Escolar Documentos
Profissional Documentos
Cultura Documentos
on:
Date:
Time:
Meeting Room:
Venue:
Cr Calum Penrose
Cr Dick Quax
Member Josie Smith
Cr Sharon Stewart, QSM
Cr Sir John Walker, KNZM, CBE
Cr Wayne Walker
Cr John Watson
Cr Penny Webster
Cr George Wood, CNZM
(Quorum 11 members)
Tam White
Democracy Advisor
6 November 2014
Contact Telephone: 09 307 7253
Email: tam.white@aucklandcouncil.govt.nz
Website: www.aucklandcouncil.govt.nz
Note:
The reports contained within this agenda are for consideration and should not be construed as Council policy
unless and until adopted. Should Members require further information relating to any reports, please contact
the relevant manager, Chairperson or Deputy Chairperson.
TERMS OF REFERENCE
Responsibilities
This committee will lead the implementation of the Auckland Plan, including the integration of
economic, social, environmental and cultural objectives for Auckland for the next 30 years. It will
guide the physical development and growth of Auckland through a focus on land use planning,
housing and the appropriate provision of infrastructure and strategic projects associated with these
activities. Key responsibilities include:
Unitary Plan
City centre development (incl reporting of CBD advisory board) and city transformation projects
Built Heritage
Urban design
Powers
(i)
powers that the Governing Body cannot delegate or has retained to itself (see
Governing Body responsibilities)
(b)
(ii)
(iii)
Powers belonging to another committee, where it is necessary to make a decision prior to the
next meeting of that other committee.
(iv)
PAGE
Apologies
Declaration of Interest
Confirmation of Minutes
Petitions
Public Input
5.1
Extraordinary Business
Notices of Motion
Housing update
The Project Director Housing will provide an update by way of power point presentation on
the Housing projects.
10
11
19
12
23
13
Page 3
Apologies
At the close of the agenda no apologies had been received.
Declaration of Interest
Members are reminded of the need to be vigilant to stand aside from decision making
when a conflict arises between their role as a member and any private or other external
interest they might have.
Confirmation of Minutes
That the Auckland Development Committee:
a)
confirm the ordinary minutes of its meeting, held on Thursday, 16 October 2014 and
the extraordinary minutes of its meeting, held on Tuesday, 28 October 2014,
including the confidential sections, as true and correct records.
Petitions
At the close of the agenda no requests to present petitions had been received.
Public Input
Standing Order 3.21 provides for Public Input. Applications to speak must be made to the
Committee Secretary, in writing, no later than two (2) working days prior to the meeting
and must include the subject matter. The meeting Chairperson has the discretion to
decline any application that does not meet the requirements of Standing Orders. A
maximum of thirty (30) minutes is allocated to the period for public input with five (5)
minutes speaking time for each speaker.
5.1
Purpose
1.
Representatives from the Motu Design Group wish to present their design for the
Avondale Regeneration Initiative into a more formal urban development proposal
incorporating the Avondale Community Action Groups (ACAG) concerns. The ACAG
presented their projects at the October 2014 Auckland Development Committee
meeting.
Recommendation/s
That the Auckland Development Committee:
a)
Page 5
Extraordinary Business
Section 46A(7) of the Local Government Official Information and Meetings Act 1987 (as
amended) states:
An item that is not on the agenda for a meeting may be dealt with at that meeting if(a)
(b)
The presiding member explains at the meeting, at a time when it is open to the
public,(i)
(ii)
The reason why the discussion of the item cannot be delayed until a
subsequent meeting.
Section 46A(7A) of the Local Government Official Information and Meetings Act 1987 (as
amended) states:
Where an item is not on the agenda for a meeting,(a)
(b)
That item is a minor matter relating to the general business of the local
authority; and
(ii)
Notices of Motion
At the close of the agenda no requests for notices of motion had been received.
Page 6
Item 10
Purpose
1.
To inform the Committee of a proposed land exchange between Fletcher Residential Ltd
(FRL), Auckland Council and the Crown to enable a comprehensive development of the
Three Kings Quarry and the surrounding reserve land.
2.
The report outlines issues and process requirements and makes recommendations to
progress actions that can enable a land exchange agreement to be finalised.
Executive summary
3.
4.
Both plan change requests would enable residential and mixed use developments to provide
between 1,200 -1,500 dwellings for approximately 3,000 to 4,000 people, but PA372 would
provide a less dense development.
5.
This report addresses the requirements of PA372 which seeks an exchange of reserve land
between Crown, Council and FRL.
6.
Attachment 1 shows the current ownership of the parcels of land around the quarry. Part of
the reserve land is council owned, and part is Crown owned. Auckland Council is the
administrative body for the reserves and holds the crown land in trust for reserve purposes.
7.
Attachment 2 was prepared by FRL and shows the proposed exchange areas. Under the
FRL proposal the blue parcels would transfer from Council or Crown to FRL, and the light
green parcels would transfer from FRL to Crown or Council. The dark green area adjacent
to Te Tatua-a-Riukiuta (Big King) is not part of the exchange proposal and FRL is in
discussions with iwi over the future ownership of this land. New roading would be built by
FRL and vest as road.
8.
The land to the south of the quarry (Area G, west of Grahame Breed Drive) has a 135 space
car park, further ancillary parking, a City Park depot and yard (Area F), but otherwise the
open space is overgrown and un-utilised, and parts are enclosed by very steep slopes.
9.
A track provides a link to the western reserve which is used as a playing field for football and
softball. The field is only accessible to the public by foot had has no facilities or
improvements. The level area is surrounded by steep banks and a concrete footpath and
staircase lead north to Te Ttua-a-Riukiuta/ Big King. The exchange proposes to provide
two adjacent sand carpeted sports fields to replace the loss of the sports field on the western
reserve.
10.
The land lies in an area subject to the provisions of the Ng Mana Whenua o Tamaki
Makaurau Collective Redress Act 2014, under which mana whenua have a right of first
refusal (RFR) on the sale of surplus Crown owned land.
11.
Exchanges of Crown derived reserve land can be made under the Redress Act, and the
Department of Conservation will be requested to confirm that this particular exchange
proposal is within that exception, and that the requisite Crown-mana whenua discussions
have occurred to reach comfort in relation to it.
12.
S.15 (1) of the Reserves Act 1977 provides for the exchange of parts of a reserve for any
other land to be held for the purposes of that reserve, subject to criteria around the improved
benefit for the purpose of the reserve.
Page 7
Item 10
The Three Kings Plan was adopted by the Puketpapa Local Board in August 2014 and sets
out five key moves to guide development in Three Kings. FRL has been active participants
in the consultation around the draft Plan, and advocate that the proposed development set
out in PA372 will deliver those key moves. The Plan indicates the location of a civic heart or
node, and the plaza area proposed in the PA372 is not in this location.
14.
The Local Board recommends that an optimum council exchange proposal is developed in
consultation with FRL, Antipodean Properties Ltd (owners of the Three Kings shopping
centre) and Housing New Zealand, another significant land owner in the area.
15.
Before any agreement is finalised, from an open space perspective it is important that any
proposal ensures that new sports field sizes, configuration and buffer areas provide for a
multifunctional open space. This should be capable of providing for maximum playing hours,
include lighting, car parking and not be adversely impacted by stormwater mitigation
measures for the whole development. It will also be important to ensure that any proposal
provides for an operational depot site, clear pedestrian access, agreement between what is
public and what is private open space and a strong interface with the town centre around a
civic heart or node.
Recommendation/s
That the Auckland Development Committee endorse that Auckland Council Property
Limited (ACPL) and council staff:
a)
engage with the Puketpapa Local Board on the Fletcher Residential Ltd land
exchange proposal to achieve a land exchange agreement aligned to the Three
Kings Plan;
b)
consult with Antipodean Properties Ltd and Housing New Zealand on the Fletcher
Residential Ltd land exchange proposal;
c)
d)
e)
Comments
Proposed Plan Change PA372
16.
In February 2014, after consultation with council and other parties over the previous 12-18
months, FRL publicly released a master plan proposal for the redevelopment of the quarry.
The plan included adjoining Crown and council reserve land to enable better integration of
the residential areas to the town centre, the improvement of active and passive open space
and improvement in the connectivity of surrounding residential areas. The release of the
master plan coincided with submissions on the proposed Auckland Unitary Plan and the
development of the draft Three Kings Precinct Plan.
17.
In August 2014 the Puketpapa Local Board adopted the Three Kings Plan to guide
development of the Three Kings area, and FRL Residential Ltd submitted two Plan Change
requests (PA372 and PA373) that were notified on 13 October 2014. Submissions close on
10 November 2014 after a period of 20 working days, and a further submission period will
likely occur in early December 2014 for 10 working days.
18.
PA372 relies upon an exchange of parts of reserve land at 1011 Mount Eden Road and 2325 Fyvie Avenue (Three Kings Reserve) that adjoin the quarry at 985 Mount Eden Road.
Page 8
19.
There are areas of reserve land identified by PA372. The reserve land adjacent to the
southern boundary of the quarry totals 3.85ha and is derived from the Crown, but held in
trust, and administered on its behalf, by Auckland Council. The other reserve land, adjacent
to the western boundary, is partially derived from the Crown (1.58ha), with the balance being
Auckland Council land (1.47ha). Attachment 1 illustrates the current land ownership.
20.
The transfer history of Area D (refer Attachment 1) is unusual and although Crown is the
underlying owner, council appears to have some claim to the land due to the unusual
changes of ownership between the Crown and Mount Roskill Borough Council in the 1960s
and 1970s. It was vested in trust to Auckland City Council as recreation reserve in 1993.
Confirmation of the ownership is required to calculate the amount of Crown and council land
included in any proposed exchange and the ownership allocation in the new reserve land.
21.
Housing New Zealand (HNZ) is a significant owner of property to the west beyond the
reserve area, and Antipodean Properties Ltd own the Three Kings retail centre. Antipodean
has direct interest in the proposed land exchange and the interface of the retail area with the
residential development proposed at 985 Mount Eden Road and the southern reserve area.
Housing New Zealand has a significant portfolio of properties to the west.
Ng Mana Whenua o Tmaki Makaurau Collective Redress Act 2014
22.
The Crown derived reserve land is subject to the provisions of this Act, under which mana
whenua have a right of first refusal (RFR) on the sale of surplus Crown owned land.
23.
Under s.135 of the Act, Crown is able to dispose of RFR land in accordance with s.15 of the
Reserves Act. Council will seek confirmation from DoC that s.135 would apply to the
disposal of any Crown land that forms part of any exchange agreement, and staff will
engage with DoC to ensure that the requisite Crown-mana whenua discussions have
occurred to reach comfort in relation to this RFR exception.
24.
Exchanged Crown land would cease to be RFR land after the exchange. Land received by
Crown and gazetted as reserve would become RFR land.
Exchange of Land - s.15 Reserves Act 1977
25.
S.15 (1) of the Reserves Act 1977 provides for the exchange of parts of a reserve for any
other land to be held for the purposes of that reserve. The assessment criteria are based on
suitability of purpose; the land to be acquired under s.15 shall be more suitable for the
purpose for which the existing part of the reserve being disposed of is held at the time of the
exchange.
26.
S.15 (2) of the Reserves Act provides that a notice of intention to request an exchange is not
necessary where, in order to enable the exchange to be made, a change has been made in
an operative district scheme under the Town and Country Planning Act. Although a plan
change has been submitted in this instance, council staff are of the view that full public
consultation under a notice of intention should be undertaken in this case.
27.
New open space land acquired as part of the exchange is gazetted as reserve and is held
subject to the same objects and purposes as the original land.
28.
In this particular case, the timing of any exchange would need to be staged to allow for
completion of engineering and remediation works.
Proposed Land Exchange Areas
29.
Attachment 2 illustrates the areas of land that are proposed by FRL in PA372 for exchange.
The original exchange proposal in February 2014 included the park maintenance depot and
a strip of land adjoining the northern boundary of the town centre. It was also suggested
that the stormwater infrastructure of swales and rain gardens on the northern and eastern
side of the development should form part of the exchange as the system had some amenity
value.
Page 9
Item 10
Ownership of Land
Item 10
Following discussions with ACPL, FRL has amended the proposal to exclude the swales and
rain gardens, most of the depot area and the strip of land between Grahame Breed Drive
and the town centre land. It is noted that the further work remains to be done on the
alignment of the roading that currently impacts severely on the operation of the depot.
31.
The western wall of the quarry in FRL ownership adjoins Te Ttua-a-Riukiuta (Big King).
Negotiations between FRL and iwi are underway over the possible transfer of this land to iwi
interests and for the provision of a site for the development of a Whare Maanaki. This quarry
wall area does not form part of the exchange proposal.
32.
There are three parcels of land in the southern area totaling 1.09ha that would be used for
the development of apartment blocks up to eight storeys. Substantial engineering works will
need to be undertaken to trim the quarry face to create the building platforms in these
locations. The retained reserve land between these buildings is proposed to be remediated
to provide stairs and ramps to connect the ground floor of the apartments at RL60 to
Grahame Breed Drive at RL75. The balance of the ground at RL60 will be remediated as
part of the sand carpeted playing fields and roading.
33.
There are two parcels of land on the western reserve totaling 1.35ha are proposed to be
developed as walk-up apartments. The land between the blocks is proposed to be
landscaped to provide passive open space and connection through to Smallfield Avenue and
down to the playing fields. It is proposed that a large area will be used for separated roading
and a graded access to Big King Reserve will be formed.
34.
Open space assessments are currently being undertaken. Key issues relate to pedestrian
access and connectivity, the loss of existing and provision of new car parking, the
configuration of the proposed open space (especially on slopes and behind buildings), the
detail of the landscaping, the size and operation of the playing fields and buffers around the
pitches, the location of the civic heart or node, and the design of the road in the area of the
depot which impacts on the usability of the depots yard.
Open Space - Suitability for Purpose
35.
The proposed land exchange provides an opportunity to provide a high quality, multifunctional central park, and the opportunity to improve open space connections between the
town centre, the Te Ttua-a-Riukiuta (Big King) and the new development.
36.
The existing open space (western sports field and the southern area) are currently underdeveloped. If retained as open space, improved open space outcomes could be achieved
but only at a significant cost. Under the land exchange proposal, the exchange should
deliver at least as good as (if not better) open space but at no cost to council and the
outcomes may be aligned more closely with the Three Kings Plan. Specifications around
the level of remediation of the retained reserve land will form part of a framework agreement.
37.
The rain garden and swales network and the flood storage pond in to the west of the sports
fields will provide additional open space amenity in the development. These elements may
be vested in council as a stormwater asset.
38.
With regard to open space configuration, pedestrian accesses have been proposed from
Grahame Breed Drive, Smallfield Avenue and between the western reserve and Te Ttua-aRiukiuta. With the current level of design provided, staff are unable to fully assess the
functionality or nature of the experience of the proposed open space areas, particularly in
relation to pedestrian access and circulation in the vicinity of the dual road layout near the
western area. It is also unclear what proportion of the passive open space proposed should
be owned or managed by the developments management structure. Design specifications
and performance requirements will form part of any framework agreement.
Page 10
39.
The car park adjacent to Grahame Breed Drive occupies the area identified in the Three
Kings Plan as a node or civic heart. The development master plan seeks to use this land for
apartment development, connection to the playing fields and the lower level development,
and for the principal access road. Car parks are proposed around the playing fields. The
town centre is well provided with parking and the impact of the car park in the exchange is
unlikely to create significant parking issues, though this needs to be evaluated further.
Sports fields - Suitability for Purpose
40.
Under the exchange proposal, the existing soil sports field on the western reserve would be
reduced in size and converted to landscaped passive open space providing connections
down to the new sports fields.
41.
Two side-by-side sports fields (sand carpet) are proposed in the development that would
also provide an opportunity for summer (cricket) and winter (football) sport. Passive open
space adjoins the sports fields.
42.
The size of the two sports fields proposed are 60m X 100m with a 3m buffer around each
(standard to optimum field sizes for football range from 65m X100m and 70m X110m with
3m buffers). The combined area would provide a cricket oval in summer. The field
configuration is close to the proposed footpath in places, with contiguous passive open
space to the east, and passive open space to the west but is separated by a road. Provision
of an open space buffer around the playing fields (20 metres plus is a normal design
guideline) would help to provide a more multifunctional park that allows for both passive and
active recreation and allows flexibility of use over time.
43.
FRLs proposal does not include the installation of lights on the proposed fields, and the
provision of toilet and changing facilities is to be confirmed. This means that the fields would
not cater for the high demand for winter training between 4 and 9.30pm on week nights
unless installed. This is a major disadvantage to councils efforts to meet the demand for
training facilities in this part of the isthmus. Approximately two thirds of all winter use is
training, most of which requires lights and the benefit of changing facilities. Lighting could be
installed on either or both fields and current light design means that glare and spillage will
not be a problem for neighbours, but other reverse sensitivity issues would need to be
addressed. A location for changing and toilet facilities is identified south-west of the fields.
44.
A full acoustic assessment is required to determine whether or not play would be limited by
acoustic constraints under the Operative Auckland Council District Plan Isthmus Section.
Given the close proximity of the proposed apartments, it is important to determine that noise
restrictions may impact on the usability of the fields.
45.
The sports fields are proposed to have a dual function as a storm water detention area for
over 1 in 10 year flood events. This is a relatively high standard and the anticipated storage
depths and soakage rates of the current design are set out below. Generally speaking,
grass would be at risk if it is submerged for more than 5 or 6 days.
46.
Rain event
1 in 10 year
1 in 50 year
40
1 in 100 year
60
47.
The Stormwater Unit is reviewing the designs presented by FRL and will advise fully on the
likely frequency of inundation and rates of soakage.
48.
Parking (100+ spaces) is provided around the sports field perimeter and access to the
parking around the town centre would also be possible, but less convenient due the
significant height differences, by the connecting staircases. It will also be important to
determine that the proposal provides sufficient car parking for sports field use in particular.
Page 11
Item 10
Item 10
49.
In its current configuration, staffs believe that the proposed central park may not fully realise
the opportunity to provide maximum playing hours and a multifunctional experience
compared to an open green field site unrestrained by adjacent land holdings.
Equality of Exchange
50.
Under the Public Finance Act, fiscal equality of exchange is required as a minimum, either
by receiving land of higher value for that exchanged, or by receiving a cash payment or an
agreement to undertake capital works by the other party to address any inequality between
the parcels of reserve land exchanged.
51.
Apart from the benefit of facilitating a comprehensive, high quality, residential development
that provides a solution to the future use of the quarry area, and an impetus to revitalise the
Three Kings town centre, the value to council in this proposed exchange lies in the quality of
the land being transferred to FRL prior to any remediation works, compared to the area,
quality and amenity of the land being transferred to into crown/council ownership. The value
to FRL is the ability to release a financial return from high density residential development
and the benefits of being able to present an improved offering to the market.
52.
The cost of remediating the current reserve land is significant. 1.78ha of land is proposed to
transfer to FRL, and the quarry wall and quarry floor land will require significant works to
prepare for development. FRL propose to transfer 2.21ha of quarry land that will be filled
and finished to agreed standards and specifications for active recreational, casual
recreational and open space purposes. There are stormwater uses designed into these
areas.
53.
As part of those works, FRL would remediate other areas totalling approximately 1.3ha of
land not subject to the exchange, which will be developed to provide high quality open
space, connection areas and form the balance of the two sand carpeted sports fields. FRL
would also undertake the development of almost 2ha of roading, walkways and cycle ways
on the retained land.
Existing Reserve land - Options for Stand Alone Remediation
54.
The southern and western reserves total 6.9ha and include the western playing field, a car
park, the City Parks depot, and undeveloped open space areas (some formerly quarried)
which is overgrown and un-utilised.
55.
The topography is challenging. Approximately 50% of the western reserve is flat and level,
with the balance being steep banks. A concrete footpath and staircase link the area with Te
Ttua-a-Riukiuta (Big King). The soil sports field provides casual year round amenity for
football and softball, but is only accessible to the public by foot. Maintenance access for
vehicles is provided from Grahame Breed Drive. There are no facilities, lighting, toilets or
other improvements to this field, but an upgrade to an artificial field is currently budgeted for
2021.
56.
The reserve land is held for recreation purpose and local purpose (depot). On assessing the
stand-alone opportunity, this land is unlikely to be a candidate for a reserve revocation. It
would be most likely that council would seek to upgrade the western reserve and remediate
the lower area adjacent to the quarry for casual recreation or another sports field.
57.
A report was commissioned by Puketpapa Local Board from Riley Consultants to look at
the feasibility of providing two playing fields on the existing reserve at different finished
levels. Seven options were assessed and a side by side configuration of the fields was not
possible. The options ranged in cost from $1.7m to over $10m. These costs excluded
roading, parking, toilets, changing facilities, sand carpeting ($250,000/pitch) and passive
recreational space improvements. From this analysis it is clear that council would need to
source substantial funding to develop the southern and western areas for those uses, and
the outcomes would not assist in providing high density residential development close the
town centre.
Page 12
58.
b)
c)
d)
If the Committee resolves to issue a notice of intention to exchange land under s.15 of the
Reserves Act 1977, then the following steps will apply:
a.
Consult with Department of Conservation, iwi and adjoining owners on the proposal.
b.
c.
Publish Notice of Intention to request an exchange under s.15 of the Reserves Act.
d.
e.
f.
g.
Subject to the submissions and objections, confirm the exchange agreement with FRL.
h.
i.
Consideration
Local board views and implications
59.
60.
Land exchange as one method to improve the quality and location of usable open
space within the Three Kings Precinct Plan Area.
b)
Following the completion of the Three Kings Precinct Plan work already underway,
staff to investigate the merit of an exchange of portions of council owned or managed
land, identified as Areas C, D, G and F in Attachment A and taking into account the
whole range of landowners in the Three Kings area.
61.
The Board has held two recent workshops with council officers and ACPL on the exchange
proposal. The workshops discussed council officers views on the exchange plan in the
context of the Three Kings Plan, and the legal aspects of the exchange process.
62.
endorse further internal work by Council to determine the land exchange opportunities
that will deliver the optimum configuration of land to meet the outcomes and actions
set out in Councils Three Kings Plan.
Page 13
Item 10
Next Steps
Item 10
once the work in a) has been completed and agreed, to enter into discussions with
landowners in the Three Kings Plan area (including FRL Residential, Antipodean and
Housing New Zealand) to explore land exchange opportunities to meet Councils
objectives.
c)
require regular updates and consultation from officers about the work identified in a)
and b).
Mana Whenua who have interests in the Puketapapa area are Te Rnanga o Ngti Whtua,
Ngti Whtua, Ngti Whatua o Kaipara, Ngti Whtua Orkei, Te Kawerau Maki, Ngti Tai
ki Tmaki, Ngti Tamaoho, Te Akitai Waiohua, Ngti Te Ata, , Ngti Whanaunga, Ngti
Maru and Ngti Tamater.
64.
Te Ttua-a-Riukiuta / Big King Reserve has transferred to Mana Whenua (the Tpuna
Taonga o Tmaki Makaurau Trust), to be administered by the Tpuna Maunga o Tmaki
Makaurau Authority under the Ng Mana Whenua o Tmaki Makaurau Collective Redress
Act 2014. Hap / Iwi will have a strong interest in any proposals that have an impact on Big
King Reserve, Te Ttua-a-Riukiuta and Crown land and other open space in the immediate
vicinity.
65.
The Ng Mana Whenua o Tmaki Makaurau Collective Redress Act provides for a mana
whenua Right of First Refusal in relation to the disposal of surplus Crown land; s135 of the
Act states that Crown may dispose of RFR land in accordance with s.15 of the Reserve Act.
Council staff will engage with DoC to ensure that the requisite Crown-mana whenua
discussions have occurred to reach comfort in relation to the s135 RFR exception.
66.
FRL have held a number of hui with iwi and are in discussions with representatives of the
Tamaki Collective around the land exchange and the master plan for the development with a
view to seeking agreement of iwi related interests and the land adjoining Te Ttua-aRiukiuta that is in FRL ownership,
67.
ACPL intends to commence its own consultation with mana whenua during the first week of
November 2014. It is understood that a number of iwi will be making submissions on PA372
and PA373 during the submission period that closes on 10 November 2014.
Implementation
68.
Implementation of any development would follow the plan change and reserve revocation
and land exchange processes. Any development would also need specific statutory planning
approval.
Attachments
No.
Title
Page
15
17
Signatories
Author
Authorisers
Clive Fuhr - Acquisitions & Disposals Manager Auckland Council Property Ltd
Roger Blakeley - Chief Planning Officer
Page 14
Attachment A
Item 10
Page 15
Attachment B
Item 10
Page 17
Item 11
Purpose
1.
Executive summary
2.
c.
3.
4.
6.
7.
Installation of the relocated bronze REO text seats started on 13 October and is
scheduled for completion by early November.
b)
Activation opportunities (events, kiosks, outdoor dining etc) are being explored for the
upcoming Spring/Summer period.
5.
The City Centre proposal was further presented to the Budget Committee workshop on
A joint opening event with Auckland Council and SkyCity is planned for 7th November
2014.
b)
b)
The Auckland City Centre Advisory Board supports funding from the City Centre
targeted rate to support the next stages of the Myers Park Development Plan, to be
delivered in 2015/16. Work will focus on improving the northern and southern
entrances, including improvements to:
i)
ii)
iii)
Stormwater detention dam and bio filtration area adjacent to the underpass
iv)
v)
Pedestrian link from Pitt Street via Poynton terrace to Myers Park
Page 19
Item 11
8.
9.
Auckland City Centre Advisory Board confirmed allocation of additional targeted rate
funds to Freyberg Square development in June 2014.
b)
Appointment of design consultants is underway for both the Ellen Melville hall upgrade
and improvements to Freyberg Square. Following appointment of a design team, City
Centre Integration will lead the project.
c)
Developed design for both Hall and Square due to be completed in early 2015.
Precinct Frameworks
a)
Framework documents will be compiled for key city centre precincts, to collate
planning and project information and inform decisions on projects and initiatives from
Council and CCOs for:
i) Wynyard Quarter complete.
10.
12.
iii)
iv)
v)
vi)
11.
ii)
The strategy will inform options for redevelopment of the harbour edge and central
wharves, including Queens Wharf and the ferry / cruise basins.
i)
Noted that the Port study stage 2 review is underway separately, and will help
inform the strategies.
ii)
Analysis of options is progressing well, with initial findings due end 2014
iii)
There will be discussions with interested local boards over the coming weeks
about evolving options.
Options are being investigated for redevelopment of the Downtown ferry infrastructure
to cater for recent updates to growth forecasts, which indicate significant growth in
passenger numbers over the next 3-5 years.
b)
Initial redevelopment will be informed by the vessel berthage strategy, and staged to
align with planned Quay St streetscapes and seawall upgrades.
Investigations have determined that sections of the seawall may fail in a moderate
seismic event. Auckland Transport as the asset owner intends to upgrade or replace
the seawall to current seismic design standards.
b)
The procurement & delivery strategy is being developed, for a planned start of physical
works 2015/16 (subject to funding). Trials will be carried out in early 2015.
c)
Page 20
14.
Following the decision regarding the sale or lease of QE Square by the ADC in
September, the downtown public open space review is developing responses to the
ADC resolutions, including detailed consideration of planning and design option.
b)
An online survey for Aucklanders to provide their feedback of what they would like to
see in Downtown public space is currently open until 12 December 2014.
www.shapeauckland.co.nz
15.
16.
17.
b)
Staging of works will be coordinated with CRL, Seawall and Ferry Basin upgrades.
c)
A review of early proposals to underground Quay Street has been completed. The
independent assessment of the options considered public realm, transport and
economic benefits plus whole of life cost estimates. The report confirms that an atgrade proposal to upgrade Quay Street will provide significant transformational
benefits, and that undergrounding provides little if any additional benefit, but at very
much higher capital and operating costs and with major disruption and constructability
risk. It is not proposed to pursue an underground option for Quay Street further.
Roading and infrastructure upgrades for Wynyard Quarter are being rolled out to align
with development during 2014-2020, subject to LTP funding
b)
Design is progressing for the southern sector first stage of construction is due to
align with completion of the Fonterra HQ development on Fanshawe / Halsey St by
end 2015.
c)
Staged delivery and property acquisitions are being aligned with lease expiries &
contractual obligations.
d)
The programme business case of city centre bus infrastructure is due to be completed,
and will inform engagement with stakeholders on options for project scope and
functional requirements.
b)
An operational plan has been completed for the bus network during the proposed CRL
Enabling Works period. Detailed planning and design will commence immediately.
c)
Concept planning is progressing well for Downtown Interchange (with CRL), for
engagement with stakeholders in late 2014.
d)
Indicative and Detailed business cases (Scheme assessment) for the Fanshawe
Street/Wynyard Station design due to go out early November 14.
18.
Council and CCOs are jointly finalising the design brief, for release (or further
modification) following clarification of funding through the current LTP budget review.
The further issue of tender documentation has been placed on hold pending LTP
budget outcomes.
The existing Te Wero Bridge was designed & built for the 2011 Rugby World Cup, with
a limited design life (5-8 years). Options for upgrade / replacement / maintenance are
being considered, within the constraints of the LTP budget review.
Westhaven Promenade
a)
Work is progressing well and will be completed in stages through 2014/15 and Stage 2
from 2015/16 (subject to funding).
Page 21
Item 11
13.
Item 11
19.
ACCAB supported the proposed concept design for Beach Road Stage 2 Cycleway
and public realm improvements in October 2014.
b)
Accelerated implementation of the city centre cycle network is being investigated with
short / medium term cycle routes to link the existing cycle routes leading into the city.
Priority routes include:
i) Nelson St (incl the Nelson St Off ramp - NZTA),
ii) Quay St,
iii) Victoria St,
iv) Beaumont St, and
v) KRoad,
c)
d)
20.
21.
Project objectives are currently being scoped in an initial concept report, for review
with key stakeholders.
b)
Funding and timing will be staged in accordance with LTP Budgets Stage 1 is
required to support the opening of the NZICC in late 2017.
22.
Earliest project start date is deferred to 2019/20 to align with CRL construction (due to
intersection constraints).
Digital Auckland
a)
Council and CCOs are investigating the roll-out of a digital data and modelling tool
which will collate information for above and below ground infrastructure as a planning
and communication tool for the region.
b)
A Business case is being prepared by Council to consider costs and benefits, resource
requirements and timeframes for delivery.
Recommendation/s
That the Auckland Development Committee:
a)
Attachments
There are no attachments for this report.
Signatories
Author
Authorisers
Page 22
Item 12
Purpose
1.
To present the attached 2014 Auckland Plan Annual Implementation Summary document
and to advise the committee of a number of proposed improvements to reporting on
Auckland Plan Implementation in future years.
Executive summary
2.
The Auckland Plan Annual Implementation Update Summary provides the reader with an
overview of how implementation of the Auckland Plan has progressed in 2014.
3.
Future reporting of implementation of the Auckland Plan will focus on progress towards
reaching the seven outcomes of the Auckland Plan through the development and refinement
of specific, measurable, achievable, relevant and timely (SMART) targets and actions.
Recommendation
That the Auckland Development Committee:
a)
note the general progress made in 2014 in regard to the implementation of the
Auckland Plan as reported through the 2014 Auckland Plan Annual Implementation
Update Summary
b)
note that the future reporting of implementation of the Auckland Plan will focus on
progress towards reaching the seven outcomes of the Auckland Plan through the
development and refinement of specific, measurable, achievable, relevant and timely
(SMART) targets and actions.
Comments
Background
4.
When the Auckland Plan was adopted in March 2012 it identified the need to annually report
progress on its implementation. In the past this has been provided through the 2012 and
2013 Auckland Plan Annual Implementation Updates.
5.
For this years update staff have produced the attached Auckland Plan Annual
Implementation Summary document which offers a more concise and reader friendly
summary on progress of implementation of the Auckland Plan.
6.
This is in addition to the 2014 Auckland Plan Annual Implementation Update (AIU) which is
available on the Auckland Council intranet page:
http://acintranet.aklc.govt.nz/EN/planspoliciesreports/plans/aucklandplan/Pages/home or
hard copies will be made available to members of this committee at their request.
7.
The summary document uses a Red, Amber, Green status to monitor progress of the
Auckland Plan actions combined with a list of achievements that have occurred over the
past twelve months under a particular outcome.
8.
The document also summarises progress on the Auckland Plan targets based on data from
the Auckland Plan Targets: Monitoring Report 2014.
9.
Moving forward the development, refinement and use of more specific, measurable,
achievable, relevant and timely (SMART) criteria for reporting purposes will enable staff to
provide more meaningful reports to assist decision making.
10.
In addition to the above reporting approach staff have also identified opportunities to
combine parts of the AIU with the Annual Report which will be investigated more thoroughly
for the 2015 Annual Report.
Page 23
Item 12
Consideration
Local board views and implications
11.
Local Boards have not been directly consulted on this report. They will however receive a
copy of the AIU summary and/or a copy of the full AIU on request
Outcome seven of the summary document A Mori identity that is Aucklands point of
difference in the World identifies areas of progress for Maori.
13.
Te Waka Angamua has had input into the content relating to this part of the summary
document and AIU.
14.
Implementation
15.
The report summary and AIU is undertaken within budgets approved through the Long Term
Plan.
Attachments
No.
Title
Page
25
Signatories
Author
Authorisers
Page 24
Attachment A
Item 12
Page 25
Attachment A
Item 12
Page 26
Attachment A
Item 12
Page 27
Attachment A
Item 12
Page 28
Attachment A
Item 12
Page 29
Attachment A
Item 12
Page 30
Attachment A
Item 12
Page 31
Attachment A
Item 12
Page 32
Attachment A
Item 12
Page 33
Attachment A
Item 12
Page 34
Attachment A
Item 12
Page 35
Attachment A
Item 12
Page 36
Attachment A
Item 12
Page 37
Attachment A
Item 12
Page 38
Attachment A
Item 12
Page 39
Attachment A
Item 12
Page 40
Attachment A
Item 12
Page 41
Attachment A
Item 12
Page 42
Attachment A
Item 12
Page 43
Attachment A
Item 12
Page 44
Attachment A
Item 12
Page 45
Attachment A
Item 12
Page 46