Escolar Documentos
Profissional Documentos
Cultura Documentos
Elemento
Caracteristica
Clase
Elemento
zapatas exentricas
zapatas concentricas
viga A-F (1-3)
viga 1-3 (A-F)
Aceros de
cimentacion y
columnas
Caracteristica
Clase
parilla
parilla
longitudinal
transversal
longitudinal
transversal
longitudinal
transversal
longitudinal
transversal
longitudinal
transversal viga
transversal canal
longitudinal
transversal
parrilla
parrilla
longitudinal
transversal
longitudinal
transversal
longitudinal
transversal
longitudinal
transversal
longitudinal
transversal
longitudinal
transversal
longitudinal
transversal
longitudinal
transversal
longitudinal
transversal
longitudinal
transversal
PDR60
PDR60
PDR60
A-37
PDR60
A-37
PDR60
A-37
PDR60
A-37
PDR60
A-37
A-37
PDR60
PDR60
PDR60
PDR60
PDR60
A-37
PDR60
A-37
PDR60
A-37
PDR60
A-37
PDR60
A-37
PDR60
A-37
PDR60
A-37
PDR60
A-37
PDR60
A-37
PDR60
A-37
Escalera
parrilla
parrilla
longitudinal
transversal
longitudinal
transversal
longitudinal
transversal
longitudinal
transversal
longitudinal
transversal
longitudinal
transversal
longitudinal
transversal
longitudinal
transversal
longitudinal
transversal
longitudinal
transversal
longitudinal
transversal
longitudinal
transversal
longitudinal
transversal
longitudinal
transversal
parilla
PDR60
PDR60
PDR60
A-37
PDR60
A-37
PDR60
A-37
PDR60
A-37
PDR60
A-37
PDR60
A-37
PDR60
A-37
PDR60
A-37
PDR60
A-37
PDR60
A-37
PDR60
A-37
PDR60
A-37
PDR60
A-37
PDR60
A-37
PDR60
Diametro
Longitud (m)
Ganchos (m)
Traslapo (m)
Total longitud
Peso (Kg)
Traslapo (m)
Total longitud
Peso (Kg)
Diametro
Longitud (m)
5
3
5
3
5
3
5
3
5
3
5
3
3
5
3
5
5
5
3
5
3
5
3
5
3
5
3
5
3
5
3
5
3
5
3
5
3
0.95
1.2
5.95
0.80
14.45
0.80
1.65
0.80
2.95
0.80
5.95
0.60
0.57
6.50
0.80
1.95
0.79
5.95
0.8
3.1
0.8
10.6
0.8
8.3
0.8
1.53
0.7
1.73
0.7
3.1
0.7
8.7
0.22
3.2
0.22
6.17
0.22
Ganchos (m)
0.4
0.4
0.40
0.16
0.4
0.16
0.4
0.16
0.4
0.16
0.4
0.16
0.16
0.4
0.16
0.4
0.16
0.4
0.16
0.4
0.16
0.4
0.16
0.4
0.16
0.4
0.16
0.4
0.16
0.4
0.16
0.4
0.16
0.4
0.16
0.6
1.2
0.6
0.6
0.6
0.6
0.6
0.51
0.51
1.35
1.6
6.95
0.96
16.05
0.96
2.05
0.96
3.35
0.96
6.95
0.76
0.73
7.5
0.96
1.95
0.79
6.95
0.96
3.5
0.96
11.6
0.96
9.3
0.96
1.93
0.86
2.13
0.86
3.5
0.86
9.61
0.38
3.6
0.38
7.08
0.38
1.55
0.56
1.55
0.56
1.55
0.56
1.55
0.56
1.55
0.56
1.55
0.56
0.56
1.55
0.56
1.55
1.55
1.55
0.56
1.55
0.56
1.55
0.56
1.55
0.56
1.55
0.56
1.55
0.56
1.55
0.56
1.55
0.56
1.55
0.56
1.55
0.56
5
5
5
3
5
3
5
3
5
3
5
3
5
3
5
3
5
3
5
3
5
3
5
3
5
3
5
3
5
3
5
1.95
0.79
5.95
0.8
3.1
0.8
10.6
0.8
8.3
0.8
1.53
0.7
1.73
0.7
3.1
0.7
8.7
0.22
3.2
0.22
6.17
0.22
8.3
0.5
5.95
0.5
1.35
0.6
1.35
0.4
0.16
0.4
0.16
0.4
0.16
0.4
0.16
0.4
0.16
0.4
0.16
0.4
0.16
0.4
0.16
0.4
0.16
0.4
0.16
0.2
0.16
0.2
0.16
0.4
0.16
0.6
0.6
0.6
0.51
0.51
0.6
0.6
1.95
0.79
6.95
0.96
3.5
0.96
11.6
0.96
9.3
0.96
1.93
0.86
2.13
0.86
3.5
0.86
9.61
0.38
3.6
0.38
7.08
0.38
9.1
0.66
6.75
0.66
1.75
0.76
8.96
0.54
1.35
1.55
1.55
1.55
0.56
1.55
0.56
1.55
0.56
1.55
0.56
1.55
0.56
1.55
0.56
1.55
0.56
1.55
0.56
1.55
0.56
1.55
0.56
1.55
0.56
1.55
0.56
1.55
0.56
1.55
0.56
1.55
Cantidad
Cantidad
14
16
36
180
18
219
6
17
18
108
10
30
30
6
54
10
6
24
120
6
16
12
108
6
42
4
11
4
12
4
21
6
174
6
66
6
126
Total PDR60
Total A-37
Total PDR60
Total A-37
29.295
14.336
387.81
447.795
19.065
93.465
107.725
69.75
29.0304
30.225
7.347
258.54
96.77
117.73
9.14
58.06
12.77
12.26
64.512
32.55
8.6016
215.76
58.0608
86.49
22.5792
11.966
5.2976
13.206
5.7792
21.7
10.1136
89.373
37.0272
33.48
14.0448
65.844
26.8128
10
6
24
120
6
16
12
108
6
42
4
11
4
12
4
21
6
174
6
66
6
126
8
112
4
40
4
7
3
82
18
Subtotal
Desperdicio 5%
TOTAL (+5%)
30.225
7.347
258.54
32.55
215.76
86.49
11.966
13.206
21.7
89.373
33.48
65.844
112.84
41.85
10.85
64.51
8.60
58.06
22.58
5.30
5.78
10.11
37.03
14.04
26.81
41.40
14.78
2.98
41.664
37.665
3176.1024
3326.3724
3326.3724
24.80
896.35
961.35
961.35
TIPO
DESCRIPCION CLASE
DIAMETRO
LONG
CANTIDAD
PESO Kg/m
TABLA MATERIALES
DOSIFICACION
PESO
AREA
ALT
PROPORCION
CEM(KG)
AREN(M)
GRAVILL(M)
3200-3700 PSI
1:2:2
420
0.70
0.70
2800-3500 PSI
1:2:3
350
0.60
0.90
1/4"
0.25
0.32
60 <
2000-2500 PSI
1.00
35 #
(kg/m)
1:2:4
300
0.50
3/8"
0.56
0.71
62 >
Pisos
1:3
454
1.09
1/2"
1.00
1.29
64 @
Mamposteria
1:4
364
1.16
5/8"
1.55
2.00
92 \
Mamposteria
1:5
302
1.20
3/4"
2.24
2.84
94 ^
Talud
1:6
261
1.20
7/8"
3.04
3.87
130
1"
LUZ (m)
VARILLA
CELOSIA
ALTURA
4.00
2 D=3/8"
1 D=3/8"
0.20
1 D="
5.00
2 D=3/8"
1 D=3/8"
0.25
1 D=5/8"
6.00
2 D="
1 D=3/8"
0.30
1 D=5/8"
7.00
2 D="
3.94
5.10
160
5.05
6.45
161
# LONG
10
6.39
8.19
162
4 1.08
11
7.89
10.06
0162
5 1.38
14
11.36
14.52
163
6 1.69
18
20.20
25.81
164
TEJAS
2 D=5/8"
9.00
1 D=7/8"
2 D=3/4"
1 D=7/8"
ESMALTE
166
10 2.91
1 D="
0.35
MURO COMUN
1 D="
1 D="
M/GALON
LADRILL
MORTE
CEME
AREN
KG
M3
55
33
118
16
0.028
0.010
0.068
0.011
13
5
31
5.0
0.03052
0.0109
0.07412
0.012
0.40
0.45
167
1 D=3/4"
8.00
165
8 2.3
SOGA
PANDERETA
DOBLE 0.25m
BLOQUE 4 CANTO
PINTURA
VINILO
M/GALON
168
171
0176
0178
0179
0190
Enero 1 de
Enero 1 de
Enero 1 de
Enero 1 de
Enero 1 de
Enero 1 de
Enero 1 de
Enero 1 de
Enero 1 de
Enero 1 de
Enero 1 de
Enero 1 de
Enero 1 de
Enero 1 de
Enero 1 de
Enero 1 de
Enero 1 de
Enero 1 de
PSI
1,994
1,995
1,996
1,997
1,998
1,999
2,000
2,001
2,002
2,003
2,004
2,005
2,006
2,007
2,008
2,009
2,010
2,011
Proporc
1,994
1,995
1,996
1,997
1,998
1,999
2,000
2,001
2,002
2,003
2,004
2,005
2,006
2,007
2,008
2,009
2,010
2,011
Baldes de 10 litros
Grava
70
2000
1 m
Agua
20
0216
248
2500
bult 50 kg
1 m
1
6
4
18
14
70
0248
253
3000
bult 50 kg
1 m
1
7
3
21
12
70
bult 50 kg
10
1 m
18
72
bult 50 kg
0182
SUPERFICIE NUEVA
12-22 MANOS 3
NUEVA/ESTUCO
25-30 MANOS 3
25-33 MANOS 3
30-40 MANOS 3
DOS/CHARMAP.EXE
35-45 MANOS 2
40-50 MANOS 2
Aaski excel
ANDAZ
3500
V
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
98,700.00
118,933.50
142,125.00
172,005.00
203,826.00
236,460.00
260,100.00
286,000.00
309,000.00
332,000.00
358,000.00
381,500.00
408,000.00
433,700.00
461,500.00
496,900.00
515,000.00
535,600.00
Baldes de 10 litros
Arena
50
10
48
8
49
7
40
5
ITEM
DESCRIPCION
UND.
REND. DIA
EDIFICACIONES
A continuacin se muestra como estudio una tabla de rendimientos aproximados.
ITEM
DESCRIPCION
PRELIMINARES
1.1
Localizacin y replanteo
1.2
Campamento 18 mts.
1.3
Campameto 36 mts.
1.4
1.5
1.6
1.7
1.8
1.9
Desmonte Ventanas
1.10
1.11
1.12
1.13
1.14
1.15
1.16
1.17
CIMENTACION Y DESAGUES
ML
ML
ML
UN
UN
UN
UN
2.3
2.4
2.5
2.6
2.7
2.8
8.00
2.2
2.10
2.11
2.12
2.13
2.14
2.15
2.16
100.00
REND. DIA
M2
UN
UN
M2
M2
M2
M2
M2
M2
M2
M2
M3
M2
M3
ML
ML
VJ
M3
M3
M3
M3
M3
M2
UN
UN
UN
2.1
2.9
UND.
0.50
0.25
10.00
30.00
20.00
18.00
30.00
30.00
10.00
8.00
1.00
80.00
30.00
40.00
40.00
6.00
50.00
4.00
8.00
8.00
30.00
1.00
1.00
1.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
ACERO DE REFUERZO
3.1
Kg
150
3.2
Kg
150
ESRUCTURAS
4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
4.9
4.10
4.11
4.12
4.13
MAMPOSTERIA
5.1
5.2
5.3
5.4
5.5
5.6
5.7
5.8
5.9
5.10
5.11
5.12
5.13
5.14
5.15
5.16
5.17
5.18
5.19
5.20
5.21
Lavada de Fachada
PAETES
6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8
M3
M3
M3
M3
M3
M2
M2
M2
M2
M2
KG
M3
M3
6.00
4.00
2.00
2.00
2.00
5.00
5.00
5.00
5.00
5.00
150.00
0.50
0.50
ML
ML
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
ML
ML
ML
M2
ML
ML
M2
10.00
M2
M2
M2
M2
M2
M2
M2
M2
20.00
8.00
10.00
10.00
6.00
8.00
8.00
5.00
5.00
20.00
12.00
15.00
12.00
8.00
10.00
10.00
10.00
5.00
10.00
3.00
10.00
20.00
20.00
15.00
15.00
15.00
15.00
15.00
6.9
6.10
6.11
Goteras
7.1
7.2
7.3
7.4
7.5
7.6
7.7
7.8
7.9
7.10
7.11
7.12
7.13
7.14
7.15
7.16
7.17
7.18
7.19
7.20
7.21
7.22
7.23
7.24
Cheque RW 1"
7.25
Cheque RW 1 1/2"
7.26
7.27
Registro RW 1/2"
7.28
7.29
7.30
7.31
7.32
7.33
INSTALACIONES ELECTRICAS
8.1
8.2
8.3
8.4
8.5
M2
ML
ML
UN
UN
ML
ML
ML
ML
ML
UN
UN
UN
UN
UN
UN
UN
ML
ML
ML
ML
ML
UN
ML
ML
ML
ML
UN
UN
ML
UN
ML
ML
ML
UN
UN
UN
UN
UN
UN
UN
UN
15.00
100.00
50.00
3.00
3.00
50.00
50.00
50.00
50.00
50.00
6.00
6.00
1.00
1.00
1.00
1.00
1.00
20.00
20.00
20.00
20.00
20.00
5.00
8.00
8.00
8.00
8.00
16.00
16.00
20.00
24.00
20.00
16.00
16.00
4.00
5.00
1.00
1.00
3.00
3.00
3.00
3.00
8.6
8.7
8.8
8.9
8.10
8.11
8.12
8.13
8.14
8.15
8.16
8.17
PINTURA
9.1
Estuco muros
9.2
9.3
9.4
9.5
9.6
9.7
9.8
9.9
9.10
9.11
9.12
9.13
9.14
9.15
9.16
9.17
Granoplast Fachada
9.18
Marmolplast Fachada
9.19
Silcoplast fachada
9.20
Muralfix fachada
9.21
9.22
9.23
10
ENCHAPES
10.1
10.2
10.3
10.4
10.5
10.6
Incrustaciones Tempo
10.7
Incrustaciones Espacio
UN
UN
UN
UN
UN
UN
ML
ML
ML
UN
UN
UN
M2
M2
M2
M2
M2
M2
M2
M2
M2
ML
M2
ML
M2
ML
ML
ML
M2
M2
M2
M2
M2
ML
M2
M2
ML
M2
M2
JGO
JGO
JGO
3.00
1.00
3.00
1.00
1.00
1.00
50.00
50.00
50.00
150.00
16.00
16.00
60.00
40.00
80.00
80.00
80.00
50.00
40.00
80.00
50.00
50.00
30.00
120.00
30.00
60.00
60.00
100.00
40.00
40.00
40.00
40.00
30.00
30.00
30.00
20.00
10.00
20.00
4.00
4.00
4.00
5.00
10.8
10.9
PISOS
11.1
11.2
Polisec
11.3
11.4
11.5
11.6
11.7
11.8
11.9
M2
M2
M2
ML
ML
UN
UN
UN
UN
UN
UN
UN
UN
UN
M3
M2
M2
M2
ML
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
ML
ML
ML
ML
ML
6.00
6.00
6.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
15.00
40.00
10.00
10.00
20.00
40.00
40.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
10.00
10.00
10.00
10.00
80.00
100.00
100.00
3.00
3.00
20.00
40.00
7.00
CUBIERTAS
12.1
12.2
12.3
12.4
12.5
12.6
12.7
12.8
12.9
CIELO RASOS
13.1
13.2
13.3
13.4
13.5
13.6
13.7
ML
ML
ML
16.00
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
ML
M2
M2
M2
M2
M2
ML
ML
M2
M2
M2
M2
M2
M2
20.00
M2
M2
M2
M2
M2
M2
M2
8.00
40.00
40.00
20.00
20.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
10.00
10.00
10.00
50.00
5.00
10.00
10.00
20.00
20.00
50.00
50.00
20.00
15.00
50.00
20.00
20.00
50.00
20.00
10.00
30.00
30.00
30.00
30.00
13.8
13.9
13.10
CARPINTERIA DE MADERA
14.1
14.2
14.3
14.4
14.5
14.6
14.7
14.8
14.9
CARPINTERIA METALICA
15.1
15.2
15.3
15.4
15.5
15.6
15.7
15.8
15.9
Inc. Anticorr.
APARATOS SANITARIOS
16.1
16.2
16.3
16.4
M2
M2
M2
M2
M2
30.00
M2
M2
ML
UN
UN
UN
UN
UN
UN
ML
M2
UN
ML
ML
M2
1.00
M2
M2
M2
M2
M2
M2
M2
M2
M2
ML
UN
ML
ML
ML
KG
M2
M2
UN
UN
UN
UN
30.00
30.00
30.00
30.00
1.00
1.00
10.00
10.00
10.00
10.00
10.00
10.00
8.00
4.00
3.00
10.00
8.00
2.00
10.00
10.00
10.00
4.00
4.00
4.00
20.00
10.00
40.00
10.00
8.00
4.00
4.00
50.00
100.00
4.00
4.00
30.00
5.00
5.00
5.00
16.5
16.6
16.7
16.8
16.9
VIDRIOS Y CERRADURAS
17.1
Vidrio 4 MM
17.2
Vidrio 5 MM
17.3
17.4
17.5
17.6
18
OBRAS EXTERIORES
18.1
18.2
18.3
18.4
18.5
Pradizacion
18.6
18.7
UN
UN
UN
UN
UN
UN
UN
5.00
5.00
5.00
5.00
5.00
5.00
10.00
M2
M2
M2
UN
UN
UN
100.00
ML
M2
M2
M2
M2
M2
UN
10.00
100.00
100.00
20.00
20.00
20.00
30.00
30.00
50.00
50.00
1.00
1.00
PRESUPUESTO
ITEM
1
DESCRIPCION
UND.
PRELIMINARES
1.1
Localizacin y replanteo
M2
1.2
Campamento 18 mts.
UN
1.3
Campameto 36 mts.
UN
1.4
M2
1.5
M2
1.6
M2
1.7
M2
1.8
M2
1.9
Desmonte Ventanas
M2
1.10
M2
1.11
M2
1.12
M3
1.13
M2
1.14
M3
1.15
ML
1.16
ML
1.17
ML
1.18
VJ
CIMENTACION Y DESAGUES
2.1
M3
2.2
M3
2.3
M3
2.4
M3
2.5
M3
2.6
M2
2.7
UN
2.8
UN
2.9
UN
2.10
ML
2.11
ML
2.12
ML
2.13
ML
2.14
UN
2.15
UN
2.16
UN
2.17
UN
CANT
V/UNITARIO
ITEM
3
DESCRIPCION
UND.
ACERO DE REFUERZO
3.1
Kg
3.2
Kg
ESRUCTURAS
4.1
M3
4.2
M3
4.3
M3
4.4
M3
4.5
M3
4.6
M2
4.7
M2
4.8
M2
4.9
M2
4.10
M2
4.11
KG
4.12
M3
4.13
M3
MAMPOSTERIA
5.1
ML
5.2
ML
5.3
M2
5.4
M2
5.5
M2
5.6
M2
5.7
M2
5.8
M2
5.9
M2
5.10
M2
5.11
M2
5.12
M2
5.13
M2
5.14
M2
5.15
ML
5.16
ML
5.17
ML
5.18
M2
5.19
ML
5.20
ML
5.21
Lavada de Fachada
M2
CANT
V/UNITARIO
ITEM
6
DESCRIPCION
UND.
PAETES
6.1
M2
6.2
M2
6.3
M2
6.4
M2
6.5
M2
6.6
M2
6.7
M2
6.8
M2
6.9
M2
6.10
ML
6.11
Goteras
ML
7.1
UN
7.2
UN
7.3
ML
7.4
ML
7.5
ML
7.6
ML
7.7
ML
7.8
UN
7.9
UN
7.10
UN
7.11
UN
7.12
UN
7.13
UN
7.14
UN
7.15
ML
7.16
ML
7.17
ML
7.18
ML
7.19
ML
7.20
UN
7.21
ML
7.22
ML
7.23
ML
7.24
ML
7.25
Cheque RW 1"
UN
7.26
Cheque RW 1 1/2"
UN
7.27
ML
7.28
Registro RW 1/2"
UN
7.29
ML
CANT
V/UNITARIO
ITEM
7.30
DESCRIPCION
Red de suministro tubera galvanizada 1/2"
7.31
ML
7.32
UN
7.33
UN
7.34
UN
8.1
UN
8.2
UN
8.3
UN
8.4
UN
8.5
UN
8.6
UN
8.7
UN
8.8
UN
8.9
UN
8.10
UN
8.11
UN
8.12
ML
8.13
ML
8.14
ML
8.15
UN
8.16
UN
8.17
UN
UND.
ML
PINTURA
9.1
Estuco muros
M2
9.2
M2
9.3
M2
9.4
M2
9.5
M2
9.6
M2
9.7
M2
9.8
M2
9.9
M2
9.10
ML
9.11
M2
9.12
ML
9.13
M2
9.14
ML
9.15
ML
9.16
ML
9.17
Granoplast Fachada
M2
9.18
Marmolplast Fachada
M2
9.19
Silcoplast fachada
M2
CANT
V/UNITARIO
ITEM
DESCRIPCION
UND.
9.20
Muralfix fachada
M2
9.21
M2
9.22
ML
9.23
M2
10
ENCHAPES
10.1
M2
10.2
ML
10.3
M2
10.4
M2
10.5
JGO
10.6
Incrustaciones Tempo
JGO
10.7
Incrustaciones Espacio
JGO
10.8
M2
10.9
M2
M2
ML
ML
UN
UN
UN
UN
UN
UN
UN
UN
UN
11
PISOS
11.1
M3
11.2
Polisec
M2
11.3
M2
11.4
M2
11.5
ML
11.6
M2
11.7
M2
11.8
M2
11.9
M2
M2
M2
M2
M2
M2
M2
CANT
V/UNITARIO
ITEM
DESCRIPCION
11.16 Adoqun gres peatonal 10*20*2,5
UND.
M2
M2
M2
M2
M2
M2
M2
M2
M2
ML
ML
ML
ML
ML
ML
ML
ML
12
CUBIERTAS
12.1
M2
12.2
M2
12.3
M2
12.4
M2
12.5
M2
12.6
M2
12.7
M2
12.8
M2
12.9
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
ML
M2
M2
M2
M2
M2
ML
CANT
V/UNITARIO
ITEM
DESCRIPCION
UND.
ML
M2
M2
M2
M2
M2
M2
13
CIELO RASOS
13.1
M2
13.2
M2
13.3
M2
13.4
M2
13.5
M2
13.6
M2
13.7
M2
13.8
M2
13.9
M2
13.10
M2
M2
M2
14
CARPINTERIA DE MADERA
14.1
M2
14.2
M2
14.3
ML
14.4
UN
14.5
UN
14.6
UN
14.7
UN
14.8
UN
14.9
UN
ML
M2
UN
ML
ML
M2
15
CARPINTERIA METALICA
15.1
M2
15.2
M2
15.3
M2
15.4
M2
15.5
M2
15.6
M2
CANT
V/UNITARIO
ITEM
15.7
DESCRIPCION
Suministro e Insta. Reja tipo bancario Inc. Anticorr.
UND.
15.8
M2
15.9
M2
M2
ML
UN
ML
ML
ML
KG
M2
M2
16
APARATOS SANITARIOS
16.1
UN
16.2
UN
16.3
UN
16.4
UN
16.5
UN
16.6
UN
16.7
UN
16.8
UN
16.9
UN
UN
UN
17
VIDRIOS Y CERRADURAS
17.1
Vidrio 4 MM
M2
17.2
Vidrio 5 MM
M2
17.3
M2
17.4
UN
17.5
UN
17.6
UN
18
OBRAS EXTERIORES
18.1
ML
18.2
M2
18.3
M2
18.4
M2
18.5
Pradizacion
M2
18.6
M2
18.7
UN
CANT
V/UNITARIO
V/PARCIAL
V/PARCIAL
ANDAZ
V/PARCIAL
V/PARCIAL
V/PARCIAL
V/PARCIAL
V/PARCIAL
V/PARCIAL
PRESUPUESTO F-01
OBRA:
LOCALIZACION:
SECTOR:
PROPONENTE:
ITEM
MUNICIPIO:
FECHA:
DESCRIPCION
UND.
CANTIDAD
V/UNITARIO V/PARCIAL
V/CAPITULO
25%
PROPONENTE:
C.C.#
ANDAZ
Direccin
Telefonos , Correo electronico
PRESUPUESTO F-01
OBRA:
LOCALIZACION:
SECTOR:
PROPONENTE:
ITEM
MUNICIPIO:
FECHA:
DESCRIPCION
UND.
CANTIDAD
V/UNITARIO V/PARCIAL
V/CAPITULO
MAMPOSTERIA
M2
12
25,000.00
300,000.00
M2
15.6
23,600.00
368,160.00
TOTAL MAMPOSTERIA
668,160.00
4 PAETES
4.1 Paete liso 1:4 Bajo placa
M2
156.25
8,900.00
1,390,625.00
M2
99.51
9,560.00
951,315.60
ML
1256
2,600.00
3,265,600.00
TOTAL PAETES
5,607,540.60
25%
6,275,700.60
1,568,925.15
7,844,625.75
PROPONENTE:
C.C.#
direccion
celular
ANDAZ
Direccin
Telefonos , Correo electronico
PRESUPUESTO F-01
OBRA:
LOCALIZACION:
SECTOR:
PROPONENTE:
ITEM
MUNICIPIO:
FECHA:
DESCRIPCION
PISOS
Base en mate afirmado
6.1
6 MAMPOSTERIA
muro tolete comun e=0.12
TOTAL PAETES
UND.
M3
M3
CANTIDAD
V/UNITARIO V/PARCIAL
100
50
41,888.00
306,150.00
V/CAPITULO
4,188,800.00
15,307,500.00
19,496,300.00
M2
80
28,041.00
2,243,280.00
2,243,280.00
25%
21,739,580.00
5,434,895.00
27,174,475.00
PROPONENTE:
C.C.#
direccion
celular
ANDAZ
L (m)
A (m)
h (m)
SUBTOTAL UND
TOTAL
2.
DESCRIPCION
TOTAL
L (m)
A (m)
h (m)
SUBTOTAL
UND
FECHA:
Mayo de 2011
DESCRPCION
1 Concreto simple 3000 psi
2 Muro tolete comun e=0,12
UND
CANTIDAD
m3
m2
10
100
CEMENTO
PIEDRA RAJON
ACERO PDR 60
ACERO A37
PUNTILLA 1"
TUBERIA
SANITARIA 2"
LADRILLO
COMUN
LADRILLO SEMIPRENSA
M3
KG
M3
KG
KG
LB
ML
UN
UN
8.6
3500
1300
ARENA LAVADA
ARENA PEA
GRAVILLA
M3
M3
5.5
3.052
1403.052
ARENA LAVADA
TOTAL MATERIAL
ARENA PEA
GRAVILLA
CEMENTO
PIEDRA RAJON
ACERO PDR 60
M3
KG
M3
M3
M3
KG
5.50
3.05
8.60
4,800.00
ACERO A37
PUNTILLA 1"
TUBERIA
SANITARIA 2"
LADRILLO
COMUN
LADRILLO SEMIPRENSA
KG
LB
ML
UN
UN
1,403.05
e 2011
FECHA:
Novienbre de 2011
DESCRPCION
UND
CANTIDAD
1.1
1.2
1.3
1.4
1.5
Localizacion y replanteo
Campamento 18 m
Descapote manual y retiro
Cerramiento en polisombra h= 3 m
Retiro de escombros
m
und
m
ml
vj
87
1
87
41
5
2.1
6.9
2.2
2.3
m
m
6.9
4.6875
2.4
2.5
2.6
2.7
m
m
m
m
10
96.25
132
87
2.8
2.9
kg
kg
896.3472
3176.1024
3.1
3.2
und
und
3
1
4.1
4.2
4.3
m
m
m
7.428125
2.5
0.196
4.4
1.7394
m
m
m
57.48
0.2445
87
4.8
4.9
m
m
57.48
1.966
5.1
5.2
m
m
18.4
296.518
6.1
648.4575
7.1
7.2
7.3
und
ml
ml
1
28
23.52
4.5
4.6
4.7
Aceite
quemado
ACPM--(Para
formaleta)
galon
galon
unidad
Und
Und
Und
Und
Adaptador
terminal 1''
und
Adaptador
terminal 1/2''
conduit
und
7.4
7.5
7.6
7.7
7.8
7.9
ml
ml
ml
und
und
ml
10.96
24.71
11.88
8
25
3
8.1
8.2
8.3
und
und
und
1
1
19
und
und
und
und
2
1
1
1
8.8
und
9.1
415.363
9.2
114.96
10.1
5.91
10.2
55.23
10.1
10.2
m
ml
157.47
15.4
12.1
63.052
12.2
63.052
12.3
13.1
13.2
und
m
14
19.8
14.1
14.2
14.3
14.4
m
m
m
m
4.6945
9.246
5.738
15.56
14.5
10.548
15.1
15.2
15.3
15.6
und
und
und
und
5
5
5
4
16.1
16.2
16.3
16.4
Vidrio 4mm
Cerraduras alcobas y baos
Cerra dura entrada doble
Espejos
m
und
und
und
20.2564
13
3
0.6
8.4
8.5
8.6
8.7
3
49.4
6.72
2.1
1.05
17.1
Anden Adoquin
4.8
18.1
Area construida
200
TOTAL MATERIAL
Adaptador
terminal 1''
und
Adaptador
terminal 1/2''
conduit
und
1.00
62.27
Novienbre de 2011
Agua
litro
Alambre
Alambre
alambre
alambre
alambre
de cobre
Cu THW 8
calibre 10 calibre 12 calibre 14
N 10- 12AWG
14
ml
ml
ml
m
ml
Alambre
de puas
Alambre
desnudo
Alambre
N18
Alambre
negro
ml
ml
kl
Kilos
Alambre
para
timbre
ml
Amarre
Amarre
Angulo de Angulo 3/4
para
plstico p/
1 x ''
* 1/8
caballete
cable
unidad
unidad
m
ml
Anticorrosivo
rojo claro
Arena de
pea
Galon
m3
787.5
72.5
24062.5
87
44.82
95.28
429.75
92.25
2.78
0.58
1307.35
440
3.45
15.60
300.57
3.65
827.71
42.25
1531.2
6.90
0.51
827.71
330.29
6.90
0.24
0.196
187.68
1512.24
1.28
10.32
112591.68
15.04
18
24
106.59
53.01
9.12
22.32
10.13
2
17.14
165.69
16
2.35
1.08
30.19
3.58
76.56
Agua
litro
145,606.02
Alambre Alambre
alambre
alambre
alambre Cu THW 8 de cobre
calibre 10 calibre 12 calibre 14
AWG
N 10- 12ml
ml
ml
m
ml
18.00
139.71
75.33
Alambre
de puas
ml
Alambre
desnudo
ml
Alambre
N18
kl
2.00
261.09
Alambre
negro
Kilos
Alambre
para
timbre
ml
10.13
Amarre
Amarre
para
plstico p/ Angulo de Angulo 3/4
caballete
cable
1 x ''
* 1/8
unidad
unidad
m
ml
16.00
32.54
Anticorrosivo
rojo claro
Galon
Arena de
pea
m3
4.66
30.01
Arena de
pea
Arena
lavada
Arena de
pea
Arena
lavada
Arena
lavada
Arena
lavada
Bisagra
Comun
Bisagra alunio
exterior 2''
Bocel porcelana
remate
viaje
m3
viaje
viaje
und
und
und
Bombilla
Bloque N Bloque N Bloque N
bombillo
incrustada
4
6
5
ahorrador
(Balas)
Und
Und
Und
unidad
Und
4.35
2.95
0.415
0.12
0.04
4.90
1.65
0.01
0.04
3.10
0.16
4.79
3.10
1.24
4447.77
bombillo
silvania
100 w
Und
Boton
timbre
breaker 12
A
und
und
0.10
56.15
1.08
27.52
8.22
16.34
0.44
Arena de
pea
viaje
Arena
lavada
m3
28.49
Arena de
pea
viaje
Arena
lavada
m
Arena
lavada
viaje
Arena
lavada
m
Bisagra
Comun
und
Bisagra alunio
exterior 2''
und
Bocel porcelana
remate
und
Bombilla
Bloque N Bloque N Bloque N incrustada bombillo
4
6
5
(Balas)
ahorrador
Und
Und
Und
unidad
Und
41.74
16.34
56.15
4,447.77
bombillo
silvania
100 w
Und
Boton
timbre
und
1.00
breaker 12
A
und
ml---Longitud
Caballete
articulado
und
cable
antifraude
monofasic
o
ml
Cable
desnudo
N1/0
ml
Cable
coaxial
Caja 60*60*12
Caja Complex
4*4
cajas 2400 y
suplemento
Cajas 5800
en aluminio
Cajas 5800
plastica
Cajas Conduit
de 4"
Caja sencilla
conduit
ml
und
unidad
unidad
unidad
unidad
und
und
Caseton
(guadua
lona)
m2
28.74
2.874
Cedro
Caqueta
Pieza
und
1
25.65
3.78
1.05
16
1.05
8.4
20.59
Caballete
articulado
und
8.40
cable
antifraude
monofasic
ml
Cable
desnudo
N1/0
ml
Cable
coaxial
ml
16.00
Caja Complex
Caja 60*60*12
4*4
und
unidad
1.00
cajas 2400 y
suplemento
unidad
Cajas 5800
en aluminio
unidad
Cajas 5800
plastica
unidad
Cajas Conduit
de 4"
und
Caja sencilla
conduit
und
Caseton
(guadua
lona)
m2
Cedro
Caqueta
Pieza
und
31.53
31.61
20.59
Cemento
"ARGOS"
cemento
blanco
Cemento
gris
Cenefa
Cenefa
corona
ceramica de
40*40cm alfa
Kg
kg
Kilos
un
ml
m2
2535.75
1722.66
130
895.35
197
2859.83
385
7.55
657.49
1810.62
92.42
2871
1810.62
722.51
401.86
3237.98
4720.77
ceramica de
40*40cm
corona
m2
ceramica de
40*40cm
iberica
m2
ceramica para
pared 20*20cm
alfa
m2
ceramica para
pared 20*20cm
corona
m2
m2
431.98
29.89
30.73
3.43
38.66
987.34
184.8
80.31
161.7
6.16
137.28
Cemento
"ARGOS"
Kg
cemento
blanco
kg
26,860.41
290.26
Cemento
gris
Kilos
Cenefa
un
Cenefa
corona
ml
ceramica de
40*40cm alfa
m2
ceramica de
40*40cm
corona
m2
ceramica de
40*40cm
iberica
m2
ceramica para
pared 20*20cm
alfa
m2
ceramica para
pared 20*20cm
corona
m2
ceramica para
piso de
30*30cm
iberica
m2
Ceramica
mediterraneo
30*30
m
Cerraduras
(Puerta cerradura schlage
principal- entrada hierro 50
alcobas)
Und
und
Cerradura yale
entrada hierro
und
chapas y
chapas y
Codo 90 - Codo 90 - Codo 90 - Codo 90 cerraduras cerraduras inater
1 1/2
2''
3''
4''
inater grande
pequea
Und
Und
und
und
und
und
Codos
1/2"
Codos
3/4"
Und
Und
2.05
0.48
15
0.42
162.1941
13
3.15
ceramica para
piso de
30*30cm
m2
Ceramica
mediterraneo
30*30
m
162.19
Cerraduras
(Puerta cerradura schlage
principal- entrada hierro 50
Und
und
13.00
Cerradura yale
entrada hierro
und
3.15
chapas y
chapas y
cerraduras cerraduras inater Codo 90 - Codo 90 - Codo 90 - Codo 90 inater grande
pequea
1 1/2
2''
3''
4''
Und
Und
und
und
und
und
15.90
Codos
1/2"
Und
2.05
Codos
3/4"
Und
Concreto
de 3000
PSI
m
Concreto de
2500 PSI
Concreto de
2000 PSI
Contador
trifasico
und
Division
Dilatacion
bao
bronce aluminio y
acrilico
ml
und
Ducha
agua
caliente
und
ducha
agua fria
Und
Enchape Enchpae
pared
piso
Espejo 4
(estrato
(estrato
mm
alto y bajo) alto y bajo)
m2
m2
m
kg
Und
28
1517.47
1517.47
31.46
Granito
Gravilla
bot
0.31
5.85
315.26
10.55
0.63
Concreto
de 3000
PSI
m
Concreto de
2500 PSI
m
Concreto de
2000 PSI
m
Contador
trifasico
und
1.00
Division
Dilatacion
bao
bronce aluminio y
ml
und
0.31
10.55
Ducha
agua
caliente
und
5.00
ducha
agua fria
Und
Enchape
pared
(estrato
m2
Enchpae
piso
(estrato
m2
Espejo 4
mm
m
0.63
343.26
Granito
bot
5.85
Gravilla
m
Gravilla
Gravilla
Hilasa
Incrustaciones
m3
Viaje
kg
und
Interruptor
conmutable
doble
und
Interruptores
unidad
Juego de bao--Ladrillo a
Kit de aseo
(Tres estratos)
la vista
und
und
Und
Ladrillo
Ladrillo
Ladrillo Sta
semiprens
prensado
Fe
ado
Und
Und
Und
Ladrillo
Tolete
Und
6.52
4.43
0.42
0.13
0.04
564
92.00
7.35
2.48
0.02
1.69
4.66
0.24
9.57
4.66
1.86
467.73
Und
19
1.68
0.10
1.77
27.62
47.24
2.58
6.85
0.44
210
Gravilla
m3
44.60
Gravilla
Viaje
Hilasa
kg
Incrustaciones
und
Interruptor
conmutable
doble
und
76.63
4.00
1.68
Juego de bao--Ladrillo a
(Tres estratos) Kit de aseo la vista
und
und
Und
19.00
210.00
Ladrillo
Ladrillo semiprens Ladrillo Sta
prensado
ado
Fe
Und
Und
Und
Ladrillo
Tolete
Und
1,123.73
5.00
Lavamanos
acuario
Und
Lavamanos
Lavamanos
con
Lija N 100 Lija N 220
corona
pedestal
Und
Und
pliego
pliego
Lija N1400
Lija N 80
Limpiador CPVC
Limpiador PVC
Llaves terminales
pliego
Hoja
Und 1/4
1/4
Und
0.01
0.28
0.24
Machimbrado (
Lona plastica para
Instalado y m2 sin
caseton
instalar)
m
m2
0.11
0.25
0.12
0.08
0.25
0.03
0.01
0.19
0.02
0.01
0.01
8.31
2.30
Lavamanos
Lavamanos
con
Lavamanos
acuario
pedestal
corona Lija N 100 Lija N 220
Und
Und
Und
pliego
pliego
Lija N1400
pliego
10.61
Lija N 80
Hoja
Limpiador CPVC
Und 1/4
Limpiador PVC
0.25
1.60
Machimbrado (
Lona plastica para Instalado y m2 sin
Llaves terminales
caseton
instalar)
Und
m
m2
1.00
Malla
electrosoldada (
especificaciones)
m2
1.74
marco lamina
para ventana de
1.40*1 m
Und
marco madera
para ventana de
1.40*1 m
Und
Marmolina
Manija para
ventanas
Mortero 1.4
Mortero 1.3
Mortero 1.2
Pasta
Pegacor
Blt
und
kg
kg
228.44965
1.1496
29.55
248.535
3.85
15.56
Malla
electrosoldada (
especificaciones)
m2
1.74
marco lamina
para ventana de
1.40*1 m
Und
marco madera
para ventana de
1.40*1 m
Und
Marmolina
Blt
Manija para
ventanas
und
3.85
15.56
Mortero 1.4
m
Mortero 1.3
m
Mortero 1.2
m
Pasta
kg
Pegacor
kg
229.60
278.09
Pegante Colbon
Piedra media
zonga
Piedra media
zonga
Pirland bronce
0.80
Polietileno
Polisec
Polisombra
Porta Candado
simple
kg
m3
viaje
Galon
ml
m2
ml
und
2
41
132
2.955
57.9915
12.32
126.104
4.95
Pegante Colbon
kg
4.95
Piedra media
zonga
m3
Piedra media
zonga
viaje
Pirland bronce
0.80
ml
Polietileno
m
12.32
132.00
Polisec
m2
Polisombra
ml
Porta Candado
simple
und
41.00
2.00
126.10
puerta en madera
de 0.80*2.10m
Puerta (lamina
triplex)
Puerta en alumino
Und
und
Puntilla
Recebo
Reducciones
Reducciones 3/4 a
1/2
Registros
Repisa
Rosetas
Lb
Und
Und
Und
unidad
unidades Ml
und
1.83
4
10.25
7.03
15
125.13
0.45
0.1
62.40
3.75
0.20
56.45
8
0.29
6.78
13.22
1.15
0.95
2.874
1.15
1.15
2.06
2.874
4.07
19
2.1
1.26104
14
9.9
9.25
puerta en madera
de 0.80*2.10m
Und
Puerta (lamina
triplex)
und
Puerta en alumino
m
Puntilla
Lb
Recebo
m
14.00
9.25
112.71
127.68
Reducciones
Und
Reducciones 3/4 a
1/2
Und
Registros
Und
Repisa
unidades Ml
Rosetas
und
103.93
21.10
sanitario acuario
sanitario
mansensa
sanitario varios
tonos corona
Segueta
Segueta
Semi-codo 1/2"
Semi-codo 3/4"
Semicodos
Sika 1
Soldadura
electrica
Soldadura CPVC
Und
Und
Und
Und hoja
Und
Und
Und
Und
Galones
kg
Und 1/4
26.89
158.81
0.0392
1.7394
10.12
0.75
2.49
sanitario acuario
Und
sanitario
mansensa
Und
5.00
sanitario varios
tonos corona
Und
Segueta
Und hoja
185.70
Segueta
Und
Semi-codo 1/2"
Und
Semi-codo 3/4"
Und
Semicodos
Und
Sika 1
Galones
Soldadura
electrica
kg
11.90
3.24
Soldadura CPVC
Und 1/4
Soldaura Liquida
PVC
Suministro de
acero 37000
Suministro de
acero 60000
Tabla 0.10
Tabla burra
Tabla chapa
Tee 1/2"
Tee 3/4"
Teja de Barro
Teja de zinc
1/4
kg
kg
ml
ml
ml
und
Und
Und
Und m2
und
127
17.34
985.98
3493.71
13.5
3.6
20.06
9.25
0.31
241.42
3.45
1.78
44.37
241.42
0.05
0.84
0.71
3.45
17.73
0.33
0.74
0.36
0.24
2
0.03
0.04
0.19
0.02
0.01
0.01
1
11.82
4.8
Soldaura Liquida
PVC
0.25
Suministro de
acero 37000
kg
Suministro de
acero 60000
kg
Tabla 0.10
ml
Tabla burra
ml
Tabla chapa
ml
5.56
1,468.81
3,510.81
16.62
200.38
44.37
1.00
Tee 1/2"
Und
Tee 3/4"
Und
Teja de Barro
Und m2
Teja de zinc
und
Teja Eternit N 10
Teja Eternit N 6
Teja Eternit N 8
Tiras alistado
madera
ml
und
14
toma corriente
doble 10 amp
/125 vol
unidad
toma corriente
sencillo 10 amp
/125 vol
unidad
toma corriente
sencillo mas
interruptor
unidad
Tornillo M 2*8
Tuberia aguas
lluvias de 3"
Tuberia aguas
lluvias de 4"
und
ml
ml
26.25
40.98
41.58
60.984
Teja Eternit N 10
Und mtr 3-90
Teja Eternit N 6
Und mtr 180-90
54.98
Teja Eternit N 8
Und mtr 240-90
Tiras alistado
madera
ml
toma corriente
doble 10 amp
/125 vol
unidad
toma corriente
sencillo 10 amp
/125 vol
unidad
toma corriente
sencillo mas
interruptor
unidad
Tornillo M 2*8
und
Tuberia aguas
lluvias de 3"
ml
60.98
26.25
Tuberia aguas
lluvias de 4"
ml
Tuberia CPVC--1/2
Tuberia electrica
de 1/2
Tuberia electrica
de 1/4
Tuberia electrica
de 3/4
Tubo (*3m)
Tubo (*3m)
Tubo (*3m)
Tubo (*3m)
Tubo (*3m)
ml
5.2
29.4
24.70
un tubo (6 metros)
6.3
6.3
64.22
8.04
9.92
12
Tuberia CPVC--1/2
Tubo (*3m)
Tuberia electrica
de 1/2
Tubo (*3m)
6.30
100.48
Tuberia electrica
de 1/4
Tubo (*3m)
Tuberia electrica
de 3/4
Tubo (*3m)
24.70
Tuberia sanitaria
de 14''
Tuberia sanitaria
de 16''
Tuberia sanitaria
de 2''
Tuberia sanitaria
de 20''
Tuberia sanitaria
de 3''
Tuberia sanitaria
de 4''
Uniones
Und
4.76
und
16.44
25.95
12.47
8.4
3.15
1.86
Tuberia sanitaria
de 14''
m
Tuberia sanitaria
de 16''
m
Tuberia sanitaria
de 2''
m
12.47
Tuberia sanitaria
de 20''
m
Tuberia sanitaria
de 3''
m
Tuberia sanitaria
de 4''
m
37.50
16.44
Uniones
Und
1.86
und
Union sanitario 1
Union PVC de 3/4
1/2
und
ml
Vara de clavo
Varilla 1''
Varilla 1/2
Varilla 1/2
Varilla 3/8
Varilla 7/8
Varilla de 1 Pulg
kg
ml-Und
KG
ml-Und
KG
ml-Und
ml-Und
66
164
4.00
4.20
2.02
2.02
Union sanitario 1
1/2
Union PVC de 3/4
und
ml
4.00
Vara de clavo
kg
230.00
Varilla 1''
ml-Und
Varilla 1/2
KG
Varilla 1/2
ml-Und
Varilla 3/8
KG
Varilla 7/8
ml-Und
Varilla de 1 Pulg
ml-Und
Varilla de 1/4
Varrilla 3/4
Varilla cw 3/4*2,40
kilo
ml
Varillon
ml
43.5
Ventaneria (
ventanas ,
materiales y
precios)
1.40- 1 m
Ventana alumino
vidrio para
ventana 4mm
Vidrios para
ventana
Vinitex
Und
galon
Und
20.76815
5.748
5.74
21.27
Varilla de 1/4
kilo
Varrilla 3/4
ml
Varilla cw 3/4*2,40
m
Varillon
1.00
43.50
Ventaneria (
ventanas ,
materiales y
1.40- 1 m
Ventana alumino
m
vidrio para
ventana 4mm
m
5.74
21.27
Vidrios para
ventana
Und
Vinitex
galon
26.52
yeso
Und
Und
kg
kg
yeso
kg
CAPITULO:
DESCRIPCION: CONCRETO DE 3000 PSI
UNIDAD :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
MARCA
Herramienta menor
Mezcladora
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
400.00
1.00
400.00
1.00
10,000.00
1 bulto
10,000.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
V\PARCIAL
Agua
litro
160.00
10.00
1,600.00
Arena lavada
m3
0.60
65000.00
39,000.00
Cemento "ARGOS"
Kg
350.00
390.00
136,500.00
Gravilla
m3
0.90
40600.00
36,540.00
1%
2,136.40
PRECIO UNITARIO
DESPERDICIO MATERIAL %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
CUADRILLA
TIPO
A4
JORNAL TOT
RENDIMIENTO
V\UNITARIO
209,000.00
8.00
26,125.00
SUBTOTAL
PROPONENTE :
OBJETO:
CAPITULO:
DESCRIPCION: CONCRETO SIMPLE DE 2500 PSI
UNIDAD :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
MARCA
Herramienta menor
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
400.00
1.00
400.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
V\PARCIAL
Agua
litro
160.00
10.00
1,600.00
Arena lavada
m3
0.50
65000.00
32,500.00
Gravilla
m3
1.00
40600.00
40,600.00
Cemento "ARGOS"
Kg
300.00
390.00
117,000.00
1%
1,917.00
PRECIO UNITARIO
DESPERDICIO MATERIAL %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
A5
JORNAL TOT
RENDIMIENTO
V\UNITARIO
247,000.00
8.00
30,875.00
SUBTOTAL
PROPONENTE :
CAPITULO:
DESCRIPCION: CONCRETO DE 2000 PSI
UNIDAD :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
MARCA
Herramienta menor
Mezcladora
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
400.00
1.00
400.00
1.00
10,000.00
1 bulto
10,000.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
litro
145.00
10.00
1,450.00
Cemento "ARGOS"
Kg
260.00
390.00
101,400.00
Gravilla
m3
0.84
40600.00
34,104.00
Arena lavada
m3
0.83
65000.00
53,950.00
1%
1,909.04
Agua
DESPERDICIO MATERIAL %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
CUADRILLA
TIPO
A4
JORNAL TOT
RENDIMIENTO
V\UNITARIO
209,000.00
8.00
26,125.00
SUBTOTAL
PROPONENTE :
OBJETO:
CAPITULO:
DESCRIPCION: MORTERO 1:4
UNIDAD :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
MARCA
Herramienta menor
Mezcladora
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
400.00
1.00
400.00
1.00
10,000.00
1 bulto
10,000.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
Cemento "ARGOS"
Kg
Arena de pea
m3
364.00
390.00
141,960.00
1.16
34800.00
40,368.00
Agua
litro
170.00
10.00
1,700.00
1%
1,840.28
DESPERDICIO MATERIAL %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
CUADRILLA
TIPO
A4
JORNAL TOT
RENDIMIENTO
V\UNITARIO
209,000.00
8.00
26,125.00
SUBTOTAL
PROPONENTE :
OBJETO:
CAPITULO:
DESCRIPCION: MORTERO 1:3
UNIDAD :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
MARCA
Herramienta menor
Mezcladora
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
400.00
1.00
400.00
1.00
10,000.00
1 bulto
10,000.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
V\PARCIAL
Agua
litro
165.00
10.00
1,650.00
Arena de pea
m3
1.16
34800.00
40,368.00
Cemento "ARGOS"
Kg
452.00
390.00
176,280.00
1%
2,182.98
PRECIO UNITARIO
DESPERDICIO MATERIAL %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
CUADRILLA
TIPO
A4
JORNAL TOT
RENDIMIENTO
V\UNITARIO
209,000.00
8.00
26,125.00
SUBTOTAL
PROPONENTE :
OBJETO:
CAPITULO:
DESCRIPCION: MORTERO 1:2
UNIDAD :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
MARCA
Herramienta menor
Mezcladora
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
400.00
1.00
400.00
1.00
10,000.00
1 bulto
10,000.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
V\PARCIAL
Agua
litro
220.00
10.00
2,200.00
Arena de pea
m3
0.97
34800.00
33,756.00
Cemento "ARGOS"
Kg
625.00
390.00
243,750.00
1%
2,797.06
PRECIO UNITARIO
DESPERDICIO MATERIAL %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
CUADRILLA
TIPO
A4
JORNAL TOT
RENDIMIENTO
V\UNITARIO
209,000.00
8.00
26,125.00
SUBTOTAL
PROPONENTE :
CAPITULO:
DESCRIPCION:
UNIDAD :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
Herramienta menor
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
V\PARCIAL
PRECIO UNITARIO
DESPERDICIO MATERIAL %
1%
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
CUADRILLA
TIPO
JORNAL TOT
RENDIMIENTO
V\UNITARIO
1.00
SUBTOTAL
TOTAL COSTOS DIRECTOS
PROPONENTE :
CAPITULO:
DESCRIPCION:
UNIDAD :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
Herramienta menor
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
V\PARCIAL
PRECIO UNITARIO
DESPERDICIO MATERIAL %
1%
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
CUADRILLA
TIPO
JORNAL TOT
RENDIMIENTO
V\UNITARIO
1.00
SUBTOTAL
TOTAL COSTOS DIRECTOS
PROPONENTE :
CAPITULO:
DESCRIPCION:
UNIDAD :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
Herramienta menor
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
V\PARCIAL
PRECIO UNITARIO
DESPERDICIO MATERIAL %
1%
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
CUADRILLA
TIPO
JORNAL TOT
RENDIMIENTO
V\UNITARIO
1.00
SUBTOTAL
TOTAL COSTOS DIRECTOS
PROPONENTE :
CAPITULO:
DESCRIPCION:
UNIDAD :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
Herramienta menor
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
V\PARCIAL
PRECIO UNITARIO
DESPERDICIO MATERIAL %
1%
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
CUADRILLA
TIPO
JORNAL TOT
RENDIMIENTO
V\UNITARIO
1.00
SUBTOTAL
TOTAL COSTOS DIRECTOS
PROPONENTE :
CAPITULO:
DESCRIPCION:
UNIDAD :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
Herramienta menor
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
V\PARCIAL
PRECIO UNITARIO
DESPERDICIO MATERIAL %
1%
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
CUADRILLA
TIPO
JORNAL TOT
RENDIMIENTO
V\UNITARIO
1.00
SUBTOTAL
TOTAL COSTOS DIRECTOS
PROPONENTE :
10,400.00
215,776.40
26,125.00
252,301
400.00
193,617.00
30,875.00
224,892
10,400.00
192,813.04
26,125.00
229,338
10,400.00
185,868.28
26,125.00
222,393
10,400.00
220,480.98
26,125.00
257,006
10,400.00
282,503.06
26,125.00
319,028
200.00
200
200.00
200
200.00
200
200.00
200
200.00
200
MATERIALES
INSUMOS
Aceite quemado
ACPM---(Para formaleta)
Adaptadores 1/2-1"
Adaptadores Hembra 1/2"
Adaptadores macho 1/2"
Adaptadores Hembra 3/4
Adaptadores Macho 3/4"
Adaptador terminal 1''
Adaptador terminal 1/2'' conduit
Agua
alambre calibre 10
alambre calibre 12
alambre calibre 14
Alambre Cu THW 8 AWG
Alambre de cobre N 10- 12-14
Alambre de puas
Alambre desnudo
Alambre N18
Alambre negro
Alambre para timbre
Amarre para caballete
Amarre plstico p/ cable
Angulo de 1 x ''
Angulo 3/4 * 1/8
Anticorrosivo rojo claro
Arena de pea
Arena de pea
Arena lavada
Arena lavada
Arena lavada
Bisagra Comun
Bisagra alunio exterior 2''
Bocel porcelana remate
Bloque N 4
Bloque N 6
Bloque N 5
Bombilla incrustada (Balas)
bombillo ahorrador
bombillo silvania 100 w
Boton timbre
breaker 12 A
UNIDAD
galon
galon
unidad
Und
Und
Und
Und
und
und
litro
ml
ml
ml
m
ml
ml
ml
kl
Kilos
ml
unidad
unidad
m
ml
Galon
m3
viaje
m3
viaje
m
und
und
und
Und
Und
Und
unidad
Und
Und
und
und
PRECIO
0
0
200 /400
326
288
592
527
739
298
10
1,600
980
690
0
680
3,268
200
450
2,134
30,000
34,800
243,600
65,000
455,000
41,600
2,500
1,500
2,500
720
835
620
7,500
6,000
900
2,000
7,300
breaker 30 A
Caballete para teja Eternit
Caballete articulado
cable antifraude monofasico
Cable desnudo N1/0
Cable coaxial
Caja 60*60*12
Caja Complex 4*4
cajas 2400 y suplemento
Cajas 5800 en aluminio
Cajas 5800 plastica
Cajas Conduit de 4"
Caja sencilla conduit
Carburo
Caseton (guadua lona)
Cedro Caqueta Pieza
Cemento "ARGOS"
cemento blanco
Cemento gris
Cenefa
Cenefa corona
ceramica de 40*40cm alfa
ceramica de 40*40cm corona
ceramica de 40*40cm iberica
ceramica para pared 20*20cm alfa
ceramica para pared 20*20cm corona
ceramica para pared 20*20cm iberica
ceramica para piso de 30*30cm alfa
ceramica para piso de 30*30cm corona
ceramica para piso de 30*30cm iberica
Ceramica mediterraneo 30*30
Cerraduras (Puerta principal-alcobas)
cerradura schlage entrada hierro 50
Cerradura yale entrada hierro
chapas y cerraduras inater grande
chapas y cerraduras inater pequea
Codo 90 - 1 1/2
Codo 90 - 2''
Codo 90 - 3''
Codo 90 - 4''
Codos 1/2"
Codos 3/4"
Concreto de 3000 PSI
Concreto de 2500 PSI
Concreto de 2000 PSI
Contador trifasico
Dilatacion bronce
und
ml---Longitud
und
ml
ml
ml
und
unidad
unidad
unidad
unidad
und
und
Kg
m2
und
Kg
kg
Kilos
un
ml
m2
m2
m2
m2
m2
m2
m2
m2
m2
m
Und
und
und
Und
Und
und
und
und
und
Und
Und
m
m
m
und
ml
7,500
25,000
30,000
5,900
16.134
600
0
2,900
600
500
0
1,364
5,500
7,000
20,000
390
840
430
12500- 1500
5,000
20,500
30,000
17,900
12,500
12,500
12,000
23,000
36,900
23,000
18,000
20,000
20,000
48,000
82,000
14,000
2,259
2,671
5,803
10,662
400
600
252,301
224,892
229,338
151,500
8,000
und
und
Und
m2
m2
m
kg
kg
Und
bot
m
m3
Viaje
kg
und
und
unidad
und
und
Und
Und
Und
Und
Und
und
Und
Und
Und
Und
pliego
pliego
pliego
Hoja
Und 1/4
1/4
Und
m
m2
m2
m2
Und
Und
Blt
und
0
m
m
85,000
38,000
3,500
12,500
45000-16900
49,000
2,700
2,000
300
17,500
80,000
40,600
284,200
3,800
50,000
6,700
3,800
235,000
1,000
1,000
800
800
1,000
300
52,000
38,000
35,000
85,000
37,000
1,100
1,100
1,200
1,200
31,667
22,000
15,000
1,400
0
4,000
6,000
100,000
150,000
7,500
1,200
78,000
222,393
257,006
Mortero 1.2
Pasta
Pegacor
Pegante Colbon
Piedra media zonga
Piedra media zonga
Pintura (Tipo 1---Tipo 2)
Pirland bronce 0.80
Polietileno
Polisec
Polisombra
Porta Candado simple
Porcelana atlantis 20*20
Planchon ordinario 4*16
puerta en madera de 0.80*2.10m
Puerta (lamina triplex)
Puerta en alumino
Puntilla
Recebo
Reducciones
Reducciones 3/4 a 1/2
Registros
Rejillas pisos sosco aluminio 4x4x3
Repisa
Rosetas
sanitario acuario
sanitario mansensa
sanitario varios tonos corona
Segueta
Segueta
Semi-codo 1/2"
Semi-codo 3/4"
Semicodos
Sika 1
Soldadura electrica
Soldadura CPVC
Soldaura Liquida PVC
Suministro de acero 37000
Suministro de acero 60000
Tabla 0.10
Tabla burra
Tabla chapa
Tablero con llave 12 circuitos
Tee 1/2"
Tee 3/4"
Teja de Barro
Teja de zinc
m
kg
kg
kg
m3
viaje
Galon
ml
m
m2
ml
und
m
ml
Und
und
m
Lb
m
Und
Und
Und
unidad
unidades Ml
und
Und
Und
Und
Und hoja
Und
Und
Und
Und
Galones
kg
Und 1/4
1/4
kg
kg
ml
ml
ml
und
Und
Und
Und m2
und
319,028
250
1,000
2,000
50,000
225,000
38000- 28000
12,000
1,500
0
1,600
2,000
26,500
5,100
18,000
130,000
145,000
2,500
20,000
300
300.0
7,000
5,500
1,500
1,500
110,000
210,000
150,000
3,000
12,000
2,141
1,111
500
26,912
6,300
70,422
28,000
2,400
2,300
1,500
3,500
1,500
114,637
500
700
27,385
Teja Eternit N 10
Teja Eternit N 6
Teja Eternit N 8
Tiras alistado madera
Triplex pizano tipo 1 4 mm
toma corriente doble 10 amp /125 vol
toma corriente sencillo 10 amp /125 vol
toma corriente sencillo mas interruptor
Tornillo M 2*8
Tuberia aguas lluvias de 3"
Tuberia aguas lluvias de 4"
Tuberia CPVC--1/2
Tuberia electrica de 1''
Tuberia electrica de 1/2
Tuberia electrica de 1/4
Tuberia electrica de 3/4
Tuberia PVC 1''
Tuberia PVC 3/4
Tuberia de presion 1/2 Rde
Tuberia de presion 3/4
Tuberia sanitaria de 12''
Tuberia sanitaria de 14''
Tuberia sanitaria de 16''
Tuberia sanitaria de 2''
Tuberia sanitaria de 20''
Tuberia sanitaria de 3''
Tuberia sanitaria de 4''
Tuberia sanitaria de 8''
Tuberia Sanitaria--4-6-8-12-14-16-20
Uniones
Union de presion 1/2
Union de sanitario 4''
Union sanitaria 3''
Union sanitario 2
Union sanitario 1 1/2
Union PVC de 3/4
Vara de clavo
Varilla 1''
Varilla 1/2
Varilla 1/2
Varilla 3/8
Varilla 3/8
Varilla 3/8"
Varilla 7/8
Varilla de 1 Pulg
Varilla de 1/4
VARILLA DE 1/4"
39,000
14,800
33,000
700
45,000
3,800
3,800
5,500
76
5,000
7,833
9,000
5,000
2,800
0
3,800
27,407
20,313
2,540
3,384
0
0
0
8,211
0
12,262
17,093
0
0
200/400/600
267
5.038
2,522
1,747
1,527
2,000
2,181
13,500
2,300
8,500
2,147
2,380
2,465
50,000
3,800
2,500
2,237
Varrilla 3/4
Varilla cw 3/4*2,40
Varillon
Ventaneria ( ventanas , materiales y precios)
Ventana alumino
vidrio para ventana 4mm
Vidrios para ventana
Vinitex
Yes 12" ---(315*200mm)
Yes 14" ---(355*110mm)
Yes 20" ---(500*160mm)
Yes 8" ---(200*160mm)
yeso
ml
m
ml
1.40- 1 m
m
m
Und
galon
Und
Und
Und
kg
kg
1,000
13,000
1,000
28,000
100,000
28,000
0
50,000
0
0
12,000
1,500
1,500
EQUIPO
NOMBRE
Volqueta 6m3
Mezcladora
Vibrador (rana)
Andamios
MARCA
FORD
1 bulto
CUADRILLAS
TIPO
6 M3
seccion
$ HORA
30,000
10,000
5,000
300
NOMBRE
$ PAGO
AA
A1
A5
A4
A3
A6
95,000
133,000
247,000
209,000
171,000
323,000
OFICIAL
1
1
1
1
1
1
AYUDANTE
1
2
5
4
3
7
ITEM
DESCRIPCION
L (m)
A (m)
h (m)
MEMORIA DE CALCULO DE CANTIDADES DE OBRA - F02
OBRA:
LOCALIZACION:
MUNICIPIO:
HOJA # _______ DE ___
1.1
1.2
1.3
1.4
1.5
1. Preliminares
Localizacion y replanteo
Campamento 18m
Descapote manual y retiro
Cerramiento en polisombra h= 3
Retiro de escombros
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.7.1
2.7.2
2.8
2.9
2.10
2.11
2. Cimentacion
Concreto zapatas excentricas
Concreto zapatas concentricas
Excavacion zapatas concentricas
Excavacion zapatas excentricas
Concreto viga de amarre
Base en concreto pobre E=0,05m 2000PSI
Afirmado ( relleno compactado)
Menos
Total afirmado
Polietileno
Malla electrosoldada
Suministro y figurado acero 60000 psi
Suministro y figurado acero 37000 psi
3.1
3.2
3. Desagues
Caja de inspeccion 0.80 x 0.80
Caja de inspeccion 0.60 x 0.60
4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
4.8.1
4.8.2
4.8.3
4.8.4
4. Estructuras en concreto
Columnas cimentacion
Columnas 1 piso
Columnas 2 piso
Columnas 3 piso
Columnas culatas
Total concreto columnas
Viga corona
Viga canal en concreto impermeabilizado
Volumen 1
Volumen 2
Volumen 3
Volumen viga canal servicio y atrs
14.50
6.00
14.50
6.00
1.00
1.25
1.25
1.00
75.00
40.00
14.00
35.00
1.00
1.25
1.25
1.00
0.25
0.25
5.50
0.25
16.50
14.50
8.00
6.00
1.00
2.30
2.25
2.25
1.00
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
40.00
0.25
0.25
6.00
6.00
6.00
0.20
0.17
0.35
0.20
0.10
0.10
0.40
0.40
0.40
0.40
0.25
1.25
0.25
4.9
4.10
4.10.1
4.10.2
4.10.3
4.10.4
4.10.5
4.10.6
4.11
4.11.1
4.11.2
4.11.3
4.12
4.13
4.14
5
7.06
0.36
0.25
10.70
1.58
2.30
0.64
0.45
6.00
1.95
2.85
3.15
2.00
4.52
0.35
0.90
1.00
1.00
1.00
0.10
0.18
0.10
8.15
1.40
14.50
0.20
1.40
6.00
0.15
0.10
Mamposteria
Primer piso
EJE 1 (A-F)
EJE 2 (B-D)
EJE 3 (E-F)
EJE B (1-4)
ESCALERAS
Pasamanos
Segundo piso
EJE 1 (A-F)
EJE 2 (A-C)
EJE 3 (E-F)
EJE4 (A-F)
EJE B (1-2)
EJE B (3-4)
EJE E (1-4)
8.00
0.68
2.03
2.04
2.30
2.30
2.30
2.30
1.23
1.04
8.00
2.80
0.51
2.03
2.30
2.30
Total
5.5
5.5.1
5.5.1.1
5.5.1.2
5.5.1.3
5.5.2
5.5.2.1
5.5.3
5.5.3.1
50.62
2.20
2.30
1.05
49.65
37.94
2.65
5.5.3.2
5.5.3.3
5.6
1.40
1.00
6.1
6.2
6.3
6.4
6.5
6 Paetes
Paete casa 1:4
Paete filos 1:4 1 piso
Paete filos 1:4 2 piso
Paete filos 1:4 3 piso
Paete bajo placas entrepiso
301.26
7.50
6.25
6.50
57.48
2.30
2.25
2.25
TOTAL PAETE VIVENDA
7.1
7.1.1
7.1.2
7 Tuberia hidrosanitaria
Tuberia hidraulica
Tuberia hidraulica 3/4" RD 21
Tuberia hidraulica 1/2" RD 21
23.52
28.00
Total tuberia hidraulica
7.2
7.2.1
7.2.2
7.2.3
Tuberia sanitaria
Tuberia sanitaria de 4"
Tuberia sanitaria de 3"
Tuberia sanitaria de 2"
10.96
24.71
11.88
Tuberia sanitaria
8.1
8.2
8.2.1
8.3
8.3.1
8.3.2
8.3.3
8.4
8.4.1
8 Estuco y vinilos
Estuco y Vinilo (Tipo 1) tres manos en muros
Menos muro de fachada 1 piso
Menos muro antepecho entrada principal
Menos muros de fachada 2 piso
Menos antepecho ventanas posteriores
Menos voladizo 1
Menos voladizo 2
Menos fachada altillo
8.4.2
8.4.3
8.5
Menos enchapes
8.6
8.7
648.46
31.26
1.71
19.80
2.11
2.15
1.20
1.60
19.80
2.11
2.15
0.90
1.60
2.30
0.65
Total primer piso
2.25
0.75
0.75
2.25
2.25
Total segundo piso
2.25
0.75
0.75
2.25
0.65
Total tercer piso
Total estuco vivienda
2.3
2.25
8.8
8.9
9.1
9.2
9.3
9.4
9.5
9.6
9.7
9.8
10.1
10.2
10.3
9 Enchapes
Murete ducha h= 15cm
Enchape vivenda
Enchape cocina
Enchape bao empleada
Enchape bao escalera
Enchape bao 1
2 piso
Enchape bao 2
2 piso
Enchape bao altillo
2.25
TOTAL ESTUCO VIVIENDA
57.48
5.91
8.92
5.16
4.66
5.88
6.42
5.78
1.50
1.50
1.50
1.50
1.50
1.50
Total enchape vivenda
10 Pisos
Piso primera planta
Piso segunda planta
Piso tercera planta
TOTAL PISO 3 PLANTAS
10.4
Piso escalera
TOTAL CON PISO CON ESCALERAS
11.1
11.2
11.3
11.4
3.78
5.81
2.08
8.00
6.00
6.00
2.65
Total cubierta entramado
12.1
12.2
12 Cielo raso
Cielo raso en Drywall
Cielo raso en Drywall cuarto de servicio
8.10
2.65
5.76
1.98
Total cielo raso en Drywall
13.1
13.2
13.3
13.4
13 Carpinteria madera
Puertas primer piso en triplex
Puertas segundo piso en triplex
Puertas altillo en triplex
Closet
1.76
14 Carpinteria metalica
14.1
14.2
0.80
1.73
2.53
2.30
1.65
Total puerta ventana
2.3
14.3
Puerta patio
1.49
14.4
2.55
14.5
14.6
0.76
0.33
0.76
0.33
14.7
14.8
14.9
14.10
Ventana cocina
Ventanas voladizo 1 2 y 3 planta
Ventanas voladizo 2 2 planta
Ventanas posteriores
0.8
1.71
1.5
2.11
2.15
14.11
14.12
14.13
14.14
0.75
1.58
1.85
1.68
0.8
1
1
1
1
TOTAL VENTANAS
1.8
1.8
1.8
1.8
TOTAL DIVISIONES
15.1
15.2
15.3
15.4
15.5
15.6
2.3
TOTAL PUERTAS METALICAS
2.25
15 Aparatos sanitarios
Lavamanos
Sanitarios
Ducha sencilla
Ducha sin salida
Jacuzzi
Incrustaciones
TOTAL APARATOS
16.3
16 Vidrios y cerraduras
Vidrio E= 4mm
Cerraduras alcobas y baos
Cerraduras de entrada doble
Espejo
0.50
0.40
17.1
17 Obras exteriores
Anden en adoquin
0.80
6.00
18.1
16.1
16.2
0.10
Cantidad
SUBTOTAL UND
OBRA - F02
87.00
1.00
87.00
41.00
5.00
11.00
4.00
4.00
11.00
1.00
1.00
1.00
1.00
1.00
1.00
3.00
1.00
17.00
17.00
14.00
13.00
2.00
1.00
2.00
2.00
2.00
4.40
2.50
2.50
4.40
4.69
10.00
96.25
2.44
93.81
132.00
87.00
3176.10
896.35
m
und
ml
vj
m
m
m
m
m
m
m
m
m
Kg
Kg
3.00 und
1.00 und
1.06
2.44
1.97
1.83
0.13
7.43
2.50
m
m
m
m
m
m
m
0.48
0.20
0.42
1.10
m
m
m
m
1.00
2.00
28.00
2.00
1.00
1.00
0.64 m
1.74 m
m
64.20 m
3.08 m
6.56 m
2.02 m
0.90 m
57.48 m
0.90
0.88
0.18
1.97
0.24
0.20
87.00
m
m
m
m
m
m
m
18.40
1.56
4.67
4.69
m
m
m
m
1.28 m
Total
16.24 m
6.44 m
1.17 m
m
m
m
m
4.69 m
116.43
2.31
118.74
4.45
114.29
111.71
13.84
97.87
85.37
1.72
m
m
m
m
m
m
m
m
m
L MAMPOSTERIA CASA
2.00
2.00
TOTAL PAETE VIVENDA
Tuberia sanitaria
87.09
10.22
76.87
2.80
296.52
m
m
m
m
602.52
17.25
14.06
14.63
114.96
648.46
m
m
m
m
m
m
23.52 m
28.00 m
51.52 m
m
10.96 m
24.71 m
11.88 m
47.55 m
648.46
71.90
1.11
73.01
44.55
1.58
1.61
2.70
3.60
54.05
44.55
1.58
1.61
2.03
1.04
50.81
55.23
415.36
18.40
13.50
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
4
TOTAL ESTUCO VIVIENDA
2.00
9.00
456.26
114.96 m
5.91 m
m
13.38 m
7.74 m
6.99 m
8.82 m
9.63 m
8.67 m
55.23 m
68.26
43.94
45.27
157.47
15.40
172.87
m
m
m
m
ml
m
1.00
Total cubierta entramado
22.68
34.86
5.51
8.00
63.05
m
m
m
ml
m
46.66 m
5.25 m
51.90 m
4.00
6.00
4.00
uertas en triplex vivenda
5
4.00
6.00
4.00
14.00
19.80
und
und
und
und
m
1.00
1.00
Total puerta ventana
1
1.84
2.85
4.69
5.82
m
m
m
m
1
TAL PUERTAS METALICAS
1
3.43 m
9.25 m
5.74 m
2
3
1.16 m
TOTAL DIVISIONES
0.33
0.64
3.42
1.50
4.22
4.30
15.56
1.35
2.84
3.33
3.02
10.55
m
m
m
m
m
m
m
m
m
m
m
m
5.00
5.00
4.00
1.00
1.00
4.00
TOTAL APARATOS
5.00
5.00
4.00
1.00
1.00
4.00
20.00
und
und
und
und
und
und
und
20.26
13.00
3.00
3.00
20.26
13.00
3.00
0.60
m
und
und
ml
1
2
1
2
2
TOTAL VENTANAS
1.00
4.80 m
200.00
200.00 m
CAPITULO
ITEM
PRESUPUESTO MANO DE OBRA
TECNOLOGIA EN OBRAS CIVILES
GRUPO 1
CAPITULO
ITEM
1. PRELIMINARES
1.1
1.2
1.3
1.4
1.5
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
3.1
3.2
4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
4.9
5.1
5.2
6 PAETES
6.1
7.1
7.2
7.3
7.4
7.5
7.6
7.7
7.8
7.9
8.1
8.2
8.3
8.4
8.5
8.6
8.7
8.8
9.1
9.2
10.1
10.2
11. PISOS
10.1
10.2
12 CUBIERTAS EN TEJAS ETERNIT
12.1
12.2
12.3
13.1
13.2
14.1
14.2
14.3
14.4
14.5
15.1
15.2
15.3
15.6
16.1
16.2
16.3
16.4
17.1
18. ASEO PARA ENTREGA
18.1
DESCRIPCION
PRESUPUESTO MANO DE OBRA
TECNOLOGIA EN OBRAS CIVILES
GRUPO 1
YEIMY PAOLA VARGASG
DESCRIPCION
UND
CANTIDAD
UND
CANTIDAD
Localizacion y replanteo
Campamento 18 m
Descapote manual y retiro
Cerramiento en polisombra h= 3 m
Retiro de escombros
m
und
m
ml
vj
87.00
1.00
87.00
41.00
5.00
m
m
m
m
m
m
m
kg
kg
6.90
6.90
4.69
10.00
96.25
132.00
87.00
896.35
3,176.10
und
und
3.00
1.00
m
m
m
m
7.43
2.50
0.20
1.74
m
m
m
m
57.48
0.24
87.00
57.48
1.97
m
m
18.40
296.52
648.46
und
ml
1.00
28.00
ml
ml
23.52
10.96
ml
24.71
ml
11.88
und
und
ml
8.00
25.00
3.00
und
und
und
und
und
und
und
1.00
1.00
19.00
2.00
1.00
1.00
1.00
und
1.00
m
m
415.36
114.96
m
m
5.91
55.23
m
ml
m
m
m
und
m
14.00
19.80
m
m
m
m
m
4.69
9.25
5.74
15.56
10.55
und
und
und
und
5.00
5.00
5.00
4.00
157.47
15.40
63.05
63.05
8.00
Vidrio 4mm
Cerraduras alcobas y baos
Cerra dura entrada doble
Espejos
m
und
und
und
20.26
13.00
3.00
0.60
Anden Adoquin
4.80
Area construida
200.00
TOTAL
V. UNITARIO
V. PARCIAL
V. UNITARIO
V. PARCIAL
$
$
$
$
$
1,091.95
114,000.00
1,187.50
1,938.78
11,875.00
$
$
$
$
$
95,000.00
114,000.00
103,312.50
79,489.80
59,375.00
$
$
$
$
$
$
$
$
$
30,875.00
11,875.00
26,125.00
6,966.67
5,937.50
95.00
633.33
633.33
633.333
$
$
$
$
$
$
$
$
$
213,037.50
81,937.50
122,460.94
69,666.67
571,484.38
12,540.00
55,100.00
567,686.56
2,011,531.52
$
$
133,000.00 $
95,000.00 $
399,000.00
95,000.00
$
$
$
$
34,833.33
104,500.00
26,600.00
47,500.00
$
$
$
$
258,746.35
261,250.00
5,213.60
82,621.50
$
$
$
$
46,142.86
104,500.00
32,300.00
64,600.00
$
$
$
$
2,652,291.43
25,550.25
2,810,100.00
3,713,208.00
266,000.00 $
522,956.00
$
$
11,875.00 $
6,333.33 $
218,500.00
1,877,947.33
4,750.00 $
3,080,173.13
$
$
31,666.67 $
1,900.00 $
31,666.67
53,200.00
$
$
1,900.00 $
1,900.00 $
44,688.00
20,824.00
1,900.00 $
46,949.00
1,900.00 $
22,572.00
$
$
$
4,750.00 $
4,750.00 $
4,750.00 $
38,000.00
118,750.00
14,250.00
$
$
$
$
$
$
$
95,000.00
3,166.67
31,666.67
31,666.67
31,666.67
633.33
31,666.67
$
$
$
$
$
$
$
95,000.00
3,166.67
601,666.67
63,333.33
31,666.67
633.33
31,666.67
95,000.00 $
95,000.00
$
$
7,916.67 $
7,916.67 $
3,288,290.42
910,100.00
9,500 $
4,750.00 $
56,145.00
262,342.50
$
$
3,166.67 $
31,666.67 $
498,655.00
487,666.67
3,166.67 $
6,650.00 $
3,166.67 $
199,664.67
419,295.80
25,333.33
$
$
9,500.00 $
31,666.67 $
133,000.00
627,000.00
$
$
$
$
$
9,500.00
23,750.00
23,750.00
9,500.00
23,750.00
$
$
$
$
$
44,597.75
219,592.50
136,265.63
147,838.05
250,515.00
$
$
$
$
19,000.00
19,000.00
9,500.00
23,750.00
$
$
$
$
95,000.00
95,000.00
47,500.00
95,000.00
$
$
$
$
950.00
4,750.00
4,750.00
950.00
$
$
$
$
19,243.58
61,750.00
14,250.00
570.00
3,166.67
15,200.00
$
$
$
$
TOTAL $
95,000.00
29,717,028.83
5,943,405.77
35,660,434.60
$
Subtotal
AIU 20%
475.00
CAPITULO
ITEM
ITEM
1. PRELIMINARES
1.1
1.2
1.3
1.4
1.5
2. CIMENTACION
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
3 DESAGUES
3.1
3.2
4 ESTRUCTURAS
4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
4.9
5 MAMPOSTERIA
5.1
5.2
6 PAETES
6.1
7 TUBERIA HIDROSANITARIA
7.1
7.2
7.3
7.4
7.5
7.6
7.7
7.8
7.9
8 INSTALACIONES ELECTRICAS
8.1
8.2
8.3
8.4
8.5
8.6
8.7
8.8
9 PINTURAS
9.1
9.2
10 ENCHAPES
10.1
10.2
11. PISOS
10.1
10.2
12 CUBIERTAS EN TEJAS ETERNIT
12.1
12.2
12.3
13 PUERTAS EN MADERA
13.1
13.2
14 CARPINTERIA METALICA
14.1
14.2
14.3
14.4
14.5
15 APARATOS SANITARIOS
15.1
15.2
15.3
15.6
16 VIDRIOS Y CERRADURAS
16.1
16.2
16.3
16.4
17. OBRAS EXTERIORES
17.1
18. ASEO PARA ENTREGA
18.1
DESCRIPCION
UND
CANTIDAD
CANTIDAD
Localizacion y replanteo
Campamento 18 m
Descapote manual y retiro
Cerramiento en polisombra h= 3 m
Retiro de escombros
m
und
m
ml
vj
87.00
1.00
87.00
41.00
5.00
m
m
m
m
m
m
m
kg
kg
6.90
6.90
4.69
10.00
96.25
132.00
87.00
896.35
3,176.10
und
und
3.00
1.00
m
m
m
m
7.43
2.50
0.20
1.74
m
m
m
m
57.48
0.24
87.00
57.48
1.97
m
m
18.40
296.52
648.46
und
ml
1.00
28.00
ml
ml
23.52
10.96
ml
24.71
ml
11.88
und
und
ml
8.00
25.00
3.00
und
und
und
und
und
und
und
1.00
1.00
19.00
2.00
1.00
1.00
1.00
und
1.00
m
m
415.36
114.96
m
m
5.91
55.23
m
ml
m
m
m
und
m
14.00
19.80
m
m
m
m
m
4.69
9.25
5.74
15.56
10.55
und
und
und
und
5.00
5.00
5.00
4.00
157.47
15.40
63.05
63.05
8.00
Vidrio 4mm
Cerraduras alcobas y baos
Cerra dura entrada doble
Espejos
m
und
und
und
20.26
13.00
3.00
0.60
Anden Adoquin
4.80
Area construida
200.00
TOTAL
V. UNITARIO
V. PARCIAL
V. UNITARIO
V. PARCIAL
$
$
$
$
$
1,749.98
992,822.00
10,178.18
12,766.03
42,075.00
$
$
$
$
$
152,248.18
992,822.00
885,501.99
523,407.05
210,375.00
$
$
$
$
$
$
$
$
$
303,940.63
17,175.00
320,605.63
18,848.24
39,922.50
1,810.00
1,284.60
3,755.67
3,639.154
$
$
$
$
$
$
$
$
$
2,097,190.38
118,507.50
1,502,838.91
188,482.38
3,842,540.63
238,920.00
111,760.32
3,366,382
11,558,325
$
$
394,922.84 $
257,348.98 $
1,184,768.52
257,348.98
$
$
$
$
371,340.12
412,021.86
79,021.09
383,384.42
$
$
$
$
2,758,360.80
1,030,054.64
15,488.13
666,858.85
$
$
$
$
142,055.29
434,915.30
58,358.15
152,430.93
$
$
$
$
8,165,338
106,336.8
5,077,159.15
8,761,729.79
604,154.72 $
1,187,768.17
$
$
48,303.91 $
22,664.85 $
888,791.92
6,720,535.91
10,178.18 $
6,600,119.62
$
$
22,664.85 $
5,910.11 $
22,664.85
165,483.19
$
$
6,760.20 $
29,067.36 $
158,999.83
318,578.27
16,607.48 $
410,370.79
12,178.33 $
144,678.51
$
$
$
19,376.11 $
16,253.72 $
19,279.40 $
155,008.90
406,342.95
57,838.19
$
$
$
$
$
$
$
200,677.33
156,381.67
57,422.80
66,921.18
66,570.27
15,336.93
66,307.67
$
$
$
$
$
$
$
200,677.33
156,381.67
1,091,033.16
133,842.36
66,570.27
15,336.93
66,307.67
218,558.37 $
218,558.37
$
$
11,214.44
11,044.57
$
$
4,658,062.47
1,269,683.38
61,426 $
40,141.43 $
363,028.25
2,217,011.18
$
$
26,228.32 $
70,261.82 $
4,130,173.50
1,082,031.98
13,819.17 $
18,081.20 $
36,090.67 $
871,326.10
1,140,055.82
288,725.33
$
$
141,100.00 $
153,833.34 $
1,975,400.00
3,045,900.08
$
$
$
$
$
52,169.50
170,400.00
124,950.00
47,779.99
109,800.00
$
$
$
$
$
244,909.72
1,575,518.40
716,900.63
743,547.42
1,158,170.40
$
$
$
$
57,580.00
231,300.00
48,080.00
75,756.54
$
$
$
$
287,900.00
1,156,500.00
240,400.00
303,026.14
$
$
$
$
30,844.00
25,150.00
55,854.00
53,114.50
$
$
$
$
624,788.40
326,950.00
167,562.00
31,868.70
29,867.17
143,362.41
$
$
$
$
TOTAL $
347,100.00
102,108,535.79
20,421,707.16
122,530,242.95
$
1,735.50
Subtotal
AIU 20%
CAPITULO: 9 PINTURAS
DESCRIPCION: 9.1
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
MARCA
Herramienta menor
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
pliego
0.02
1200.00
24.00
Cemento "ARGOS"
Kg
1.04
390.00
405.60
Pasta
kg
0.55
250.00
137.50
Vinitex
galon
0.05
50000.00
2,500.00
1%
30.67
Lija N1400
DESPERDICIO MATERIAL %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
AA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
12.00
7,916.67
SUBTOTAL
PROPONENTE :
DESCRIPCION: 9.2
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Herramienta menor
Global
200.00
1.00
200.00
Andamios
seccion
1.00
300.00
300.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
Cemento "ARGOS"
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
Kg
0.26
390.00
101.40
Lija N1400
pliego
0.02
1200.00
24.00
Vinitex
galon
0.05
50000.00
2,500.00
Pasta
kg
0.01
250.00
2.50
DESPERDICIO MATERIAL %
1%
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
AA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
12.00
7,916.67
SUBTOTAL
PROPONENTE :
CAPITULO: 10 ENCHAPES
DESCRIPCION: 10.1
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
und
9.50
2500.00
23,750.00
cemento blanco
kg
0.58
840.00
487.20
0.02
229338.04
4,586.76
Hilasa
kg
0.30
3800.00
1,140.00
Pegacor
kg
5.00
1000.00
5,000.00
0.50
26500.00
13,250.00
Tabla 0.10
ml
2.00
1500.00
3,000.00
1%
512.14
DESPERDICIO MATERIAL %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
AA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
10.00
9,500.00
SUBTOTAL
PROPONENTE :
CAPITULO: 10 ENCHAPES
DESCRIPCION: 10.2
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
Herramienta menor
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
2.50
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
Agua
litro
3.00
10.00
30.00
cemento blanco
kg
0.70
840.00
588.00
Hilasa
kg
0.50
3800.00
1,900.00
Pegacor
kg
4.50
1000.00
4,500.00
1.05
DESPERDICIO MATERIAL %
26500.00
27,825.00
1%
348.43
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
AA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
20.00
4,750.00
SUBTOTAL
PROPONENTE :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
Herramienta menor
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
6.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNITARIO
Pegacor
kg
0.51
1000.00
510.00
Cemento "ARGOS"
Kg
6.27
390.00
2,445.30
1.03
18000.00
18,540.00
Hilasa
kg
0.30
3800.00
1,140.00
1%
226.35
DESPERDICIO MATERIAL %
V\PARCIAL
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
JORNAL TOT
RENDIMIENTO
V\UNITARIO
CUADRILLA
AA
95,000.00
30.00
3,166.67
SUBTOTAL
PROPONENTE :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
MARCA
Herramienta menor
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
V\PARCIAL
Dilatacion bronce
ml
0.02
8000.00
160.00
Arena lavada
m3
0.07
65000.00
4,550.00
Pegacor
kg
10.50
1000.00
10,500.00
Cemento "ARGOS"
Kg
12.00
390.00
4,680.00
Granito
bot
0.38
17500.00
6,650.00
Marmolina
Blt
0.25
7500.00
1,875.00
ml
0.80
12000.00
9,600.00
1%
380.15
PRECIO UNITARIO
DESPERDICIO MATERIAL %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
CUADRILLA
TIPO
AA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
3.00
31,666.67
SUBTOTAL
PROPONENTE :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
MARCA
Herramienta menor
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
300.00
1.00
300.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
Puntilla
Lb
0.02
2500.00
50.00
ml
2.00
5100.00
10,200.00
1%
102.50
DESPERDICIO MATERIAL %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
AA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
30.00
3,166.67
SUBTOTAL
PROPONENTE :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
MARCA
Herramienta menor
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
Teja Eternit N 6
Gancho teja Eternit 55mm
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
0.65
14800.00
9,620.00
Und
5.00
300.00
1,500.00
1%
111.20
DESPERDICIO MATERIAL %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
A1
JORNAL TOT
RENDIMIENTO
V\UNITARIO
133,000.00
20.00
6,650.00
SUBTOTAL
PROPONENTE :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
Herramienta menor
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
Caballete articulado
Amarre para caballete
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
und
1.05
30000.00
31,500.00
unidad
2.00
450.00
900.00
1%
324.00
DESPERDICIO MATERIAL %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
AA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
30.00
3,166.67
SUBTOTAL
PROPONENTE :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
Herramienta menor
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
300.00
1.00
300.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
Puerta (lamina triplex)
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
und
1.00
130000.00
130,000.00
DESPERDICIO MATERIAL %
1%
1,300.00
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
AA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
10.00
9,500.00
SUBTOTAL
PROPONENTE :
Closets en madera
UNIDAD :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
MARCA
Herramienta menor
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
Bisagra Comun
und
1.39
2500.00
3,475.00
Puntilla
Lb
0.50
2500.00
1,250.00
Pegante Colbon
kg
0.25
2000.00
500.00
und
1.04
20000.00
20,800.00
Tornillo M 2*8
und
3.08
76.00
234.08
und
2.10
45000.00
94,500.00
1%
1,207.59
DESPERDICIO MATERIAL %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
CUADRILLA
TIPO
AA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
3.00
31,666.67
SUBTOTAL
TOTAL COSTOS DIRECTOS
PROPONENTE :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
MARCA
Herramienta menor
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
300.00
1.00
300.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
ml
0.50
2134.00
1,067.00
Galon
0.23
30000.00
6,900.00
Bisagra Comun
und
1.75
2500.00
4,375.00
und
0.55
52000.00
28,600.00
Soldadura electrica
kg
0.16
6300.00
1,008.00
1%
419.50
DESPERDICIO MATERIAL %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
CUADRILLA
TIPO
AA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
10.00
9,500.00
SUBTOTAL
PROPONENTE :
Puertas metalicas
UNIDAD :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
MARCA
Herramienta menor
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
Puerta en alumino
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
1.00
145000.00
145,000.00
1%
1,450.00
DESPERDICIO MATERIAL %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
AA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
4.00
23,750.00
SUBTOTAL
PROPONENTE :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
MARCA
Herramienta menor
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
Ventana alumino
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
1.00
100000.00
100,000.00
1%
1,000.00
DESPERDICIO MATERIAL %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
AA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
4.00
23,750.00
SUBTOTAL
PROPONENTE :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
Herramienta menor
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
ml
1.94
2134.00
4,139.96
und
1.05
1500.00
1,575.00
Galon
0.23
30000.00
6,900.00
und
0.44
52000.00
22,880.00
und
1.00
kg
0.16
Soldadura electrica
1,200.00
1,200
DESPERDICIO MATERIAL %
6300.00
1,008.00
1%
377.03
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
AA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
10.00
9,500.00
SUBTOTAL
PROPONENTE :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
MARCA
Herramienta menor
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
und
85,000
85,000.00
DESPERDICIO MATERIAL %
1%
850.00
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
AA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
4.00
23,750.00
SUBTOTAL
PROPONENTE :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
MARCA
Herramienta menor
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
Lavamanos mansenta
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
Und
1.00
38000.00
38,000.00
1%
380.00
DESPERDICIO MATERIAL %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
CUADRILLA
TIPO
AA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
5.00
19,000.00
SUBTOTAL
PROPONENTE :
Sanitarios
UNIDAD :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
MARCA
Herramienta menor
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
sanitario mansensa
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
Und
1.00
210000.00
210,000.00
1%
2,100.00
DESPERDICIO MATERIAL %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
CUADRILLA
TIPO
AA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
5.00
19,000.00
SUBTOTAL
PROPONENTE :
OBJETO:
Ducha sencilla
UNIDAD :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
MARCA
Herramienta menor
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
Ducha agua caliente
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
und
1.00
38000.00
38,000.00
1%
380.00
DESPERDICIO MATERIAL %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
AA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
10.00
9,500.00
SUBTOTAL
PROPONENTE :
Incrustaciones
UNIDAD :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
Herramienta menor
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
cemento blanco
kg
1.54
840.00
1,293.60
Incrustaciones
und
1.00
50000.00
50,000.00
1%
512.94
DESPERDICIO MATERIAL %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
AA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
4.00
23,750.00
SUBTOTAL
PROPONENTE :
Vidrio 4mm
UNIDAD :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
Herramienta menor
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
vidrio para ventana 4mm
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
1.05
28000.00
29,400.00
DESPERDICIO MATERIAL %
1%
294.00
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
AA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
100.00
950.00
SUBTOTAL
PROPONENTE :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
MARCA
Herramienta menor
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
und
1.00
20000.00
20,000.00
1%
200.00
DESPERDICIO MATERIAL %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
CUADRILLA
TIPO
AA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
20.00
4,750.00
SUBTOTAL
PROPONENTE :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
MARCA
Herramienta menor
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
Cerradura yale entrada hierro
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
und
1.05
48000.00
50,400.00
1%
504.00
DESPERDICIO MATERIAL %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
AA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
20.00
4,750.00
SUBTOTAL
PROPONENTE :
Espejos
UNIDAD :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
MARCA
Herramienta menor
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
1.05
49000.00
51,450.00
1%
514.50
Espejo 4 mm
DESPERDICIO MATERIAL %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
AA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
100.00
950.00
SUBTOTAL
PROPONENTE :
Anden Adoquin
UNIDAD :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
Herramienta menor
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
Tabla 0.10
ml
1.00
1500.00
1,500.00
0.11
224892.00
24,738.12
1%
262.38
DESPERDICIO MATERIAL %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
AA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
30.00
3,166.67
SUBTOTAL
PROPONENTE :
Area construida
UNIDAD :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
Herramienta menor
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
Kit de aseo
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
und
1.05
1000.00
1,050.00
DESPERDICIO MATERIAL %
1%
10.50
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
AA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
200.00
475.00
SUBTOTAL
PROPONENTE :
CAPITULO:
DESCRIPCION:
UNIDAD :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
Herramienta menor
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
DESPERDICIO MATERIAL %
1%
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
JORNAL TOT
CUADRILLA
RENDIMIENTO
V\UNITARIO
10.00
SUBTOTAL
TOTAL COSTOS DIRECTOS
PROPONENTE :
CAPITULO:
DESCRIPCION:
UNIDAD :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
Herramienta menor
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
DESPERDICIO MATERIAL %
1%
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
JORNAL TOT
CUADRILLA
RENDIMIENTO
V\UNITARIO
10.00
SUBTOTAL
TOTAL COSTOS DIRECTOS
PROPONENTE :
CAPITULO:
DESCRIPCION:
UNIDAD :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
Herramienta menor
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
DESPERDICIO MATERIAL %
1%
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
JORNAL TOT
CUADRILLA
RENDIMIENTO
V\UNITARIO
10.00
SUBTOTAL
TOTAL COSTOS DIRECTOS
PROPONENTE :
CAPITULO:
DESCRIPCION:
UNIDAD :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
Herramienta menor
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
DESPERDICIO MATERIAL %
1%
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
JORNAL TOT
CUADRILLA
RENDIMIENTO
V\UNITARIO
10.00
SUBTOTAL
TOTAL COSTOS DIRECTOS
PROPONENTE :
CAPITULO:
DESCRIPCION:
UNIDAD :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
Herramienta menor
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
DESPERDICIO MATERIAL %
1%
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
JORNAL TOT
CUADRILLA
RENDIMIENTO
V\UNITARIO
10.00
SUBTOTAL
TOTAL COSTOS DIRECTOS
PROPONENTE :
CAPITULO:
DESCRIPCION:
UNIDAD :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
Herramienta menor
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
DESPERDICIO MATERIAL %
1%
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
CUADRILLA
TIPO
JORNAL TOT
RENDIMIENTO
V\UNITARIO
10.00
SUBTOTAL
TOTAL COSTOS DIRECTOS
PROPONENTE :
und
200.00
3,097.77
7,916.67
11,214
500.00
2,627.90
7,916.67
11,045
200.00
51,726.10
9,500.00
61,426
200.00
PEGACOR
BOQUILLA
35,191.43
4,750.00
40,141
200.00
22,861.65
3,166.67
26,228
ml
200.00
38,395.15
31,666.67
70,262
300.00
10,352.50
3,166.67
13,819
200.00
11,231.20
6,650.00
18,081
200.00
32,724.00
3,166.67
36,091
und
300.00
131,300.00
9,500.00
141,100
200.00
121,966.67
31,666.67
153,833
300.00
42,369.50
9,500.00
52,170
200.00
146,450.00
23,750.00
170,400
200.00
101,000.00
23,750.00
124,950
200.00
38,079.99
9,500.00
47,780
200.00
85,850.00
23,750.00
109,800
und
200.00
38,380.00
19,000.00
57,580
und
200.00
212,100.00
19,000.00
231,300
und
200.00
38,380.00
9,500.00
48,080
und
200.00
51,806.54
23,750.00
75,757
200.00
29,694.00
950.00
30,844
und
200.00
20,200.00
4,750.00
25,150
und
200.00
50,904.00
4,750.00
55,854
und
200.00
51,964.50
950.00
53,115
200.00
26,500.50
3,166.67
29,867
200.00
1,060.50
475.00
1,736
200.00
200
200.00
200
200.00
200
200.00
200
200.00
200
200.00
200
CAPITULO: 6 PAETES
DESCRIPCION: 6.1
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
MARCA
Herramienta menor
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
V\PARCIAL
Agua
litro
3.63
10.00
36.30
Mortero 1.3
0.02
257005.98
5,140.12
1%
51.76
PRECIO UNITARIO
DESPERDICIO MATERIAL %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
CUADRILLA
TIPO
AA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
20.00
4,750.00
SUBTOTAL
PROPONENTE :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
MARCA
Herramienta menor
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
300.00
1.00
300.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
Und
2.05
400.00
820.00
ml
5.20
2540.00
13,208.00
0.25
0.01
22000.00
220.00
Llaves terminales
Und
1.00
15000.00
15,000.00
0.25
0.05
28000.00
1,400.00
1%
306.48
Codos 1/2"
Tuberia de presion 1/2 Rde
Limpiador PVC
V\PARCIAL
PRECIO UNITARIO
DESPERDICIO MATERIAL %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
CUADRILLA
TIPO
AA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
3.00
31,666.67
SUBTOTAL
PROPONENTE :
OBJETO:
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
MARCA
Herramienta menor
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
ml
1.05
2540.00
2,667.00
und
0.17
267.00
45.39
0.25
0.03
28000.00
840.00
Limpiador PVC
0.25
0.01
22000.00
220.00
1%
37.72
DESPERDICIO MATERIAL %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
CUADRILLA
TIPO
AA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
50.00
1,900.00
SUBTOTAL
PROPONENTE :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
MARCA
Herramienta menor
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
V\PARCIAL
und
0.17
5.04
0.86
Limpiador PVC
0.25
0.01
22000.00
220.00
0.25
0.03
28000.00
840.00
ml
1.05
3384.00
3,553.20
1%
46.14
PRECIO UNITARIO
DESPERDICIO MATERIAL %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
50.00
1,900.00
AA
SUBTOTAL
TOTAL COSTOS DIRECTOS
PROPONENTE :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
MARCA
Herramienta menor
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
Tuberia sanitaria de 4''
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
1.50
17093.00
25,639.50
und
0.17
5.04
0.86
0.25
0.03
28000.00
840.00
Limpiador PVC
0.25
0.01
22000.00
220.00
1%
267.00
DESPERDICIO MATERIAL %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
AA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
50.00
1,900.00
SUBTOTAL
PROPONENTE :
CAPITULO: 7.5
DESCRIPCION: Tuberia sanitaria de 3''
UNIDAD :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Herramienta menor
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
Tuberia sanitaria de 3''
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
1.05
12262.00
12,875.10
und
0.17
2522.00
428.74
Limpiador PVC
0.25
0.01
22000.00
220.00
0.25
0.03
28000.00
840.00
1%
143.64
DESPERDICIO MATERIAL %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
50.00
1,900.00
AA
SUBTOTAL
TOTAL COSTOS DIRECTOS
PROPONENTE :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
Herramienta menor
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
Tuberia sanitaria de 2''
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
1.05
8211.00
8,621.55
Union sanitario 2
und
0.17
1747.00
296.99
0.25
0.03
28000.00
840.00
Limpiador PVC
0.25
0.01
22000.00
220.00
1%
99.79
DESPERDICIO MATERIAL %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
AA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
50.00
1,900.00
SUBTOTAL
PROPONENTE :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
Herramienta menor
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
Codo 90 - 3''
und
Limpiador PVC
0.25
0.06
5803.00
348.18
0.01
22000.00
220.00
0.25
0.03
28000.00
840.00
1.05
12262.00
12,875.10
DESPERDICIO MATERIAL %
1%
142.83
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
AA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
20.00
4,750.00
SUBTOTAL
PROPONENTE :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
Herramienta menor
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
Codo 90 - 3''
und
0.60
5803.00
3,481.80
Limpiador PVC
0.25
0.01
22000.00
220.00
0.25
0.08
28000.00
2,240.00
ml
1.05
5000.00
5,250.00
1%
111.92
DESPERDICIO MATERIAL %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
AA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
20.00
4,750.00
SUBTOTAL
PROPONENTE :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
MARCA
Herramienta menor
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
0.25
0.01
22000.00
220.00
Codo 90 - 3''
und
0.14
5803.00
812.42
0.25
0.01
28000.00
280.00
1.05
12262.00
12,875.10
1%
141.88
Limpiador PVC
DESPERDICIO MATERIAL %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
CUADRILLA
TIPO
AA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
20.00
4,750.00
SUBTOTAL
PROPONENTE :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
MARCA
Herramienta menor
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
und
3.00
298.00
894.00
und
1.00
739.00
739.00
alambre calibre 10
ml
18.00
1600.00
28,800.00
alambre calibre 12
ml
24.00
980.00
23,520.00
Caja 60*60*12
und
1.00
Limpiador PVC
0.25
0.01
22000.00
220.00
0.25
0.04
28000.00
1,120.00
Tubo (*3m)
6.30
2800.00
17,640.00
Tubo (*3m)
6.30
5000.00
31,500.00
1%
1,044.33
DESPERDICIO MATERIAL %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
CUADRILLA
TIPO
AA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
1.00
95,000.00
SUBTOTAL
PROPONENTE :
Contador trifasico
UNIDAD :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
MARCA
Herramienta menor
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
Contador trifasico
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
und
1.00
151500.00
151,500.00
1%
1,515.00
DESPERDICIO MATERIAL %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
AA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
30.00
3,166.67
SUBTOTAL
PROPONENTE :
UNIDAD :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
MARCA
Herramienta menor
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
und
2.60
298.00
774.80
alambre calibre 12
ml
5.61
980.00
5,497.80
alambre calibre 14
ml
2.79
690.00
1,925.10
und
1.35
1364.00
1,841.40
Interruptores
unidad
1.00
3800.00
3,800.00
Limpiador PVC
0.25
0.01
22000.00
220.00
Rosetas
und
1.00
1500.00
1,500.00
0.25
0.01
28000.00
280.00
Tubo (*3m)
3.38
2800.00
9,464.00
1%
253.03
DESPERDICIO MATERIAL %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
CUADRILLA
TIPO
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
3.00
31,666.67
AA
SUBTOTAL
TOTAL COSTOS DIRECTOS
PROPONENTE :
DESCRIPCION
MARCA
Herramienta menor
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
und
3.36
298.00
1,001.28
alambre calibre 12
ml
4.56
980.00
4,468.80
alambre calibre 14
ml
11.16
690.00
7,700.40
und
1.89
1364.00
2,577.96
und
0.84
6700.00
5,628.00
Limpiador PVC
0.25
0.01
22000.00
220.00
Rosetas
und
1.05
1500.00
1,575.00
0.25
0.01
28000.00
280.00
Tubo (*3m)
4.02
2800.00
11,256.00
1%
347.07
DESPERDICIO MATERIAL %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
AA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
3.00
31,666.67
SUBTOTAL
PROPONENTE :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
Herramienta menor
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
und
2.10
298.00
625.80
ml
10.13
200.00
2,026.00
Boton timbre
und
1.00
2000.00
2,000.00
und
1.05
1364.00
1,432.20
Limpiador PVC
0.25
0.01
22000.00
220.00
0.25
0.01
28000.00
280.00
Tubo (*3m)
9.92
2800.00
27,776.00
DESPERDICIO MATERIAL %
1%
343.60
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
AA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
3.00
31,666.67
SUBTOTAL
PROPONENTE :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
Herramienta menor
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
V\PARCIAL
Alambre desnudo
ml
2.00
680.00
1,360.00
Varilla cw 3/4*2,40
1.00
13000.00
13,000.00
1%
143.60
PRECIO UNITARIO
DESPERDICIO MATERIAL %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
AA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
150.00
633.33
SUBTOTAL
PROPONENTE :
Punto tv
UNIDAD :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
Herramienta menor
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNITARIO
und
1.05
298.00
Cable coaxial
ml
16.00
600.00
und
1.05
1364.00
Limpiador PVC
0.25
0.01
22000.00
V\PARCIAL
220.00
0.25
0.01
28000.00
280.00
Tubo (*3m)
12.00
2800.00
33,600.00
1%
341.00
DESPERDICIO MATERIAL %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
AA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
3.00
31,666.67
SUBTOTAL
PROPONENTE :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
Herramienta menor
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
und
1.00
114637.00
114,637.00
breaker 30 A
und
1.00
7500.00
7,500.00
1%
1,221.37
DESPERDICIO MATERIAL %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
JORNAL TOT
RENDIMIENTO
V\UNITARIO
CUADRILLA
AA
95,000.00
1.00
95,000.00
SUBTOTAL
PROPONENTE :
200.00
5,228.18
4,750.00
10,178
und
300.00
30,954.48
31,666.67
62,921
ml
200.00
3,810.11
1,900.00
5,910
ml
200.00
4,660.20
1,900.00
6,760
ml
200.00
26,967.36
1,900.00
29,067
ml
200.00
14,507.48
1,900.00
16,607
ml
200.00
10,078.33
1,900.00
12,178
und
200.00
14,426.11
4,750.00
19,376
und
200.00
11,303.72
4,750.00
16,254
ml
200.00
14,329.40
4,750.00
19,279
und
200.00
105,477.33
95,000.00
200,677
und
200.00
153,015.00
3,166.67
156,382
und
200.00
25,556.13
31,666.67
57,423
und
200.00
35,054.51
31,666.67
66,921
und
200.00
34,703.60
31,666.67
66,570
und
200.00
14,503.60
633.33
15,337
und
200.00
34,441.00
31,666.67
66,308
und
200.00
123,358.37
95,000.00
218,558
CAPITULO: 1. PRELIMINARES
DESCRIPCION: 1.1
Localizacion y replanteo
UNIDAD :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
MARCA
Herramienta menor
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
100.00
1.00
100.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
Varillon
ml
0.50
1000.00
500.00
Puntilla
Lb
0.02
2500.00
52.50
1%
5.53
DESPERDICIO MATERIAL %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
JORNAL TOT
RENDIMIENTO
V\UNITARIO
AA
95,000.00
95,000.00
87.00
1,091.95
SUBTOTAL
PROPONENTE :
CAPITULO: 1. PRELIMINARES
DESCRIPCION: 1.2
Campamento 18 m
UNIDAD :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
MARCA
Herramienta menor
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
500.00
1.00
500.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
Bisagra Comun
und
6.00
2500.00
15,000.00
Und
28.00
300.00
8,400.00
und
2.00
2000.00
4,000.00
Puntilla
Lb
4.00
2500.00
10,000.00
Tabla burra
ml
127.00
3500.00
444,500.00
14.00
14800.00
207,200.00
Vara de clavo
ml
66.00
2000.00
132,000.00
Recebo
2.00
20000.00
40,000.00
2%
17,222.00
Teja Eternit N 6
DESPERDICIO MATERIAL %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
A3
JORNAL TOT
RENDIMIENTO
V\UNITARIO
171,000.00
1.50
114,000.00
SUBTOTAL
PROPONENTE :
CAPITULO: 1. PRELIMINARES
DESCRIPCION: 1.3
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Herramienta menor
Global
Volqueta 6m3
FORD
6 M3
200.00
30,000.00
1.00
200.00
10.00
3,000.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
V\PARCIAL
PRECIO UNITARIO
DESPERDICIO MATERIAL %
1%
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
AA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
80.00
1,187.50
SUBTOTAL
PROPONENTE :
CAPITULO: 2. CIMENTACION
DESCRIPCION: 1.4
Cerramiento en polisombra h= 3 m
UNIDAD :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
Herramienta menor
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
500.00
1.00
500.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
ml
1.00
1600.00
1,600.00
Vara de clavo
ml
4.00
2000.00
8,000.00
Puntilla
Lb
0.25
2500.00
625.00
1%
102.25
Polisombra
DESPERDICIO MATERIAL %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
AA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
49.00
1,938.78
SUBTOTAL
PROPONENTE :
CAPITULO: 1. PRELIMINARES
DESCRIPCION: 1.5
Retiro de escombros
UNIDAD :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
MARCA
Herramienta menor
Volqueta 6m3
FORD
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
30,000.00
6 M3
30,000.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
V\PARCIAL
PRECIO UNITARIO
DESPERDICIO MATERIAL %
1%
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
AA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
8.00
11,875.00
SUBTOTAL
PROPONENTE :
CAPITULO: 2. CIMENTACION
DESCRIPCION: 2.1
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
Herramienta menor
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
Global
500.00
1.00
500.00
5,000.00
1.00
5,000.00
Vibrador (rana)
V\PARCIAL
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
Concreto de 3000 PSI
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
1.05
252301.40
264,916.47
DESPERDICIO MATERIAL %
1%
2,649.16
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
A5
JORNAL TOT
RENDIMIENTO
V\UNITARIO
247,000.00
8.00
30,875.00
SUBTOTAL
PROPONENTE :
CAPITULO: 2. CIMENTACION
DESCRIPCION: 2.2
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
MARCA
Herramienta menor
Volqueta 6m3
FORD
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
300.00
1.00
300.00
6.00
5,000.00
6 M3
30,000.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
DESPERDICIO MATERIAL %
1%
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
AA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
8.00
11,875.00
SUBTOTAL
PROPONENTE :
CAPITULO: 2. CIMENTACION
DESCRIPCION: 2.3
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
Herramienta menor
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
5,000.00
1.00
5,000.00
Vibrador (rana)
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
1.05
252301.40
264,916.47
Puntilla
Lb
1.50
2500.00
3,750.00
Repisa
unidades Ml
3.20
1500.00
4,800.00
ml
3.70
3500.00
12,950.00
Tabla burra
DESPERDICIO MATERIAL %
1%
2,864.16
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
A4
JORNAL TOT
RENDIMIENTO
V\UNITARIO
209,000.00
8.00
26,125.00
SUBTOTAL
PROPONENTE :
CAPITULO: 2. CIMENTACION
DESCRIPCION: 2.4
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
Herramienta menor
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
300.00
1.00
300.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
Concreto de 2000 PSI
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
0.05
229338.04
11,466.90
DESPERDICIO MATERIAL %
1%
114.67
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
A4
JORNAL TOT
RENDIMIENTO
V\UNITARIO
209,000.00
30.00
6,966.67
SUBTOTAL
PROPONENTE :
CAPITULO: 2. CIMENTACION
DESCRIPCION: 2.5
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
Herramienta menor
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
5,000.00
1.00
5,000.00
Vibrador (rana)
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
Recebo
1.30
20000.00
26,000.00
Agua
litro
250.00
10.00
2,500.00
DESPERDICIO MATERIAL %
1%
285.00
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
AA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
16.00
5,937.50
SUBTOTAL
PROPONENTE :
CAPITULO: 2. CIMENTACION
DESCRIPCION: 2.6
Polietileno
UNIDAD :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
Herramienta menor
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
Polietileno
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
1.00
1500.00
1,500.00
DESPERDICIO MATERIAL %
1%
15.00
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
AA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
1,000.00
95.00
SUBTOTAL
PROPONENTE :
CAPITULO: 2. CIMENTACION
DESCRIPCION: 2.7
Malla electrosoldada
UNIDAD :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
Herramienta menor
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
m2
0.02
6000.00
120.00
Alambre N18
kl
0.10
3268.00
326.80
DESPERDICIO MATERIAL %
1%
4.47
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
AA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
150.00
633.33
SUBTOTAL
PROPONENTE :
CAPITULO: 2. CIMENTACION
DESCRIPCION: 2.7
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
Herramienta menor
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
Suministro de acero 37000
Alambre N18
Segueta
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
kg
1.10
2400.00
2,640.00
kl
0.05
3268.00
163.40
Und hoja
0.03
3000.00
90.00
DESPERDICIO MATERIAL %
1%
28.93
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
AA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
150.00
633.33
SUBTOTAL
PROPONENTE :
CAPITULO: 2. CIMENTACION
DESCRIPCION: 2.9
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
Herramienta menor
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
Suministro de acero 60000
Segueta
Alambre N18
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
kg
1.10
2300.00
2,530.00
Und hoja
0.05
3000.00
150.00
kl
0.03
3268.00
98.04
DESPERDICIO MATERIAL %
1%
27.78
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
AA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
150.00
633.33
SUBTOTAL
PROPONENTE :
CAPITULO: 3 DESAGUES
DESCRIPCION: 3.1
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
Herramienta menor
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
0.05
229338.04
11,466.90
Ladrillo Tolete
Und
188.00
300.00
56,400.00
Mortero 1.4
0.80
222393.28
177,914.62
Recebo
0.15
20000.00
3,000.00
kg
4.50
2300.00
10,350.00
DESPERDICIO MATERIAL %
1%
2,591.32
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
A1
JORNAL TOT
RENDIMIENTO
V\UNITARIO
133,000.00
1.00
133,000.00
SUBTOTAL
PROPONENTE :
CAPITULO: 3 DESAGUES
DESCRIPCION: 3.2
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
Herramienta menor
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
Ladrillo Tolete
Und
92.00
300.00
27,600.00
0.05
229338.04
11,466.90
Recebo
0.10
20000.00
2,000.00
Mortero 1.4
0.50
222393.28
111,196.64
kg
3.60
2300.00
8,280.00
DESPERDICIO MATERIAL %
1%
1,605.44
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
AA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
1.00
95,000.00
SUBTOTAL
PROPONENTE :
CAPITULO: 4 ESTRUCTURAS
DESCRIPCION: 4.1
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Herramienta menor
Global
200.00
1.00
200.00
Andamios
seccion
1.00
1,800.00
1.00
5,000.00
Vibrador (rana)
300.00
5,000.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
Alambre N18
kl
2.10
3268.00
6,862.80
1.10
252301.40
277,531.54
Puntilla
Lb
8.40
2500.00
21,000.00
Repisa
unidades Ml
7.60
1500.00
11,400.00
Tabla burra
ml
2.70
DESPERDICIO MATERIAL %
3500.00
9,450.00
1%
3,262.44
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
A4
JORNAL TOT
RENDIMIENTO
V\UNITARIO
209,000.00
6.00
34,833.33
SUBTOTAL
PROPONENTE :
CAPITULO: 4 ESTRUCTURAS
DESCRIPCION: 4.2
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
Herramienta menor
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
5,000.00
1.00
5,000.00
seccion
300.00
1.00
300.00
Vibrador (rana)
Andamios
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
1.10
252301.40
277,531.54
Puntilla
Lb
1.50
2500.00
3,750.00
Repisa
Tabla burra
unidades Ml
3.20
1500.00
4,800.00
ml
3.70
3500.00
12,950.00
1%
2,990.32
DESPERDICIO MATERIAL %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
A4
JORNAL TOT
RENDIMIENTO
V\UNITARIO
209,000.00
2.00
104,500.00
SUBTOTAL
PROPONENTE :
CAPITULO: 4 ESTRUCTURAS
DESCRIPCION: 4.3
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
Herramienta menor
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
Global
200.00
1.00
200.00
5,000.00
1.00
5,000.00
Vibrador (rana)
V\PARCIAL
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
Concreto de 3000 PSI
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
0.11
252301.40
27,753.15
Puntilla
Lb
1.00
2500.00
2,500.00
Alambre N18
kl
1.00
3268.00
3,268.00
Tabla burra
ml
1.60
3500.00
5,600.00
Repisa
unidades Ml
1.50
1500.00
2,250.00
Sika 1
Galones
0.20
26912.00
5,382.40
1%
467.54
DESPERDICIO MATERIAL %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
A1
JORNAL TOT
RENDIMIENTO
V\UNITARIO
133,000.00
5.00
26,600.00
SUBTOTAL
PROPONENTE :
CAPITULO: 4 ESTRUCTURAS
DESCRIPCION: 4.4
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
Herramienta menor
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
5,000.00
1.00
5,000.00
Vibrador (rana)
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
Alambre N18
kl
2.10
3268.00
6,862.80
1.08
252301.40
272,485.51
Puntilla
Lb
3.90
2500.00
9,750.00
Repisa
unidades Ml
7.60
1500.00
11,400.00
Sika 1
Galones
1.00
26912.00
26,912.00
1%
3,274.10
DESPERDICIO MATERIAL %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
AA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
2.00
47,500.00
SUBTOTAL
PROPONENTE :
CAPITULO: 4 ESTRUCTURAS
DESCRIPCION: 4.5
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
Herramienta menor
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
5,000.00
1.00
5,000.00
Vibrador (rana)
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
Alambre N18
Repisa
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
kl
0.12
3268.00
392.16
unidades Ml
0.05
1500.00
75.00
0.09
252301.40
22,707.13
Puntilla
Lb
0.02
2500.00
50.00
Tabla burra
ml
0.06
3500.00
210.00
kg
4.20
2400.00
10,080.00
kg
26.40
2000.00
52,800.00
m2
0.50
7000.00
3,500.00
1%
898.14
DESPERDICIO MATERIAL %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
A6
JORNAL TOT
RENDIMIENTO
V\UNITARIO
323,000.00
7.00
46,142.86
SUBTOTAL
PROPONENTE :
CAPITULO: 4 ESTRUCTURAS
DESCRIPCION: 4.6
Viga cinta
UNIDAD :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Herramienta menor
Global
200.00
1.00
200.00
Andamios
seccion
Vibrador (rana)
300.00
5,000
1.00
300.00
1.00
5,000.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
Alambre N18
kl
2.10
3268.00
6,862.80
1.08
252301.40
272,485.51
Puntilla
Lb
3.90
2500.00
9,750.00
Repisa
unidades Ml
4.70
1500.00
7,050.00
Tabla burra
ml
7.30
DESPERDICIO MATERIAL %
3500.00
25,550.00
1%
3,216.98
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
CUADRILLA
TIPO
A4
JORNAL TOT
RENDIMIENTO
V\UNITARIO
209,000.00
2.00
104,500.00
SUBTOTAL
PROPONENTE :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
Herramienta menor
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
300.00
1.00
300.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
Tabla chapa
ml
0.51
1500.00
765.00
0.11
224892.00
24,738.12
DESPERDICIO MATERIAL %
1%
255.03
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
CUADRILLA
TIPO
A6
JORNAL TOT
RENDIMIENTO
V\UNITARIO
323,000.00
10.00
32,300.00
SUBTOTAL
PROPONENTE :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
Herramienta menor
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
300.00
1.00
300.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
kl
0.12
3268.00
392.16
unidades Ml
0.05
1500.00
75.00
0.09
252301.40
22,707.13
Puntilla
Lb
0.02
2500.00
50.00
Tabla burra
ml
0.06
3500.00
210.00
kg
4.20
2400.00
10,080.00
kg
26.40
2000.00
52,800.00
Alambre N18
Repisa
m2
0.05
DESPERDICIO MATERIAL %
7000.00
350.00
1%
866.64
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
A6
JORNAL TOT
RENDIMIENTO
V\UNITARIO
323,000.00
5.00
64,600.00
SUBTOTAL
PROPONENTE :
CAPITULO: 4 ESTRUCTURAS
DESCRIPCION: 4.9
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
Herramienta menor
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
Alambre N18
kl
0.12
3268.00
392.16
1.05
252301.40
264,916.47
Puntilla
Lb
1.05
2500.00
2,625.00
Repisa
unidades Ml
2.07
1500.00
3,105.00
Tabla burra
ml
9.02
3500.00
31,570.00
kg
16.00
2000.00
32,000.00
DESPERDICIO MATERIAL %
1%
3,346.09
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
A1
JORNAL TOT
RENDIMIENTO
V\UNITARIO
133,000.00
0.50
266,000.00
SUBTOTAL
PROPONENTE :
CAPITULO: 5 MAMPOSTERIA
DESCRIPCION: 5.1
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
Herramienta menor
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
300.00
1.00
300.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
Ladrillo Tolete
Und
25.42
300.00
7,626.00
Mortero 1.4
0.06
222393.28
13,343.60
Galones
0.55
26912.00
14,801.60
Sika 1
DESPERDICIO MATERIAL %
1%
357.71
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
TIPO
CUADRILLA
AA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
8.00
11,875.00
SUBTOTAL
PROPONENTE :
CAPITULO: 5 MAMPOSTERIA
DESCRIPCION: 5.2
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
Herramienta menor
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
1.00
1.00
1.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
Bloque N 5
Und
15.00
620.00
9,300.00
Mortero 1.4
0.03
222393.28
6,671.80
1%
159.72
DESPERDICIO MATERIAL %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
CUADRILLA
TIPO
AA
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
15.00
6,333.33
SUBTOTAL
PROPONENTE :
100.00
558.03
1,091.95
1,750
und
500.00
878,322.00
114,000.00
992,822
und
3,200.00
1,187.50
4,388
ml
500.00
10,327.25
1,938.78
12,766
vj
30,200.00
11,875.00
42,075
5,500.00
267,565.63
30,875.00
303,941
5,300.00
11,875.00
17,175
5,200.00
289,280.63
26,125.00
320,606
300.00
11,581.57
6,966.67
18,848
5,200.00
28,785.00
5,937.50
39,923
200.00
1,515.00
95.00
1,810
200.00
451.27
633.33
1,285
kg
200.00
2,922.33
633.33
3,755.7
kg
200.00
2,805.82
633.33
3,639
und
200.00
261,722.84
133,000.00
394,923
und
200.00
162,148.98
95,000.00
257,349
7,000.00
329,506.78
34,833.33
371,340
5,500.00
302,021.86
104,500.00
412,022
5,200.00
47,221.09
26,600.00
79,021
5,200.00
330,684.42
47,500.00
383,384
5,200.00
90,712.43
46,142.86
142,055
5,500.00
324,915.30
104,500.00
434,915
300.00
25,758.15
32,300.00
58,358
300.00
87,530.93
64,600.00
152,431
200.00
337,954.72
266,000.00
604,155
300.00
36,128.91
11,875.00
48,304
200.00
16,131.52
6,333.33
22,665
CAPITULO:
DESCRIPCION:
CONCRETOS
5.1 CONCRETO SIMPLE 3000 PSI
UNIDAD :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
MARCA
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Herramienta menor
Global
300.00
1.00
300.00
Mezcladora
1 BTO
10,000.00
1.00
10,000.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
Cemento
kg
350.00
400.00
140,000.00
Arena lavada
m3
0.60
50,000.00
30,000.00
Gravilla
m3
0.90
80000.00
72,000.00
lt
160.00
10.00
1,600.00
5%
12,180.00
Agua
DESPERDICIO MATERIAL %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
Cuadrilla
TIPO
CC
JORNAL TOT
RENDIMIENTO
V\UNITARIO
418,000.00
8.00
52,250.00
SUBTOTAL
PROPONENTE
CAPITULO:
DESCRIPCION:
MAMPOSTERIA
6.1 MURO TOLETE COMUN E=0.12
UNIDAD :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
MARCA
Herramienta menor
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
200.00
1.00
200.00
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
Cemento
Arena Pea
Ladrillo comun
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
kg
13.00
400.00
5,200.00
m3
0.03052
30,000.00
915.60
UNIDAD
55.00
300.00
16,500.00
2%
452.31
DESPERDICIO MATERIAL %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
Cuadrilla
TIPO
BB
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
10.00
9,500.00
SUBTOTAL
PROPONENTE
CAPITULO:
DESCRIPCION:
PISOS
BASE EN MATERIAL DE AFIRMADO
UNIDAD :
1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
MARCA
Herramienta menor
TIPO
TARIFA\HORA
RENDIMIENTO
V\PARCIAL
Global
300.00
1.00
300.00
8,000.00
2.00
4,000.00
Rana
SUBTOTAL
2. MATERIALES EN OBRA
DESCRIPCION
Material de afirmado
UNIDAD
CANTIDAD
PRECIO UNITARIO
V\PARCIAL
m3
1.25
25,000.00
31,250.00
DESPERDICIO MATERIAL %
SUBTOTAL
3. MANO DE OBRA
TRABAJADOR
Cuadrilla
TIPO
BB
JORNAL TOT
RENDIMIENTO
V\UNITARIO
95,000.00
16.00
5,937.50
SUBTOTAL
PROPONENTE
M3
10,300.00
255,780.00
52,250.00
318,330
M2
200.00
23,067.91
9,500.00
32,768
M3
4,300.00
31,250.00
5,937.50
41,488
OFICIAL
AYUDANTE
F.P.S = 90%
OFICIAL
CUADRILLA
AA
A1
A5
A4
A3
A6
CANT
1
1
1
1
1
1
$
$
$
$
$
$
$
V/DIA
30,000.00
30,000.00
30,000.00
30,000.00
30,000.00
30,000.00
30,000.00
AYUDANTE
CANT
V/DIA
1
$ 20,000.00
2
$ 20,000.00
5
$ 20,000.00
4
$ 20,000.00
3
$ 20,000.00
7
$ 20,000.00
$ 20,000.00
SUBTOTAL
F.P.S
JORNAL TOTAL
$ 50,000.00 $ 45,000.00 $
95,000.00
$ 70,000.00 $ 63,000.00 $ 133,000.00
$ 130,000.00 $ 117,000.00 $ 247,000.00
$ 110,000.00 $ 99,000.00 $ 209,000.00
$ 90,000.00 $ 81,000.00 $ 171,000.00
$ 170,000.00 $ 153,000.00 $ 323,000.00
$
$
$
-
FECHA: ______________
..
VALOR DIA
30,000.00
20,000.00
F.P.S = 90%
OFICIAL
AA
CC
BB
DD
EL
CA
DT
CUADRILLA
Preliminares
Concretos
CANT
1
2
2
2
2
2
2
$
$
$
$
$
$
$
V/DIA
30,000.00
30,000.00
30,000.00
30,000.00
30,000.00
30,000.00
30,000.00
AYUDANTE
CANT
V/DIA
1
$ 20,000.00
8
$ 20,000.00
2
$ 20,000.00
3
$ 20,000.00
4
$ 20,000.00
5
$ 20,000.00
6
$ 20,000.00
$
$
$
$
$
$
$
SUBTOTAL
50,000.00
220,000.00
100,000.00
120,000.00
140,000.00
160,000.00
180,000.00
$
$
$
$
$
$
$
F.P.S
45,000.00
198,000.00
90,000.00
108,000.00
126,000.00
144,000.00
162,000.00
JORNAL TOTAL
$
95,000.00
$ 418,000.00
$ 190,000.00
$ 228,000.00
$ 266,000.00
$ 304,000.00
$ 342,000.00
FECHA: ______________
ITEM
F-06
MUNICIPIO:
FECHA:
DESCRIPCION
UND. CANTIDAD
RENDIM
DIA
# CUADRILLAS DURACION
A UTILIZAR
TOTAL DIAS
DURACION
TOTAL
(APROX)
1.1
Localizacion y replanteo
87
87.00
1.00
1.2
Campamento 18 m
und
1.50
0.67
1.3
87
80.00
1.09
1.4
Cerramiento en polisombra h= 3 m
ml
41
49.00
0.84
1.5
Retiro de escombros
vj
8.00
0.63
#DIV/0!
#DIV/0!
2.1
6.9
8.00
0.86
2.2
6.9
8.00
0.86
2.3
4.6875
8.00
0.59
2.4
10
30.00
0.33
2.5
96.25
16.00
6.02
2.6
Polietileno
132
1,000.00
0.13
2.7
Malla electrosoldada
87
150.00
0.58
2.8
kg
896.3472
150.00
5.98
2.9
kg
3176.1024
150.00
21.17
22
#DIV/0!
#DIV/0!
3.1
und
1.00
3.00
3.2
und
1.00
1.00
#DIV/0!
#DIV/0!
4.1
7.428125
6.00
1.24
4.2
2.5
2.00
1.25
4.3
0.196
5.00
0.04
4.4
1.7394
2.00
0.87
4.5
7.00
8.21
4.6
Viga cinta
0.2445
2.00
0.12
4.7
87
10.00
8.70
4.8
5.00
11.50
12
4.9
0.50
3.93
#DIV/0!
#DIV/0!
1.966
5.1
18.4
8.00
2.30
5.2
296.518
15.00
19.77
20
#DIV/0!
#DIV/0!
648.4575
32.42
33
#DIV/0!
#DIV/0!
0
6.1
0
Paete liso muro 1:4
20.00
7.1
und
3.00
0.33
7.2
ml
28
50.00
0.56
7.3
ml
23.52
50.00
0.47
7.4
ml
10.96
50.00
0.22
7.5
ml
24.71
50.00
0.49
7.6
ml
11.88
50.00
0.24
7.7
und
20.00
0.40
7.8
und
25
20.00
1.25
7.9
ml
20.00
0.15
#DIV/0!
#DIV/0!
8.1
1.00
1.00
8.2
Contador trifasico
und
30.00
0.03
8.3
und
19
3.00
6.33
8.4
und
3.00
0.67
8.5
und
3.00
0.33
8.6
und
150.00
0.01
8.7
Punto tv
und
3.00
0.33
8.8
1.00
1.00
#DIV/0!
#DIV/0!
9.1
415.363
12.00
34.61
35
9.2
114.96
12.00
9.58
10
#DIV/0!
#DIV/0!
5.91
10.00
0.59
55.23
20.00
2.76
#DIV/0!
#DIV/0!
157.47
30.00
5.25
ml
15.4
3.00
5.13
#DIV/0!
#DIV/0!
63.052
30.00
2.10
63.052
20.00
3.15
30.00
0.27
#DIV/0!
#DIV/0!
und
14
10.00
1.40
19.8
3.00
6.60
#DIV/0!
#DIV/0!
4.6945
10.00
0.47
9.246
4.00
2.31
5.7375
4.00
1.43
15.5619
10.00
1.56
10.548
4.00
2.64
#DIV/0!
#DIV/0!
und
5.00
1.00
15.2 Sanitarios
und
5.00
1.00
und
10.00
0.50
15.6 Incrustaciones
und
4.00
1.00
#DIV/0!
#DIV/0!
20.2564
100.00
0.20
und
13
20.00
0.65
und
20.00
0.15
16.4 Espejos
und
0.6
100.00
0.01
#DIV/0!
#DIV/0!
4.8
0.16
#DIV/0!
#DIV/0!
200
1.00
30.00
200.00
Direccin
Telefonos ,
Correo electronico
F-06
OBRA:
LOCALIZACION:
Traer rendimiento
MUNICIPIO: del APU
SECTOR:
PROPONENTE:
ITEM
FECHA:
DESCRIPCION
AFIRMADO
UND. CANTIDAD
M3
RENDIM
DIA
# CUADRILLAS DURACION
A UTILIZAR
TOTAL DIAS
DURACION
TOTAL
(APROX)
100
16
6.25
M3
50
6.25
MUROS
M2
80
10
8.00
PROPONENTE:
ITEM
DESCRIPCION
PROPONENTE: ________________________________
DURACION ( DIAS)
7
8
9 10
11
12
13
14
15
16
FECHA: __________________
ITEM
1
1.1
1.2
1.3
DESCRIPCION
PRELIMINARES
Descapote mecanico
Localzacin y replanteo
Cerramiento en lona H=3.00m
2
2.1
2.2
2.3
CIMENTACION Y DESAGUES
Excavacin manual y retiro
Caja de Inspeccin 60x60x60
Base concreto pobre E=0.05m
DURACION ( DIAS)
7
8
9 10
11
12
13
14
15
16
xxxx
xxxx
xxxx xxxx
PROPONENTE: ________________________________
FECHA: __________________
2. CONCRETO CICLOPEO
DESCRIPCION
EJE 1A-1D
EJE 2A-2D Inc 3B-3C
EJE 4A-4D
EJE 1A-4D
EJE 1D-4D
EJE 2B-4B
EJE 2C-4C
TOTAL CONCRETO CICLOPEO
L (m)
6.65
6.65
6.65
7.05
7.05
2.70
2.70
A (m)
0.60
0.40
0.60
0.40
0.40
0.40
0.40
h (m)
0.55
0.55
0.55
0.55
0.55
0.55
0.55
SUBTOTAL
2.19
1.46
2.19
1.55
1.55
0.59
0.59
10.14
6.09
3.04
1.01
UND
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
0.45
0.45
0.45
0.45
0.45
0.45
0.45
SUBTOTAL
1.80
1.20
1.80
1.27
1.27
0.49
0.49
8.30
UND
M3
M3
M3
M3
M3
M3
M3
M3
0.10
0.10
0.10
0.10
0.10
0.10
0.10
SUBTOTAL
0.40
0.27
0.40
0.28
0.28
0.11
0.11
1.84
UND
M3
M3
M3
M3
M3
M3
M3
M3
60%
30%
10%
L (m)
A (m)
6.65
6.65
6.65
7.05
7.05
2.70
2.70
h (m)
0.60
0.40
0.60
0.40
0.40
0.40
0.40
A (m)
6.65
6.65
6.65
7.05
7.05
2.70
2.70
h (m)
0.60
0.40
0.60
0.40
0.40
0.40
0.40