Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units1, 2, 3 & 5 at Matla Power Station
GCD/MTL/SHE/036
22 October 2012
0
COMPILED BY:
Name: Jeffrey Mthimkulu Signature Date ..
Designation: Health and Safety Environmental Manager
Name: Sandra Simelane
Signature Date ..
Designation: Health and Safety Environmental Officer
Name: Itumeleng Serache Signature... Date ..
Designation: C&I Project Supervisor
Accepted By:
Name: Rajesh Ramluckun Signature Date .
Designation: Engineering Manager
Approved By:
Signature. Date ..
Name: Danny Molamu
Designation: C&I Project Manager (Acting)
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure it is
in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
2 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
Contents
Page
1.
Definitions
..
2.
Abbreviations
3.
Introduction
..
..
4.
5.
10
5.1
10
5.2
11
5.3
14
5.4
Legal Compliance ..
15
5.5
SHE Policy
...
15
5.6
15
5.7
Training ....
19
5.8
21
5.9
Project and Site Rules (Zero Harm to People and the Environment) .....
21
5.10
22
5.11
25
5.12
26
5.13
26
5.14
Occupational Hygiene .
29
5.15
30
5.16
Environmental Management
31
5.17
33
5.18
Housekeeping .
35
5.19
Signage ....
36
5.20
36
5.21
39
5.22
41
5.23
Machine Guarding ..
42
5.24
..
42
5.25
44
5.26
45
5.27
Work Stoppage ..
46
5.28
SHE Audits
47
5.29
.....
..
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
47
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
3 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
5.30
52
5.31
52
5.32
53
5.33
SHE File
53
5.34
53
5.35
Hours of Work
54
5.36
Supporting Documents
54
Annexure A
SHE Policy
Annexure B
Annexure C
CR Check List
Annexure D
61
Annexure E
71
Annexure F
78
Annexure G
83
Annexure H
84
Annexure I
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
55
56
57
85
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
4 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
1.
Definitions
Note: where there are no definitions, the Occupational Health and Safety Act, 1993 (Act
No 85 of 1993: OHSA) or its regulations should be referred to.
1.1
Agent: means any external person who acts as a representative for the client and has
formally been appointed as such by the client. (Internal Eskom departments must not
be appointed as agent.)
1.2
1.3
Client: means the Eskom 16.2 appointed person directly involved and for whom
construction work is performed on the basis of a contractual agreement formally
entered into with either an agent or a principal contractor (external to Eskom).
1.4
1.5
1.6
1.8
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
5 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
1.9
Duty of care to the environment: anybody who causes or has caused or may cause
significant pollution or degradation of the environment must take reasonable measures
to prevent such pollution or degradation from occurring, continuing, or recurring. If
such harm to the environment is authorised by law, or cannot reasonably be avoided or
stopped, such person must minimise and rectify such pollution or degradation of the
environment.
1.10
Employee: means a person who performs work for an employer. This includes any
person who has entered into, or works under, a contract of service, apprenticeship, or
learnership with an employer, whether the contract is explicit or implicit, oral or in
writing, whether the remuneration is calculated by time or work done and paid for in
cash or in kind, and includes a situation where such a person is under the control,
instruction, and supervision of Eskom, namely:
1.11
Employer: means any person who employs or provides work for any person and
remunerates that person or expressly or tacitly undertakes to remunerate him/her.
1.12
Environment: means:
1.13
Hazard: a hazard is defined as any real or potential condition that can cause illness,
injury, death, property damage, or loss of equipment or property.
1.14
1.15
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
6 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
1.16
Joint venture: means a strategic alliance between two or more parties to undertake
economic activity together. The parties agree to create a new entity (incorporated or
unincorporated) together by each partys contribution of equity, and they then share in
the profits, losses, and control of the Group Capital Division. The venture may be for
one specific project only or a continuing business relationship.
1.17
Method statement: means a written document detailing the key activities to reduce
the hazards identified in any risk assessment. In the case of internal work, it includes
procedure, safe work procedure, and work standards.
1.18
1.19
substances;
radioactive or other waves; or
noise, odours, dust, or heat,
emitted from any activity, including the storage or treatment of waste or substances,
construction, and the provision of services, whether engaged in by any person or an
organ of state, where that change has an adverse effect on human health or wellbeing or on the composition, resilience, and productivity of natural or managed
ecosystems or on materials useful to people, or will have such an effect in the
future.
1.20
Pre-job briefing meetings: mean a meeting that is held prior to the commencement
of the days work and that is attended by all the relevant staff members associated with
the work task. The job, relevant procedure, associated hazards, and safety measures,
that is, the task risk assessments, must be discussed. Each employee who attends the
briefing must sign the pre-job briefing form. Toolbox talks must be included in the prejob briefing meetings. The toolbox topics will be based on SHE issues pertaining to the
construction site. The topic contents must be in writing.
1.21
1.22
1.23
Project: means an activity or a group of activities that has a defined start and end
date, a defined scope, and a defined sum of money allocated to complete the activities.
1.24
Project manager: means the person who has the responsibility for the successful
planning and execution of a project. The project manager must satisfy the certification
requirements set by the South African Council for the Project and Construction
Management Professions.
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
7 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
1.25
1.26
1.27
1.28
1.29
Safety, health, and environmental plan: means a documented plan that addresses
the hazards identified in the SHE specification and risk assessments of the project work
activities of principal contractors and subcontractors. This plan must include any
required method statements, safe work procedure to mitigate, reduce, or control the
hazards identified, SHE rules, and monitoring procedure. It is specific to each
construction project undertaken and site where work is done, is compiled by the
principal contractor or subcontractor, and must be approved by the client or agent prior
to the commencement of any construction activities on a project. The principal
contractor and the client (or agent, where applicable) must both be signatories to the
SHE plan once negotiated, agreed, and accepted. This plan has to be regularly
updated to take account of any changes in project scope and unanticipated conditions.
1.30
Site: means a specific project site, or the site where the contractor does the work.
1.31
Structure: means:
(a) any building, steel or reinforced concrete structure (not being a building), railway
line or siding, bridge, waterworks, reservoir, pipe or pipeline, cable, sewer,
sewage works, fixed vessels, road, drainage works, earthworks, dam, wall, mast,
tower, tower crane, batching plants, pylon, surface and underground tanks, earth
retaining structure or any structure designed to preserve or alter any natural
feature, and any other similar structure;
(b) any form work, false work, scaffold, or other structure designed or used to
provide support or means of access during construction work; or
(c) any fixed plant in respect of work, which includes the installation, commissioning,
decommissioning, or dismantling, and where such work involves a risk of a
person falling two metres or more.
1.32
The Act: means the Occupational Health and Safety Act, No 85 of 1993.
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
8 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
Abbreviations
2.1
2.2
2.3
2.4
NDE:
2.5
2.6
2.7
2.8
2.9
2.10
2.11
SACPCMP:
Professions
2.12
2.13
2.14
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
9 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
3.
INTRODUCTION
The Scope of the project includes the supply of the supply and delivery of steam pipes for
attemperator system for units1, 2, 3 & 5 at Matla Power Station. All work will be done
under Occupational Health and Safety Act, No. 85 of 1993 and applicable Regulations.
Please take note of the legal requirements of the construction regulations as per
checklist attached (Annexure C). The required documentation must be submitted before
commencement of work. Every contractor doing work for GCD Matla Power Station
Refurbishment Project will comply with all relevant legislation governing Health, Safety
and Environment.
All contractors are expected to provide the GCD Matla Power Station Refurbishment
Project Manager with a suitable, practical, well-documented and workable health and
safety plan for approval. No contractor will be allowed to enter GCD Matla Power Station
Refurbishment before the SHE plan is approved.
All contractors shall comply with the requirements of the OHS Act and its regulations as
well as the conditions of the contract.
In terms of Section 37 (2) of the OHS Act and the contract, every contractor will be
responsible and accountable for his own employees and will comply with the
requirements of the Occupational Health and Safety act, the relevant regulations and the
contract at all times. (Annexure B)
The GCD Matla Power Station Refurbishment Project team has the right to suspend,
terminate or refuse any access permit or the permission to drive a motor vehicle on site
at any time for any valid SHE related reason.
The GCD Matla Power Station Refurbishment retains the right to audit and / or inspect
any principal contractor or contractor at any reasonable time. Periodical audit s on all
contractors will be done on a monthly basis by GCD Matla Power Station Refurbishment
Project team. All Principle contractors and their contractors health and safety plans shall
first be approved by GCD Matla Power Station Refurbishment Project Manager before
being allowed on site.
4.
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
10 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
5.
SHE SPECIFICATION
5.1
5.1.1
Location: Matla Power Station is situated near Kriel town in the province of
Mpumalanga, South Africa GPS Location - 02617.29S, 02908.61E
5.1.2
The contract document and works information form part of this enquiry package.
5.1.3
5.1.5
Programme details:
5.1.5.1
For Evaluation and Assessment of the Cycle of the SHE Plan: 2 weeks prior to
commencement of work.
5.1.5.2
Time allowed for preparation of SHE plan: 2 weeks prior to proposed starting date.
5.1.5.3
5.1.5.4
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
11 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
5.1.6
Site Details:
5.1.6.3
Matla Power Station is situated near Kriel town in the province of Mpumalanga, South
Africa. Postal Address is GCD Matla Power Station, Private Bag X5012, Kriel 2271
5.2
5.2.1
5.2.2
5.2.3
PROJECT SUPERVISOR:
NAME: Itumeleng Serache C&I Project Supervisor
The site manager/supervisor is a delegated responsible person appointed in terms of
the OHS Act by the Section 16(2) delegated responsible person. He is responsible for
the overall management of the project on-site and is accountable to the
Discipline/Contract Project Manager.
5.2.4
DESIGNER:
NAME: Tshifhiwa Musetsho Engineer
The Designer is the person responsible for the overall management of the project
design as well as ensuring the management of the compliance of the completed works
to the design during and after construction on site.
5.2.5
PROJECT ENGINEER:
NAME: Rajesh Ramluckun Project Engineering Manager
The Project Engineer is the person responsible for ensuring that the designer fulfils his
professional and legal obligations with respect to the implementation of his design.
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
12 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
5.2.6
5.2.7
5.2.8
PRINCIPAL CONTRACTORS
The Principal Contractor carries primarily accountability and responsibility for the health
and safety of his/her employees and his/her sub-contractors within his/her working
area, as contemplated by Section 37(2) of the OHS Act (Annexure B). None of the
additional safety requirements specified by the Client/Agent reduces the Principal
Contractors accountability and responsibility for the health and safety of his employees
and sub-contractor employees within his working area.
5.2.9
The Principal Contractor shall ensure that the performance of all specified work is
supervised throughout the contract period, by a sufficient number of competent
appointed representatives of the Principal Contractor and/or sub-contractor, who
have experience in the type of work specified.
Note:
It must also be noted that the required appointed Construction Supervisor (OHS
Act CR 6.1) may not leave the site unless there is a sufficient number of
appointed competent subordinate supervisors (OHS Act CR 6.2) on site to
assist with supervision.
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
13 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
c)
d)
e)
The Principal Contractor shall ensure that his managers and supervisors give
clear and unambiguous instructions for the work in hand to the personnel for
whom they are responsible for. The instructions shall include, but not necessarily
be limited to:
5.2.11.1 The Principal Contractor is responsible for adequately informing his employees and
sub-contractors of all relevant information of the Eskom issued SHE specifications
and the Principal Contractors SHE plan.
5.2.11.2 Employees are responsible for their own health and safety and that of their coworkers in their area. They must be made aware of their responsibilities during
induction and awareness sessions some of which are:
Familiarising themselves with their workplaces and health and safety procedure.
Working in a manner that does not endanger them or cause harm to others.
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
14 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
Carrying out lawful orders and obeying health and safety rules.
5.2.11.3 Every employee must undergo site induction provided by the Client/Agent before
commencement of the contracted work. Only once this induction has been received,
will each employee receive a site access permit.
5.2.11.4 It must be highlighted to all employees, that anyone who becomes aware of any
person disregarding a safety notice, instruction or regulation shall immediately report
this to the person concerned. If the person persists, stop the person from working
and report the matter to the Eskom Site/Project Manager and the Principal Contractor
Supervisor immediately.
5.2.11.5 No person shall damage, alter, remove, render ineffective, or interfere with anything
that has been provided for the protection of the site, or for the health and safety of
persons.
5.2.11.6 No person under the influence of alcohol, drugs or medication (in a state of
intoxication) or any other condition that may render him incapable of controlling
himself or of other persons under his charge shall be allowed to enter the site.
5.2.11.7 All safety and warning signs must be obeyed at all times.
5.2.11.8 Entering or leaving the Site may only be done via the official designated walkways,
do not take short cuts. Follow designated walkways to and from your work place.
Walk, do not run, and be alert for motor vehicle traffic and mobile equipment.
5.2.11.9 All employees must adhere to the SHE and other site specific rules.
5.2.11.10 If any of the Principal Contractors employees or his sub-contractor employees has
transgressed any of the requirements of the SHE Specification, SHE plan or site
rules, then the employee will be removed from site and his/her site access revoked.
The Principal Contractor must follow a process of disciplinary action which shall
include re-training/inducting the employee (at the cost of the Principal Contractor)
and provide proof thereof to the Eskom site/Project Manager and upon the
satisfaction of the Eskom Site/Project Manager will the employee be allowed back
on site.
5.3 COMPLIANCE AND NON-CONFORMANCES
As legislation forms part of any countrys legal system, the Client/Agent requires all of
its Contractors to comply with legislation as part of the contract. All expenses to the
Contractor, which result from compliance with this legislation as well as special
requirements specific to the site, will be for the Contractors account.
Should the Principal Contractor appoint a sub-contractor, the Principal Contractor
would then have the same role and responsibility in relation to the sub-contractors, in a
similar way as the Client has in relation to the Principal Contractor.
The Client/Agents representative reserves the right to stop work and issue a nonconformance report whenever safety, health or environmental violations are observed
for both Principal Contractors and/or their sub-contractors. Expenses incurred as a
result of such work stoppage and standing time shall be for the Principal Contractors
account.
Any
non-conformances/findings/observations
found
in
these
audits/inspections on sub-contractors shall be raised and discussed with the relevant
Principal Contractor (with whom the sub-contractor is contracted with).
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
15 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
The Constitution of the Republic of South Africa (particularly Section 24 of the Bill of
Rights).
Occupational Health and Safety Act 1993 (Act 85 of 1993) and its Regulations.
National Environmental Management Act 1998 (Act 107 of 1998).
Environment Conservation Act 1989 (Act 73 of 1989).
National Water Act 1998 (Act 36 of 1998).
Conservation of Agricultural Resources Act 1983 (Act 43 of 1983).
Civil and Building Work Act.
COID Act.
Any other applicable South African legislation.
Applicable South African National Standards (SANS).
Applicable international standards.
Plant Safety Regulations (Low Voltage Regulations) GGR 0992 Rev 1.
It is the duty of the Principal Contractor and sub-contractor to ensure that they are
familiar with the necessary SHE legislation required.
The Principal Contractor shall compile a legal register listing all applicable legislation
and standards that may have an impact on the scope of work that they are performing
on the construction project. The register shall be updated on a regular basis.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
16 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
not applicable should be made, but should an appointment become applicable during
the duration of the contract work, then these appointments are to be made available)
5.6.1
The Principal Contractor shall ensure that all their appointees are made aware of their
accountabilities and responsibilities in terms of their appointment, and to advise and
assist these appointees in the execution of their duties.
5.6.2
Appointment letters and competency certificates which are signed by the OHS Act
Section 16(1) or 16(2) appointee which refers to the relevant training certificates and
proof of experience of appointees must be submitted with the Health and Safety Plan.
5.6.3
All minimum required training that is stipulated below are to be provided by accredited
training service providers.
5.6.4
The Principal Contractor shall ensure that competent persons are appointed in writing
in accordance with the following applicable appointments:
5.6.4.1 OHS Act, Section 16(1) Chief Executive Officer (only the details of Chief Executive
required).
5.6.4.2 OHS Act, Section 16(2) Assistant to Chief Executive Officer.
5.6.4.3 OHS Act, Section 17 Health and Safety Representative.
Staffing
One trained Health and Safety Representative for every 20 employees or part
thereof.
To be elected and appointed per work area and discipline and comply with OHS Act
Section 17 and 18 and GAR Section 6.
Competencies/Training
Competencies for Short Term Contractors (working on site for less than 30 days)
Indicate which competent person will perform these duties:
o
o
o
o
5.6.4.5 OHS Act, Section 19 Health and Safety Committee Member (if there are 2 or more
Health and Safety Representatives then there will be a Health and Safety committee)
5.6.4.6 Chairperson of Health and Safety Committee
5.6.4.7 OHS Act, GSR 3 First Aiders
Staffing
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
17 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
One first-aider trained to Level 2 per team (as per OHS Act or project risk profile of
workers.)
Competencies/Training
In possession of a valid level 2 first aid certificates issued by any one of the following:
The SA Red Cross Society; the St Johns Ambulance; the SA First Aid League; or a
person or organisation approved by the Chief Inspector for this purpose
5.6.4.8
5.6.4.9
5.6.4.10
5.6.4.11
5.6.4.12
5.6.4.13
5.6.4.14
5.6.4.15
5.6.4.16
5.6.4.17
5.6.4.18
5.6.4.19
Competencies/Training
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
18 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
5.6.4.20
For those contractors that do not meet the minimum competencies: full
compliance to the above competencies would be expected within 6 months after
the contract is placed. A weekly status report on meeting 100% compliance
shall be submitted to the SHE Manager/Practitioner for tracking.
5.6.4.21
5.6.4.22
5.6.4.23
OHS Act, CR 8 (1) (a) Competent person to Compile Fall Protection Plan
5.6.4.24
5.6.4.25
5.6.4.26
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
19 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
5.6.4.27
5.6.4.28
5.6.4.29
5.6.4.30
5.6.4.31
5.6.4.32
5.6.4.33
5.6.4.34
OHS Act, CR 19 (2 )(g) (i) Person responsible for issuing and collection of
Explosive Powered Tools cartridges and nails or studs
5.6.4.35
OHS Act, CR 21(1) (j) Construction Vehicle and Mobile Plant Inspector
5.6.4.36
5.6.4.37
5.6.4.38
5.6.4.39
5.6.4.40
5.6.4.41
5.7
TRAINING
The scope of the training includes but is not limited to the type of work being performed
and the relevant procedure. It is a requirement that the Principal Contractors and sub
contractors employees shall have the appropriate qualifications, certificates and
tickets, and are under competent supervision. Records of all training and qualifications
of all contractor employees must be kept. The Contractor shall maintain comprehensive
records of all employees under his/her control (including all employees of the subcontractor) attending induction training. Acknowledgement of receiving and
understanding the induction must be signed by all persons receiving the induction
respectively.
When there is an amendment to the Acts and/or to the regulations, SHE specification
and SHE plan, all affected staff shall undergo the relevant re-training.
5.7.1
General
The Principal Contractor shall ensure that all his employees and his contractors
employees working on the site are adequately trained in the type of work/tasks to be
performed. The training shall extend to include relevant procedure, hazard identification
and risk assessment. They shall have the appropriate qualifications, certificates and
tickets, and are under competent supervision. Copies of records of appropriate training
and qualifications for all employees must be kept and maintained.
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
20 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
5.7.2
Site Induction
The Principal Contractor shall ensure that all his employees, agents and contractors
have undergone the Project safety induction programme prior to commencing work on
site.
Appropriate time must be set-aside for training (induction and other) of all employees.
Prior to induction all employees must undergo a pre-employment medical examination
in accordance to the man-job- specification and found fit for duty. An original copy of
the certificate of fitness must be presented for permanent record at the induction centre
and kept at site offices for permanent record.
All employees and visitors on site shall carry the proof of induction training.
5.7.3
5.7.4
5.7.5
Visitors to Site
Visitors to the site shall be required to undergo and comply with Client/Agents sitespecific safety induction requirement prior to being allowed access to site.
All visitors must remain in the care and custody of a person (host) who has been
properly inducted. No visitors are permitted to undertake any construction work, of any
nature.
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
21 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
5.9
PROJECT AND SITE RULES (ZERO HARM TO PEOPLE AND THE ENVIRONMENT)
The objective of this section is to define the rules that are over and above the internal
regulations and procedure of Eskom and relevant legislation which will ensure zero
harm to persons and the environment. These rules will be specific to the project and
site.
Group Capital Divisions Division Life-saving Rules
There are 5 Life-saving rules that have been identified for the Group Capital Divisions
Division. Failure to adhere to these rules by any Eskom Group Capital Divisions
Division employee or employee of a Principal Contractor or sub-contractor will be
considered a serious transgression. These rules are being implemented to prevent
serious injury or death of any employee, labour broker or contractor working in any
area within the Group Capital Divisions Division.
The rules are:
Rule 1: Open, isolate, test, earth, bond, and/or insulate before touch.
Rule 2: Hook up at heights.
Rule 3: Buckle up.
Rule 4: Be sober.
Rule 5: Permit to work.
GCD Matla operates from a zero tolerance stance regarding these rules.
Any non compliance to any health and safety requirement in this SHE specification is
subject to discipline/removal of person from the project site.
Non compliance to a Life-saving rule will be considered serious misconduct and will
lead to serious disciplinary action, which may include dismissal.
This is to ensure that every person who works on or visits any Group Capital Divisions
Division work site returns home safely to his or her family.
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
22 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
No person will:
Ignore any instruction given to him in the interest of Health ant Safety.
Use Eskoms or any contractors tools and equipment without proper authorisation. (If a
contractor uses Eskom tools or equipment he will be responsible and accountable for
the condition and safety of that tool or equipment).
Clean oil or adjust machinery whilst in motion.
Allow an unqualified person to do electrical repairs or alterations or to operate any
machine unless they have been trained to do so.
Allow electric cables to run through water. Electric cables are to be suspended.
Home-made or defective tools must not be used.
Do not handle any substance (e.g. gas, liquids) or equipment that you have not had
permission to use.
Do not sit on the sides of the vehicle; sit on top of materials in the back of the vehicles,
crowd onto or climb on or off moving vehicles.
Wander around in any other area that is not his or her working area.
Tamper with any Health and Safety precautions or any Safety Installation.
Run at any time, except in the case of an emergency.
Fool around or play on site
Bring alcohol or illegal drugs onto site.
Be under the influence of alcohol or illegal drugs on site.
Bring any weapons onto site.
Blow himself down with compressed air.
Tamper with any incident or accident scene before permission is given by Eskom.
It is the responsibility of the Principal Contractor to ensure that his/her employees and SubContractor employees are conversant and comply with these rules.
5.10
provide method statements or written safe work procedure for all the Contractor
activities.
ensure that emerging risks and hazards are managed during construction work.
ensure that activity based risk assessments are conducted by an appointed and
competent person.
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
23 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
(a)
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
24 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
The work at Matla Power Station will be executed on an existing plant. All work will be
carried out under Eskom Plant Safety Regulations system (GGR 0992) which shall be
complied with in full at all times
No contractor will be allowed to tap into any system without a safe work permit
(b)
In identifying hazards and potentially hazardous work operations, for each work
operation identified, the Contractor shall supply Risk Assessment, which shall:
Describe the operation to be performed in the sequence of the basic job steps.
The principal contractor shall provide method statements and written safe work
procedure for all activities.
During construction work, the Principal Contractor, his Sub-Contractors or the Eskom
Representative may identify emerging hazards and risks. For each such newly
identified hazard or risk, the Eskom Project Manager shall review the baseline site
hazard identification and the relevant section/s SHE specification. The revised SHE
specification and hazard identification shall be submitted to the Principal Contractor
who will review his own risk assessments and relevant sections of the SHE plan, as
well as those of the sub-contractors. The Principal Contractor will prepare and submit
to the Eskom Project Manager, both documents for approval.
The Principal Contractor and his Sub-Contractors shall not proceed with the
work/operation in hazardous areas until the Client/Agents representative has reviewed
the Risk Assessment and has approved and signed the revised SHE plan and issued a
valid permit to work and work as per Eskoms Plant Safety Regulations
The Contractor shall on a daily basis and for every task to be performed, conduct a pretask risk assessment with all employees involved with the task(s). The pre-task risk
assessment will form the basis of the daily pre-job brief/toolbox talks prior to the start of
work. Proof of communication as well as confirmation that it was received and
understood by all will be noted on a standard form, which will be kept at the job site
during the job execution. The completed signed pre-task risk assessment form will be
filed in the Principal Contractors safety file.
(c)
Activity based risk assessments must be conducted and approved by the Principal
Contractors competent person/ GCD SHE office before any activity begins and must
be updated regularly to ensure its relevance to changing scope and/or circumstances.
The intent is Zero Tolerance of unsafe acts and conditions on the construction site
through the assessment of risk of each operation executed by the Principal Contractor
and the provision of the necessary means to eliminate or minimise the risk to ensure a
healthy and safe working environment.
The process involves input from the site manager, supervisor(s), safety practitioner,
and the specialist artisans for the job as well as the health and safety representative for
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
25 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
the workplace concerned. Additional operation specific risk assessments are required
for certain tasks throughout the project.
Guidelines for actual steps involved in an operation specific risk assessment are:
5.11
All known documentary and supervisory controls are listed. For instance: What Safe
Work Procedure exist for scaffolds and ladders;
In the event of deficient controls for the particular activity. Actions to be taken will be
recorded and safe working procedure drawn up;
Persons responsible for implementing and supervising the task are to be identified.
Nominated and duly assigned;
Persons responsible for monitoring the task and carrying out the Planned Job
Observation must be nominated;
The relevant section of the risk assessment is to be issued with a Transmittal Note
to the Supervisor nominated as the responsible person; and the
Names of workmen who have received instruction on the work content and the
sequence of the activities listed in the risk assessment are to be recorded, obtain
their confirmation of comprehension of their roles (signature or other markings).
This instruction must be done through an interpreter if required and recorded on the
Pre-Job Brief (Daily Safe Task Instructions), with reference to applicable Risk
Assessments.
Reviewing a procedure when problems have been identified, e.g. from near miss
incidents or an accident/incident investigation.
The supervisor for the task or job and the employees who will undertake the task;
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
26 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
5.12
The control measures that have been built into these tasks;
Actions to be undertaken to address safety issues that may arise while undertaking
the task.
Ensue that permanent and adequate on site supervision is available for the entire
duration of the work that is being conducted.
b)
Ensure the use of safety standbys in areas of high risk activities, and activities
that fall within the scope of the permit to work system.
c)
Provide, erect and maintain all the required barricading, lighting, flags, flashing
lights, or other safety control equipment to enable operations to proceed in a safe
manner;
The Principal Contractor shall maintain, at all times, defined access ways, which is
clear of objects or obstructions, so as to allow for emergency vehicle entry.
The Principal Contractor shall provide any temporary protective shielding required for
protecting nearby operations from the construction activities, at his own cost.
5.13
The Principal Contractor must ensure that his employees and sub-contractor
employees shall be registered on a medical surveillance programme and shall be in
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
27 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
The Principal Contractor must ensure that his employees and sub-contractor
employees have undergone pre-entry medical examination before starting work on
site should it be for longer than three (3) days. An exit medical examination must be
done by all employees before leaving site.
The certificate shall be renewed annually (for employees who are not office bound
including drivers) and once every 3 years (for employees that are office bound)
(until completion of the project) at which stage an exit medical examination shall be
conducted, unless otherwise advised by the Occupational Health Practitioner.
All employees shall be issued with the required medical records to prove medical
status at the time of exiting the construction project.
The principal contractor shall provide a documented process for managing those
employees who are issued with a conditional certificate of fitness.
In instances where sick leave is taken for a period of one week or more, the
contractor shall institute an arrangement that employees need to sign a declaration
indicating that they did not suffer any illness or injuries which occurred in the period
of absence, which may affect his ability to work on site.
The Group Capital Divisions Division has established a contract with Euro
Assistance for all employees and its contractor employees for emergency medical
assistance incurred whilst on duty anywhere in South Africa. The telephone number
is 0861 2ESKOM or 0861 237566.
The Matla Power Station emergency number is x6666 or 7911. This emergency
number shall be used to activate the Emergency Response Team in emergency
situations only.
Contractors shall have one first aid box for the first 5 persons and thereafter one for
every 50 or team of workers on site or part thereof.
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
28 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
More first aid boxes shall be provided if the risks, distance between work teams or
workplace requirements require it (it should be available and accessible for the
treatment of injured persons at that workplace).
Minimum contents of a first aid box (Include the first aid treatment register in each
first aid box):
In the case of shops and offices, the quantities stated under items 1, 8, 9, 10, 14, 15,
17 and 18 may be reduced by half.
Item 1: Wound cleaner/antiseptic (100ml).
Item 2: Swabs for cleaning wounds.
Item 3: Cotton wool for padding (100 g).
Item 4: Sterile gauze (minimum quantity 10).
Item 5: 1 Pair of forceps (for splinters).
Item 6: 1 Pair of scissors (minimum size 100 mm).
Item 7: 1 Set of safety pins.
Item 8: 4 Triangular bandages.
Item 9: 4 Roller bandages (75 mm X 5 m).
Item 10: 4 Roller bandages (100 mm X 5 m).
Item 11: 1 Roll of elastic adhesive (25 mm X 3 m).
Item 12: 1 Non-allergenic adhesive strip (25 mm X 3 m).
Item 13: 1 Packet of adhesive dressing strips (minimum quantity, 10 assorted
sizes).
Item 14: 4 First aid dressings (75 mm X 100 mm).
Item 15: 4 First aid dressings (150 mm x 200 mm).
Item 16: 2 Straight splints.
Item 17: 2 Pairs large and 2 pairs medium disposable latex gloves.
Item 18: 2 CPR mouth pieces or similar devices.
Where services are not available from the medical centre or where there is no
medical centre, the Principal Contractor shall make alternative arrangements for
any medical assistance. Proof of this must be made available in the Principal
contractors SHE Plan.
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
29 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
5.14
OCCUPATIONAL HYGIENE
Occupational hygiene factors and stresses are those that effect a person over a long
period of time e.g. noise - results in deafness during old age, exposure to asbestos
could result in Asbestosis in due time.
NOISE
All employees who are exposed to noise must be educated and made aware of the
harmful effects of long-term exposure to noise.
They must be provided with approved hearing protection where necessary and
record must be kept of such issues.
Noise areas must be demarcated with the appropriate signboards. The following
areas should be considered, e.g. where compressors, jackhammers, explosive
tools, riveting tools, etc. are used.
Acuity hearing tests shall be done on all employees prior to the commencement of
work. Records of such tests shall be available on site.
Equipment/ machinery shall be well maintained to eliminate/ reduce vibration and
noise. Quitter equipment/ machinery should be purchased where possible.
HEAT
When employees are working in hot conditions, clean cool drinking water must be
supplied with easy access to all workers.
Employees must be made aware of the dangers of heat exhaustion/stroke and the
signs and symptoms of impeding heat collapse.
Frequent and extended rest periods must be provided in accordance with the
Occupational Health and Safety Act.
NB! Salt tablets will not be used.
ILLUMINATION
DUST / ABSESTOS
All employees must be made aware of the inherent dangers of asbestos dust.
Employers must take such measures as may be necessary to decrease the
generation of dust and post warning signs.
The use of thermal Insulation Materials containing Asbestos is not allowed at Matla
Power Station. Where any process necessitates the breaking up, grinding,
pulverising, crushing or cutting of Asbestos cement products the Project Leader
must be notified immediately of the quantity and location.
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
30 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
Herbicide register for usage to be compiled and maintained, and a copy handed to
the project leader / environmental advisor on completion of the project / contract.The
application of herbicides to be in accordance with the Fertilizers, Farm Feeds,
Agricultural Remedies and Stock Remedies Act No. 36 of 1947.
awreness
or
Only approved and tested herbicides with a low environmental risk shall be used.
Only registered pest control operators may apply herbicides on a commercial basis. All
staff applying herbicides must be trained in the application of herbicides.
5.17.2 Fire hazard
The Contractor shall ensure that staff are educated in fire prevention and will be held
responsible to avoid the risk of fire. No area is to be denuded of vegetation to create
firebreaks, to prevent or make fires. No open fires are allowed on site. The contractor
must ensure that operations are in compliance with statutory requirements at all times.
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
31 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
5.17.3 Waste
A register of hazardous waste. A waste plan is to be compiled before commencing of
work. A register of hazardous waste. Keep record of disposal. No waste, whether it be
biodegradable or not, is to be left on site once work has ended. Domestic and hazardous
waste generated will not be burned, buried, or disposed of on GROUP CAPITAL
DIVISIONS DIVISION or other Landowners property but will be controlled and removed
to a registered waste site on a regular basis. (Daily / Weekly). The contractor and subcontractor working on site must ensure that oil, fuel, and chemicals are confined to
specific and secure areas throughout the construction period. These materials must be
stored in a bunded area with adequate containment for potential spills and leaks.
Contractors must ensure that sufficient waste bins / containers are made available for
waste control.
5.16.4 Material requirement
The use of any material or property belonging to a specific Landowner will not be
undertaken prior to arrangements with the applicable Landowner. Written proof of such
agreement to be handed to project leader / co-coordinator for record keeping
5.16.5 Dust and Noise
The Contractor shall monitor dust and noise caused by mobile equipment, generators
and other equipment during construction. Factors such as wind can often affect the
intensity to which these impacts are experienced.
To ensure that noise does not constitute a disturbance during construction activities, all
construction works shall occur between specific working hours. This must be stipulated
in the contract.
Mitigation measures to be implemented as required / agreed upon with the project
leader / environmental advisor.
Dust suppression measures must be in place to reduce the dust caused by the
movement of heavy vehicles.
5.16.6 Environmental Incidents
All environmental incidents such as pollution (air, water, land, noise, etc.), bird kills,
animals killed, plants destroyed, public complaints etc. must be reported to project
leader and / or environmental advisor within 24 hours of its occurrence.
All environmental incidents occurring on site must be recorded, detailing how each
incident was dealt with. Proof thereof must be kept in an incident register.
The Contractor will be held liable for any infringement of statutory requirements of the
Environmental Conservation Act, No 73 of 1989, or any other relevant legislation.
5.16.7 Water
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
32 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
No construction is allowed within the 1:100 year floodlines. Should any pollution of the
watercourse occur, the Department of Water Affairs and Forestry must be notified
immediately.
Water usage on site to be verified with the substations/powerstations responsible
person, the project leader / environmental advisor to ensure compliance with legislation.
Bore hole water must be verified for human consumption fitness. All incidents related to
water contamination to be reported within 24 hours.
Chemical toilets may not be within close proximity of the drainage lines / ways.
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
33 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
No sediment generated is permitted to escape into the drainage system and/or local
storm water system.
No harmful solids or liquids are permitted to spill from containers whilst in transit on
the premises.
All oil-based waste material shall be kept segregated and placed in sealed 200 litre
drums. This material shall be disposed of through a recognised oil recycling
company.
All water-based waste material shall be kept apart. Small amounts shall be
collected and stored in 200 litre containers. Large amounts shall be pumped into a
bulk tanker for disposal. Prior to disposal, all water-based material shall be sampled
to allow analyses to be carried out.
He/she and their passengers wear seat belts whilst the vehicle is in motion.
Ensure that vehicle loads are properly secured and loaded onto vehicles.
Watch out for pedestrians when approaching stationary buses/vehicles (Do not
overtake a bus picking up or people alighting from it)
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
34 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
Fitted with fixed and firmly secured seats with seat belts adequate for the
number of passengers being transported;
The driver and all passengers to be seated with seatbelts fastened whilst the
vehicle is in motion,
Tools, equipment and material to be secured in order to prevent movement;
Any vehicle found to be illegally parked on site, access permit shall be cancelled.
All vehicles and persons entering and leaving Matla Power Station are subjected to
being searched.
Special care will be taken with pedestrians and no passing/ overtaking of a
stationary bus at a bus stop.
5.17.10 The Principal Contractor shall ensure that his employees and those of his
subcontractors do not:
5.17.11 Eskom reserves the right to search any vehicle on the premises or when entering or
leaving the premises.
5.17.12 The Contractor shall be solely responsible for the safety and security of any of his
vehicles (including private vehicles) on the premises.
5.17.13 The Contractor shall attach identification markers on all of their vehicles that are
permitted to enter the site.
5.17.14 A current maintenance logbook is required for all cranes and large plant equipment,
and shall be available for inspection at any time. The logbook shall be located in the
cabin of the crane or plant equipment.
5.17.15 Principal contractor is to ensure that visibility (e.g.: switching on of lights, reflectors,
barricades equipped with lights, etc.) is enhanced on all Construction Vehicles and
Mobile plants in order to identify the location of the vehicles or plant.
5.17.16 The Contractor must maintain his vehicles in roadworthy condition and a valid
license. These vehicles shall be subject to inspection by the Client/Agents
representative. Vehicles which are not roadworthy will not be allowed onto the site.
5.17.17 In the event where the principal Contractor and his sub contractor do not own the
equipment, the principal Contractor is still responsible for ensuring all conditions are
complied with by all of his subcontractors or hire companies.
5.17.18 Drivers/operators shall be responsible for the travel-worthiness of all loads conveyed
by them. Precautions shall be taken to lash all loads properly. Loads projecting from
vehicles shall be securely loaded and in daytime a red flag and during darkness a red
light or red reflective material shall be attached to the extreme end of such projecting
material.
5.17.19 All servicing and repairs must be carried out by the Contractor in a designated area.
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
35 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
5.17.20 All waste from servicing must be disposed of in accordance with the environmental
legislation.
5.17.21 Every mobile machine whose vision is impaired when reversing must have a
siren/hooter, which sounds, when the machine is reversing. This includes trucks,
cranes, loaders, etc.
5.17.22 Operators have great difficulty in seeing light vehicles behind their machines. Drivers
of light vehicles must avoid stopping or parking in the vicinity of machines. At least
30 (thirty) meters must be left clear between such a vehicle and such a machine.
5.18 HOUSEKEEPING
5.18.1 The Principal Contractor and his sub-contractor shall maintain a high standard of
housekeeping within the site. Prompt disposal of waste materials, scrap and rubbish is
essential. Stipulate as to whether waste separation and removal is for the account of
the Principal Contractor or for Eskom. Refer to what the requirements are in the EMP.
5.18.2 Adequate care must be taken by the Contractor to ensure that storage and stacking is
correctly and safely carried out.
5.18.3 Before stacking any material, the Contractor, sub-contractor or their employees must
consult the Eskom Project/site Manager for allocation of a stacking area.
5.18.4 Materials/objects shall not be left unsecured in elevated areas falling objects may
cause serious injuries/fatalities.
5.18.5 Nails protruding through timber shall be bent over or removed so as not to cause injury.
5.18.6 All packaging material including boxes, pallets, crates, etc. to be removed from the
work area immediately.
5.18.7 Meal rooms shall be kept in a clean and tidy manner.
5.18.8 On completion of his work, the contractor is responsible for clearing his work area of all
materials, scrap, temporary buildings and building bases to the satisfaction of the
Client/Agent.
5.18.9 In cases where an inadequate standard of housekeeping has developed, compromising
safety and cleanliness, anyone has the responsibility to bring it to the attention of the
Eskom Project/Site Manager. The Eskom Project/Site Manager has the right to instruct
the Principal Contractor and his sub-contractor to cease work until the area has been
tidied up and made safe. Neither additional costs nor extension of time to the Contract
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
36 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
shall be allowed as a result of such a stoppage. Failure to comply will result in site
cleaning by another cleaning contractor company at the cost of the Principal
Contractor.
5.18.10
The Principal Contractor shall carry out regular safety/housekeeping inspections
(at least weekly) to ensure maintenance of satisfactory standards. The Principal
Contractor shall document the results of each inspection and shall maintain records for
viewing.
5.19 SIGNAGE
All symbolic safety signage, that the Principal Contractor or his/her sub-contractors are
to use/display are to conform the requirements of SANS 1186.
The display of the following signs is mandatory:
For Contractors with Site Establishment: The Contractor Company sign must be
posted at their site offices to reflect the name and contact details of the:
Construction Supervisor; Health and Safety Manager/Practitioner; First Aider;
Health and Safety Representative and Evacuation
The location of every first aid box; fire extinguisher and emergency exit is to be
clearly indicated by means of a sign.
When in use, an explosive Power Tool shall have a sign, warning people of its use.
The Contractors shall provide the signage where work is conducted and where
unauthorised entry is prohibited and/or where alerting and cautioning passers-by to be
aware of potential dangers.
5.20
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
37 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
Flammable Liquid.
No Smoking.
No Naked flames.
a) Hazchem identification.
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
38 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
No Smoking.
No naked flames.
6)
7)
8)
Storage areas must be kept free from all combustible materials; no other materials
must be stored in cylinder enclosure.
9)
Full cylinders must be kept apart from empty cylinders so that it will not be
necessary to open valves to check whether cylinders are empty or full.
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
39 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
10) Cylinders must always be chained separately in an upright position and special
stands must be used for cylinders.
11) Cylinders must be stored in rows with aisle in-between for easy removal in event
of fire.
12) Mark empty cylinders clearly and move to approved storage areas.
13) Adequate fire fighting equipment must be available.
14) Cylinders for different gasses must be stored separately.
15) Flammable and oxidising gasses must not be stored together; greases and oils
must never be allowed to come in contact with oxygen.
16) Only flame-proof electrical lighting should be used, if required.
17) Cylinders will only be allowed on site in an approved trolley, properly secured and
with a chain.
18) All gas cylinder torches to have flashback arrestors fitted on both sides.
5.21
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
40 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
Safety harness will be used when working at height.Safety belts are not allowed
on site. Only double lanyard safety harnesses are allowed and must be used
when conducting work at elevated positions.
j)
Eye and face protection: Wearing of impact Safety Spectacles with side shields.
Prescription glasses must comply with the same standard or cover impact safety
spectacles must be worn over them. Welders, braziers, cutters and aiders shall
wear suitable eye protection. Suitable eye protection shall be worn by all persons
including visitors, to any designated eye protection area.
Other risk based PPE based on the principal contractors risk assessment.
Note:
The Principal contractor is required to keep an updated register of all PPE issued,
including that of his employees and sub-contractors.
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
41 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
5.22
5.22.1
The Contractor shall ensure that all machinery, tools and equipment are identified,
safe to be used and is maintained in a good condition.
5.22.2
Every contractor shall clearly identify his equipment in a prominent place with the
name of his Company.
5.22.3
All machines driven by means of belts, gear wheels, chains and couplings shall be
adequately guarded. A machine is guarded when persons cannot gain inadvertent
access to the moving parts.
5.22.4
The Principal Contractor shall ensure that all machinery, tools and equipment to be
listed on an inventory list and handed to security with a copy kept on site.
5.22.5
5.22.6
All machinery, tools and equipment must have the necessary approved test or
calibration documentation where applicable prior to being brought onto the premises
and the records shall form part of the SHE plan.
5.22.7
All fuel driven equipment must be inspected by the Eskom SHE Practitioners prior to
mobilizing it onto site.
5.22.8
All fuel driven equipment must be properly maintained in accordance with the
manufacturers recommendations and legal requirements.
5.22.9
The Contractor shall supply, at his cost, all items of plant and equipment necessary to
perform the work else otherwise indicated.
5.22.10 The Client/Agent reserves the right to inspect items of plant or equipment brought to
site by the Contractor for use on this Contract. Should the Client/Agent find that any
item is inadequate, faulty, unsafe or in any other way unsuitable for the safe and
satisfactory execution of the work for which it is intended, the Client/Agent shall
advise the Principal Contractor in writing and the Principal Contractor shall forthwith
remove the item from the site and replace it with a safe and adequate substitute. In
such cases, the Principal Contractor shall not be entitled to extra payments or
extensions of time in respect of delay caused by the Clients/Agents instructions.
5.22.11 The Principal Contractor/sub-contractor will ensure that he has all the necessary
registers to record all tools and equipment.
5.22.12 All employees shall be competent when operating or using machines and tools.
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
42 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
5.23
MACHINE GUARDING
5.23.1
An assessment should be conducted in writing to ensure that all machines and tools
are fitted with a guard and the assessment should be kept on the safety file.
5.23.2
The machine or tool should be guarded to prevent limbs or loose clothing from getting
under, into, above or around the dangerous moving parts.
5.23.3
Every shaft, pulley, wheel-gear, sprocket, coupling, clutch, friction drum, spindle end
screw, key , bolt on a revolving shaft, driving belt, chain rope or similar object shall be
securely fenced or guarded .
5.23.4
Guards should form a permanent part of the machine or tool, easy to remove non
corrosive, rigged and as far as reasonable heat resistant.
5.23.5
Machine guards must be painted on the outside in the same colour as the machine or
tool.
5.23.6
5.23.7
A register should be used which indicate the name, number of the machine or tool
and the number of guards.
5.24
5.24.1
A risk assessment shall be conducted prior to commencing with the task to identify
the risk involved and appropriate mitigation measures must be put in place.
5.24.2
5.24.3
All lifting machine operators shall be competent to operate a lifting machine. They
must be in possession of a valid permit.
5.24.4
When ever you are making use of an external contractor to do lifting work the
Principal Contractor must ensure that the operator is competent and if the Principal
Contractor is satisfied with the operator's competency after looking at his portfolio
he/she should issue a temporary permit to the operator.
5.24.5
The Principal Contractor should verify if the lifting machines have been examined and
a performance test done.
5.24.6
The training should have been done according to the Code of practice by a provider
registered by the Department of Labour.
5.24.7
Before using any lifting machines or tackle the operator should inspect it.
5.24.8
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
43 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
5.24.9
5.24.10 Refer to the requirements of the Driven Machinery Regulation 18 and Construction
Regulation 17 and 20 of the OHS Act.
5.24.11 All lifting tackle should be recorded on a register.
5.24.12 All hooks shall be fitted with a safety latch/catch.
5.24.13 A lock out system should be implemented to ensure that only an operator that is
competent can draw lifting machines and fork lifts.
5.24.14 All lifting tackle should be conspicuously and clearly marked with identification
particulars and the maximum mass load which it is designed for.
5.24.15 No person shall be moved or supported by means of a lifting machine unless such a
machine is fitted with a cradle approved by an inspector.
5.24.16 A risk assessment should be conducted prior to starting with the task.
Account should be taken of wind forces.
Lifting machines are erected taking into account a safe distance from excavations.
When working in close proximity to power lines, the contractor must apply for a
permit. Refer to Eskom Plant Safety Regulations and/or Operating Regulations for
High Voltage Systems and Electrical Machinery Regulation 15 of the OHS Act.
Account should be taken of the bearing capacity of the ground.
5.24.17 Principal Contractors and their employees shall keep out from under suspended
loads, including excavators, and between a load and a solid object where they might
be crushed if the load should swing or fall. They shall not pass or work under the
boom or any crane or excavator.
5.24.18 Contractors and their employees shall ensure that crane loads are not carried over
the heads of any workmen.
5.24.19 Guide ropes to be used to prevent loads from swinging.
Record keeping
Record books and test certificates of lifting machined and tackle should be kept
on the safety file.
Register of all lifting machines and tackle on site (For inspection purposes).
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
44 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
5.25
FIRE SAFETY
Contractors must develop a fire safety procedure for the specific construction site prior
to commencing work. The procedure must take into consideration the size of the site,
type of work being done (e.g. cutting, welding, grinding, etc.) and amount of
combustible materials. It must be developed in accordance with the hot work permit of
the Eskom Plant Safety Regulations, Eskom Fire Risk Management requirements and
all other applicable Regulations. All workers entering and working in the construction
site need to be trained in fire safety and any duties they are required to perform. Preexisting fire systems in buildings shall be maintained during construction whenever
possible. Any changes must be approved by the Client/Agent.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
45 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
Smoking
5.26
Fire Extinguishers.
Sand Buckets.
Name and contact details of person and Contractor Company that is responsible
for the barricading shall be posted on the actual barricading.
All openings and edges must be barricaded with solid barricading to withstand an
impact of at least 100 kg.
Only solid (scaffolding or stand alone) barricading with Orange Snow Netting will
be allowed.
Ballard (containers filled with liquid) can be used as solid barricading (exempted
for use inside power plant units).
Contractors must pre-plan the delivery of floor grating, stair treads, landings and
handrails to ensure safe access and protection for persons working on structures.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
46 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
The Client/agent representative is to provide more details on the permit to work system
for the specific work to be conducted by the Principal Contractor.
Management of change this is when there are changes to the work environment
(e.g.: climatic changes) and/construction work (e.g.: modifications to the design), in
any phase of the construction project, and/or amendments with regards to Eskom
rules and regulations and/or legislative amendments;
Unsafe acts/behaviours;
Unsafe conditions;
The Eskom site/project manager and/or Principal Contractor and his subcontractors
shall immediately remove the workforce from the work area and correct the health and
safety deficiencies by allowing only the people in the area that are competent to make
the area safe.
Principal Contractor and his subcontractors shall ensure that no other work is being
performed during this time. Should the estimated time from the outset to make the area
safe where life threatening/imminent danger situations exist, then the area will be
barricaded and a sign placed with the wording Unsafe Area Authorized Access
Only.
The Eskom Site/Project Manager shall review the affected parts/sections of the
SHE specification with the purpose of providing sufficient SHE information to the
principal contractor.
The principal contractor shall then revise the relevant sections in the SHE plan to
accommodate the changes.
The Eskom Site/project manager must ensure that the revised provisions in the
SHE plan are adequate and must approve it before the work activity is commenced.
Before the workforce is allowed back in the area, Principal Contractor and his
subcontractors shall ensure:
The area is re-inspected by Contractor Safety Practitioner and supervisor and note
corrective actions taken;
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
47 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
Declare the area safe for work by signing off on the work stoppage notice issued
by the Eskom Site/Project Manager.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
48 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
5.30.7 The Principal Contractor shall ensure that all accidents/incidents are investigated by
him/her and are discussed at the Project Executive SHE committee meeting held on
site.
5.30.8 Accidents/incidents shall be investigated and recorded in terms of the requirements of
the Occupational Health and Safety Act, the National Environmental Management Act
and National Water Act as applicable.
5.30.9 The Client/Agent shall be allowed to participate in any accident/incident investigation if
the accident/incident is directly linked to any activity within the scope of the construction
project.
5.30.10
Case studies will be compiled for all near misses, lost time incidents and
fatalities.
5.30.11
The Principal Contractor shall keep on site/workplace a record of all accidents
and incidents reported in the form of the OHS Act Annexure 1 investigation form as
referenced in the OHS Act. (Incident Investigation Report)
5.30.12
The Principal Contractor shall provide SHE related statistics to the Client at the
end of each week/month.
5.30.13
Eskom reserves the right to conduct an independent investigation in any
incident.
5.30.14
Investigation committees
Note that the committees below are the investigation committees that are expected
as a minimum for the Principal Contractor to establish for incidents and accidents.
In addition to the Principal Contractor and his sub-contractor investigations, Eskom
will also, separately, conduct its own separate investigation. The principal contractor
and sub-contractor would be required to co-operate with the Eskom investigation
committee. No joint investigations would be held, i.e.: with Eskom and Principal
Contractor.
Parties to be involved in the investigation of any of the above are as follows:
First Aid Injuries
Chairman:
Attendees:
Principal Contractor/s and their sub-contractor/s
o Safety representative
o Safety Practitioner
o Injured
Medical Treatment Injuries
Chairman: Principal Contractors OHS Act Section 16(2) appointee
Attendees:
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
49 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
Lost Time Incidents (Lost Time Injuries, Occupational Diseases and Fatalities):
Chairman: Principal Contractors OHS Act Section 16(2) appointee
Attendees:
Eskom
o Eskom Project Manager
o Eskom Area/Discipline Project Manager
o Eskom SHE practitioner
Attendees:
Eskom
o
Eskom contract supervisor
o
SHE practitioner
o
Other
o
Witnesses (if any)
The severity and potential for injury and/or damage to plant/equipment will be
determined, by at least the following people below:
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
50 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
All investigation teams must include at least 1 person (from both the Eskom and
Principal Contractor) that is competent in Root Cause Analysis.
Recording and Reporting of Incidents/Accidents
Contractors shall ensure the incident/accident scene is not disturbed until after the
investigation unless it is done to prevent further injury or for rescue purposes (OHS .Act,
Section. 24(2) applies). Investigation shall begin promptly after the incident/accident.
Where applicable and with proper authorization, photographs may be taken of the scene
of the incident as well as any equipment involved in the incident. The results of the
investigation together with the Root Cause Analysis of the incident and the committees
recommendations for preventative action(s) shall be submitted to Eskom Project
Manager, within 3 days after the incident occurred unless proof can be given that due to
technical or other difficulties, more time is needed.
Contractors shall also review and analyze all incidents; to establish trends that may
indicate deviations from established work standards and safe working
procedure/practices. The Contractor shall take appropriate corrective action and submit
report to Eskom Project Manager.
The Contractor shall investigate all incidents immediately and give the Eskom Project
Manager a report within the specified time frame, which shall include:
Please note that providing the Accident/incident investigation report does not
exempt the Principal Contractor from providing accident reports required by
Statutory Authorities, in particular, the Contractors responsibility for reporting
accidents in accordance with the requirements of the OHS Act and COlD Act.
It is essential that the Principal Contractor demonstrate that corrective action has
been taken and that correction action is communicated by a predetermined means
to all Contractors staff affected. All corrective actions must be closed within 3
months from the date of issuing of investigation report.
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
51 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
Feedback on the status of close out of corrective actions must be communicated at the
following forums:
a)
b)
c)
d)
e)
Reporting and investigation of incidents This document sets out the procedure to
be followed when reporting, recording and investigating incidents that occur on a
construction site.
b)
Workplace Injury and Disease Recording The purpose of this document should be
a guide to the Principal contractor on how to accurately evaluate, define and
categorise fatalities, injuries and occupational diseases in a data format for the
calculation of performance indicators for health and safety.
The aim of this section is to outline all the incidents the Contractors must report to
Eskom, every week, name of principal contractor company and name of each subcontractor company and each companys performance, which includes the following as
a minimum Form 75, see Annexure H:
Incidents: Lost time, medical; first aid, near misses reported
Manpower numbers per principal contractor and sub-contractor company
Actual man-hours worked
Status on incidents investigated and recommendations closed out
Status on audits conducted and findings closed out.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
52 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
53 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
The safety plan shall be reviewed to ensure that it fully addresses all the issues and
complies with the requirements of the SHE Specifications and contract. If necessary
the Contractor shall amend the SHE Plan as required by the Client/Agent
Representative.
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
54 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
5.35.4 The Principal Contractor shall ensure that the sub-contractors appointed have the
necessary competencies and resources to perform the work safely.
5.35.5 The Principal Contractor shall provide any sub-contractor who is making a bid or
appointed to perform construction work, with the relevant sections of the documented
SHE specification, who would in turn provide the client/agent with a SHE plan for
approval.
5.35.6 The Principal Contractor shall carry out audits on the sub-contractor at least monthly to
ensure that their SHE plan is being implemented and maintained.
5.35.7 Eskom may conduct audits on the Principal Contractors sub-contractor/s. Any nonconformances/findings/observations found in these audits shall be raised and
discussed with the relevant Principal Contractor (with whom the sub-contractor is
contracted with).
5.35.8 The Client/Agent and/or the Principal Contractor shall stop any sub-contractor from
executing construction work which poses a threat to the safety and health of persons or
the environment or non-compliance to the approved SHE plan.
SHE Policy
Annexure B
Annexure C
Annexure D
Annexure E
Annexure F
Annexure G
Annexure H
Annexure I
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
55 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
ANNEXURE A
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
56 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
ANNEXURE B
LETTER OF APPOINTMENT
CAPITAL EXPANSION DEPARTMENT MATLA POWER STATION
OCCUPATIONAL HEALTH AND SAFETY ACT, ACT 85 OF 1993
Section 37.2
Written Agreement between
..
and
As contemplated in Section 37(2) of the Occupational Health and Safety Act No. 85 of 1993 as
amended.
That, .(NAME) OHSAct Section 16(2) (Dedicated
Employer) is an employer with duties as prescribed in the Occupational Health & Safety Act No. 85
of 1993 as amended, and agree to ensure that all work will be performed or machinery and plant
used in accordance with the provisions of the said Act.
I furthermore agree to comply with the requirements of Group Capital Divisions Division GCD Matla
Power Station as contained in the contract documents and with the Safety, Health and
Environmental requirements for contractors and to liaise with the Client should, I for whatever
reason, be unable to perform in terms of this Agreement and the legal requirements of the
Occupational health and safety Act, Act No. 85 of 1993 and amendments.
........................................................
SIGNATURE
FOR COMPANY/CONTRACTOR:
.............................................................
NAME
.........................................................
SIGNATURE
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
57 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
Annexure C
CONSTRUCTION REGULATIONS CHECKLIST. (REV. 0 15 FEB 09)
Y=
Acceptable
N=
NA. =
Not Applicable
Not Acceptable
ESKOM PROJECT
MANAGER
NAME OF
COMPANY
MANAGER
CELL. #
DATE
ACT
1
.
QUESTION
CR 3(1)
CR 4(1)(g)
Letter
of
good
Compensation)
CR 5(1)
2
.
standing
(Workmans
Registration number
Sec. 16(2)
Designated Employer
Sec. 17(1)
GMR 2(1)
CR 6(1)
Construction supervisor
CR 6(2)
CR 6(6)
CR 7(1)
CR 8(1)(a)
Full time
Part time
Monitoring plan
Review plan
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
58 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
CR 10(a)
CR 11(1)
CR 12(1)
CR 14(2)
CR
17(6)(a)
CR
17(8)(a)
GSR (3)
First aid :
First aider
CR 9(2)(b)
CR 9(2)(g)
CR 20(g)
CR 1(1)(j)
CR 22(d)
CR 26(a)
CR 27(h)
CR 7 (1)
CR 7 1)(a)
Risk Identification
Structures
Excavation work
Demolition work
Water environments
CR 7 1)(b)
Risk Analysis
CR 7 1)(c)
CR 7 1)(d)
Monitoring Plan
CR 7 1)(e)
Review Plan
Training attendance register
CR 7 (7)
INDUCTION TRAINING
CR 7 (4)
CR 7 9)(a)
CR 7(9)(b)
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
59 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
CR 8 (1)(a)
CR 8 (2)(A)
A Risk Assessment
CR 8 (2)(c)
Training Program
Training attendance register
CR 8 (2)(d)
CR 8 (3)
CR 8 (2)(b)
& 21
Various
Sec. 44
Scaffolds
CR 8 (2)(d)
DMR 18 (5)
GSR 3 (4)
VUP 11
EMR 9
EMR 10
GSR 2
RECORDS TO BE KEPT.
CR 3(3)
CR 5(6)
CR 5(7)
CR 5(8)
CR 5(9)
CR 7(2)
CR 7(9)
GAR (4)
GCD/KPL/P
RCD/003
CR11(3)(h)
CR 12(2)
CR 12(11)
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
60 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
CR 15(2)(b)
CR 15(2)(c)
CR 15(10)
Permit
system
CR 15(11)
CR15(12)(c)
CR17(8)( c )
CR 18(9)
CR 19(2)(9)
CR 21(1)(j)
CR 22(d)
PERMIT
SYSTEM
HCS.
REGS.
GSR. 2
Issuing of PPE
Treatment Register (out of first aid box)
GAR. 9.1
ANNEX.1
FILE
Blank annexure 1
WCA forms
PROJECT MANAGER
APPROVED
Safety Risk
APPROVED
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
61 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
Annexure D
Form
Group Capital Divisions
Title:
Unique Identifier:
22
Document Type:
NFM
Revision:
Total Pages:
1 of 11
Physical
Physical
Noise
Pressure
Physical
Physical
Physical
Ventilation
Hazard
Chemical
Substances
Hazard
Chemical
Substances
Gases
Fumes
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
62 of 85
Hazard
Chemical
Substance
Hazard
Chemical
Substance
Chemical Vapours
Hazard
Chemical
Substance
Chemical Mists
Hazardous Waste
Hazard
Chemical
Substance
Hazard
Chemical
Substance
Hazard Chemical
Substance
Hazard
Chemical
Substance
Dust (Coal/Ash)
Hazard
Chemical
Substance
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
63 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
Bomb Threats
Other (Specify)
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
64 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
Fire
Malicious act
Hazard Category
Hazards
Explosions
Overpressure
Ignition of contents
Collision
Contamination
Exothermic process
Over temperature
Electrical faults
Fire
Isolation
Lock-outs
Cable damage
Power failure
Electrical
Mechanical Breakdown
Ignition of contents
Earthing
Malicious act
Tampering
Temperature differential
Bridging out
Gas/dust ignition
Lightning strike
Explosives
Gas bottles
Pressure vessels
Level indicators
Blasting
Syphons
Gas Escape
Gaskets
Guarding
Impact
Thermal fatigue
Instrumentation (Dp cells)
Shaft failures
Bolts and/or fasteners
Bearings
Maintenance
Mechanical failure
Crack leading to material failure
Fabrication faults not previously detected
Collision or impact
Protection devices failing open
Corrosion
Control system failures
Human error and/or procedure
Liquid Escape
Malicious act
Maintenance
Mechanical Failure
Crack leading to Material Failure
Fabrication Faults not Previously Detected
Collision or Impact
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
65 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
Hazard Categories
Hazards
Protection devices failing open
Corrosion
Control systems failures
Human error and/or procedure
Malicious act
Structural Failure
Wind loading
Earthquake
Foundation collapse
Lightning strike
Corrosion / erosion externally
Corrosion / erosion internal on baffles
Over stress steel structures from pipe work
Over stress by weight overload e.g. waterlogged drier can
Collision / impact
Design / Fabrication / Modifications / Repair faults
Rupture
Process deviation
Radiation Exposure
Moving Parts
Nip points
Operator protection
Maintenance
Guards
Load locks
Lock-outs
Ergonomics
Environment
Air emissions
Water pollution
Ground pollution
Waste management
Spills
Raw material consumption
Habitat destruction
Energy consumption
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
66 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
CONDUCTING THE
ENTANGLEMENT
YES / NO
Can anyone's hair, clothing, gloves, neck-tie, jewelry, cleaning brushes, loose clothing,
rags or other materials become entangled with moving parts of the plant, or materials in
motion?
[B]
CRUSHING
YES / NO
YES / NO
SHEARING
YES / NO
Can anyone's body parts be sheared between two parts of the plant, or between a part of
the plant and a work piece or structure?
[E]
FRICTION
YES / NO
Can anyone be burnt due to contact with moving parts or surfaces of the plant, or
material handled by the plant?
[F]
STRIKING
YES / NO
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
67 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
YES / NO
Can anyone come into contact with fluids under high pressure, due to plant failure or
misuse of the plant?
[H]
ELECTRICAL
YES / NO
EXPLOSION
YES / NO
Can anyone be injured by explosion of gases, vapors, liquids, dusts or other substances,
triggered by the operation of the plant or by material handled by the plant?
[J]
YES / NO
Can anyone using the plant, or in the vicinity of the plant, slip, trip or fall due to:
a. uneven or slippery work surfaces?
b. poor housekeeping, e.g. swarf in the vicinity of the plant, spillage not cleaned up?
c. obstacles being placed in the vicinity of the plant?
d. other factors not previously mentioned?
Can anyone fall from a height due to:
a. lack of a proper work platform?
b. lack of proper stairs or ladders?
c. lack of guardrails or other suitable edge protection
d. unprotected holes, penetrations or gaps?
e. poor floor or walking surfaces, such as the lack of a slip-resistant surface?
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
68 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
SUFFOCATION
YES / NO
YES / NO
Can anyone come into contact with objects at high or low temperatures?
Can anyone suffer ill-health due to exposure to high or low temperatures?
Can anyone be injured by fire?
[M]
MANUAL HANDLING
YES / NO
Can anyone be injured from manual handling due to the following factors:
a. the force to be applied by the person?
b. the actions and movements involved in the manual handling?
c. the range of weights handled?
d. the duration and frequency of the manual handling?
e. the time, and distance, over which an object is handled?
f. the lack of mechanical aids?
g. the layout and condition of the workplace environment?
h. the way work is organized? (e.g. availability of people and materials; quotas,
targets, job rotation etc)
i. the postural requirements imposed by the manual handling?
j. the age of the employee carrying out the manual handling?
k. the skill and experience of the employee carrying out the manual handling?
l. the nature of the object being handled? (e.g. size, shape, structure and material of
load; sharp edges; slippery; difficult to grasp/hold; unstable; live person or animal
etc)
m. other factors not previously mentioned? (Refer also to the Manual Handling
Code of Practice for further information).
[N]
OTHER HAZARDS
YES / NO
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
69 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
[N]
OTHER HAZARDS
YES / NO
YES / NO
PRODUCT ERGONOMICS
YES / NO
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
70 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
h. does the product require any special aptitude, physical ability or prior knowledge
or experience
i. are the points of contact with the user likely to be uncomfortable, or create
pressure points?
j. are there any special considerations that apply, e.g. does it suit left handers; can it
be used by disabled persons;
k. does it need special storage requirements?
l. will transport during and between use be a problem?
m. if it is to be used in conjunction with other products are there adequate
provisions made for this interaction?
n. are the materials of manufacture and methods of fastening/joining/assembly
appropriate?
o. are labels (instructions etc.) liable to obliteration, (peeling etc.) through use or
maintenance?
p. other factors not previously mentioned?
[Q]
ENVIRONMENTAL
YES / NO
During the use of the plant or product is there any risk to the environment from:
a. spillage, e.g. of fuel or other substance from the plant itself or above/below
ground storage tanks?
b. leaking, e.g. of fuel or other substance from the plant itself or above/below
ground storage tanks?
c. the generation of fumes, dusts, or vapors?
d. the generation of excessive noise?
e. the generation of any wastes (liquid or solid) that will need to be disposed of?
f. will transport, handling or storage of the plant or product require any special
consideration?
[R]
OTHER
YES / NO
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
71 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
Annexure E
Form
Title:
Unique Identifier:
23
Document Type:
NFM
Revision:
Total Pages:
0
1 of 3
Hazards
Explosions
Overpressure
Collision
Corrosion / Erosion / External / Internal
Over temperature
Fire
Fabrication / Material Defect
Repairs / Modifications / Maintenance
Protection Failure (Safety Valves)
Environment (i.e. conditions of operation)
Contamination / Impurities
Ignition of contents
Malicious act
Temperature differential
Gas/dust ignition
Explosives
Gas bottles
Pressure vessels
Blasting
Mechanical
Breakdown
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
72 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
Housekeeping
Fire
Malicious act
Maintenance specifically to oxy-acetylene sets
Ignition of contents
Contamination
Exothermic process
Electrical faults
Electrical
Isolation
Lock-outs
Cable damage
Power failure
Fuses blowing
Flame proofing
Earthing
Tampering
Bridging out
Lightning strike
Short circuits and general electrical faults
Proximity to high voltage (HV)
Level indicators
Loss of pressure control
Temporary wiring installations
Water ingress into critical electrical systems
Corrosion of IC cards in a DCS
Contamination or failure of instrument air system
Gas Escape
Maintenance
Mechanical failure
Crack leading to material failure
Fabrication faults not previously detected
Collision or impact
Protection devices failing open
Corrosion
Control system failures
Human error and/or procedure
Liquid Escape
Malicious act
Maintenance
Mechanical Failure
Crack leading to Material Failure
Fabrication Faults not Previously Detected
Collision or Impact
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
73 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
Hazard Categories
Hazards
Protection devices failing open
Corrosion
Control systems failures
Human error and/or procedure
Malicious act
Structural Failure
Wind loading
Earthquake
Foundation collapse
Lightning strike
Corrosion / erosion externally
Corrosion / erosion internal on baffles
Over stress steel structures from pipe work
Over stress by weight overload e.g. waterlogged drier can
Collision / impact
Design / Fabrication / Modifications / Repair faults
Rupture
Process deviation
Radiation Exposure
Moving Parts
Nip points
Operator protection
Maintenance
Guards
Load locks
Lock-outs
Ergonomics
Environment
Air emissions
Water pollution
Ground pollution
Waste management
Spills
Raw material consumption
Habitat destruction
Energy consumption
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
74 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
CONDUCTING THE
ENTANGLEMENT
YES / NO
Can anyone's hair, clothing, gloves, neck-tie, jewelry, cleaning brushes, loose clothing,
rags or other materials become entangled with moving parts of the plant, or materials in
motion?
[B]
CRUSHING
YES / NO
YES / NO
SHEARING
YES / NO
Can anyone's body parts be sheared between two parts of the plant, or between a part of
the plant and a work piece or structure?
[E]
FRICTION
YES / NO
Can anyone be burnt due to contact with moving parts or surfaces of the plant, or
material handled by the plant?
[F]
STRIKING
YES / NO
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
75 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
YES / NO
Can anyone come into contact with fluids under high pressure, due to plant failure or
misuse of the plant?
[H]
ELECTRICAL
YES / NO
EXPLOSION
YES / NO
Can anyone be injured by explosion of gases, vapors, liquids, dusts or other substances,
triggered by the operation of the plant or by material handled by the plant?
[J]
YES / NO
Can anyone using the plant, or in the vicinity of the plant, slip, trip or fall due to:
a. uneven or slippery work surfaces?
b. poor housekeeping, e.g. dirt in the vicinity of the plant, spillage not cleaned up?
c. obstacles being placed in the vicinity of the plant?
d. other factors not previously mentioned?
Can anyone fall from a height due to:
a. lack of a proper work platform?
b. lack of proper stairs or ladders?
c. lack of guardrails or other suitable edge protection
d. unprotected holes, penetrations or gaps?
e. poor floor or walking surfaces, such as the lack of a slip-resistant surface?
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
76 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
SUFFOCATION
YES / NO
YES / NO
Can anyone come into contact with objects at high or low temperatures?
Can anyone suffer ill-health due to exposure to high or low temperatures?
Can anyone be injured by fire?
[M]
MANUAL HANDLING
YES / NO
Can anyone be injured from manual handling due to the following factors:
a. the force to be applied by the person?
b. the actions and movements involved in the manual handling?
c. the range of weights handled?
d. the duration and frequency of the manual handling?
e. the time, and distance, over which an object is handled?
f. the lack of mechanical aids?
g. the layout and condition of the workplace environment?
h. the way work is organized? (e.g. availability of people and materials; quotas,
targets, job rotation etc)
i. the postural requirements imposed by the manual handling?
j. the age of the employee carrying out the manual handling?
k. the skill and experience of the employee carrying out the manual handling?
l. the nature of the object being handled? (e.g. size, shape, structure and material of
load; sharp edges; slippery; difficult to grasp/hold; unstable; live person or animal
etc)
m. other factors not previously mentioned? (Refer also to the Manual Handling
Code of Practice for further information).
[N]
OTHER HAZARDS
YES / NO
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
77 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
[N]
OTHER HAZARDS
YES / NO
YES / NO
PRODUCT ERGONOMICS
YES / NO
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
78 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
Annexure F
Form
Title:
[A]
Unique Identifier:
24
Document Type:
NFM
Revision:
Page:
0
1 of 5
YES / NO
Can anyone's hair, clothing, gloves, neck-tie, jewelry, cleaning brushes, loose
clothing, rags or other materials become entangled with moving parts of the plant, or
materials in motion?
[B]
CRUSHING
YES / NO
YES / NO
SHEARING
YES / NO
Can anyone's body parts be sheared between two parts of the plant, or between a
part of the plant and a work piece or structure?
[E]
FRICTION
YES / NO
Can anyone be burnt due to contact with moving parts or surfaces of the plant, or
material handled by the plant?
[F]
STRIKING
YES / NO
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
79 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
(continued)
a. uncontrolled or unexpected movement of the plant or material handled by the
plant?
b. the plant, parts of the plant or work pieces disintegrating?
c. work pieces being ejected?
d. mobility of the plant?
e. other factors not previously mentioned?
[G]
YES / NO
Can anyone come into contact with fluids under high pressure, due to plant failure or
misuse of the plant?
[H]
ELECTRICAL
YES / NO
EXPLOSION
YES / NO
Can anyone be injured by explosion of gases, vapors, liquids, dusts or other substances,
triggered by the operation of the plant or by material handled by the plant?
[J]
YES / NO
Can anyone using the plant, or in the vicinity of the plant, slip, trip or fall due to:
a. uneven or slippery work surfaces?
b. poor housekeeping, e.g. dirt in the vicinity of the plant, spillage not cleaned up?
c. obstacles being placed in the vicinity of the plant?
d. other factors not previously mentioned?
Can anyone fall from a height due to:
a. lack of a proper work platform?
b. lack of proper stairs or ladders?
c. lack of guardrails or other suitable edge protection
d. unprotected holes, penetrations or gaps?
e. poor floor or walking surfaces, such as the lack of a slip-resistant surface?
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
80 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
SUFFOCATION
YES / NO
YES / NO
Can anyone come into contact with objects at high or low temperatures?
Can anyone suffer ill-health due to exposure to high or low temperatures?
Can anyone be injured by fire?
[M]
MANUAL HANDLING
YES / NO
Can anyone be injured from manual handling due to the following factors:
a. the force to be applied by the person?
b. the actions and movements involved in the manual handling?
c. the range of weights handled?
d. the duration and frequency of the manual handling?
e. the time, and distance, over which an object is handled?
f. the lack of mechanical aids?
g. the layout and condition of the workplace environment?
h. the way work is organized? (e.g. availability of people and materials; quotas,
targets, job rotation etc)
i. the postural requirements imposed by the manual handling?
j. the age of the employee carrying out the manual handling?
k. the skill and experience of the employee carrying out the manual handling?
l. the nature of the object being handled? (e.g. size, shape, structure and material of
load; sharp edges; slippery; difficult to grasp/hold; unstable; live person or animal
etc)
m. other factors not previously mentioned? (Refer also to the Manual Handling
Code of Practice for further information).
[N]
OTHER HAZARDS
YES / NO
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
81 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
(continued)
[N]
OTHER HAZARDS
YES / NO
YES / NO
PRODUCT ERGONOMICS
YES / NO
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
82 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
(concluded)
h. does the product require any special aptitude, physical ability or prior knowledge
or experience
i. are the points of contact with the user likely to be uncomfortable, or create
pressure points?
j. are there any special considerations that apply, e.g. does it suit left handers; can it
be used by disabled persons;
k. does it need special storage requirements?
l. will transport during and between use be a problem?
m. if it is to be used in conjunction with other products are there adequate
provisions made for this interaction?
n. are the materials of manufacture and methods of fastening/joining/assembly
appropriate?
o. are labels (instructions etc.) liable to obliteration, (peeling etc.) through use or
maintenance?
p. other factors not previously mentioned?
[Q]
ENVIRONMENTAL
YES / NO
During the use of the plant or product is there any risk to the environment from:
a. spillage, e.g. of fuel or other substance from the plant itself or above/below
ground storage tanks?
b. leaking, e.g. of fuel or other substance from the plant itself or above/below
ground storage tanks?
c. the generation of fumes, dusts, or vapors?
d. the generation of excessive noise?
e. the generation of any wastes (liquid or solid) that will need to be disposed of?
f. will transport, handling or storage of the plant or product require any special
consideration?
[R]
OTHER
YES / NO
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
1 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
Annexure G
Form
Title:
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure
it is in line with the authorised version on the database.
TimeIncident
Incident
Incidents
Number of LostTimeInjuries
Number of Fatals
Diseases (OD's)
Number of Occupational
Number
Number
of
of
workers
workers complet
Complet ed other
ed Site
training
Inductio
on
n
Health
Training
and
Safety
Number
of
Workers
Complet
ed
Medical
Surveilla
nce
Examina
tion
PERFORMAN
CE OF
COMPANY
WHILST
WORKING ON
PROJECT
Number of Lost
Time Incidents
Injuries
Number of workers
Sub-Contractor
Principal Contractor
No.f
sdfs
d
75
Document Type:
NFM
Revision:
Total Pages:
Unique Identifier:
Contact
details of
Name of Site
CEO
Construction
(Telephone
Name of CEO
Supervisor
number,
(CR 6.1
email address
appointee)
and postal
address)
Contact details
Contact details
of Health and
of Site
Safety
Construction
Name of
Practitioner/M
Supervisor
Health and
anager
(Telephone
Safety
(Telephone
number, email Practitioner/M
number, email
address and
anager
address and
postal
postal
address)
address)
Unique Identifier:
74
Document Type:
NFM
Revision:
Total Pages:
1 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units1, 2, 3 & 5 at Matla Power Station
Annexure H
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure it is
in line with the authorised version on the database.
Title:
Unique Identifier:
74
Document Type:
NFM
Revision:
Page:
2 of 85
Matla Refurbishment Project: The Supply and Delivery of Steam Pipes for Attemperator System for Units 1, 2, 3 & 5 at Matla Power Station
ANNEXURE I
Form
Title:
Unique Identifier:
0001
Document Type:
NFM
Revision:
Incident/Accident Notification Flash Report for Employees/ Contractors/ Members of the Public
NOTE: This document must be Faxed/e-Mailed to the relevant department/project line of authority up to EEE/GM level PLUS ED
Assurance Dept. (EDSHEIncidents@eskom.co.za ; Jace Naidoo, Kajal Mansingh
(FLASH REPORT TO BE SUBMITTED BEFORE THE END OF SHIFT OR DAY)
NOTE: One flash report to be completed per incident/accident
SITE/DEPARTMENT:
UNIT/SECTION/PROJECT:
TIME OF
INCIDENT:
DATE OF INCIDENT:
PLACE OF
INCIDENT:
Medical
(no shift loss)
(MI)
Lost Time
Injury
(shift loss) (LTI)
OHS Act
Sect 24
(S24)
Occupational
Disease (confirmed
or unconfirmed) (OD)
Fatality
(FT)
Near Miss
(NM)
N/A
Explosion
Environmental
Contravention
Electrical contact/
Operating Error/ Flash
Crane/Cherry
Picker etc.
Crime
Related
Fall
Chemical
Spillage
Vehicle Accident
Tree Felling
Moving
Machinery
Other
OTHER (Specify)
ESKOM VOLTAGE INVOLVED:
kV
NETWORK:
CLASS OF PERSONS INVOLVED IN INCIDENT/ACCIDENT Mark the appropriate box with an X and add company name
EMPLO
YEE
(EM)
LABOUR
BROKER
(LB)
PRINCIPLE
CONTRACTOR (PC)
FULL NAME
SUBCONTRACTOR
(SC)
SUBSIDIARY
& JOINT
VENTURE
Injury
Classification
Class
of person
PUBLIC
Name of Company
1
2
3
FULL NAME(S) OF WITNESS(S)
1:
2:
3:
THIRD
PARTY
MOTOR VEHICLE(S) REGISTRATION NUMBER(S)
GROUP
CAPITAL
DIVISIONS
DIVISION
THIRD
PARTY
DETAILED DESCRIPTION OF THE INCIDENT/ACCIDENT INCLUDING THE NATURE OF INJURY
(e.g.: laceration or fracture or contusion of RH forearm)
DATE:
TEL NO: