Volume 2
Employers Requirements
Contents
Pt. Indonesian Coal Development (ICD) East Kutai Mine Mouth Coal-Fired
Power Station
1
1.
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
General
1
Plant Configuration
2
Design Life of the Power Plant
3
Standards
3
Approvals and Permits
3
Operation requirements
3
Environmental
4
Electrical Systems
5
1.8.1 Mine Supply
6
1.8.2 Port Supply
6
1.9
Water Systems
6
1.10 Coal Handling and Storage
7
1.11 Telecommunications Systems and Equipment, and Public Address
System
7
1.12 Storage Facilities
7
1.13 Maintenance
8
1.14 Civil Work
9
1.15 Terminal Points
10
1.16 Scope of Works
11
1.17 General Particulars and Working Conditions
12
1.18 Plant Design Conditions
13
1.18.1Location of the Site
13
1.18.2Climatic Conditions
13
1.18.3Seismic Conditions
14
1.18.4Power Station
14
1.18.5Coal and Ash Analysis
15
1.18.6Emission limits
17
1.19 Operation and Maintenance
19
1.19.1Warranty Engineer
19
1.19.2Operations and Maintenance Support Option
19
1.19.3Operations and Maintenance Package Option
19
2.
Boiler Plant
20
2.1
2.2
20
21
21
21
Tender Document
Volume 2
Employers Requirements
2.2.3 Draft Plant
2.2.4 Stacks
2.2.5 Platforms
2.2.6 Chemical Clean and Steam Line Blow
2.2.7 Boiler Firing System
2.2.8 Chemical Dosing Systems
23
23
24
24
24
24
3.
25
3.1
25
25
27
28
29
29
30
Specific Requirements
3.1.1
3.1.2
3.1.3
3.1.4
3.1.5
3.1.6
4.
Electrical Plant
31
4.1
4.2
31
32
32
33
33
33
34
34
34
34
34
34
35
35
35
36
36
37
37
37
37
4.3
4.4
4.5
4.6
4.7
5.
General
Electrical Studies
4.2.1 Load flow and Fault level studies
4.2.2 Lightning protection
Switchboards
4.3.1 11kV Switchboard
4.3.2 LV Switchboards/MCCs
Auxiliary Systems
4.4.1 Station AC systems
4.4.2 DC Systems
4.4.3 Control Circuits
4.4.4 UPS systems
4.4.5 Electrical Protection
4.4.6 Sync check provision
Unit transformers
Cabling
Earthing system
4.7.1 Equipment earthing
4.7.2 Structure earthing
4.7.3 Lightning protection
4.7.4 Indicating instruments
38
5.1
38
38
38
39
39
Scope of Work
5.1.1 Outline Scope
5.1.2 Breadth of Scope
5.2
Control Philosophy
5.2.1 Local Control
Tender Document
Volume 2
Employers Requirements
5.2.2 Process (Unit) control
5.2.3 System Control
5.3
5.4
Performance Requirements
5.4.1 Availability and Reliability
5.4.2 Personnel Safety
5.5
5.6
5.7
6.
7.
Implementation
5.5.1 Function Specification
5.5.2 Software Specification
General Requirements
5.6.1 Man Machine Interface
5.6.2 System Spare Capacity
5.6.3 Data Acquisition and Monitoring
5.6.4 Secure Power Supplies
5.6.5 Protection Systems
5.6.6 Degrees of Environmental Protection for equipment
5.6.7 Communications Interfaces
System support documentation
39
41
42
43
43
44
45
45
46
47
48
48
49
49
50
50
51
51
52
Balance of Plant
53
6.1
6.2
6.2.1.1 Compressors
6.2.1.2 Driers
6.2.1.3 Air Receivers
6.2.2 Cooling Water System
6.2.2.1 Cooling Tower
6.2.2.2 Cooling Water Circulation System
6.2.3 Seawater Reverse Osmosis Plant (or Equivalent Filter Plant)
6.2.4 Demineralised Water Plant
6.2.5 Potable Water System
6.2.6 Water Storage Systems
6.2.7 Sanitary Treatment Plant
6.2.8 Waste Water Treatment Plant
6.2.9 Ancillary Plant Cooling System (if required)
6.2.10Fire Fighting Systems
6.2.11Ash Handling System
53
54
54
54
54
55
55
55
55
56
56
56
57
57
57
58
58
59
60
7.1
60
60
60
General Requirements
7.1.1 General
7.1.2 Method statements
Tender Document
Volume 2
Employers Requirements
7.1.3 Planning and building regulation approvals
7.1.4 Scope of civil / structural works
7.2
Design Requirements
7.2.1 General
7.2.1.1 Structural Loading
7.2.1.2 Geotechnical Requirements
7.2.2 Earthworks
7.2.3 Foundations
7.2.3.1 General
7.2.3.2 Piling
7.2.4 Roads and hardstand areas
7.2.5 Drainage
7.2.5.1 General Drainage
7.2.5.2 Oily Water Drainage
7.2.5.3 Coal contaminated drainage
7.2.6 Concrete
7.2.6.1 General
7.2.6.2 Precast Concrete
7.2.6.3 Formwork
7.2.6.4 Reinforcement
7.2.6.5 Concrete Block Work
7.2.7 Structural steel
7.2.8 Cladding
7.2.9 Masonry
7.2.10Piping
7.2.10.1 Plumbing and Drainage
7.2.10.2 Pressure Piping
7.2.10.3 Buried Pipelines
7.2.10.4 Precast Reinforced Concrete Pipes
7.2.10.5 Fibre-Reinforced Concrete Pipes
7.2.10.6 Piping Connections
7.2.11Ladders, platforms, stairs and handrailing
7.2.12Fences
7.2.13Buildings
7.2.13.1 General requirements
7.2.13.2 Design requirements
7.2.13.3 Buildings to be Provided
7.2.13.4 Heating and ventilation
7.3
60
60
61
61
61
62
62
62
62
63
63
64
64
65
66
66
66
67
67
67
68
68
68
69
69
69
69
69
69
70
70
70
70
71
71
71
72
72
73
73
74
74
74
74
Tender Document
Volume 2
Employers Requirements
7.3.6 Concreting strategy
7.3.7 Setting out and monitoring
7.3.8 Earthworks, excavation and filling
7.3.9 Roads, hardstandings, car parks and paths
7.3.10Piling
7.3.11Structural steelwork
7.3.12Surface water drainage and buried pressure pipelines
7.3.13Building drainage
7.3.14Concrete, formwork and reinforcement
7.3.15Brickwork and blockwork
7.3.16Building works
74
74
75
76
76
76
76
76
77
77
77
8.
78
8.1
78
78
79
79
79
83
83
84
84
84
85
9.1
9.2
9.3
85
85
85
85
86
86
87
87
manuals/documents
9.4.3 Contractors Site Safety Procedures
9.4.4 Contractors Site Safety Procedures
9.4.5 Training
9.4.6 Safety equipment
9.4.7 Assistance to Employer
9.4.8 Confined spaces
9.4.9 Land owned by third parties
9.4.10Temporary electricity supply
9.4.11Fire precautions
9.4.12Compressed gases
87
88
88
89
89
89
90
91
91
91
92
Project Management
8.1.1 Programmes and progress
8.2
Quality Assurance
8.2.1 General
8.2.2 Quality assurance and quality control
8.3
9.
9.4
Tender Document
Volume 2
Employers Requirements
9.4.13Access, fencing and safety barriers
9.4.14Site rules
9.4.14.1 Statutory and other regulations
9.4.14.2 Personal Protective Equipment
9.4.14.3 Protection of hearing
9.4.14.4 Respiratory protective equipment
9.4.14.5 Maintenance of safety equipment
92
92
92
93
93
93
93
95
10.1
10.2
10.3
10.4
10.5
10.6
10.7
10.8
10.9
10.10
10.11
10.12
10.13
10.14
10.15
General
Drawing Submittal
Drawing Control
Final Drawings
Availability of Documents
Confidentiality of Documents
As Built Drawings
95
95
95
95
96
96
97
97
98
98
98
99
99
99
100
102
102
103
103
103
103
105
105
105
105
12. Training
107
12.1
12.2
12.3
12.4
107
107
108
108
Basics
Operational Training
Maintenance Training
Trouble shooting Training
109
Appendix B Drawings
110