ASHOK Kondeti

Email: ashok_kondeti@yahoo.co.in

H. No: 5-29,
Warangal,
Andhra Pradesh-506006

Contact:+918978625906
.

CAREER OBJECTIVE
To advance further into advanced construction in an organization that can utilize my
skills and experience in challenging projects.

EDUCATIONAL QUALIFICATION
Bachelor of Engineering (B.E) in civil (KITS College of Engineering, Nagpur
University, Nagpur, Maharashtra) with 71.3 % in May 2007.

Higher Secondary Schools (SPR Jr College, Hanamkonda, Andhra Pradesh)


84.8 % in April 2003.

with

Secondary School Leaving Certificate (SGV, Warangal, Andhra Pradesh) with


74.3% in April 2003.

CAREER SUMMARY

Company
Position
Period
Project 1

: B.S.C.P.L Infrastructure Ltd, Hyderabad


: Sr. Engineer (structures)
: Mar 2011 to till date
: Six Laning of Chilakaluripeta-Nellore Section of NH-5 from Km 1182.802 to
Km 1366.547 in the State of Andhra Pradesh under NHDP PHASE-V
as BOT ON DBFOT PATTERN
Client
: National Highway authority of India (NHAI)
Project Cost : 1535 Crore
Roles and Responsibilities:

Construction of Vehicular Underpasses (VUP), Pedestrian Underpasses (PUP)


with precast voided planks.
Construction of 3 Major Bridges with pile foundation, casting and erection of
25mtr PSC I-Girders.
Construction of toll plaza.
Construction of Retaining Wall with RE blocks and fiber reinforcement (Geo Grid).
Executing all the Precast activities in Precast yard .
Construction of box culverts, pipe culverts and minor bridges.

Preparation of work programmes within given duration.

Preparation of working drawings, Layouts and bar bending Schedule.


Monitoring the Supervisors, Juniors Engineers & Machinery
Monitoring and supervising the all the structural activities.
Preparation of subcontractor bills.
Reconciliation of concrete and steel.

Period

: Nov o8 - Mar 11.

Project-2

: Construction of New Four Lane Roads (For Package -1,Road No. 1, 3, 4, 5, 6, 8 &
9B
& for Package-II, Road No. 2, 7, 9A, 10 & 11) in Naya Raipur)

Client

: Naya Raipur development authority (NRDA).

Project cost : 320 crore

ROLES AND RESPONSIBILITIES:


Construction of interchange cast in-situ 30m PSC I-Girders.
Construction of box culverts, pipe culverts, minor bridges and ducts.

Preparation of work programmes within given duration.

Preparation of bills as per work carried out at site.


Preparation of reconsilation for all structural items.
Maintaining good Quality in structures.

Period

: June o7 Nov 08.

Project-3

: Widening and strengthening of existing National Highway from 2 lane to 4 lane


From Km 551.00 to Km 526.00 of Siliguri to Islampur section of NH-31 in
West Bengal on East West Corridor under Phase-II Programme of
NHDP (Contract Package No EW-II (WB-6).

Client

: National Highway authority of India (NHAI)

Project cost: 158 crore

ROLES AND RESPONSIBILITIES:


Well foundation Mahananda River Bridge of 192 M length (7 Spans) with prestressed girder POT-PTFE bearings 2 Strip seal expansion joint.
Well foundation of Bridge of 40 M length (Single Span) with pre-stressed girder,
POT-PTFE bearings, Strip seal expansion joints.

Open foundation & R.C.C girder minor bridge of 14.5 M length (Single Span) with
elastomeric bearings.
Open foundation of 3 Nos Minor Bridge of 37.5 M length (4 Span), 14.5 M,7.5 M

length of Single span of R.C.C. Slab with paper bearing & filler type expansion
joint.
R.C.C. Slab culvert & Box culvert of different spans & different vertical clearance.

6 KM R.C.C Retaining wall of Height up to 6.5 M with R.C.C. Crash barrier in


different location

CERTIFICATIONS:

AutoCAD

PERSONAL DETAILS
Name
Date Of Birth

Ashok Kondeti
12th Nov 1985

Sex

Male

Fathers Name

K.Komurareddy

Marital status

Married

Degree

(B.E)

Discipline

Civil Engineering

Linguistic Ability
Passport No

Hindi, Telugu, English


L4101060

REFERENCES:Available on request.
Declaration
I hereby declare that the information furnished by me above is true to the best of my
knowledge.

Place: Warangal
Date: 08/2/14

Signature:
Ashok kondeti