Escolar Documentos
Profissional Documentos
Cultura Documentos
Date: 1/29/2014
Download: QUANTUM MAX PERFPAC Single-Trip Perforating and Gravel- and Frac-Packing
System (0.42 MB PDF)
Schlumberger offers the broadest, most versatile sand screen portfolio in the
industry. Robust, reliable, fit-for-purpose sand screens and inflow control devices
give you the versatility to complete almost any type of interval for optimal recovery.
Direct Wire-Wrapped Sand Screens | Wire-Wrapped Sand Screens | Prepacked Sand
Screens | Premium Mesh Sand Screens | Alternate Path Sand Screens | Specialty
Screens | Inflow Control Devices
{487CDBAE-A94C
Library
ResourceListingT
Conventional gravel packing requires multiple trips into and out of the well to run
the sump packer, perforate, and deploy the screen and gravel-pack assembly.
This proven and reliable technology is widely used and is often the most practical
choice. Our QUANTUM gravel-pack system and QUANTUM MAX system with
higher pressure and temperature ratings are both available for this technique.
Alternate Path technology can be combined with either system when increased
reservoir or wellbore complexity makes it more challenging to pack the annulus
fully.
Perforating and gravel or frac packingin a single trip
Your choice of tubing-conveyed perforating (TCP) string design will vary depending on your completion type:
temporary, permanent, or workover. The strings listed below include only the most common components for
different TCP applications. Your Schlumberger representative can advise you on the most efficient string
configuration for your application.
Tool Drawing
Library
{5BDBC94D-CD6A
{5BDBC94D-CD6A
RichTextTab
ResourceListingT
The IRDV dual valve features nitrogen-free, hydrostatically powered testing and
circulating valves in one tool. Low-pressure pulses in the annulus enable
independent multicycle operation of both valves without interfering with the
operation of other tools in your test string. The IRDV dual valve, as part of the
Quartet downhole reservoir testing system enabled by Muzic wireless telemetry,
can be controlled using wireless commands or low-pressure pulses, provides realtime tool feedback, and allows bidirectional communication for greater tool
command and verification.
Reduced operating time
The IRDV dual valve enables faster, more efficient operations by issuing direct or
sequential commands that eliminate the need to use complex indexing systems.
The intelligent command of the system keeps a complete record of tool
operations, valuable information that can be used for postjob verification. As part
of the Quartet system enabled by Muzic telemetry, the dual valve allows real-time
data to be wirelessly transmitted between downhole and the surface. The data
Exclusive to the IRDV dual valve is a downhole redundancy option. This oncommand mechanical override gives greater flexibility during reservoir testing,
providing the ability to run multiple IRDV dual valves in your tool string.
Complementary downhole configuration
Run the IRDV dual valve as part of the Quartet-HT high-temperature downhole
reservoir testing system or the Quartet system enabled by Muzic telemetry. These
systems deliver the highest-quality pressure measurements and representative
fluid samples with maximum safety and efficiency for altogether higherperformance reservoir testing.
Special IRDV applications
The IRDV dual valve offers a variety of command options to provide the flexibility
and diversity to operate for specific applications in which low-pressure pulses,
system-activation compatibility, or sequential and automatic valve operation is
required.
QUANTUM PERFPAC System (0.49 MB PDF)
ESP Integrated Services for Heavy Oil Testing (0.31 MB PDF)
TRUST (0.13 MB PDF)
http://www.slb.com/services/characterization/testing/drillstem/quartet_muzic/iris_remote_impl
ement.aspx
Tool Drawing
{5BDBC94D-CD6A
RichTextTab
Library
{5BDBC94D-CD6A
{5BDBC94D-CD6A
ResourceListingT
{63116813-CB01
Library
{63116813-CB01
ResourceListingT
Track Record
2
1
{90BAE1ED-FEDA
{90BAE1ED-FEDA
RichTextTab
Library
{90BAE1ED-FEDA
ResourceListingT
Each system is composed of a screen with shunt tubes, fluid systems with specific
requirements, and a customized pumping design. This design helps achieve a
successful stimulation treatment with a complete annular pack while ensuring the
integrity of the lower completion.
Applications for the most challenging environments
Alternate Path systems can be used in both cased hole and openhole applications
in challenging environments. The system helps ensure a successful completion by
producing complete annular packs--both in cased hole wells with long or
laminated intervals and in openhole wells with narrow windows between fracture
and pore pressures.
Multiple configurations combining technologies
Several types and configurations of Alternate Path systems are available for
openhole and cased hole completions.
Openhole wells
OptiPac Alternate Path openhole screen options are available le to suit the
characteristics of the reservoir and wellbore to be gravel packed. Both wirewrapped and premium sintered mesh versions are available, each with either one
or two transport tubes.
Cased hole wells
In cased hole wells, Alternate Path screens are available with conventional
QUANTUM and HPHT QUANTUM MAX gravel-pack systems. the MZ Alternate
Path system, the QUANTUM PERFPAC system, and the MZ-Xpress gravel pack
system.
Library
{17D26197-3D6A
{17D26197-3D6A
ResourceListingT
Track Record
{2BC5C1A3-27C0
RichTextTab
Library
{2BC5C1A3-27C0
{2BC5C1A3-27C0
ResourceListingT
OptiPac Alternate Path openhole screen options are available to suit the
characteristics of the reservoir and wellbore to be gravel packed. Both wirewrapped and premium sintered mesh versions are available, each with either one
In cased hole wells, Alternate Path screens can be used with conventional
QUANTUM and HPHT QUANTUM MAX gravel-pack systems and the single-zone
QUANTUM PERFPAC perforating and gravel-pack system. They are also
compatible with the multizone MZ-Xpress and QUANTUM PERFPAC systems,
which fracture and gravel pack in a single trip
The resulting pack helps prevent premature screenout, erosion hot spots, hardware damage, and consequent
completion failure, in even the most challenging environments.
OptiPac Alternate Path screens use shunt tubes and nozzles to bypass bridges and fill in voids left during
gravel and frac packing
In nonhomogeneous reservoirs, bridges can form prematurely when high leakoff occurs from the wellbore to
the formation, leaving voids in the annulus below the bridge. This premature bridging increases the risk of early
screenout and leads to potential completion failure. Alternate Path technology uses shunt tubes with nozzles
on the outside of screens to create an alternate flow path that allows slurry to bypass the bridges and fill the
voids below them. Use of the shunt tubes reduces the risks of screen failure and deterioration in well
productivity, lowers the risk of gravel pack failure, increases completion longevity, and enhances completion
reliability.