SOUTH PARS GAS FIELD DEVELOPMENT 15 & 16

ONSHORE FACILITIES
Pars Oil & Gas Company

TEST PACKAGE COVER SHEET


SUBSYSTEM NO.:

TEST PACKAGE NO.:

DESCRIPTION

UNIT:

AREA:

TEST MEDIUM:

TEST PRESSURE (BarG.):

PRESSURE GAUGE
:
CALIBRATION DATE &
NUMBERS

REMARKS:

PIP-008

SOUTH PARS GAS FIELD DEVELOPMENT 15 & 16


ONSHORE FACILITIES
Pars Oil & Gas Company

TEST PACKAGE INDEX


SUBSYSTEM NO.
ITEM

FORM
No.

AREA/
UNIT

TEST PACKAGE NO.


DESCRIPTION

APPLICABLE

PIP-008 TEST PACKAGE COVER SHEET

PIP-020 TEST PACKAGE INDEX

PIP-010 RELEASE NOTE FOR PIPING TEST PACKAGE ACTIVITY SHEET

PIP-005 PUNCH LIST FOR COMPANY AND CONTRACTOR

PIP-028 PIPING INSPECTION CHECK LIST

PIP-007 PIPING PRESSURE TEST REPORT

ATTACH. LINE LIST

NOT
APPLICABLE

PIP-027 MECHANICAL COMPLETION CHECK LIST

PIP-024 REINSTATEMENT REPORT

10

PIP-021 REINFORCING PAD TEST REPORT

11

PIP-029 CLEANING REPORT

12

PIP-022 FLUSHING/DRYING REPORT

13

PIP-018 TIE IN JOINT LIST SUMMARY

14

PIP-025 ORIFICE FLANGE INSPECTION REPORT

15

PIP-026 SUPPORT LIST

P
P
P

16

ATTACH. FIELD SITE QUERY (FSQ)/DCN

17

ATTACH. ROTARY FLANGE INITIAL ALIGNMENT

18

ATTACH. PRESSURE GAUGE CALIBRATION/RECORDER CERTIFICATE

19

ATTACH. WATER ANALYSIS REPORT (FOR STAINLESS STEEL MATERIAL)

20

ATTACH. JOINT HISTORY SHEET (SUBONTRACTOR)

21

ATTACH. JOINT HISTORY SHEET (WCS FORMAT,CONTRACTOR)

22

ATTACH. MARKED-UP P&ID

23

ATTACH. ISO DRAWING (AS-BUILT)

24

ATTACH. COMPOSITE PLAN DRAWING

P
P

FORM No.: PIP-020

SOUTH PARS GAS FIELD DEVELOPMENT 15 & 16


ONSHORE FACILITIES

RELEASE NOTE FOR


PIPING TEST PACKAGE ACTIVITY SHEET
TEST
PACKAGE No.

SUBSYSTEM NO.
SUBCONTRACTOR

AREA/UNIT
COMPLETION CONFIRMATION
ACTIVITY

SUBCON.

CONTRACTOR

NAME/DATE

NAME/DATE

MECHANICAL COMPLETION CHECK LIST

REINFORCING PAD TEST REPORT

PUNCH "A"
(RELEASE FOR PRESSURE TEST)

CLEANING

PRESSURE TEST

DRAINING

FLUSHING & BLOWING

PUNCH "B"
(RELEASE FOR PRE-COMMISSIONING)

REINSTATEMENT
(RELEASE FOR PAINTING/INSULATION)

PUNCH "C"
(CAN BE DONE AFTER PRE-COMMISSIONING
AND BEFORE COMMISSIONING)
PUNCH "D"
(CAN BE DONE AFTER COMMISSIONING
AND BEFORE START-UP)
FORM No : PIP-010

Pars Oil & Gas Company

RELEASE NOTE FOR


PIPING TEST PACKAGE ACTIVITY SHEET

COMPLETION CONFIRMATION
TPA / COMPANY
NAME/DATE

FORM No : PIP-010

SOUTH PARS GAS FIELD DEVELOPMENT 15 & 16


ONSHORE FACILITIES
Pars Oil & Gas Company

PUNCH LIST (A/G)


SUBSYSTEM NO.
ITEM

ISO DWG. NO.

AREA/
UNIT

TEST PACKAGE NO.


DESCRIPTION OF PUNCH ITEM(S)

PUNCH

SUBCONTRACTOR

SHEET

OF

STATUS OF CONFIRMATION

ORIGINATOR
SUBCON

CONTRACTOR

TPA / COMPANY

PUNCH ITEM(S)
A : ITEM TO BE WORKED OFF BEFORE HYDROTEST
B : ITEM TO BE WORKED OFF AFTER HYDROTEST AND BEFORE PRE-COMM.
C : ITEM CAN BE WORKED OFF AFTER PRE-COMM. AND BEFORE COMM.
D : ITEM CAN BE WORKED OFF AFTER COMM. AND BEFORE START-UP

SUBCONTRACTOR

CONTRACTOR

TPA / COMPANY

NAME
DATE
SIGNATURE
FORM No.: PIP-005

SOUTH PARS GAS FIELD DEVELOPMENT 15 & 16


ONSHORE FACILITIES
Pars Oil & Gas Company

PIPING INSPECTION CHECK LIST


SUBSYSTEM NO.

TEST PACKAGE NO.


ITEMS TO CHECK

ITEM
1

PIPING MATERIALS AS PER SPECIFICATION

SYSTEM COMPLIES WITH P&ID AND ISOMETRIC

SUPPORT COMPLETED (SHOE, ANCHOR, GUIDE, etc.)

TEMPORARY GASKET INSTALLED

TEMPORARY SPADE/BLIND/SPOOL INSTALLED

TEMPORARY SUPPORT FOR HYDROTEST(IF ANY)

TEMPORARY BLIND FLANGE(IF ANY)

NUT AND BOLT TORQUE TIGHTENED & CORRECT SIZE

FLOW DIRECTION OF VALVE CORRECT

10

VENT & DRAIN CORRECT

11

SPRING HANGER/SUPPORT INSTALLED & LOCKED

12

SAFETY RELIEF VALVE REMOVED

13

CONTROL VALVE BY-PASSED/REMOVED

14

STRAINER AND FILTER REMOVED

15

CHECK VALVE FLAPPER REMOVED/LOCK OPEN

16

BELLOW REMOVED

17

IN LINE INSTRUMENT ITEM REMOVED

18

ORIFICE PLATE REMOVED (EXCLUDE IN FLUSHING/TESTING)

19

INSIDE OF ORIFICE FLANGE GRIND AS PER REQUIRED

20

PLUG REMOVED FROM TELL-TAIL HOLE

21

FLANGE DISCONNECTED FROM EQUIPMENT

22

FLANGE ALIGNMENT CORRECT

23

AS-BUILT CONDITION AND RECORD CHECKED

24

WELDING AND NDT COMPLETED AS PER ISO DWG'S

25

VALVE TAG NO CORRECT

26

VALVE STEM ORIENTATION CORRECT

27

VALVE OPERATION CORRECT

28

BURSTING DISC REMOVED

29

LINE SPACING ALIGNMENT CORRECT

SUBCON.
SUBCON.

CONTRACTOR

AREA/
UNIT
TPA / COMPANY

Remarks:

SUBCONTRACTOR

CONTRACTOR

TPA / COMPANY

NAME

DATE

SIGNATURE
FORM No.: PIP-028

Pars Oil & Gas Company

PIPING INSPECTION CHECK LIST

TPA / COMPANY

TPA / COMPANY

FORM No.: PIP-028

SOUTH PARS GAS FIELD DEVELOPMENT 15 & 16


ONSHORE FACILITIES
Pars Oil & Gas Company

PIPING PRESSURE TEST REPORT


AREA/
UNIT
MATERIAL
CLASS

SUBCON.
ELEVATION

FROM

REPORT No.

TEST PRESSURE
(BAR)

DATE

TO
MEASURING RANGE
(BAR)

GAUGE SERIAL No.

SUBSYSTEM NO.

SHEET
CALIBRATION DATE

OF

TEST SCHEDULE

High Point

START TIME

Low Point

FINISH TIME

Manifold

HOLDING TIME(Min)

No.

P&ID No.

REV.

LINE No.

ISO DWG No.

REV.

SHEET

FINAL STATUS
Acc.

Remarks:

SUBCONTRACTOR
NAME
SIGNATUR
E
DATE

CONTRACTOR

CONTRACTOR
(Precomm./Comm.Rep)

TPA / COMPANY

FORM NO.:00

Pars Oil & Gas Company

PRESSURE TEST REPORT

OF

TEST SCHEDULE

FINAL STATUS
Rej.

TPA / COMPANY

FORM NO.:007

FORM No.: TPG-023

SOUTH PARS GAS FIELD DEVELOPMENT 15 & 16


ONSHORE FACILITIES
Pars Oil & Gas Company

MECHANICAL COMPLETION CHECK LIST


SUBSYSTEM No.

SUBCON.

TEST PACKAGE No.

SUBCON.
NO.

TPA / COMPANY

INSPECTION ITEM
Acc.

CONTRACTOR

AREA/
UNIT

Acc.

Rej.

Rej.

Acc.

MECHANICAL CLEARANCE

A) CONFORMITY WITH DRAWING

B) VENT AND DRAIN FOR HYDROTEST

C) EQUIPMENT TO BE ISOLATED

WELDING AND NDT CLEARANCE

A) MATERIAL AS PER PIPING CLASS

B) VISUAL CHECK OF COMPLETION WELD

C) ARC STRIKE REMOVED

D) PT/MT

E) RADIOGRAPHY EXAMINATION

F) REINFORCING PAD TEST

SUPPORT COMPLETION

A) CONFORMITY WITH DRAWING

B) VISUAL CHECK OF COMPLETION


NOTE:
ITEMS No.1&3 TO BE COMPLETED BY CONSTRUCTION TEAM.
ITEM No. 2 TO BE COMPLETED BY QC TEAM.

SUBCON.

CONTRACTOR
CONST. PIPING

QC

TPA / COMPANY

NAME
SIGNATURE
DATE
FORM No. : 027

Pars Oil & Gas Company

CHANICAL COMPLETION CHECK LIST

TPA / COMPANY
Rej.

BY CONSTRUCTION TEAM.
Y QC TEAM.

TPA / COMPANY

FORM No. : 027

SOUTH PARS GAS FIELD DEVELOPMENT 15 & 16


ONSHORE FACILITIES
Pars Oil & Gas Company

REINSTATEMENT REPORT
SUBSYSTEM NO.

INSPECTION ITEMS

ITEM

SUBCON.

LATEST REVISION OF ALL DOCUMENTS INSERTED

TEMPORARY BLIND FLANGE/SPADE / SPOOL REMOVED

TEMPORARY GASKET REPLACED WITH ORIGINAL GASKET

TEMPORARY SUPPORT REMOVED (IF ANY PROVIDED FOR TEST)

SUPPORT COMPLETED (SHOE, ANCHOR, GUIDE, ETC.)

TEMPORARY BOLT & NUT REPLACED WITH CLEANED ORIGINAL BOLT & NUT AND TIGHTENED

CAP/PLUG REINSTALLED(AND SEAL WELDED IF REQUIRED)

INSTRUMENT IN-LINE ITEM REINSTALLED

SPRING SUPPORT ALIGNMENT (COLD SETTING/EXPANSION BELLOW SETTING)

10

ROTATING EQUPMENT FLANGE CONNECTION WITHIN TELORANCE (FINAL ALIGNMENT)

11

VALVE INSTALLATION AND DIRECTION CHECKED

12

VALVE OPERATION CORRECT

13

HANDLE AND LOCK FOR VALVE INSTALLED

14

SAFETY RELIEF VALVE INSTALLED (WITH TEMPORARY GASKET)

15

CONTROL VALVE REINSTALLED

16

SHUT-OFF VALVE REINSTALLED

17

STRAINER/FILTER REINSTALLED (MESH AFTER PERCOM FLUSHING)

18

STEAM TRAP REINSTALLED (AFTER STEAM OUT)

19

TRACER LINE COMPLETED

20

INSULATION KIT INSTALLED

21

BELLOW REINSTALLED

22

BURSTING DISC INSTALLED

23

CHECK VALVE FLAPPER REINSTALLED (AFTER PRECOM FLUSHING)

24

ORIFICE PLATE / RO INSTALLED

25

ORIFICE FLANGE TAPPING SEAL WELDED (IF REQUIRED)

26

TELLTALE PLUG REINSTALLED AND SEALD

27

SPECTICALE / FIGURE 8 / RING SPACER DIRECTION AS PER DWG.

28

BIRD SCREEN INSTALLED (IF REQUIRED)


P

NOTE: FILL IN THE ABOVE BLANKS AS EXAMPLE:


__

SUBCON.

NAME

SIGNATURE

AREA/
UNIT

SUBCON.

TEST PACKAGE NO.

CONTRACTOR

TPA /
COMPANY

CHECKED
N/A

CONTRACTOR

CONTRACTOR
( Precomm. / Comm. Rep)

TPA / COMPANY

DATE
FORM No.PIP-024

SOUTH PARS GAS FIELD DEVELOPMENT 15 & 16


ONSHORE FACILITIES
Pars Oil & Gas Company

REINFORCING PAD TEST REPORT


SUBSYSTEM No.

GAUGE
SERIAL No.

REPORT No.

TEST PACKAGE No.

CALIBRATION
DATE

DATE
MEASURING RANGE
(BAR)

SUBCONTRACTOR

ITEM

ISO DWG. No.

LINE No.

SHEET

REV.

SPOOL JOINT
No.
No.

WELD
TYPE

TEST
PRESS.
(Bar)

RESULT
Acc.

Rej.

COMMENTS:

SUBCON.

CONTRACTOR

TPA / COMPANY

NAME

SIGNATURE

DATE
FORM No. : PIP-021

SOUTH PARS GAS FIELD DEVELOPMENT 15 & 16


ONSHORE FACILITIES
Pars Oil & Gas Company

CLEANING
SUBSYSTEM

AREA/UNIT

REPORT
No.

TEST PACKAGE No.

SUBCON

DATE

BEFORE HYDROTEST

AFTER HYDROTEST

AIR BLOWING

WATER FLUSHING

OIL FLUSHING

CHEMICAL CLEANING

STEAM
OUT

CLEANING METHOD

ITEM

LINE NUMBER

CLEANING
MEDIA

RATE

RESULT
Acc.

REMARKS

Rej.

COMMENTS:

SUBCONTRACTOR

CONTRACTOR

TPA / COMPANY

NAME
DATE
SIGNATURE
FORM No. : PIP-029

Pars Oil & Gas Company

REMARKS

TPA / COMPANY

FORM No. : PIP-029

SOUTH PARS GAS FIELD DEVELOPMENT 15 & 16


ONSHORE FACILITIES
Pars Oil & Gas Company

FLUSHING/DRYING AFTER HYDROSTATIC TEST


SUBSYSTEM NO.

TEST PACKAGE NO.

REPORT
No.

AREA
/UNIT

DATE
RESULT

NO.

ISO DWG. NO.

LINE NO.

SHT.

REV.
ACCEPT

REJECT

COMMENT:
IN THE ABOVE BLANKS AS EXAMPLE:

FILL
P
__

CHECKED
N/A

SUBCONTRACTOR

CONTRACTOR

TPA / COMPANY

NAME
DATE
SIGNATURE
FORM NO. : PIP-022

Pars Oil & Gas Company

RESULT
REJECT

FILL

TPA / COMPANY

FORM NO. : PIP-022

SOUTH PARS GAS FIELD DEVELOPMENT 15 & 16


ONSHORE FACILITIES
Pars Oil & Gas Company

TIE IN JOINT LIST SUMMARY


SUBSYSTEM NO.
ITEM

ISO DWG. NO.

AREA/
UNIT

TEST PACKAGE NO.


LINE NO.

SHEET

REV. JOINT NO.

RT
RESULT

REMARKS

COMMENTS:

SUBCONTRACTOR

CONTRACTOR

TPA / COMPANY

NAME:
DATE:
SIGNATURE:
FORM No.PIP-018

SOUTH PARS GAS FIELD DEVELOPMENT 15 & 16


ONSHORE FACILITIES
Pars Oil & Gas Company

INSPECTION REPORT FOR ORIFICE INTERNAL WELD FLUSH GRINDING


SUBSYSTEM NO.
ITEM

ISO DWG. NO.

AREA/
UNIT

TEST PACKAGE NO.


FLANGE TAG NO

JOINT NO.

SIZE

REMARKS

COMMENTS:

SUBCONTRACTOR

CONTRACTOR

TPA / COMPANY

NAME:
DATE:
SIGNATURE:
FORM No.PIP-025

SOUTH PARS GAS FIELD DEVELOPMENT 15 & 16


ONSHORE FACILITIES
Pars Oil & Gas Company

SUPPORT LIST
SUBSYSTEM NO.

ITEM

ISO DWG NO.

AREA/
UNIT

TEST PACKAGE NO.

REV.

SHT.

LINE NO.

SUPPORT DWG NO. REV.

PAGE

SUPPORT
TYPE

OF
SUPPORT
SIZE

QTY.

COMMENTS:

SUBCONTRACTOR

CONTRACTOR

TPA / COMPANY

NAME

DATE

SIGNATURE
FORM NO.: PIP-026