GENIVAR

MEETING SUMMARY

MeetingNo.2-Design
Anaerobic Treatment of Septage/Corn Stover and Blosollds to produce Blogas,
Electrlcal Power and Treated Biosollds
Townshlp of Georglan Bluffs and Townshlp of Chatsworth

Date:
Tlmc:

Friday, Juty 3, 2@9

Profcu

B:00 a.m.

Locatlon: Municipal Offces of the Township of

Attendees:

Mr. Howard Greig, Mayor, Township of Chatsworth

OS-0A-012-11-OS
Georgian Bluffs

Mr. Bob pringle, Deputy Mayor, Township of Chatsworth

Mr. AlBarfoot, Mayor, Township of Georgian Bluffs

Mr. Dwight Burtey, peguty Mayor, Township of Georgian Blutfs


Mr. WillMoore, CAO, Township of Chalsworth
Mr. BillWhite, CAO, Township of Georgian Blutfs
Mr- Rick Wnter9, Dreclor of Public Works, Township of Georgian Blutfs
Mr. Martin_Lensink, p.Eng., CEM Engineering
Mr. Ross Slaughter, p.Eng., GENIVAR Consultants Lp

Dlstrlbutlon:
Preparcd

By:

Thoseprosent
Ross Slaughter, p.Eng.

The following items were discussed at Meeting No. 2 for the design of the anaerobic freatment
of
geptage/com stover and biosolids to produce -biogas, electrical power and treated biosolids for the

Township of Georgian Bluffs and the Township of Chtsworth:

Actlon Bv:
1.

Mr. Marlin Lensink from cEM Engineering was introduced to committee


members.

2.

Mlnutes of Meeting No. 1 were reviewed and accepted.

3.

hs

table of contents for the Design Brief was reviewed which had been
previously sent to members of the committea. The table of conlents
outlined the work tasks to be carried out for the Design Brief.

4.

There was a briel discussion regarding dewatering of septage. Ross


'boling

slaughter indicated that he was in- the process of

into

dewatsring septage using geotubes and also mechanical mens of


dewatering. However, it should be noted that during the Design Brief
process it was found that this liquid was needed when combind with
the corn stover, estimared ar 40o/o solids, to provide a liquid in the
digester of approximately g.5olo sotids. Martin Lensink ab indicated
thal.during the Deslgn Brief process that heating this extra water in the
septage could easily be done through the wastE heat from the gas

generator.
5.

Ross slaughter reviewed the proposd new electrical power rates from
the ontario Power Authority.for the proposed feed-in iarilf program for
biogas projects which are off-farm. The data avaitable at tht time was
$0.16/kwh for lsss than or equat to soO kw. This has subsequenily

changed to a higher rate for on-farm and the same ralos for ofl-farm.

owEN SOUND 945 Thlrd Avenue East, Suite 212,OwenSound, Ontario N4K 2K8 Tel.: (St9)07&76.t2 Fax:(sr9p76goog

Meeting No.2 -Deoign. JUV 3.2009


Anaeroblc Treanont of Sptag/Blosollds/Com Stalks to Prode Blogas, Elec{rtcal powr artd
Tratd 9iosoll - Tolnoh of Gorgian Blufa and Township of Chais'.rorth

Ac'tlon Bv:

6.

Martn Lensnk reviewed the biodigester process and options avalabl.


very inleresting presentation and answered many
questions with regard to inputs into the digester, how it operates anil
the general design. He also indcated thal rates from lhe Ontario power
Authorily will probably increase somewhat for farm-based digesters.

Martin had

7.

There was a number of questions wlth regard lo what could be treatd


in the digester such as chicken manure, waste products frorn New Life
Mills and abattoir waste. Martin also indicated how the dgester would
stafi up, likely using beef or dairy manure and silage. Once the digester
was operating properly then other products such as corn stovsr will be
fed in.

8.

Martin Lensink also indicated that material such as corn stover or wheat
straw that is fed in will need to be shredded to a small size such as 1 to
2 cm.

9.

The Comminee indicated that they would like to wait to appty for the
new power prices by tho ontario Power Authority under the feed-in tarff
qrogram: which are approximately a 45o/o increase from the existing
standard otfer Program of approximately $0,11/kwh. wilh the new
program you would get S0.16/kWh. lt looks like there may also be a
2070 escalation clause. We cannot apply for the program until it is
finalized, whereas lf we applied for the ontario power Authority
Slandard Offer Program, then it could be processed within a short

period ol time.

10.

lt was indicated that Ross slaughter should proceed with the Hydro

GENIVAR

One Connection Agreement-

11.

Ross slaughter lndicatod that the site survey was scheduled for
Monda July 6, 2009. This was carried out and base plans have been

subsequently prepared for the site, ncluding an air photo plan.

12,

The next Project Team Meeting is scheduled for g:00 a.m. on Monday,
August 10, 2009 at the Township of Georgian Bluffs.

The meeting concluded at 11:00


contact the undersigned.
Prepared by;
GENIVAR Consultanto LP

M.R. Slaughter, P. Eng.


Designated Consulting Engineer
Senior Water Resources Engineer

MFS/dlw
Encl.

a.m. lf there are any erors or omissions

n th abov minutes, pfease