MEETING SUMMARY
MeetingNo.2-Design
Anaerobic Treatment of Septage/Corn Stover and Blosollds to produce Blogas,
Electrlcal Power and Treated Biosollds
Townshlp of Georglan Bluffs and Townshlp of Chatsworth
Date:
Tlmc:
Profcu
B:00 a.m.
Attendees:
OS-0A-012-11-OS
Georgian Bluffs
Dlstrlbutlon:
Preparcd
By:
Thoseprosent
Ross Slaughter, p.Eng.
The following items were discussed at Meeting No. 2 for the design of the anaerobic freatment
of
geptage/com stover and biosolids to produce -biogas, electrical power and treated biosolids for the
Actlon Bv:
1.
2.
3.
hs
table of contents for the Design Brief was reviewed which had been
previously sent to members of the committea. The table of conlents
outlined the work tasks to be carried out for the Design Brief.
4.
into
generator.
5.
Ross slaughter reviewed the proposd new electrical power rates from
the ontario Power Authority.for the proposed feed-in iarilf program for
biogas projects which are off-farm. The data avaitable at tht time was
$0.16/kwh for lsss than or equat to soO kw. This has subsequenily
changed to a higher rate for on-farm and the same ralos for ofl-farm.
owEN SOUND 945 Thlrd Avenue East, Suite 212,OwenSound, Ontario N4K 2K8 Tel.: (St9)07&76.t2 Fax:(sr9p76goog
Ac'tlon Bv:
6.
Martin had
7.
8.
Martin Lensink also indicated that material such as corn stover or wheat
straw that is fed in will need to be shredded to a small size such as 1 to
2 cm.
9.
The Comminee indicated that they would like to wait to appty for the
new power prices by tho ontario Power Authority under the feed-in tarff
qrogram: which are approximately a 45o/o increase from the existing
standard otfer Program of approximately $0,11/kwh. wilh the new
program you would get S0.16/kWh. lt looks like there may also be a
2070 escalation clause. We cannot apply for the program until it is
finalized, whereas lf we applied for the ontario power Authority
Slandard Offer Program, then it could be processed within a short
period ol time.
10.
lt was indicated that Ross slaughter should proceed with the Hydro
GENIVAR
11.
Ross slaughter lndicatod that the site survey was scheduled for
Monda July 6, 2009. This was carried out and base plans have been
12,
The next Project Team Meeting is scheduled for g:00 a.m. on Monday,
August 10, 2009 at the Township of Georgian Bluffs.