr. 2006.
<http://www.oilonline.com/news/features/aog/20031001.Belanak_.12636.asp>.
Natuna Sea, Indonesia. Map. 20 Mar. 2006. < http://www.ict-silat.com/ Indonesia_map1.JPG>.
78
Oil Companies International Marine Forum. Prediction of Wind and Current Loads of VLCCs. 2
nd
Edition. 1994.
Det Norske Veritas. MIMOSA Mooring Analysis Software, Version 5.7. November 2004.
Autodesk, Inc. AutoCAD Software, 2004.
Integrated Engineering Software, Inc. Visual Analysis, Version 4.0 1.014, 2004.
Vryhof. Anchor Manual 2000. 2000. Ed. Netherlands, 1999
79
APPENDIX
MIMOSA Output
80
81
82
83
84
85
Mooring Input (.mos)
86
Anchor Selection Chart
(Vyrhof 2000)
87
Stab-CAD Input File
ALPI D 3D Vi ew 0. 707 0. 707 - 0. 424 0. 424 0. 800
1
ALPI D Gl obal XY Pl 10. 000 10. 000
ALPI D Gl obal YZ Pl 10. 000 10. 000
ALPI D Gl obal XZ Pl 10. 000 10. 000
ALPREF 3D Vi ew 0. 0 0. 0 0. 75
1
STBOPT 0 CALC ME ME PTPT
KGPAR 51. 5 25. 6 1. 4
CFORM 0. 22. 1.
CROSS DF 1. 20. 1. 0. 60. 5. 0. 19. 63
*I NTACT 0. 35. 1.
*DAMAGE 0. 80. 5.
DRAFT 19. 67 19. 63 0. USER USER
DWNFLD BALLAST TANK1 374
DWNFLD BALLAST TANK2 377
DWNFLD BALLAST TANK3 378
DWNFLD BALLAST TANK4 379
DWNFLD BALLAST TANK5 380
DWNFLD BALLAST TANK6 381
DWNFLD BALLAST TANK7 382
DWNFLD BALLAST TANK8 383
DWNFLD BALLAST TANK9 384
DWNFLD BALLAST TANK10 385
J OI NT 1 0. 000 0. 000 0. 000
J OI NT 2 0. 000 29. 000 0. 000
J OI NT 3 0. 000- 29. 000 0. 000
J OI NT 4 0. 000 29. 000 30. 400
J OI NT 5 0. 000- 29. 000 30. 400
J OI NT 6 301. 000 29. 000 0. 000
J OI NT 7 301. 000- 29. 000 0. 000
\ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / / \ / \ / \ / \ / \ / \ \ / \ / \ / /
PANEL BRG 13 14 11 12
PANEL BRG 183 7 3 5 10
PANEL BRG 5 3 2 4
PANEL BRG 2 6 184 9 4
PANEL BRG 9 12 11 10 5 4
PANEL BRG 3 7 14 13 6 2
PANEL BRG 7 182 14
PANEL BRG 183 182 7
PANEL BRG 13 181 6
PANEL BRG 181 184 6
\ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / / \
BODY 1 . 95OI L TANK 1
PANEL T1 15 18 19 22
PANEL T1 20 19 18 17
PANEL T1 16 15 22 21
PANEL T1 17 18 15 16
PANEL T1 21 22 19 20
88
PANEL T1 21 20 17 16
BODY 2 . 95OI L TANK 2
PANEL T2 20 24 23 19
PANEL T2 26 25 21 22
PANEL T2 25 24 20 21
PANEL T2 26 23 24 25
PANEL T2 22 19 23 26
PANEL T2 22 21 20 19
BODY 3 . 95OI L TANK 3
PANEL T3 23 24 27 28
PANEL T3 30 25 26 29
PANEL T3 29 28 27 30
PANEL T3 26 23 28 29
PANEL T3 25 24 23 26
PANEL T3 30 27 24 25
\ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \ / \
BODY 50 . 95FORWARD STORE
PANEL FST 9 12 11 10 179 178
PANEL FST 183 182 181 184 177 176
PANEL FST 183 176 179 10
PANEL FST 179 176 177 178
PANEL FST 184 9 178 177
PANEL FST 12 181 182 11
PANEL FST 11 182 183
PANEL FST 10 11 183
PANEL FST 9 184 181
PANEL FST 12 9 181
END