Você está na página 1de 3

CURRICULUM VITATE

NAME

NAING ZAW HTUN

FATHERS NAME

U SEIN WIN

DATE OF BIRTH

11, JUNE 1976

N.R.C NO

12/ THA LA NA (NAING) 002076

DRIVING LIENCE

NIL

NATIONALITY

MYANMAR

RACED & RELIGION

BAMAR & BUDDHIST

MARITAL STATUS & SEX :

MARRIED & MALE

BLOOD TYPE

AB GROUP

HEIGHT &WEIGHT

57 1/2 & 130 LBS

EDUCATION
(1) MATRICULATION (1980-1993)
(2)A.G.T.I (ELECTRICAL POWER),(1995 TO 1997)
OTHER QUALIFICATION
1.

PERIOD OF STUDY

COURSE STUDIED

October 1996 to December 1996

Aircon& Refrigeration Training Center

2.

PERIOD OF STUDY
August 1998 to October 1998

COURSE STUDIED
Window 95,KMD

3.

PERIOD OF STUDY

COURSE STUDIED

January 2011 to March 2011

Programmable Logic Controller (PLC)


Course

Training Courses
1.
2.
3.

English Proficiency course


Skill Evaluation Certificate (Steel structure fitting)
SEC Lever 1 Certificate (ITE, equivalent with NTC3, Electric Technology)

Working Experience
1.
Employer
Period
Position
Responsibility

2.

Employer
Period
Position
Responsibility

3.

Employer
Period
Position
Responsibility

4.

Employer
Period
Position
Responsibility

: Myanmar Sampoerna Tobacco Co.ltd


: June 1999 to May 2002
: Electricial&Aircon Technician
: Preventive Checklist & Servicing of factory facilities
equipments(Electrical Generator, Air compressor, sub
station, subswitch board)and airconditioning
system.Troubleshoot and repair the factory equipments and
aircons.
: Systematic Control & Instrumentation Pte Ltd
: July 2004 to June 2007
: Service Technician
: Installation, Service and repair marineautomation system
(fire alarm and smoke detector system, Engine room
monitoring system, dewatering System, hydraulic actuator
valve, electrical distribution system etc.....
: EXE corporation (SAKURA TOWER)
: August 2007 to Aug 2009
: Assistant Engineer
: Supervise, service, maintain and repair electrical
distribution system,Air-condition system,Fire Alarm, Fire
Fighting system,PASystem,Water Supply & Sanitary
system.....etc and building Maintenance work. Installationof
system for new projects.
: CPG Facilities Management Pte Ltd
: August 2009 to Nov 2010
: Technician
: Preventive checklist & servicing of ACMV, Chilled air
conditioning system equipments (AHS,AHU,FCU,
Mechanical ventilation fan, etc...) at Changi Terminal 3.
Troubleshoot service, maintain and repair system
equipments, control system (relay logic, controller PLC
Control....etc)

5.

Employer
Period
Position
Responsibility

CONTACT ADDRESS
EMAIL ADDRESS
CONTACT NO.

: CPG Facilities Management Pte Ltd.


: May 2011 to Dec 2013
: Technical Executive
: Manage,Superuise,service,maintain and repair ACMV &
Mechnical system ( chilled mater & Gas type airconditioning system, Auto door system, Fire alarm, Fire
Fighting system,water supply saintary system etc....at
Changi airport Terminal 3.
: NO.3, AUNG THEIK DI STREET, AUNG MINGALAR
QT,THANLYIN,YANGON
: nainghtu@gmail.com
: 056-22457,09421064675.

Você também pode gostar