Você está na página 1de 5

Archetype Project Name Project Phase

0726 PRECISION AIR CONDITIONING SYSTEM


Archetype Specification
This section is part of the Archetype Specification and should be used in conjunction with the Specification Management Procedure of the
Quality Management System.
Rei!ion "ritten #y Reie$e% #y& MEP
De!i'n Mana'er
Approe% #y& MEP
De!i'n Director
Effectie %ate
A
Maila P. bal !uynhNgoc Nghia "hab Qasem

TA()E O* CONTENTS
# $"N"%A&..............................................................................................................................'
#.# S(MMA%)...................................................................................................................'
#.' S(*MTTA&S...............................................................................................................'
#.+ Q(A&T) ASS(%AN,"...................................................................................................'
#.- .A%%ANT)..................................................................................................................'
' P%/0(,TS............................................................................................................................'
'.# MAN(1A,T(%"%S........................................................................................................'
'.' P%",S/N A% ,/N0T/NN$ (NT.............................................................................'
'.+ 1%AM" AN0 ,A*N"T...................................................................................................'
'.- ,/& S",T/N.............................................................................................................'
'.2 1AN S",T/N..............................................................................................................'
'.3 ,/MP%"SS/%S............................................................................................................+
'.4 1&T"%S......................................................................................................................+
'.5 "&",T%,A& %"!"AT....................................................................................................+
'.6 ST"AM $"N"%AT/% !(M01"%7/PT/N8......................................................................+
'.#9 ,/N0"NSN$ S",T/N................................................................................................+
'.## M/NT/%N$ AN0 ,/NT%/&&N$ S)ST"M......................................................................+
+ ":",(T/N...........................................................................................................................-
+.# NSTA&&AT/N.............................................................................................................-
+.' ,/NN",T/NS............................................................................................................2
+.+ 1"&0 Q(A&T) ,/NT%/&.............................................................................................2
- S,!"0(&"............................................................................................................................2
%e;ision 9< 0ate= Specifications 94'3 Precision air conditioning system Page #>2
Archetype Project Name Project Phase
+ GENERA)
+,+ S-MMARY
a8 This section co;ers the specification of the precision air<conditioning for ser;er
rooms or if specified in the drawings which re?uires clean air and well distributed
with precisely controlled temperature and humidity for high sensible heat
en;ironment.
+,2 S-(MITTA)S
a8 Product 0ata= 1or each unit indicated. nclude performance data in terms of
capacities@ outlet ;elocities@ static pressures@ sound power characteristics@ motor
re?uirements@ and electrical characteristics.
b8 /peration and maintenance data.
+,. /-A)ITY ASS-RANCE
a8 "lectrical ,omponents@ 0e;ices@ and Accessories= &isted and labeled as defined
in N1PA 49@ Article #99@ by a testing agency acceptable to authorities ha;ing
jurisdiction@ and marAed for intended use.
+,0 "ARRANTY
a8 1urnish two year manufacturer warranty to include co;erage for complete
assembly including materials and labor or as the period mentioned in the
condition of contract whiche;er is greater.
2 PROD-CTS
2,+ MAN-*ACT-RERS
a8 Manufacturers= Subject to compliance with re?uirements@ pro;ide products by
one of the following=
#. ,yber ,orp.
'. 0aiAin@ nc.
+. &iebert ,orp. cc
-. /r e?ui;alent to the appro;al of the engineer
2,2 PRECISION AIR CONDITIONING -NIT
) "ach unit shall be a complete en;ironmental control system factory wired@ tested
and specifically designed to pro;ide temperature@ humidity and dust control for
computer room or telecommunications installations. The precision air<
conditioners shall be either floor standing or ceiling hung type to suit drawings
and construction site limitation.
2,. *RAME AND CA(INET
a8 The unit shall ha;e aluminium profile structural frame for maBimum strength@
minimum weight and ease of access and assembly. Side and front panel shall be
easily opened and remo;ed with ?uarter<turn fasteners allowing full access to all
unit components. All panels shall include '2mm thicA fibreglass insulation with
matt surface for thermal protection and sound attenuation.
2,0 COI) SECTION
a8 The unit shall be designed for draw through or blow through type with large face
areas for low ;elocity to reduce turbulence and pro;ide greater efficiency in the
cooling and dehumidification process. The cooling coils shall be of seamless
copper tubes mechanically bonded to hydrophilic coated aluminum fins for cooling
performance enhancement as well as corrosion resistance and tested under water
to '599 APa with compressed air.
%e;ision 9< 0ate= Specifications 94'3 Precision air conditioning system Page '>2
Archetype Project Name Project Phase
2,1 *AN SECTION
) The fan shall be centrifugal forward cur;e@ double width@ double inlet blower
configuration for ?uiet operation. ,eiling hung series shall ha;e direct dri;e +<
speed motors for ease of change of air<flow for optimum air<change and noise
le;el. The floor standing unit shall be a belt dri;e system. The blowers shall be
AM,A certified and factory certified dynamically balanced. The motor shall be
totally enclosed and mounted on an adjustable slide base.
2,6 COMPRESSORS
a8 The unit shall be a single or multiple scroll compressors type with a high ""%@ low
sound power le;el@ best sound ?uality due to low discharge pulse and high
reliability to meet application re?uirement. 1loor standing precision air<
conditioners with capacity eBceeding '2 C. shall ha;e dual compressors with
independent refrigerant circuit for maBimum load fleBibility. The hermetic motor
shall be suction gas<cooled with high starting tor?ue and the windings shall be
inherently protected from o;er<loading@ single phasing and under<;oltage
operation. The compressor shall ha;e a checA ;al;e which located directly abo;e
the fiBed scroll discharge port to pre;ent the compressor from running bacAwards
after the power has been switched off. The motor shall be fitted with a
thermostat which protects the compressor if a malfunction occurs.
2,7 *I)TERS
a8 The filter chamber shall be an integral part of the system@ designed within the
frame and cabinet. The filters shall be disposable type +9D efficient 7based on
AS!%A" 2'<438 or "(- basd on "uropean standards.
2,2 E)ECTRICA) RE3EAT
a8 The unit shall ha;e multi<stage stainless steel finned tubular reheat coils capable
of pro;iding ample capacity to maintain room dry bulb conditions during a system
call for dehumidification. The reheat shall be installed on the air discharge side of
the cooling coil and shall ha;e three 7+8 stages to pro;ide more accurate
controlled response to the re?uirements of the computer room. The heating
elements shall be protected by thermal and air flow status safety switches. The
three stages of reheat shall ha;e a noticeable lowering of energy use and to be
operate on +<phase supply.
2,4 STEAM GENERATOR 3-MIDI*IER5OPTION6
a8 "ach en;ironmental control units shall pro;ide with a steam generator humidifier.
The steam generating humidifier shall be of the self contained disposable type
with electronic control to pro;ides humidification downstream of the cooling coil.
The humidifier is designed to produce full rated steam output at an optimum low
water le;el.
2,+0 CONDENSING SECTION
a8 The casing of the condensing section shall be hea;y gauge steel panels@ insulated
with EF thicA B # E ib per cu. 1t mat faced line<acoustic fiberglass@ tightly fitted
with gasAet on rigid frame@ to guard against leaAs of conditioned air. All steel
parts shall be coated with o;en<baAed epoBy paint@ which gi;es eBcellent
finishing@ weatherability and salt<spray test of minimum 5-9 hours. /;en<baAed
epoBy paint shall pro;ide the best painting system@ which e;en can coat the
inaccessible places of part liAe the edges@ the joints or interior surface of hollow
sections.
b8 The condenser coils shall be of seamless copper tubes mechanically bonded to
aluminum fins for heat rejection performance enhancement as well as corrosion
resistance and tested under water to '599 APa with compressed air. 1ans shall be
propeller type direct dri;en by weatherproof electric induction motors. 1an motor
has class * insulation and splash<proof enclosure. The motor shall be suitable for
operation with -#2>+>29 electric supply with G#9D or #2D ;oltage fluctuation.
%e;ision 9< 0ate= Specifications 94'3 Precision air conditioning system Page +>2
Archetype Project Name Project Phase
2,++ MONITORING AND CONTRO))ING SYSTEM
a) The unit shall ha;e - rows@ '9 character &,0 display wall mounted type for
ceiling hung unit and 5 rows@ '' character &,0 display for floor mounted unit. t
shall display data centreHs temperature@ humidity@ airflow status@ cleanliness and
shall be able to pro;ide component run times@ alarm history@ an automatic self<
test of the microprocessor on system start<up. The microprocessor controller shall
be of #3 bits type with flash memory to stored customised application
programming data. All of these messages shall be spelled out in full "nglish
&anguage on the &"0 display. Multiple alarms shall be able to be displayed
se?uentially in order of occurrence.
b) The user<friendly menu selection switch shall permit step<by<step programming
and display of the following functions=
Temperature set point #5 9, to '6 9, 732 1 to 52 18
Temperature sensiti;ity 9.2 9, to '.4 9, 7# to 218
!umidity set point -9D to 39D %!
!umidity sensiti;ity #D to #9D %!
Temperature alarm points
!umidity alarm points
(nit start time delay
,urrent temperature 79, or 18
,urrent humidity 7D%!8
,ooling stages #@ ' as applicable
!eating stages #@'@+
!umidification
0ehumidification
,urrent D of capacity and the a;erage D of capacity for the last hour of
operation for compressors@ humidification@ dehumidification@ reheat and chilled water.
The unit shall ha;e standard alarm system as follows=
,ompressor high pressure
!igh and low temperature
!igh and low humidity
No air flow
,hange filter
!umidifier failure
Manual o;erride
Power failure restart
,ompressor short cycle
Temperature sensor error
!umidity sensor error
1irestat tripped
&ocal alarm 7programmable8
Maintenance due
c) n order to facilitate maintenance and ser;ice@ component run times for fan
motor@ compressor operation@ reheat stages@ humidification and dehumidification@
%e;ision 9< 0ate= Specifications 94'3 Precision air conditioning system Page ->2
Archetype Project Name Project Phase
the unit shall be able to recall and display on the &,0. The historical data base
shall be maintained by battery bacA<up should power fail.
. E7EC-TION
.,+ INSTA))ATION
a) nstall e;aporator<fan components using manufacturerIs standard mounting
de;ices securely fastened to building structure.
b) nstall ground<mounted@ compressor<condenser components on #99<mm thicA@
reinforced concrete baseJ #99 mm larger on each side than unit.
c) nstall ground<mounted@ compressor<condenser components on polyethylene
mounting base.
d) nstall roof<mounted@ compressor<condenser components on e?uipment supports
specified in related Sections.
e) nstall compressor<condenser components on restrained@ spring isolators with a
minimum static deflection of '2 mm. %efer to related Section.
.,2 CONNECTIONS
a8 ,onnect precharged refrigerant tubing to componentIs ?uicA<connect fittings.
nstall tubing to allow access to unit.
b8 ,onnect supply and return water coil with shutoff<duty ;al;e and union or flange
on the supply connection and with throttling<duty ;al;e and union or flange on
the return connection.
c8 ,onnect supply and return condenser connections with shutoff<duty ;al;e and
union or flange on the supply connection and with throttling<duty ;al;e and union
or flange on the return connection.
d8 nstall piping adjacent to unit to allow ser;ice and maintenance.
.,. *IE)D /-A)ITY CONTRO)
a) %etain first paragraph below to re?uire a factory<authoriKed ser;ice representati;e
to perform@ or assist ,ontractor with@ field inspections@ tests@ and adjustment.
%etain one of two options to suit ProjectJ delete both to re?uire only an inspection
before field testing.
b) ManufacturerIs 1ield Ser;ice= "ngage a factory<authoriKed ser;ice representati;e
to inspect@ test@ and adjust field<assembled components and e?uipment
installation@ including connections. %eport results in writing.
c) &eaA Test= After installation@ charge system and test for leaAs. %epair leaAs and
retest until no leaAs eBist.
d) /perational Test= After electrical circuitry has been energiKed@ start units to
confirm proper motor rotation and unit operation. %emo;e malfunctioning units@
replace with new components@ and retest.
e) Test and adjust controls and safeties. %eplace damaged and malfunctioning
controls and e?uipment.
0 SC3ED-)E
"N0 /1 S",T/N