NO.:
QP-001
REVISION
NO.:
N/A
EFFECTIVE
DATE:
PAGE NO.:
DOCUMENT TITLE
MANAGEMENT
RESPONSIBILITY
1 OF 59
Rev. No.
Page No.
Revision History
Originator
Date
DOCUMENT
NO.:
QP-001
REVISION
NO.:
N/A
EFFECTIVE
DATE:
PAGE NO.:
DOCUMENT TITLE
MANAGEMENT
RESPONSIBILITY
1 OF 59
1.0
PURPOSE
1.1
2.0
SCOPE
2.1
3.0
QUALITY POLICY
4.1
4.2
5.0
REFERENCES
3.1
4.0
ORGANIZATION
5.1
RESPONSIBILITY AND AUTHORITY
5.1.1 THE CHAIRMAN
- Responsible for overall management of the company and
involves only in the final decision making of the company
policies.
5.1.2 THE PRESIDENT
Responsibilities:
Establishment of the company policies
Directing the development and improvement of the
company
systems
Statement of Quality Policy and Quality Objective
Reviewing the operation and effectiveness of the
quality system
Recruiting and assigning trained personnel
Reviewing project performance and initiate corrective
actions
5.1.3 VICE PRESIDENT
Responsibilities:
Assisting the President in performing his functions
Managing the company resources and controlling the
administrative and government matters
Performing Presidents duties in his absence
DOCUMENT
NO.:
QP-001
REVISION
NO.:
N/A
EFFECTIVE
DATE:
PAGE NO.:
DOCUMENT TITLE
MANAGEMENT
RESPONSIBILITY
1 OF 59
DOCUMENT
NO.:
QP-001
REVISION
NO.:
N/A
EFFECTIVE
DATE:
PAGE NO.:
DOCUMENT TITLE
MANAGEMENT
RESPONSIBILITY
1 OF 59
-
ensure
quality
DOCUMENT
NO.:
QP-001
REVISION
NO.:
N/A
EFFECTIVE
DATE:
PAGE NO.:
DOCUMENT TITLE
MANAGEMENT
RESPONSIBILITY
1 OF 59
-
5.2
RESOURCES
5.2.1 The resources requirements are identified at the tender stage
of the project and activities planned in advance to make
timely mobilization. The provisions made include:
- Assignment of qualified, trained and experienced
personnel
- Provision of construction, inspection and testing
equipment and tools
- Procurement of long lead materials and subcontracted
services
5.2.2 The establishment procedures in MRK ensure that key staff
controlling the quality of the work is properly trained,
qualified and experienced. The required manpower is
mobilized from the available personnel or through new
recruitment. Additional training for the personnel is provided,
wherever required.
5.2.3 The MRK owns wide range of equipment and tools suitable for
construction, inspection and test, which are rapidly mobilized
to an awarded project. Any additional requirement or needs
for special equipment and tools are either met through new
purchase or by hiring from third parties. MRK Support
Services Department provides the necessary maintenance
and services for the equipment.
5.2.4 Procedures are established in MRK to control the timely
procurement of correct type, quantity and quality of materials
and subcontractor services. Item requiring long lead-time are
identified and planned in advance. The material control
procedures ensure that materials received at Site are
properly controlled and used.
5.3
DOCUMENT
NO.:
QP-001
REVISION
NO.:
N/A
EFFECTIVE
DATE:
PAGE NO.:
DOCUMENT TITLE
MANAGEMENT
RESPONSIBILITY
1 OF 59
5.3.2 He will be the contact point for all matters related to the
quality system implemented in the company.
6.0
MANAGEMENT REVIEW
6.1
The documents, which from the basis of Management Review of the
Quality System is:
- Customer Complaints
- Internal Audit Reports
- Non-conformance Report (NCR)
- Corrective and Preventive Action Reports (CAPA)
6.2
The review shall be conducted once in a year as a minimum. But the
frequent shall be increased in case of recurring quality problems.
6.3
The General Manager (Tech.) shall compile all the documents as
described in section 6.1 above, for the review.
6.4
The review shall also be made on the following:
- Whether the Quality System complies with the
applicable sections and elements of standards
established and recognized by the client.
- The quality manual is current and up-to-date to reflect
changes to the system.
- Procedures and instructions are implemented as
written and approved.
6.5
6.6
6.7
7.0
SIGNATURE
PREPARED BY:
REVIEWED BY:
DA
DOCUMENT
NO.:
QP-001
REVISION
NO.:
N/A
EFFECTIVE
DATE:
PAGE NO.:
1 OF 59
APPROVED BY:
DOCUMENT TITLE
MANAGEMENT
RESPONSIBILITY