(ATS) AUTOMATIC TRANSFER

SWITCH
JOB-NO.
CUSTOMER
PROJECT
DRAWING

A.

2.
3.
4.

Revision:

ITEM(S)
Check the equipment tag number is correct against the tag number
shown on the One Line Diagram and the equipment data sheet.
Check the nameplates against, the One Line Diagram and the
equipment data sheet.
Verify that all internal control and instrumentation terminations are
securely and properly connected.
Verify that all control wires terminal markings are properly and clearly
printed. No visible signs of hand markings.

6.

Verify that all components (e.g. MCB, CT, CPT/VT, relays, fuses, etc.)
are installed properly.
Verify that the incoming power connections / lugs are properly secured
Verify that control wirings are correctly and properly identified.
Verify that the cubicle is clean and free from debris.

10.

MECHANICAL TEST

11.

Check switch to insure positive interlock between normal and alternate


sources.
Check tightness of all cable connections and bus joints.

12.

Perform manual transfer operation.

13.

Verify that all internal control and instrumentation terminations are


securely and properly terminated.

C.

ELECTRICAL TEST

14.

Verify continuity of all power and control leads.

15.

Verify that the Overload Reset button operates freely and correctly.

16.
17.

Carry out Current Transformer (CT) and Voltage Transformer (VT)


Tests. ( Attached computer generated test reports affixed with QC stamped)
Perform automatic transfer by simulating loss of normal power.

18.

Perform automatic transfer by return to normal power.

19.

Monitor and verify correct operation and timing Normal Voltage sensing
relays.
Monitor and verify correct operation and time delay upon transfer.

20.
21.
22.

March 28, 2011

PANEL TAG NO.


NO OF SECTIONS
INSPECTION REF:
SHOP ORDER NO.

Verify that the number of sections is correct.

B.

Date:

5.

7.
8.
9.

EEICQC-F-34

VISUAL TEST

S/N
1.

Ref.

Monitor and verify correct operation and timing of Alternate voltage


sensing relays.
Monitor and verify correct operation and timing of Automatic transfer
operation.

Page 1 of 3

Done

STATUS
Not
Done

Date

(ATS) AUTOMATIC TRANSFER


SWITCH
23.

Ref.
Revision:

26.
27.

Carry out Hi-Pot Test.

28.

Verify that the Ammeter is accurately calibrated by current injection.

29.

Verify that the Voltmeter is accurately calibrated by voltage application.

30.

Carry out a complete functional check of the Control Scheme.

25.

Date:

Monitor and verify correct operation and timing of mechanical and


electrical interlocks and limit switches
Monitor and verify correct operation and timing, of time-delay and
Re-transfer upon normal power restoration.
Verify that space heaters have been correctly installed operate
properly.(if applicable as per customers request or approved data
schedule)
Carry out Insulation Resistance Test.

24.

EEICQC-F-34
March 28, 2011

* N/A Not Applicable

D.

One Minute Insulation Resistance Test

Test Equipment: SEFELEC

Serial No.: 677

Cal Due Date:

Resistance Test Results (Test Voltage = 1000Vdc)


Test Description
AB+C+
Ground

E.

BA+C+
Ground

CA+B+
Ground

PHASE TO PHASE
A - B

B - C

C - A

Pass / Fail

Over-potential Withstand (Hi-Pot) Test Method and Results

Test Equipment: BAUR

Description

Rated AC
Voltage (V)

Serial No.:
071325002
Test Voltage
( 2.5 KVac)

Time

AB+C+
Ground
BA+C+
Ground
CA+B+
Ground

Page 2 of 3

Cal Due Date:


Measured
Leakage
Current

PASS / FAIL
(Pass if no disruptive
charge or flashover)

(ATS) AUTOMATIC TRANSFER


SWITCH

Ref.

EEICQC-F-34

Revision:
Date:

1
March 28, 2011

Test Voltages and Minimum Acceptable Resistance


(NETA 1990 TABLE 10.1 P.190)

Max Equip Rating (V)

Minimum Test Voltage (dc)

Minimum Acceptable Resistance


(M)

250
600
5000
8000
15000
35000

500
1000
2500
2500
2500
15000

25
100
1000
2000
5000
100000

Dielectric tests ANSI/IEEE C37.20.2 ANSI/IEEE C37.20.1 & C37.20.3 Metal-Clad, Station-Type Cubical
and Metal Enclosed MV Switchgear, C37.23 Bus, Outdoor Circuit Breakers, and ANSI C37.32 Air
Switches
Power Frequency Field
Reference DC Field Test Voltage for 60 seconds
Rated Maximum
Test Voltage for 60 sec.
duration
Voltage AC
duration
4.76 kVac
14.25 kVac
20.25 kVdc
8.25 kVac
19.5 kVac
27.75 kVdc
15 kVac
27 kVac
37.5 kVdc
15.5 kVac
37.5 kVac
52.5 kVdc
25.8/27 kVac
45 kVac
38.0 kVac
60 kVac
72.5 kVac
120 kVac
*Notes:
1.

The presence of the column headed 'dc withstand' does not imply any requirement for a dc withstand test on ac
equipment. The column is given as a reference only for those using dc tests and represents values believed to
be approximately equivalent to the corresponding power frequency withstand test values specified for each class
of bus.

2.

Direct current withstand tests are recommended for flexible bus to avoid loss of insulation life that may result
from the dielectric heating that occurs with rated frequency withstand testing.

3.

Because of the variable voltage distribution encountered when making 'dc withstand tests' and variances in
leakage currents associated with various insulation systems, the manufacturer should be consulted for
recommendations before applying 'dc withstand tests' to this equipment.

COMMENTS

QUALITY CONTROL ENGINEER

CUSTOMER

Page 3 of 3

DATE