Incident

Incident ReportReport

For Internal Use Only

Report Date: Feb. 12, 2014


Start Date: Feb. 12, 2014
Report Number: 1

I. Problem Definition
What: Unit #7 Tripped
When: 1/1/2013 @ 10:14 am
Where: HTPS
Significance: Costs of Maintenance & Lost Revenues of 29,000 JD
Safety: N/A
Environment: Gas Emissions, Noise from Startup
Revenue: -20,000 JD Availability
Cost: 9,000 JD Maintenance Spare Parts Used & Startup Costs
Frequency: Once

II. Executive Summary


Unit #7 Tripped, caused by C.B. opened, caused by 86U activated, caused by electrical generator
protection, caused by AVR system failed, caused by 60-90 relay operated, caused by 90 lead relay
operated, caused by frequency converter failed, caused by no maintenance & Aging.

III. Solutions
Causes
Causes Solutions
Solutions Owner
Owner Due Date
Frequency Converter Frequency Converter Shehadeh Seaifan Feb. 12, 2014
Failed Replacement
No Maintenance Implementing New PM Shehadeh Seaifan Feb. 19, 2014
schedule
No Maintenance Check Further Shehadeh Seaifan Feb. 19, 2014
Maintenance from OEM
No Maintenance Check Further I&C Section Head Feb. 19, 2014
Maintenance from
Electronics Section
Aging Using Air Conditioning Shehadeh Seaifan Feb. 19, 2014
for the AVR panel to cool
down electronic
components to increase
life expectancy

IV. Team Members


Name Email
Email Member
Member Info
Info
Sultan Al-Sharary s.sharari@cegco.com.jo Electrical Protection Section Head
Ahmad Al-Ghodran alghodran@cegco.com.jo HTPS Plant Manager
Shehadeh Seaifan s_seaifan@cegco.com.jo HTPS Electrical Maintenance
Section Head
Izzeddeen Rabbaa e.rabbaa@cegco.com.jo HTPS HSE Engineer
Hasan Al-Salhi h.alsalhi@cegco.com.jo HTPS Shift Charge Engineer
I&C Section Head

V. Notes
1. The Realitychart and Incident Report have been finalized.
2. Some causes have been purposefully left off the chart.

VI. References
1. Deleted