Escolar Documentos
Profissional Documentos
Cultura Documentos
Question
Are You Going to Do Something Corny
Again This Year?
Question
What is the first thing that comes to mind
when you think Drury Lane?
Agenda
8:15
8:45
9:30
10:15
10:30
11:30
12:00
12:45
1:30
2:00
3:00
PechaKucha
From Wikipedia
A presentation style developed by a
Japanese architecture firm in which 20 slides
are shown for 20 seconds each. The format
keeps presentations concise and fastpaced
My Inspiration:
PechaKucha Presentation #1
Becoming
The Choice for Collection System Solutions
1990 - CASSWORKS
2014 - GATAR
The Future???
PechaKucha Presentation #2
Inflow and Infiltration
Inflow
Rain or Surface Water that Finds Direct
Entrance by Way of Downspouts, Sump
Pumps, Manholes, and Catch Basins
Infiltration
Groundwater that Enters through
Defective Pipes, Manholes, or Building
Connections
I/I In a Hydrograph
Inflow - Downspouts
Inflow - Cleanouts
Lateral Defects
Mainline Defects
Flow Migration
PechaKucha Presentation #3
Sanitary Sewer Evaluation Survey
Flow Monitoring
Manhole Inspections
Smoke Testing
CCTV
Building Inspections
Dyed Water Flooding
Velocity Probe
Pressure Sensor
Ultrasonic Sensor(s)
Desiccant
Antenna
We Calculate Flow
V
Q = Flow = A*V
With No Velocity, We Can
Approximate with Manning, But
NO DEPTH, NO DATA
Depth Varies Exponentially (r2)
Velocity is 1:1
Must have Depth to Calculate Q
Installation
Proper Installation prevents debris buildup and extends
the life of the installation and equipment
Calibrations
~At least 4-5 throughout the
duration of any metering period!
Multi-point Profile
Depth
Velocity Profile
Manhole Inspections
Quick Inspections
Surface Inspections
Full-Depth Entry Inspections
Rehabilitation Focused Inspections
Smoke Testing
SINGLE Blower
DUAL Blower
26
16
29
100
Area Drains/Downspouts
12
Cleanouts
22
80
TOTAL
67
234
CCTV
Objectives:
Structural integrity
Location of laterals
Technology
Pan and tilt digital camera
3D Laser / Sonar Scanning
Deliverables
Digital video with PACP codes
X/Y Coordinates for defects /
laterals
Viewable through GIS
Televising Prioritization
Flow Quantification
Flow Balance
Flow Balance
Defect Mapping
PechaKucha Presentation #4
Sanitary Sewer Rehabilitation
Manhole Rehabilitation
Mainline Rehabilitation
Lateral Rehabilitation
Easy Private Property Disconnections
Sump Pump Disconnection
Foundation Drain Removal
Internal/External
Chimney Seals
Cement Lining
Epoxy Coating
Chemical Injection
Grouting
Lateral Rehabilitation
Whats your Responsibility?
Rehabilitation Methods
Top Hat
T-Liner
Grouting
Point Repair / Pipe Burst
Funding Considerations
Wet-Weather Storage
Total
Infiltration/Inflow
Start of
Rehabilitation
3
Time - Years
CMOM
Rainbows A Haiku
The End!
ONLY 17 SLIDES!!!