RE! Pa"e O#
$ 0 6
PRO%ECT CLIENT LOCATION ISSUE DATE
AL&'ORRIA PO(ER PLANT&PP)
Ministr* O+ Ener"* &
IRA, -a".dad/ IRA, )0&$1&2$)$
SAKR POWER GENERATION

COMMISSIONING MANUALS
-OOK No TA- No
E 17
DOCUMENT TITLE
DOCUMENT No
COMMISSIONING PROCEDURE3
EARTH RESISTANCE MEASUREMENT
RE!ISION
$
No O# PAGES APPENDICIES
4 $$
PRO%ECT LOCATION ISSUED -5
AL&'ORRIA' 6PP&)7/ '#O Power P8ant -a".dad/ IRA,
CLIENT9 ENGINEER CONTRACTOR %O- Re+ ISSUE DATE
Ministr* O+ Ener"* SAKR Power Generation 1005 %u8* )0/ 2$)$
These instructions do not purport to cover all details or variations in equipment, nor to provide for every possible contingency to be met during testing or
commissioning. Should further Information be desired or should particular problems arise that are not covered sufciently for the purchasers purpose, The matter
should be referred to OE. This document contains proprietary information of S!"#, $E%!&O& and is furnished to its client solely to assist him in the testing and
commissioning of the equipment described herein. This 'ocument shall not be reproduced in (hole or in part nor shall its contents be disclosed to any third party
(ithout the (ritten approval of S!"# )o(er *roup.
Note
The component level chec+ sheets and test procedures referenced herein depict philosophies for minimum chec+ out requirements. Other vendors or
subcontractors may have equivalent documentation that may be substituted for chec+ sheets,forms (ith the concurrence of the site -ommissioning anager.
SAKR Power Group
Power Generation
Power Projects
DOCUMENT TITLE Procedure No
COMMISSIONING PROCEDURE
EARTH RESISTANCE MEASUREMENT
PP1-ER-TP-001
RE! Pa"e O#
$ 1 6
PRO%ECT CLIENT LOCATION ISSUE DATE
AL&'ORRIA PO(ER PLANT&PP)
Ministr* O+ Ener"* &
IRA, -a".dad/ IRA, )0&$1&2$)$
RE! DESCRIPTION APPRO!ED9 ISSUED
CONTENTS
1.0 SYSTEMS CONCERNED...........................................................................................................................2
2.0 SCOPE...........................................................................................................................................................2
3.0 REFERENCE DOCUMENTS....................................................................................................................2
4.0 PRECAUTIONS AND LIMITATIONS......................................................................................................3
5.0 PREREQUISITES........................................................................................................................................3
6.0 APPLICABLE SETTING TABLES & INSTRUCTION MANUALS....................................................3
7.0 REFERENCE TECHNICAL DOCUMENTS...........................................................................................3
.0 APPLICABLE TEST FORMS & PROCEDURES...................................................................................4
!.0 TEST EQUIPMENT"TOOLS.....................................................................................................................4
10.0 CRITERIA OF ACCEPTANCE..................................................................................................................4
11.0 TEST E#ECUTION.....................................................................................................................................4
SAKR Power Group
Power Generation
Power Projects
DOCUMENT TITLE Procedure No
COMMISSIONING PROCEDURE
EARTH RESISTANCE MEASUREMENT
PP1-ER-TP-001
RE! Pa"e O#
$ 2 6
PRO%ECT CLIENT LOCATION ISSUE DATE
AL&'ORRIA PO(ER PLANT&PP)
Ministr* O+ Ener"* &
IRA, -a".dad/ IRA, )0&$1&2$)$
1.0 S$%&'(% C)*+',*'-
1.1 Earthing grid.
2.0 S+).'
2.1 The scope of the procedure is to perform inspection and tests to verify that the
equipment has been installed and will function according to design and
operation requirements.
3.0 R'/','*+' D)+0('*&%
Drawing !"#$0%0&$E'$(0)0$01 *+verall Earthing 'ayout
Drawing !"#$0%0&$E'$(0)0$02 *,witchyard Earthing 'ayout
Drawing !"#$0%0&$E'$(160$0( Earthing -alculations.

.ame ,ignature -ompany Date
Test Done By /+E
Test Supervisor ,#D--+
SAKR Power Group
Power Generation
Power Projects
DOCUMENT TITLE Procedure No
COMMISSIONING PROCEDURE
EARTH RESISTANCE MEASUREMENT
PP1-ER-TP-001
RE! Pa"e O#
$ 0 6
PRO%ECT CLIENT LOCATION ISSUE DATE
AL&'ORRIA PO(ER PLANT&PP)
Ministr* O+ Ener"* &
IRA, -a".dad/ IRA, )0&$1&2$)$
4.0 P,'+10&2)*% A*- L2(2&1&2)*%
(.1 !erform thorough inspection prior to any tests and or energi1ing being done.
(.2 !rovide signs and barriers2 where necessary2 for safety.
(.0 !erform voltage chec3s to ensure voltages absence on the system being tested.
(.( 4se electrical test equipment with caution and as per manufacturer instructions.
(.& /a3e sure to remove any temporary 5installed during tests62 wiring or 7umpers
after tests completion.
5.0 P,','302%2&'%
&.1 The equipment installation is complete and turn$over done.
&.2 8ll mechanical chec3s2 if any2 are complete.
&.0 8ll the reference documents should be at hand. #nstruction manuals2 wiring
diagrams2 protection settings etc.
&.( !ersonnel performing the commissioning are e9pected to perform the attached
tests as minimum2 in addition to any other tests and inspections that their
e9perience2 training might require.
&.& Test team should verify that the equipment can be safely energi1ed as a part of the
whole plant electrical system.
6.0 A..42+154' S'&&2*6 T154'% & I*%&,0+&2)* M1*014%
Earthing measurement tester manual
7.0 R'/','*+' T'+7*2+14 D)+0('*&%
:,%(002 #EE$)0.
.0 A..42+154' T'%& F),(% & P,)+'-0,'%
.;8

.ame ,ignature -ompany Date
Test Done By /+E
Test Supervisor ,#D--+
SAKR Power Group
Power Generation
Power Projects
DOCUMENT TITLE Procedure No
COMMISSIONING PROCEDURE
EARTH RESISTANCE MEASUREMENT
PP1-ER-TP-001
RE! Pa"e O#
$ ( 6
PRO%ECT CLIENT LOCATION ISSUE DATE
AL&'ORRIA PO(ER PLANT&PP)
Ministr* O+ Ener"* &
IRA, -a".dad/ IRA, )0&$1&2$)$
!.0 T'%& E302.('*&"T))4%
a6 Earth resistance measurement 3it
b6 Transformer for current in7ection
c6 Digital multi$meter
d6 -lamp /eter
10.0 C,2&',21 O/ A++'.&1*+'
Earth resistance shall be <= value indicated in earthing calculation document.
11.0 T'%& E8'+0&2)*
11.1 #nitial conditions
a. Earthing grid erection completed.
b. The earthing grid to be tested is disconnected from the overall grid where test
lin3s are provided.

11.2 Earthing resistance measurement
The >fall of potential? method will be used according to #EEE$)0$1).1.&.
8 current of about (08 will be in7ected in the ground through the earthing
grid and the current rod will be grounded at about 000 meters from the
grounding grid. The voltage rod will be moved from the grid towards the
current probe. -onduct test for both wet and dry conditions for all areas
where test lin3 is provided.
Test -ircuit@

.ame ,ignature -ompany Date
Test Done By /+E
Test Supervisor ,#D--+
SAKR Power Group
Power Generation
Power Projects
DOCUMENT TITLE Procedure No
COMMISSIONING PROCEDURE
EARTH RESISTANCE MEASUREMENT
PP1-ER-TP-001
RE! Pa"e O#
$ & 6
PRO%ECT CLIENT LOCATION ISSUE DATE
AL&'ORRIA PO(ER PLANT&PP)
Ministr* O+ Ener"* &
IRA, -a".dad/ IRA, )0&$1&2$)$
Test Aesults
C0,,'*& D2%&1*+' E9P:D2; <)4&16' <EP G,)0*-2*6 R'%2%&1*+' R=
Tested
Design
2&m
&0m
%&m
B0m


.ame ,ignature -ompany Date
Test Done By /+E
Test Supervisor ,#D--+
C
D
;
'
D
C
1
C
2
E
1
E
2
8
u
t
o

T
r
a
n
s
f
o
r
m
e
r
Frid
-lamp$meter
Doltmeter
Doltage !robe
-urrent !robe
220vac
D2
D1
-urrent flow
E
!
-