400 K ltr
4.00 m
0.20 m
M
fy
scbc
Nominal cover
20
2
415 N/mm
2
7 N/mm
35 mm
400000
4000
200
Tensile stess
Effective cover
sst =
scbc =
k=
150
7
m*c
m*c+sst
j=1-k/3 =
1
R=1/2xc x j x k = 0.5
x
7
0.383
0.872
7
+
150
0.383
400
3.143
2
150 N/mm
13.3
40 mm
20
2
= #### N/mm
m = 13.3
13.3
13.3 x
Dimention of tank:-
\ from which D
wt. of concrete
N/mm2
=
=
m =
=
Cocrete M
N/mm2
mm
mm
mm
4
=
11.57
x
3.80
Provide a diameter of =
0.383
0.872
1.169
say
11.60
11.60
Determination of bending moment and hoop tension:Thickness of wall from empirical formula
= 3H+5 =
4.00
17
cm
= 4.00
x
4.00
H
=
8
h
= H/3 = 4.00
DT
11.60
x
0.17
The height above base, upto which cantilever action will be there is given by
H/3 or
D
Maximum ring tension at this level, per meter height =
w (H-h)
where w
2
11.60
pressure at h/3 = 9800 x ( 4.00 - 1.333 )x
= 151573
N
2
Maximum prerssure at bottom =
wH = 9800 x
4.00
= 39200
N
1
1.33
x
39200
x 1.33 x
\ maximum cantilever B.M. =
Mf =
2
3
9800
= 11615
Design of setion for cantilever action:if d is the effective thickness of tank wall,
11615
1000
Mf
x
D=
=
= 100.00 mm
1000
1.17
1000 R
x
= 100 +
35
=
135 =
say
140
\
Total thickness =d +cover
However, provide a minimum thickness equal to the greater of following;
30
x 4.00 +
50
=
170 Hence provide T=
(I) 150mm (II) 30H+ 50 =
Providing
=
135
35 mm cover to the center of reinforcement,
availble d
Mf
11615
x ###
Ast =
Area of steel for cantilever bending is given by=
=
=
sst . J .d
150 x 0.872 x 135
2
3.14xdia
3.14 x 12 x 12
using # mm bars
A
=
=
=
4 x100
4
x 100
Spacing of hoop Bars = 1000 x
113 /
658
=
172
say
= 170 mm
Hence Provided
12 mm F bar, @
170
mm c/c upto height of 1.40 m from base
Above this height, curtail half bars and continue the other half upto top. Let us test this for devlopment length
12
x 150
f .sst
=
563
mm say
0.56
m
4
0.8
=
4. tbd
x
1.40 m height above the base. These vertical bars are to be
Hence half bars may be curtailed at
=
25 mm
provided inner face . Keep a clear cover of
Ld
151573
N
mm2
1010
=
=
at
mm2
505
3.14 x 12 x 12
=
4
x 100
224
say
= 220 mm
1.40 m from base
mm2
1028
0.652
)x 1028 =
x 11.60 /
2.00 =
mm2
=
=
=
<
1.2
113680
mm2
379
3.14 x 12 x 12
=
4
x 100
298
say
= 290 mm
2.00 m from base
510
443
170
450
2
say
255
= 440 mm c/c
0.30
0.10
100
100
= 0.280
0.280
x
1000 x 170 =
476
area of steel in each face =
100
However , no additional reinforcement will be provided at inner face since the vertical steel for cantilever action
2
will serve this purpose. Hence provided Ast=
238 mm in vertical direction at the outer face.
2
3.14xdia
3.14 x
8
x 8
using 8 mm bars
A
=
=
=
4 x100
4
x 100
Spacing of hoop Bars = 1000 x
50 /
238
=
211
say
= 200 mm
Hence Provided these 8 mm F bar, @ 200
mm c/c
\
Ash
Provision for haunches:It is customary to provide150 mmx150mm haunchesat the junction of wall and base.
A haunches reinforcement of 8 mm f @
200 mm c/c may be provided.
Design of tank floor.:Since the tank floor is resting on ground throughout , provide a minimum thickness of
0.30
Minimum Ast
=
x
150 x 1000
=
450
mm2 in each direction
100
Provide half the reinfocement near each face, Ast
=
225
mm2
2
3.14xdia
3.14 x
8
x 8
using 8 mm bars
A
=
=
=
4 x100
4
x 100
Spacing of hoop Bars = 1000 x
50
/
225
=
223
say
= 200 mm
However provide 8 mm f bars @ 200 mm c/c in both direction , at top and bottom of floor slab.
The floor slab will rest on
75 mm thick layer of lean concrete covered with a layer of tar felt.
Detail of reinforcement :-
joint)
3.80 m
1000
1000
170
mm
1.333
N/m2
N-m/m
mm
170
mm
mm
657.52 mm2
113
mm2
mm
m from base
s for devlopment length
113
mm2
mm
1.2
113680
113
N/mm 2
mm2
mm
mm2
mm c/c
238
mm2
50
mm2
mm
150
mm
50
mm
mm2