Grade of concrete
= M-350
= 2400.00 kg/sq.cm
modular ratio
= 10.000
Grade of Steel
= Fe 500
= 1.800 m.
1
K = --------------1 + (6st/m6cb)
= 0.365
J = 1 - K/3
= 1 - 0.365/3
= 0.878
Q = 1/2 x K x J x 6cb
= 1/2 x 0.365 x 0.878 x 115.000
= 18.437
deff = 180.00 - 5.00(pile embedded in pilecap) - 4.00
= 171.00 cm
dispersion width = 0.150 + 1.200 + 1.710/2
= 2.205 m.
Load / m = 365.000 / (2.205 x 2.205)
= 75.072 t/m
D.L. of pile cap = 1.80 x 2.5 = 4.50 t/m
Maximum moment at the face of pier
= (365.000 x 2.581 / 2.205) - (4.500 x 3.331 /2)
= 402.275 t.m./m
CHECK FOR DEPTH :
|-------| Mmax
d req. = | ------\| Q x b
cm)
Asv x 6sv x d
Sv = --------------V
Design Consultancy for Vadodara - Bharuch Road
Project on NH-8 from km 108/700 to km 192/000
= M-350
= 2400.00 kg/sq.cm
modular ratio
= 10.000
Grade of Steel
= Fe 500
= 1.800 m.
1
K = --------------1 + (6st/m6cb)
= 0.365
J = 1 - K/3
= 1 - 0.365/3
= 0.878
Q = 1/2 x K x J x 6cb
= 1/2 x 0.365 x 0.878 x 115.000
= 18.437
deff = 180.00 - 5.00(pile embedded in pilecap) - 4.00
= 171.00 cm
dispersion width = 0.150 + 1.200 + 1.710/2
= 2.205 m.
Load / m = 365.000 / (2.205 x 2.205)
= 75.072 t/m
D.L. of pile cap = 1.80 x 2.5 = 4.50 t/m
Design Consultancy for Vadodara - Bharuch Road
Project on NH-8 from km 108/700 to km 192/000
20
dia @
125