b
230 mm
D
450 mm
Cover
40 mm
d
410 mm
Factored
Pu
637 Kn
Unfactored
P
425 Kn
Fck
20 N/mm2
Fy
415 N/mm2
SBC
250 Kn/m2
167 Kn/m2
Mux =
60 .0Kn-m
D
300 mm
Offset
100 mm
Loads:
T.L.on footing:
(Working)
Area of footing
required:
B.M.at col.base=
Provide area
Area provided
q=
tan =
tan provided=
Length reqd=
467 Kn
2 .80m2
0 .1m
L
2050 mm
2 .829m2
B
1380 mm
0 .150N/mm2
1.19
6.37 Safe
2 .0m
Min.length reqd=
1038 mm
So,provide footing
size
Area =
Bf
Lf
1380 mm
2050 mm
2 .83m2 Safe
Projection
Max projection
606 mm
288 mm
Intensity of soil
Pressure
225 Kn/m2
Depth reqd
Mux=
Reqd.eff.Depth =
So,provide total D=
d=
12 .9Kn-m
58 mm
350 mm
290 mm
20 Kn Safe
230 mm
Shear resi.by concrete
Ks =
1 .118N/mm2
Vuc =
354 .9Kn
157 mm2
So,provide =
no.
10
Dia.
10 mm
Ast.provided
785 mm2
580 mm2
Dia.
8
Spacing
150 mm
Ast.provided
141372 mm2
637.5
Pt
<=0.15
0.25
0.5
0.75
1
1.25
1.5
1.75
2
2.25
2.5
2.75
3
M20
0.28
0.36
0.48
0.56
0.62
0.67
0.72
0.75
0.79
0.81
0.82
0.82
0.82
Concrete Grade
M25
M30
0.29
0.36
0.49
0.57
0.64
0.7
0.74
0.78
0.82
0.85
0.88
0.9
0.92
0.25
0.5
0.3366
0.401568
0.36
0.48
Column size:
Loads:
SBC
Mux =
T.L.on footing:
(Working)
Area of footing
required:
B.M.at col.base=
Provide area
Area provided
q=
tan =
tan provided=
Length reqd=
Min.length reqd=
So,provide footing
size
Area =
b
300 mm
D
570 mm
Cover
40 mm
d
530 mm
Factored
Pu
330 Kn
Unfactored
P
220 Kn
Fck
20 N/mm2
Fy
415 N/mm2
400 Kn/m2
267 Kn/m2
D
660 mm
Offset
100 mm
192 .5Kn-m
242 Kn
0 .91m2
0 .6m
L
2250 mm
1 .125m2
0 .196N/mm2
1.27
3.3 Safe
1 .8m
2137 mm
Bf
Lf
500 mm
2250 mm
1 .13m2 Safe
Projection
Max projection
157 mm
1267 mm
Intensity of soil
Pressure
293 Kn/m2
Depth reqd
Mux=
Reqd.eff.Depth =
So,provide total D=
d=
117 .7Kn-m
292 mm
600 mm
540 mm
B
500 mm
144 Kn Safe
480 mm
Shear resi.by concrete
Ks =
1 .118N/mm2
Vuc =
268 .3Kn
725 mm2
So,provide =
no.
10
Dia.
10 mm
Ast.provided
785 mm2
360 mm2
Dia.
8
Spacing
150 mm
Ast.provided
141372 mm2
637.5
Pt
<=0.15
0.25
0.5
0.75
1
1.25
1.5
1.75
2
2.25
2.5
2.75
3
M20
0.28
0.36
0.48
0.56
0.62
0.67
0.72
0.75
0.79
0.81
0.82
0.82
0.82
Concrete Grade
M25
M30
0.29
0.36
0.49
0.57
0.64
0.7
0.74
0.78
0.82
0.85
0.88
0.9
0.92
0.25
0.5
0.3366
0.401568
0.36
0.48