ONSHORE FACILITIES
Pars Oil & Gas Company
DESCRIPTION
UNIT:
AREA:
TEST MEDIUM:
PRESSURE GAUGE
:
CALIBRATION DATE &
NUMBERS
REMARKS:
PIP-008
FORM
No.
AREA/
UNIT
APPLICABLE
NOT
APPLICABLE
10
11
12
13
14
15
P
P
P
16
17
18
19
20
21
22
23
24
P
P
SUBSYSTEM NO.
SUBCONTRACTOR
AREA/UNIT
COMPLETION CONFIRMATION
ACTIVITY
SUBCON.
CONTRACTOR
NAME/DATE
NAME/DATE
PUNCH "A"
(RELEASE FOR PRESSURE TEST)
CLEANING
PRESSURE TEST
DRAINING
PUNCH "B"
(RELEASE FOR PRE-COMMISSIONING)
REINSTATEMENT
(RELEASE FOR PAINTING/INSULATION)
PUNCH "C"
(CAN BE DONE AFTER PRE-COMMISSIONING
AND BEFORE COMMISSIONING)
PUNCH "D"
(CAN BE DONE AFTER COMMISSIONING
AND BEFORE START-UP)
FORM No : PIP-010
COMPLETION CONFIRMATION
TPA / COMPANY
NAME/DATE
FORM No : PIP-010
AREA/
UNIT
PUNCH
SUBCONTRACTOR
SHEET
OF
STATUS OF CONFIRMATION
ORIGINATOR
SUBCON
CONTRACTOR
TPA / COMPANY
PUNCH ITEM(S)
A : ITEM TO BE WORKED OFF BEFORE HYDROTEST
B : ITEM TO BE WORKED OFF AFTER HYDROTEST AND BEFORE PRE-COMM.
C : ITEM CAN BE WORKED OFF AFTER PRE-COMM. AND BEFORE COMM.
D : ITEM CAN BE WORKED OFF AFTER COMM. AND BEFORE START-UP
SUBCONTRACTOR
CONTRACTOR
TPA / COMPANY
NAME
DATE
SIGNATURE
FORM No.: PIP-005
ITEM
1
10
11
12
13
14
15
16
BELLOW REMOVED
17
18
19
20
21
22
23
24
25
26
27
28
29
SUBCON.
SUBCON.
CONTRACTOR
AREA/
UNIT
TPA / COMPANY
Remarks:
SUBCONTRACTOR
CONTRACTOR
TPA / COMPANY
NAME
DATE
SIGNATURE
FORM No.: PIP-028
TPA / COMPANY
TPA / COMPANY
SUBCON.
ELEVATION
FROM
REPORT No.
TEST PRESSURE
(BAR)
DATE
TO
MEASURING RANGE
(BAR)
SUBSYSTEM NO.
SHEET
CALIBRATION DATE
OF
TEST SCHEDULE
High Point
START TIME
Low Point
FINISH TIME
Manifold
HOLDING TIME(Min)
No.
P&ID No.
REV.
LINE No.
REV.
SHEET
FINAL STATUS
Acc.
Remarks:
SUBCONTRACTOR
NAME
SIGNATUR
E
DATE
CONTRACTOR
CONTRACTOR
(Precomm./Comm.Rep)
TPA / COMPANY
FORM NO.:00
OF
TEST SCHEDULE
FINAL STATUS
Rej.
TPA / COMPANY
FORM NO.:007
SUBCON.
SUBCON.
NO.
TPA / COMPANY
INSPECTION ITEM
Acc.
CONTRACTOR
AREA/
UNIT
Acc.
Rej.
Rej.
Acc.
MECHANICAL CLEARANCE
C) EQUIPMENT TO BE ISOLATED
D) PT/MT
E) RADIOGRAPHY EXAMINATION
SUPPORT COMPLETION
SUBCON.
CONTRACTOR
CONST. PIPING
QC
TPA / COMPANY
NAME
SIGNATURE
DATE
FORM No. : 027
TPA / COMPANY
Rej.
BY CONSTRUCTION TEAM.
Y QC TEAM.
TPA / COMPANY
REINSTATEMENT REPORT
SUBSYSTEM NO.
INSPECTION ITEMS
ITEM
SUBCON.
TEMPORARY BOLT & NUT REPLACED WITH CLEANED ORIGINAL BOLT & NUT AND TIGHTENED
10
11
12
13
14
15
16
17
18
19
20
21
BELLOW REINSTALLED
22
23
24
25
26
27
28
SUBCON.
NAME
SIGNATURE
AREA/
UNIT
SUBCON.
CONTRACTOR
TPA /
COMPANY
CHECKED
N/A
CONTRACTOR
CONTRACTOR
( Precomm. / Comm. Rep)
TPA / COMPANY
DATE
FORM No.PIP-024
GAUGE
SERIAL No.
REPORT No.
CALIBRATION
DATE
DATE
MEASURING RANGE
(BAR)
SUBCONTRACTOR
ITEM
LINE No.
SHEET
REV.
SPOOL JOINT
No.
No.
WELD
TYPE
TEST
PRESS.
(Bar)
RESULT
Acc.
Rej.
COMMENTS:
SUBCON.
CONTRACTOR
TPA / COMPANY
NAME
SIGNATURE
DATE
FORM No. : PIP-021
CLEANING
SUBSYSTEM
AREA/UNIT
REPORT
No.
SUBCON
DATE
BEFORE HYDROTEST
AFTER HYDROTEST
AIR BLOWING
WATER FLUSHING
OIL FLUSHING
CHEMICAL CLEANING
STEAM
OUT
CLEANING METHOD
ITEM
LINE NUMBER
CLEANING
MEDIA
RATE
RESULT
Acc.
REMARKS
Rej.
COMMENTS:
SUBCONTRACTOR
CONTRACTOR
TPA / COMPANY
NAME
DATE
SIGNATURE
FORM No. : PIP-029
REMARKS
TPA / COMPANY
REPORT
No.
AREA
/UNIT
DATE
RESULT
NO.
LINE NO.
SHT.
REV.
ACCEPT
REJECT
COMMENT:
IN THE ABOVE BLANKS AS EXAMPLE:
FILL
P
__
CHECKED
N/A
SUBCONTRACTOR
CONTRACTOR
TPA / COMPANY
NAME
DATE
SIGNATURE
FORM NO. : PIP-022
RESULT
REJECT
FILL
TPA / COMPANY
AREA/
UNIT
SHEET
RT
RESULT
REMARKS
COMMENTS:
SUBCONTRACTOR
CONTRACTOR
TPA / COMPANY
NAME:
DATE:
SIGNATURE:
FORM No.PIP-018
AREA/
UNIT
JOINT NO.
SIZE
REMARKS
COMMENTS:
SUBCONTRACTOR
CONTRACTOR
TPA / COMPANY
NAME:
DATE:
SIGNATURE:
FORM No.PIP-025
SUPPORT LIST
SUBSYSTEM NO.
ITEM
AREA/
UNIT
REV.
SHT.
LINE NO.
PAGE
SUPPORT
TYPE
OF
SUPPORT
SIZE
QTY.
COMMENTS:
SUBCONTRACTOR
CONTRACTOR
TPA / COMPANY
NAME
DATE
SIGNATURE
FORM NO.: PIP-026