Escolar Documentos
Profissional Documentos
Cultura Documentos
MDYConstructionLtd
Page1
Management/Organisational Chart
Management/OrganisationalChart
Page 2
Page2
CurrentProjects
Page3 4
SampleProjects Healthcare
Page5
SampleProjects FoodIndustry
Page6 9
SampleProjects Industrial
Page10 12
SampleProjects Commercial
Page13 15
SampleProjects Housing
Page16 18
p
j
Educational
SampleProjects
Page19
g
21
SampleProjects Leisure
Page22 24
SampleProjects CivilWorks
Page25
SampleProjectReferences
Page26 30
AnnualTurnover
l
Page31
SampleBankReference
Page32
SampleBondLetter
Page33
InsuranceSchedule
Page34 35
Quality&Safety
Page36
ClientList
Page37
MDYConstructionLtd CompanyProfile
CompanyProfile
MDYConstruction,fromitsincorporationin
1985 has grown and developed under the
1985,hasgrownanddevelopedunderthe
directionoffounderandManagingDirector,
PatrickCosgrove,tobecomeanestablishedand
recognised companyinallsectorsofthe
buildingindustry.Projectscompletedoverthe
past26years,ranginginvaluefrom1m
50m.
MDYConstructionhasabreadthofexperience
encompassingallsectorsoftheindustryfrom
educationalandleisurefacilities,healthcare,
industrialandcommercialbuildings,building
refurbishment heritage works food production
refurbishment,heritageworks,foodproduction
anddistributionfacilities,tolargescale
residentialdevelopmentsandsmallengineering
projectssuchasdrainageschemes,mainswater
networks,andwastewatertreatmentplants.
Contractshavebeenundertakensuccessfullyall
Contracts
have been undertaken successfully all
overIrelandwiththemainareaof
concentrationbeingtheGreaterDublinand
Leinsterareas,whichareeasilyservicedfrom
ourbaseinNorthKildare.
Overtheyearstheskillsandmanagementbase
of the company has grown and developed and
ofthecompanyhasgrownanddevelopedand
ourteamofstaffandmanagershasan
enthusiasm,competence,andcommitment
unequalledintheindustry.
Competitivetendering,professional
management,qualityconstruction,anexcellent
safety record a proven ability to meet exacting
safetyrecord,aprovenabilitytomeetexacting
programmes,andourcooperativeand
proactiveapproach,haveensuredthe
satisfactionofDesignTeamsandclientsinboth
thepublicandprivatesectors.
MDYConstructionistheidealchoiceforyour
MDY
C t ti i th id l h i f
buildingproject.
Page 1
Page 2
Current Projects
GaelscoilU Cheadaigh,Bray,Co.Wicklow
Theworkincludestheconstructionofanewtwostoreyextensiontotheexisting
The
work includes the construction of a new two storey extension to the existing
schoolwithseparatenewshedbuildingandthephasedrefurbishmentoftheexisting
twostoreyschool.Thestructureofthenewextensioncomprisesasteelframewith
reinforcedconcretepadsandstripfootingssubstructure,reinforcedconcreteground
slab,meshreinforcedscreedonprecasthollowcoreupperfloorandmembraneand
insulationcoveredmetaldeckroof.
Therefurbishmentworkincludestakingdownandmakinggoodworks,thecomplete
internalreconfigurationoftheexistingtoiletblockontwolevels,structuralalterations
atthejunctionwiththenewextensionontwolevels,windowandexternaldoor
replacementfortheentirebuilding,refurbishmentoftheexistingroofcoverings,new
roofinsulationthroughout,somenewpartitioning,doorsandframes,new
ironmongery,newmechanicalandelectricalinstallations,raisingandrefurbishingthe
existingstaircasebalustrades,newfloorandstaircasefinishesandredecorationofthe
entire.
Theworksalsoincludemechanicalandelectricalinstallations,builtinjoineryand
sanitaryfittings.
National University of Ireland Maynooth New University Restaurant
NationalUniversityofIrelandMaynooth,NewUniversityRestaurant
New2storeyRestaurantbuildingtoconsistofgroundfloorrestauranttocaterfor450
people,caftocaterfor100people,firstfloorcaftocaterfor100peopleprivate
diningroom,and2separatefullyfittedcateringkitchensincludingcold
stores. Developmentalsoconsistsofsiteworksincludingnewhardpavedplaza,soft
landscaping covered bicycle stores and set down area Thenewbuildingwilllinkwith
landscaping,coveredbicyclestoresandsetdownarea.
The new building will link with
theexistingsportshallatbothgroundandfirstfloorlevelandprovideashared
entranceforbothfacilities.
PresentationCollegeBray,Co.Wicklow
Demolitiontotheexistingthreestoreyclassroombuildingandadjoiningswimming
g
y
g
j
g
g
poolandtheconstructionofnewschoolbuildingcomprisinganewthreestorey
buildingandadjoiningsinglestoreyextensioncontaininggeneralclassrooms,
specialiststeachingareasandancillaryaccommodation,anewsinglestoreysportshall
withadjoiningancillaryaccommodation,constructionofanewaccessroad,5new
externalplayingcourts,permanentstaffcarparkfor40spaces,visitorcarparkfor12
spaces. Alsoincludedallassociatedsiteworks,drainageandlandscaping.
Page 3
Current Projects
BordnaMnaDrehidInVesselCompostFacility,Carbury,Co.Kildare
Thisturnkeydesign,build,commission,andvalidatecompostingfacilityisbeing
This
turnkey design build commission and validate composting facility is being
providedforIrelandsleadingWaste&EnergySemiStateCompany,Bordna Mna.
Theseworkswillbecapableofprocessing25,000tonnesperyearofseparately
collectedbiowastefromhouseholds,foodwastefromtheserviceindustryandretail
outlets,andothercommercialbiowaste toproduceamarketableproductfor
integrationintotheirhorticulturalproducts.Theentirefacilityandallofthedesignare
includedinthescopeofworks.Aspecialistprocesssubcontractor(WasteTreatment
p
p
p
(
Technology,Holland)hasbeenbroughtonboardtoprovidetheuniquecomposting
expertise.
Allemissionsduringtheconstruction,commissioning,performancetestingand
operationalstagesincludingemissionstoairandwater,dust,odourandnoisecomply
withtheEPAWasteLicence.Priortosubstantialcompletionthefacilitywillachieve
ABPLicensingfromtheDepartmentofAgricultureandFoodandwillbeoperatedfora
threemonthperiodtoproveperformanceandguaranteerequirements.
GlenashlingNursingHome,Celbridge,Co.Kildare
Theprojectcomprisesa22bedroomextensiontoanexistingnursinghomeat
Celbridge Co Kildare The new build will involve constructing a new two storey
Celbridge,Co.Kildare.Thenewbuildwillinvolveconstructinganewtwostorey
buildingwhichislinkedtotheexistingbuilding,togetherwithalterationstothe
existingfacility.Aseparatestore,plantroomandsingleapartmentbuildingisalso
beingprovided.Siteworksandmechanicalandelectricalinstallationsformpartof
theworks.
Thenewbuildingsaretobebuiltandcertifiedtoachievethepassivehousestandards,
The
new buildings are to be built and certified to achieve the passive house standards
withairtightnessrequirementof0.6ach.Theworkswillbecarriedoutwhile
maintainingfulloperationoftheexistinghealthcarefacilityandwillbecompletedto
meetHIQAstandards.
Respond!HousingDevelopment,Cookstown,Dublin22
161unitsineightbuildingscomprisingof5multistoreyapartmentblocks,
independentliving/communalservicesblock,onecrche/communitybuildingandone
independentliving/St.JohnofGodsMenniServicesblock.
SeeHouse,17TempleRoad,Dartry,Dublin6
Theworkscomprisedofanextension,renovationstoanexistingdwellingandChapel
fortheRepresentativeChurchBody(ChurchofIreland).Thetotalareais460m2.
Page 4
SITE
Construction contract:
(Title & brief description)
Site location:
Construction contract
value at award stage:
2,509,347.96
Construction contract
value at completion:
2,509,347.96
DATES
Start Date:
30/06/2009
Date of Substantial
Completion:
02/04/2010
C t
Contracting
ti
Authority
A th it
name
& address:
O'K ll P
O'Kelly
Partnership
t
hi
Granite Place
Ballsbridge
Dublin 4
Contracting Authority
contact name:
Andrew OKelly
Phone no.:
01 6630290
www.mdy.ie
Page 5
SITE
Construction contract:
(Title & brief description)
Olhausen Foods
Conversion and extension of existing factory building into food
production facility, food grade panels and doors, resin floors, cold and
chilled stores, refrigeration, etc. All associated site works and car
parking formed part of the works.
Site location:
Blanchardstown, Dublin 15
Construction contract
value at award stage:
4,000,000
DATES
Start Date:
23 Mayy 2005
Contracting
g Authority
y
name
& address:
O ause
Olhausen
Blanchardstown Industrial Park
Sungborough Road
Dublin 15
Contracting Authority
contact name:
Seamus O Suilleabhain
rd
Construction contract
value at completion:
4,149,354
Date of Substantial
Completion:
21 November 2005
Phone no.:
st
01 8695600
www.mdy.ie
Page 6
SITE
Construction contract:
(Title & brief description)
Site location:
Construction contract
value at award stage:
g
3,315,725
DATES
Start Date:
4 May 2004
Contracting Authority
name
& address:
Contracting Authority
contact name:
Ian Hickey
th
Construction contract
value at completion:
p
3,315,725
Date of Substantial
Completion:
12 May 2005
Phone no.:
no :
th
01 8348033
www.mdy.ie
Page 7
SITE
Construction contract:
(Title & brief description)
Site location:
Construction contract
value at award stage:
6,100,000
DATES
Start Date:
21 June 2001
Contracting
g Authority
y
name
& address:
Donnellys
y Fruit & Veg.
g
Roslin Park
St. Margarets
Co. Dublin
Contracting Authority
contact name:
Harry McNamee
st
Construction contract
value at completion:
6,100,000
Date of Substantial
Completion:
5 November 2001
Phone no.:
th
1890 810000
www.mdy.ie
Page 8
SITE
Construction contract:
(Title & brief description)
Vinegrove
New Fruit Distribution Building and Banana Ripening Rooms, food
grade insulated cold store paneling. Administration offices and staff
changing rooms. Dock Yards, Carparks and all associated site works.
Site location:
Construction contract
value at award stage:
3,115,000
Construction contract
value at completion:
3,115,000
DATES
Start Date:
June 2003
Date of Substantial
Completion:
February 2004
Contracting
g Authority
y
name
& address:
Contracting Authority
contact name:
Neal Hagan
Phone no.:
01 8855595
www.mdy.ie
Page 9
SITE
Construction contract:
(Title & brief description)
Greenstar Offices
Site location:
Construction contract
value at award stage:
3,000,000
DATES
Start Date:
7 July 2007
Contracting Authority
name
& address:
Greenstar Holidays
Ballyogan Busines Park
Sandyford
Dublin 18
Contracting Authority
contact name:
Simon Kelly
th
Construction contract
value at completion:
3,000,000
Date of Substantial
Completion:
7 March 2008
Phone no.:
th
01 2947990
Page 10
SITE
Construction contract:
(Title & brief description)
Site location:
Ballycoolin Dublin 15
Ballycoolin,
Construction contract
value at award stage:
9,034,592.25
DATES
Start Date:
29 March 2005
Contracting Authority
name
& address:
Greenstar Holidays
Ballyogan Busines Park
Sandyford
Dublin 18
Contracting Authority
contact name:
Simon Kelly
th
Construction contract
value at completion:
12,318,785.52
Date of Substantial
Completion:
1 September 2006
Phone no.:
st
01 2947990
Page 11
SITE
Construction contract:
(Title & brief description)
Curragh Carpets
8500 m Warehouse and production facility with associated offices.
Structural steel frame, architectural cladding and extensive site works
and car park.
Sit location:
Site
l
ti
N b id
Newbridge,
C Kild
Co.Kildare
Construction contract
value at award stage:
6,500,000
DATES
Start Date:
14 February 2005
Contracting Authority
name
& address:
Contracting Authority
contact name:
John Barry
th
Construction contract
value at completion:
6,500,000
Date of Substantial
Completion:
23 November 2006
Phone no.:
rd
045 431199
Page 12
SITE
Construction contract:
(Title & brief description)
Site location:
Prosperous, Co.Kildare
Construction contract
value at award stage:
7,600,000
DATES
Start Date:
8 January 2008
Contracting Authority
name
& address:
Contracting Authority
contact name:
Conleth McCarthy
th
Construction contract
value at completion:
7,600,000
Date of Substantial
Completion:
5 December 2008
Phone no.:
th
045 868114
Page 13
Site location:
Construction contract
value at award stage:
9.0m
DATES
Start Date:
26 January 2001
Contracting Authority
name
& address:
Lanmeur Developments
Block 10 Unit 3
Blanchardstown Corporate Park
Dublin 15
Contracting Authority
contact name:
Sean Murphy
th
Construction contract
value at completion:
9.0m
Date of Substantial
Completion:
19 October 2001
Phone no.:
th
01 8209577
Page 14
SITE
Construction contract:
(Title & brief description)
Site location:
Construction contract
value at award stage:
2,576,369
DATES
Start Date:
14 May 2003
Contracting Authority
name
& address:
Contracting Authority
contact name:
Ullick Burke
th
Construction contract
value at completion:
2,244,889
Date of Substantial
Completion:
11 February 2004
Phone no.:
th
01 4625766
Page 15
SITE
Construction contract:
(Title & brief description)
Site location:
Mulhuddart Dublin 15
Construction contract
value at award stage:
40,783,672
DATES
Start Date:
28 February 2006
Contracting Authority
name
& address:
Contracting Authority
contact name:
Reuben Kirrane
th
Construction contract
value at completion:
42,715,774
Date of Substantial
Completion:
30 March 2008
st
to 21 July 2008
Phone no.:
th
0818 357901
www.mdy.ie
Page 16
SITE
Construction contract:
(Title & brief description)
Site location:
Construction contract
value at award stage:
4,242,312
DATES
Start Date:
28 November 2006
Contracting Authority
name
& address:
Contracting Authority
contact name:
Theresa Byrne
th
Construction contract
value at completion:
4,407,192
Date of Substantial
Completion:
2 November 2007
Phone no.:
nd
01 6243124
www.mdy.ie
Page 17
SITE
Construction contract:
(Title & brief description)
Site location:
Construction contract
value at award stage:
15,810,633
Construction contract
value at completion:
15,492,750
DATES
Start Date:
Date of Substantial
Completion:
Contracting Authority
name
& address:
Contracting Authority
contact name:
Patrick Cogan
Phone no.:
01 8572020
www.mdy.ie
Page 18
SITE
Construction contract:
(Title & brief description)
Site location:
Kilternan, Dublin 18
VALUE
Construction contract
value at award stage:
4,239,022
DATES
Start Date:
23 June 2008
GENERAL INFO
Role of Firm in delivery of
Project:
Contracting Authority
name
& address:
Contracting Authority
contact name:
Ben Duignan
rd
Construction contract
value at completion:
4,239,022
Date of Substantial
Completion:
12 June 2009
Phone no.:
th
057 8324300
Page 19
SITE
Construction contract:
(Title & brief description)
Ardscoil na Trionoide
The works consisted of the refurbishment of the existing 5000m
5000m
secondary school, together with extensions totalling 2100m on three
sides of the existing building. Construction was mainly of masonry
walls with in-situ RC elements, high pitch timber truss roofs with
concrete tile finish, aluminium windows, and external render.
Laboratories, woodwork facilities, and computer rooms were
incorporated into the new areas and the full range of mechanical and
electrical services formed part of the works.
The contract period was 30 months: the works were fully completed
and handed over in 20 months.
Site location:
Construction contract
value at award stage:
5,002,586
DATES
Start Date:
9 September 2006
Contracting
C
t ti
Authority
A th it
name
& address:
Board
B
d off M
Managementt
Ardscoil na Trionoide
Athy
Co. Kildare
Contracting Authority
contact name:
Anthony Creevy
th
Construction contract
value at completion:
5,384,216
Date of Substantial
Completion:
24 August 2007
Phone no.:
th
059 8638423
Page18
Page 20
SITE
Construction contract:
(Title & brief description)
Lucan Educate
L
Ed
t Together
T
th School.
S h l
This primary school of 2,800m was built on the grounds of an existing,
and operational, school.
Construction was mainly fair faced masonry walling with RC columns
and beams, precast upper floors, steel roof structure, double-skin
roofing, aluminium windows, and a mixture of monocouche render and
Powerwall external finish. The management and coordination of
mechanical and electrical installations were an integral part of the
process. The external works included connections to foul and SW
drainage on the public road, attenuation tank, piped and ducted
services, and hard and soft landscaping.
The works were completed on time and within budget.
Site location:
Construction contract
value at award stage:
3.6m
Construction contract
value at completion:
3.4m
DATES
Start Date:
August 2002
Date of Substantial
Completion:
September 2003
Contracting Authority
name
& address:
Contracting Authority
contact name:
Bill Kavanagh
Phone no.:
087 6992281
Page 21
SITE
Construction contract:
(Title & brief description)
Site location:
Construction contract
value at award stage:
2.5m
DATES
Start Date:
14 December
2006
Contracting Authority
name
& address:
Department of Defence
Parkgate,
Infirmary Road
Road, Dublin 7
Contracting Authority
contact name:
Neil Murphy
th
Construction contract
value at completion:
2,524,310
Date of Substantial
Completion:
17 September 2007
Phone no.:
th
01 8046974
Page 22
SITE
Construction contract:
(Title & brief description)
Site location:
Construction contract
value at award stage:
2,765,775
DATES
Start Date:
3 March 2004
Contracting
g Authority
y
name
& address:
Chris Ryan
y Architects
29 Upper Mount Street,
Dublin 2
Contracting Authority
contact name:
Chris Ryan
rd
Construction contract
value at completion:
2,822,689
Date of Substantial
Completion:
1 September 2004
Phone no.:
st
01 2782480
Page17
Page 23
SITE
Construction contract:
(Title & brief description)
Site location:
Construction contract
value at award stage:
4,672,398.29
DATES
Start Date:
13 August 2007
GENERAL INFO
Role of Firm in delivery of
P j t
Project:
Contracting Authority
name & address:
Bondsway Ltd
Camden Court Hotel
Camden Street, Dublin 2
Contracting Authority
contact name:
Stephen Hanna
th
Construction contract
value at completion:
5,088,684
Date of Substantial
Completion:
19 May 2008
Phone no.:
th
01 4759666
Page 24
Client: VeoiliaWater
Architect: MaloneORegan
Engineer: MaloneORegan
Value: 1m
Description:
As a planning condition for extensive housing developments in the town of Ashbourne a new
AsaplanningconditionforextensivehousingdevelopmentsinthetownofAshbourneanew
WasteWaterTreatmentfacilitywasrequired. Theworksconsistedofthecivilelementsfor
theentireplantincludingtankbases,insituconcretestoragetanks,pumpingchambers,
interconnectingpipelines,controlvalves,controlvalves,controlbuildingandstafffacilities.
=====================================================================
Client: DewValleyFoods
Engineer: Design&Project Management
Value: 1m
Description:
Effluenttreatmentplantandoutfall/dischargefromDewValleyFoodstoThurles
WWTW. TheworkscomprisedtheconstructionofanewDAFFPlantinthefoodprocessing
facility,ahighpressureHDPEeffluentlinefromthemunicipaltreatmentfacilityalonga
7.5kmrouteinopencountrysideincludingatunnelbeneathanactiveandbusyintercityrail
li
lineandsubstantialexcavationinrock.
d b t ti l
ti i
k Continuousliaisonwithlandowners,IrishRailandthe
C ti
li i
ith l d
I i h R il d th
localauthoritywasrequired.
=====================================================================
CoillDubhWWTW
Client: KildareCountyCouncil
Engineer: MDYConstructionLtd
Value: 3m
Description:
Anew2000PEMunicipalWasterWaterTreatmentPlantwasdesigned,procured,built,fully
fittedandcommissionedtoservetheexistingtownandnewhousingdevelopments. It
involvedliaisingwiththeDepartmentoftheEnvironment,KildareCountyCouncilWater
Services,landowners,andotherdevelopers. TheprocesstechnologywasMembraneBio
ReactorprovidedbyaUKsubsidiaryofBordnaMnaandwasoneofthefirstofitskindin
Ireland. Theworksincludedlandacquisition,1.5kmofgravityfoullinealongapublicroad,
theplantincludedprocessmechanicalandelectricalinstallation,and1.1kmofdischargeline
toariveroutfall.
Page 25
Sample References
Olhausens Ltd contracted MDY Construction Ltd to manage and construct a food factory of 50,000
sq foot. There was an existing building which comprised of a warehouse and a small assembly line
for computer parts. This building was re-roofed, drainage put in and manufacturing rooms built.
MDY, through Mel OReilly, conducted site meetings with all the mechanical, electrical and other
contractors on the site. The schedule was tight; the project started at the end of May 2005 and
finished a week over in early November 2005. All building work was completed and the finishing of
the building was excellent. The snag list was attended to in a professional manner with any
outstanding issues completed. The project even came in on budget.
I would have no hesitation in recommending MDY construction for any building work especially
food premises. The knowledge in the core team in MDY certainly came to the fore in resolving
issues and in the management of the site.
This is the second building completed by MDY of which I had an association. I am looking forward
to another all going well.
Seamus O Suilleabhain
Facilities Manager
Olhausens Ltd.
Chairman: G. Sparks
Directors: C. Crawford, P. Farrell, B. Gormley, M. Hawkes, D. Hurley, P. McDonagh
K. Mahony, D. Murphy (Managing), R. Nolan.
Registered in Ireland No. 8929
Page 26
Sample References
Page 27
Sample References
Page 28
Sample References
Page 29
Sample References
Page 30
Page 31
Page 32
Page 33
Page 34
Page 35
Quality:
MDYConstructionLtdhavecompletedtheirqualitymanagement
systemsandareconfidentofachievingcertificationforISO
9001:2008 by the NSAI by June 2011 We are dedicated to ensure
9001:2008bytheNSAIbyJune2011.Wearededicatedtoensure
thatallofouractivitiesarecarriedouttothehighestpossible
standardsandthatbuildingprojectsare:
Builtinaccordancewithcontractspecificationsanddrawings
IncompliancewithBuildingRegulations
Incompliancewithstatutoryrequirements
Inconformitywithindustrybestpractice
In compliance with Planning Conditions, where applicable
IncompliancewithPlanningConditions,whereapplicable
CompletedtothesatisfactionoftheDesignTeamand
Clients
TheQualityManagementSystemhasbeen
developedandisreviewedandrevisedonan
ongoingbasistoachievetheaimsoutlinedabove.
Safety:
y
MDYConstructionLtdsSafetyManagementSystemhas
beencertifiedbySateTCertSafetyManagementSystem.
TheaimsofMDYareto:
EstablishanOccupationalHealth&SafetyManagement
Systemtoeliminateorminimiseriskstoemployeesand
otherthirdpartieswhomaybeexposedtoOccupational
risksassociatedwithMDYConstructionsactivities.
Implement,maintainandcontinuallyimprovetheir
OccupationalHealth&SafetyManagementSystem.
EnsureconformancewithitsstatedOccupationalHealth&
Safetypolicy.
Demonstratesuchconformancestootherinterestedparties.
RetainregistrationofitsOccupationalHealth&Safety
ManagementSystembytheN.S.A.I.
Providingemployeeswiththeinformation,trainingand
supervisionthattheyneedtoworksafelyandefficientlyand
todevelopsafetyawarenessamongemployeesandsub
contractors.
Definingallindividualresponsibilitiesforhealthandsafety
obligations
Page 36
MDYConstructionLtd ClientList
Allen Church
Allied Logistics
Ashbourne WWT
Athy Parish Centre
Best Foods
Bistro Express
Bord na Mna
Brady Family Foods
Camden Court Hotel
Carbury GAA
Celbridge Community Centre
Chanor Ltd
Church of Ireland
Coil Dubh WWT
Conlons Garage
Coughlan & White
Dalgety Foods
Del Monte Fruit
Dept. of Defence
Dept. of Education & Science
Derrinstown Stud
Derrinturn Housing
Dew Valley Foods
Donnellys Fruit & Veg
Dowlings Pub
Drover Meats
Dunn Seafare
Durkans
Easton Mews Partnership
Eircom
Electro Automation
Evanne Cahill
Fingal County Council
Finn McCarthy & Son
Florian
Freshways Ltd
GAA
Glanbia
Goldstar Meats
Grand Canal Hotel
Greenstar
Groundforce
Kanes Pass
Keelings Fruit
Kilcock Credit Union
Kildare County Council
Kildare Credit Union
Kiltipper Nursing Home
Kylemore Bakery
Lanmeur
Limerick Cold Stores
Lumville Stud
Lynch Ardee
Lyonara Cold Stores
Natures Best
Navan Racecourse
Newtown Stud
NUI Maynooth
OKane Foods
Olhausen
Plermona Liverpool
Presentation College Bray
Prosperous Church
Rathcoffey GAA
Realtime Technology
Red Sail
Rehab Group
Superquinn
Synopis
Tender Meats
Theological Institute
Thoroughbred Remedies
Veolia
37
Page 37
www.mdy.ie
Waste Management