Escolar Documentos
Profissional Documentos
Cultura Documentos
Caudal de diseo.Qmx.h=
Qmx.d + Qci =
Qmxd + Qci =
26.6
19.20
21.53
L/s
+
2.334
L/s
L/s
Y
3080.00
3075.00
3070.00
3065.00
3060.00
3055.00
3050.00
3045.00
3041.54
DX
0.00
26.02
26.70
23.10
46.95
52.53
64.46
75.48
85.87
DY
0.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
3.5
Long.
0.00
26.50
27.16
23.63
47.22
52.77
64.65
75.65
85.94
Long. Acum.
0.00
26.50
53.66
77.30
124.51
177.28
241.93
317.58
403.52
=
PUNTO
Reservorio
1
2
3
4
5
6
7
NUDO 01
Long. Real
3080.00
3075.00
3070.00
3065.00
3060.00
3055.00
3050.00
3045.00
3040.00
3035.00
0.00
50.00
100.00
150.00
200.00
250.00
300.00
350.00
400.00
450.00
Tubera de Aduccin.Dimetros:
Dmx = 0.23754 m
Dmx =
9.35 "
Dmn = 0.13011 m
Dmn =
5.12 "
Vmx = 2 m/s
e=
5.3 mm
Longitud = 403.52 m
Carga esttica = 38.5 m
Tubera : PVC-Clase 5
K = 31.85
tiempo de cierre:
10
seg
(3080 - 3041.54)
(t)
Clculo de la celeridad:
9900
a=
48.3 + K
a=
D
e
277.86
m/seg
>
seg
T
S/P =
2LV
gt
V=
0.820
m/s
S/P =
6.745
m.c.a.
02
0.
0
0.
8
19
94
88
V
m/s
-
20
20
3
Reservorio
1
2
3
4
5
6
7
NUDO 01
8 ''
0.
PUNTO
hf
(m)
0.0764
0.0783
0.0681
0.1361
0.1521
0.1864
0.2180
0.2477
LP
(m)
3080.00
3079.92
3079.85
3079.78
3079.64
3079.49
3079.30
3079.08
3078.84
Presin
(mca)
0.00
4.92
9.85
14.78
19.64
24.49
29.30
34.08
37.30
LNEA DE ADUCCIN
3085.00
3080.00
3075.00
3070.00
3065.00
3060.00
3055.00
3050.00
3045.00
3040.00
3035.00
0.00
50.00
100.00
150.00
200.00
250.00
300.00
LP
350.00
400.00
450.00
RED DE DISTRIBUCIN
Clculo del caudal de salida en cada nudo.NUDO 01
Manzanas:
rea Actual:
rea Futura:
Ancho
60
120
Total
Lado
60
120
N
6
2
rea
2.16
2.88
5.04
Ancho
100
120
Total
Lado
100
120
N
1
2
rea
1.00
2.88
3.88
4661
2.28
Hab
l/s
Otros Usos:
DESCRIPCION
Estadio
Q (l/d)
2100
Q (l/s)
0.024
0.024 l/s
K2 = 1.8
Qm_01 =
Qmx.h_01 =
Qmx.h_01 =
2.30
4.14
4.42
l/s
l/s
l/s
(Considerando Prd.)
NUDO 02
Manzanas:
rea Actual:
rea Futura:
Ancho
60
120
Total
Lado
60
120
N
6
4
rea
2.16
5.76
7.92
Ancho
60
Total
Lado
60
N
6
rea
2.16
2.16
4918
2.40
Hab
l/s
Otros Usos:
DESCRIPCION
Cementerio
Q (l/d)
13256.75
Q (l/s)
0.153
0.153 l/s
K2 = 1.8
Qm_02 =
Qmx.h_02 =
Qmx.h_02 =
2.56
4.60
4.91
l/s
l/s
l/s
(Considerando Prd.)
NUDO 03
Manzanas:
rea Actual:
rea Futura:
Ancho
60
80
Total
Lado
60
80
N
6
1
rea
2.16
0.64
2.80
Ancho
60
80
Total
Lado
60
80
N
2
1
rea
0.72
0.64
1.36
2103
1.03
Hab
l/s
Otros Usos:
DESCRIPCION
1/2 Plaza Armas
Escuela
Iglesia
1/2 Municipalidad
Q (l/d)
12600
11500
3750
55062
Q (l/s)
0.146
0.133
0.043
0.637
0.960 l/s
K2 = 1.8
Qm_03 =
Qmx.h_03 =
Qmx.h_03 =
1.99
3.58
3.82
l/s
l/s
l/s
(Considerando Prd.)
NUDO 04
Manzanas:
rea Actual:
rea Futura:
Ancho
80
Total
Lado
80
N
7
rea
4.48
4.48
Ancho
80
Total
Lado
80
N
1
rea
0.64
0.64
Poblacin =
Caudal Domstico =
2426
1.19
Hab
l/s
Otros Usos:
DESCRIPCION
1/2 Municipalidad
Parque
Q (l/d)
55062
4816.56
Q (l/s)
0.637
0.056
0.693 l/s
K2 = 1.8
Qm_04 =
Qmx.h_04 =
Qmx.h_04 =
1.88
3.38
3.61
l/s
l/s
l/s
(Considerando Prd.)
NUDO 05
Manzanas:
rea Actual:
rea Futura:
Ancho
80
100
Total
Lado
80
100
N
2
4
rea
1.28
4.00
5.28
Ancho
80
100
Total
Lado
80
100
N
3
2
rea
1.92
2.00
3.92
4795
2.34
Hab
l/s
Otros Usos:
DESCRIPCION
Colegio
Hotel
Parque
Comisara
Posta Mdica
Q (l/d)
20998
17500
2230.2
500
9000
Q (l/s)
0.243
0.203
0.026
0.006
0.104
0.581 l/s
K2 = 1.8
Qm_05 =
Qmx.h_05 =
Qmx.h_05 =
2.92
5.26
5.62
l/s
l/s
l/s
(Considerando Prd.)
NUDO 06
Manzanas:
rea Actual:
Ancho
60
80
100
Total
Lado
60
80
100
N
3
2
4
rea
1.08
1.28
4.00
6.36
2889
1.41
Hab
l/s
Otros Usos:
DESCRIPCION
1/2 Plaza Armas
Mercado
Q (l/d)
12600
55113
Q (l/s)
0.146
0.638
0.784 l/s
K2 = 1.8
Qm_06 =
Qmx.h_06 =
Qmx.h_06 =
2.19
3.95
4.22
l/s
l/s
l/s
(Considerando Prd.)
CUADRO RESUMEN:
NUDO
01
02
03
04
05
06
Total
1 TE
Qmx.h (l/s)
4.42
4.91
3.82
3.61
5.62
4.22
26.60
26.6
Hab.
4661
4918
2103
2426
4795
2889
21793
21793
FACULTAD DE INGENIERA
3.61 L/s
4.91 L/s
Q3= 6.27
L3= 355.47 m
(-)
Q6= 4.70
L6= 602.04 m
II
(+)
493.5 m
(+)
(-)
(-)
(+)
(-)
5.62 L/s
Aduccin = 403.52 m
Reservorio
pg.56
FACULTAD DE INGENIERA
TRAMO
L1
L2
L3
L4
L5
L6
L7
DE NUDO
01
02
03
04
05
06
01
Vmn =
Vmx =
0.6 m/s
5.0 m/s
A NUDO
02
03
04
05
06
03
06
CAUDAL
Q1 = 10.30 L/s
Q2 = 5.39 L/s
Q3 = 6.27 L/s
Q4 = 2.66 L/s
Q5 = 2.96 L/s
Q6 = 4.70 L/s
Q7 = 11.88 L/s
Dmn
2.02
1.46
1.57
1.02
1.08
1.36
2.17
Dmx
5.82
4.21
4.54
2.96
3.12
3.93
6.25
Dimetros
3", 4"
1.5", 2", 3", 4"
2", 3", 4"
1.5", 2"
1.5", 2", 3"
1.5", 2", 3"
2", 3", 4", 6"
44.16
Dimetros seleccionados:
Longitud
m
433.49
288.05
355.47
493.50
276.04
602.04
308.21
Tramo
L1
L2
L3
L4
L5
L6
L7
1-2
2-3
3-4
4-5
5-6
3-6
1-6
Dimetro
Pulg.
4
4
4
2
2
2
4
mm
101.6
101.6
101.6
50.8
50.8
50.8
101.6
DQ =
hf
1 . 85
hf
Q
K =
10 . 7 xL
C 1 .85 xD 4 .87
hf = KQ1.85
pg.57
TUBERA :
C (RNE) =
CIRC.
II
CIRC.
II
CIRC.
II
CIRC.
II
CIRC.
II
CIRC.
II
CIRC.
II
CIRC.
II
FACULTAD DE INGENIERA
PVC
150
TUB.
D(m)
L(m)
Q'(m3/s)
h'f(m)
1 (-)
2 (-)
6 (+)
7 (+)
SUMA
3 (-)
4 (-)
5 (+)
6 (-)
SUMA
0.1016
0.1016
0.0508
0.1016
0.1016
0.0508
0.0508
0.0508
-
433.49
288.05
602.04
308.21
355.47
493.50
276.04
602.04
-
0.01030
0.00539
0.00470
0.01188
0.00627
0.00266
0.00296
0.00470
-
6.321
1.268
60.126
5.852
58.390
2.069
17.194
11.720
60.126
-67.670
TUB.
D(m)
L(m)
Q'(m3/s)
h'f(m)
1 (-)
2 (-)
6 (+)
7 (+)
SUMA
3 (-)
4 (-)
5 (+)
6 (-)
SUMA
0.1016
0.1016
0.0508
0.1016
0.1016
0.0508
0.0508
0.0508
-
433.49
288.05
602.04
308.21
355.47
493.50
276.04
602.04
-
0.01253
0.00762
0.00091
0.00965
0.00472
0.00111
0.00451
0.00091
-
9.087
2.407
2.904
3.981
-4.609
1.222
3.394
25.578
2.904
18.059
TUB.
D(m)
L(m)
Q'(m3/s)
h'f(m)
1 (-)
2 (-)
6 (+)
7 (+)
SUMA
3 (-)
4 (-)
5 (+)
6 (-)
SUMA
0.1016
0.1016
0.0508
0.1016
0.1016
0.0508
0.0508
0.0508
-
433.49
288.05
602.04
308.21
355.47
493.50
276.04
602.04
-
0.01200
0.00709
0.00225
0.01018
0.00552
0.00191
0.00371
0.00225
-
8.379
2.102
15.430
4.401
9.351
1.634
9.303
17.812
15.430
-8.556
TUB.
D(m)
L(m)
Q'(m3/s)
h'f(m)
1 (-)
2 (-)
6 (+)
7 (+)
SUMA
3 (-)
4 (-)
5 (+)
6 (-)
SUMA
0.1016
0.1016
0.0508
0.1016
0.1016
0.0508
0.0508
0.0508
-
433.49
288.05
602.04
308.21
355.47
493.50
276.04
602.04
-
0.01261
0.00770
0.00137
0.00957
0.00524
0.00163
0.00399
0.00137
-
9.185
2.450
6.125
3.926
-1.584
1.486
6.976
20.329
6.125
5.742
TUB.
D(m)
L(m)
Q'(m3/s)
h'f(m)
1 (-)
2 (-)
6 (+)
7 (+)
SUMA
3 (-)
4 (-)
5 (+)
6 (-)
SUMA
0.1016
0.1016
0.0508
0.1016
0.1016
0.0508
0.0508
0.0508
-
433.49
288.05
602.04
308.21
355.47
493.50
276.04
602.04
-
0.01246
0.00755
0.00173
0.00972
0.00546
0.00185
0.00377
0.00173
-
8.992
2.365
9.477
4.036
2.155
1.604
8.810
18.306
9.477
-1.584
TUB.
D(m)
L(m)
Q'(m3/s)
h'f(m)
1 (-)
2 (-)
6 (+)
7 (+)
SUMA
3 (-)
4 (-)
5 (+)
6 (-)
SUMA
0.1016
0.1016
0.0508
0.1016
0.1016
0.0508
0.0508
0.0508
-
433.49
288.05
602.04
308.21
355.47
493.50
276.04
602.04
-
0.01263
0.00772
0.00151
0.00955
0.00541
0.00180
0.00382
0.00151
-
9.218
2.464
7.335
3.907
-0.439
1.574
8.326
18.810
7.335
1.575
TUB.
D(m)
L(m)
Q'(m3/s)
h'f(m)
1 (-)
2 (-)
6 (+)
7 (+)
SUMA
3 (-)
4 (-)
5 (+)
6 (-)
SUMA
0.1016
0.1016
0.0508
0.1016
0.1016
0.0508
0.0508
0.0508
-
433.49
288.05
602.04
308.21
355.47
493.50
276.04
602.04
-
0.01259
0.00768
0.00160
0.00959
0.00547
0.00186
0.00376
0.00160
-
9.167
2.442
8.217
3.936
0.544
1.605
8.829
18.286
8.217
-0.365
TUB.
D(m)
L(m)
Q'(m3/s)
h'f(m)
1 (-)
2 (-)
6 (+)
7 (+)
SUMA
3 (-)
4 (-)
5 (+)
6 (-)
SUMA
0.1016
0.1016
0.0508
0.1016
0.1016
0.0508
0.0508
0.0508
-
433.49
288.05
602.04
308.21
355.47
493.50
276.04
602.04
-
0.01264
0.00773
0.00155
0.00954
0.00545
0.00184
0.00378
0.00155
-
9.227
2.468
7.677
3.902
-0.116
1.598
8.714
18.404
7.677
0.415
h'f/Q'
1 aproximacin
613.668
235.159
12792.847
492.587
14134.260
330.007
6463.909
3959.393
12792.847
23546.156
Q''
-0.00223
-0.00223
-0.00379
-0.00223
0.00155
0.00155
0.00155
0.00379
-
-0.01253
-0.00762
0.00091
0.00965
0.02218
-0.00472
-0.00111
0.00451
-0.00091
0.00562
h'f/Q'
2 aproximacin
725.052
315.732
3178.981
412.688
4632.454
259.075
3067.008
5667.148
3178.981
12172.212
Q''
0.00054
0.00054
0.00134
0.00054
-0.00080
-0.00080
-0.00080
-0.00134
-
-0.01200
-0.00709
0.00225
0.01018
0.02218
-0.00552
-0.00191
0.00371
-0.00225
0.00562
h'f/Q'
3 aproximacin
698.521
296.697
6848.073
432.162
8275.453
296.069
4874.507
4798.986
6848.073
16817.635
Q''
-0.00061
-0.00061
-0.00089
-0.00061
0.00027
0.00027
0.00027
0.00089
-
-0.01261
-0.00770
0.00137
0.00957
0.02218
-0.00524
-0.00163
0.00399
-0.00137
0.00562
h'f/Q'
4 aproximacin
728.640
318.300
4479.352
410.032
5936.325
283.481
4270.674
5099.575
4479.352
14133.082
Q''
0.00014
0.00014
0.00036
0.00014
-0.00022
-0.00022
-0.00022
-0.00036
-
-0.01246
-0.00755
0.00173
0.00972
0.02218
-0.00546
-0.00185
0.00377
-0.00173
0.00562
h'f/Q'
5 aproximacin
721.548
313.223
5473.912
415.276
6923.959
293.541
4753.985
4859.798
5473.912
15381.235
Q''
-0.00017
-0.00017
-0.00022
-0.00017
0.00006
0.00006
0.00006
0.00022
-
-0.01263
-0.00772
0.00151
0.00955
0.02218
-0.00541
-0.00180
0.00382
-0.00151
0.00562
h'f/Q'
6 aproximacin
729.822
319.146
4865.957
409.156
6324.080
290.997
4632.345
4920.763
4865.957
14710.061
Q''
0.00004
0.00004
0.00010
0.00004
-0.00006
-0.00006
-0.00006
-0.00010
-
-0.01259
-0.00768
0.00160
0.00959
0.02218
-0.00547
-0.00186
0.00376
-0.00160
0.00562
h'f/Q'
7 aproximacin
727.977
317.825
5126.626
410.524
6582.952
293.642
4758.851
4857.350
5126.626
15036.469
Q''
-0.00004
-0.00004
-0.00006
-0.00004
0.00001
0.00001
0.00001
0.00006
-
-0.01264
-0.00773
0.00155
0.00954
0.02218
-0.00545
-0.00184
0.00378
-0.00155
0.00562
h'f/Q'
8 aproximacin
730.171
319.396
4969.093
408.897
6427.557
293.044
4730.256
4871.723
4969.093
14864.115
Q''
0.00001
0.00001
0.00002
0.00001
-0.00002
-0.00002
-0.00002
-0.00002
-
-0.01263
-0.00772
0.00157
0.00955
0.02218
-0.00547
-0.00186
0.00376
-0.00157
0.00562
pg.58
CIRC.
II
CIRC.
II
CIRC.
II
CIRC.
II
CIRC.
II
CIRC.
II
CIRC.
II
CIRC.
II
CIRC.
II
CIRC.
FACULTAD DE INGENIERA
TUB.
D(m)
L(m)
Q'(m3/s)
h'f(m)
1 (-)
2 (-)
6 (+)
7 (+)
SUMA
3 (-)
4 (-)
5 (+)
6 (-)
SUMA
0.1016
0.1016
0.0508
0.1016
0.1016
0.0508
0.0508
0.0508
-
433.49
288.05
602.04
308.21
355.47
493.50
276.04
602.04
-
0.01263
0.00772
0.00157
0.00955
0.00547
0.00186
0.00376
0.00157
-
9.214
2.462
7.907
3.909
0.140
1.606
8.847
18.269
7.907
-0.091
TUB.
D(m)
L(m)
Q'(m3/s)
h'f(m)
1 (-)
2 (-)
6 (+)
7 (+)
SUMA
3 (-)
4 (-)
5 (+)
6 (-)
SUMA
0.1016
0.1016
0.0508
0.1016
0.1016
0.0508
0.0508
0.0508
-
433.49
288.05
602.04
308.21
355.47
493.50
276.04
602.04
-
0.01264
0.00773
0.00155
0.00954
0.00546
0.00185
0.00377
0.00155
-
9.230
2.469
7.768
3.901
-0.030
1.604
8.818
18.298
7.768
0.108
TUB.
D(m)
L(m)
Q'(m3/s)
h'f(m)
1 (-)
2 (-)
6 (+)
7 (+)
SUMA
3 (-)
4 (-)
5 (+)
6 (-)
SUMA
0.1016
0.1016
0.0508
0.1016
0.1016
0.0508
0.0508
0.0508
-
433.49
288.05
602.04
308.21
355.47
493.50
276.04
602.04
-
0.01264
0.00773
0.00156
0.00954
0.00547
0.00186
0.00376
0.00156
-
9.226
2.468
7.828
3.902
0.036
1.606
8.852
18.263
7.828
-0.024
TUB.
D(m)
L(m)
Q'(m3/s)
h'f(m)
1 (-)
2 (-)
6 (+)
7 (+)
SUMA
3 (-)
4 (-)
5 (+)
6 (-)
SUMA
0.1016
0.1016
0.0508
0.1016
0.1016
0.0508
0.0508
0.0508
-
433.49
288.05
602.04
308.21
355.47
493.50
276.04
602.04
-
0.01264
0.00773
0.00156
0.00954
0.00547
0.00186
0.00376
0.00156
-
9.231
2.469
7.792
3.900
-0.008
1.606
8.845
18.271
7.792
0.028
TUB.
D(m)
L(m)
Q'(m3/s)
h'f(m)
1 (-)
2 (-)
6 (+)
7 (+)
SUMA
3 (-)
4 (-)
5 (+)
6 (-)
SUMA
0.1016
0.1016
0.0508
0.1016
0.1016
0.0508
0.0508
0.0508
-
433.49
288.05
602.04
308.21
355.47
493.50
276.04
602.04
-
0.01264
0.00773
0.00156
0.00954
0.00547
0.00186
0.00376
0.00156
-
9.230
2.469
7.808
3.901
0.009
1.606
8.854
18.261
7.808
-0.006
TUB.
D(m)
L(m)
Q'(m3/s)
h'f(m)
1 (-)
2 (-)
6 (+)
7 (+)
SUMA
3 (-)
4 (-)
5 (+)
6 (-)
SUMA
0.1016
0.1016
0.0508
0.1016
0.1016
0.0508
0.0508
0.0508
-
433.49
288.05
602.04
308.21
355.47
493.50
276.04
602.04
-
0.01264
0.00773
0.00156
0.00954
0.00547
0.00186
0.00376
0.00156
-
9.231
2.470
7.798
3.900
-0.002
1.606
8.852
18.263
7.798
0.007
TUB.
D(m)
L(m)
Q'(m3/s)
h'f(m)
1 (-)
2 (-)
6 (+)
7 (+)
SUMA
3 (-)
4 (-)
5 (+)
6 (-)
SUMA
0.1016
0.1016
0.0508
0.1016
0.1016
0.0508
0.0508
0.0508
-
433.49
288.05
602.04
308.21
355.47
493.50
276.04
602.04
-
0.01264
0.00773
0.00156
0.00954
0.00547
0.00186
0.00376
0.00156
-
9.231
2.469
7.802
3.900
0.002
1.606
8.854
18.261
7.802
-0.002
TUB.
D(m)
L(m)
Q'(m3/s)
h'f(m)
1 (-)
2 (-)
6 (+)
7 (+)
SUMA
3 (-)
4 (-)
5 (+)
6 (-)
SUMA
0.1016
0.1016
0.0508
0.1016
0.1016
0.0508
0.0508
0.0508
-
433.49
288.05
602.04
308.21
355.47
493.50
276.04
602.04
-
0.01264
0.00773
0.00156
0.00954
0.00547
0.00186
0.00376
0.00156
-
9.231
2.470
7.800
3.900
-0.001
1.606
8.854
18.262
7.800
0.002
TUB.
D(m)
L(m)
Q'(m3/s)
h'f(m)
1 (-)
2 (-)
6 (+)
7 (+)
SUMA
3 (-)
4 (-)
5 (+)
6 (-)
SUMA
0.1016
0.1016
0.0508
0.1016
0.1016
0.0508
0.0508
0.0508
-
433.49
288.05
602.04
308.21
355.47
493.50
276.04
602.04
-
0.01264
0.00773
0.00156
0.00954
0.00547
0.00186
0.00376
0.00156
-
9.231
2.470
7.801
3.900
0.001
1.606
8.854
18.261
7.801
0.000
TUB.
D(m)
L(m)
Q'(m3/s)
h'f(m)
h'f/Q'
9 aproximacin
729.692
319.053
5036.950
409.252
6494.948
293.733
4763.184
4855.170
5036.950
14949.038
Q''
-0.00001
-0.00001
-0.00001
-0.00001
0.00000
0.00000
0.00000
0.00001
-
-0.01264
-0.00773
0.00155
0.00954
0.02218
-0.00546
-0.00185
0.00377
-0.00155
0.00562
h'f/Q'
10 aproximacin
730.266
319.463
4996.048
408.827
6454.604
293.582
4755.973
4858.798
4996.048
14904.400
Q''
0.00000
0.00000
0.00001
0.00000
0.00000
0.00000
0.00000
-0.00001
-
-0.01264
-0.00773
0.00156
0.00954
0.02218
-0.00547
-0.00186
0.00376
-0.00156
0.00562
h'f/Q'
11 aproximacin
730.141
319.374
5013.686
408.919
6472.121
293.761
4764.532
4854.492
5013.686
14926.472
Q''
0.00000
0.00000
0.00000
0.00000
0.00000
0.00000
0.00000
0.00000
-
-0.01264
-0.00773
0.00156
0.00954
0.02218
-0.00547
-0.00186
0.00376
-0.00156
0.00562
h'f/Q'
12 aproximacin
730.291
319.481
5003.061
408.809
6461.641
293.723
4762.673
4855.427
5003.061
14914.884
Q''
0.00000
0.00000
0.00000
0.00000
0.00000
0.00000
0.00000
0.00000
-
-0.01264
-0.00773
0.00156
0.00954
0.02218
-0.00547
-0.00186
0.00376
-0.00156
0.00562
h'f/Q'
13 aproximacin
730.258
319.458
5007.644
408.832
6466.193
293.769
4764.898
4854.308
5007.644
14920.619
Q''
0.00000
0.00000
0.00000
0.00000
0.00000
0.00000
0.00000
0.00000
-
-0.01264
-0.00773
0.00156
0.00954
0.02218
-0.00547
-0.00186
0.00376
-0.00156
0.00562
h'f/Q'
14 aproximacin
730.297
319.486
5004.884
408.804
6463.470
293.759
4764.416
4854.551
5004.884
14917.609
Q''
0.00000
0.00000
0.00000
0.00000
0.00000
0.00000
0.00000
0.00000
-
-0.01264
-0.00773
0.00156
0.00954
0.02218
-0.00547
-0.00186
0.00376
-0.00156
0.00562
h'f/Q'
15 aproximacin
730.289
319.480
5006.075
408.810
6464.653
293.771
4764.993
4854.260
5006.075
14919.099
Q''
0.00000
0.00000
0.00000
0.00000
0.00000
0.00000
0.00000
0.00000
-
-0.01264
-0.00773
0.00156
0.00954
0.02218
-0.00547
-0.00186
0.00376
-0.00156
0.00562
h'f/Q'
16 aproximacin
730.299
319.487
5005.358
408.802
6463.946
293.769
4764.868
4854.323
5005.358
14918.317
Q''
0.00000
0.00000
0.00000
0.00000
0.00000
0.00000
0.00000
0.00000
-
-0.01264
-0.00773
0.00156
0.00954
0.02218
-0.00547
-0.00186
0.00376
-0.00156
0.00562
h'f/Q'
17 aproximacin
730.297
319.485
5005.667
408.804
6464.253
293.772
4765.018
4854.247
5005.667
14918.704
Q''
0.00000
0.00000
0.00000
0.00000
0.00000
0.00000
0.00000
0.00000
-
-0.01264
-0.00773
0.00156
0.00954
0.02218
-0.00547
-0.00186
0.00376
-0.00156
0.00562
Q''
h'f/Q'
18 aproximacin
pg.59
II
1 (-)
2 (-)
6 (+)
7 (+)
SUMA
3 (-)
4 (-)
5 (+)
6 (-)
SUMA
0.1016
0.1016
0.0508
0.1016
0.1016
0.0508
0.0508
0.0508
-
FACULTAD DE INGENIERA
433.49
288.05
602.04
308.21
355.47
493.50
276.04
602.04
-
0.01264
0.00773
0.00156
0.00954
0.00547
0.00186
0.00376
0.00156
-
9.231
2.470
7.800
3.900
0.000
1.606
8.854
18.261
7.800
0.000
730.299
319.487
5005.481
408.802
6464.069
293.771
4764.986
4854.264
5005.481
14918.501
0.00000
0.00000
0.00000
0.00000
0.00000
0.00000
0.00000
0.00000
-
-0.01264
-0.00773
0.00156
0.00954
0.02218
-0.00547
-0.00186
0.00376
-0.00156
0.00562
pg.60
3-6
1-6
Qi (m/s)
0.01264
0.00773
0.00156
0.00954
CIRCUITO II
TRAMO
3-4
4-5
Qi (l/s)
12.64
7.73
1.56
9.54
5-6
3-6
Qi (m/s)
0.00547
0.00186
0.00376
0.00156
Total =
Qi (l/s)
5.47
1.86
3.76
1.56
44.11
VERIFICACIN DE VELOCIDADES:
4 * Qi
V =
* D2
CIRCUITO
I
TRAMO
1-2
2-3
3-6
1-6
CIRCUITO
II
TRAMO
3-4
4-5
5-6
3-6
Qi
0.01264
0.00773
0.00156
0.00954
(pulg)
4
4
2
4
(m)
0.1016
0.1016
0.0508
0.1016
V(m/s)
1.559
0.953
0.769
1.177
Qi
0.00547
0.00186
0.00376
0.00156
(pulg)
4
2
2
2
(m)
0.1016
0.0508
0.0508
0.0508
V(m/s)
0.674
0.917
1.856
0.769
VERIFICACIN DE PRESIONES:
PRDIDAS FINALES EN CADA TRAMO.CIRCUITO I
TRAMO
1-2
2-3
3-6
1-6
CIRCUITO II
TRAMO
3-4
4-5
hf
9.231
2.470
7.800
3.900
5-6
3-6
hf
1.606
8.854
18.261
7.800
CLCULO DE LAS PRESIONES EN LOS NUDOS.Preson con la que llega el agua desde el reservorio al nudo 1:
Punto
R
1
Cota
3080.00
3041.54
sabemos que:
10.7 x Q 1.85
S f = 1.85
C x D 4.87
Donde:
Entonces:
Sf =
Luego:
Q = 0.0266 m/s
C (PVC) = 150
(") = 8
0.00288
Sf = hf / L
hf =
1.163 m
Entonces:
P1 = 37.30 m
Presin en el nudo 1
Cota
3041.54
3034.00
3032.17
3036.00
3041.30
3040.50
TRAMO
1--2
2--3
3--4
4--5
1--6
6--3
6--5
hf en tramo
9.23
2.47
1.61
8.85
3.90
7.80
18.26
Teniendo como datos las cotas de cada nudo y las prdidas en cada tramo. Procedemos
a calcular las presiones en cada nudo, con la relacin dada anteriormente.
NUDO
1
2
3
4
5
6
3
5
PRESIN
37.297 m
35.606 m
34.966 m
29.530 m
15.376 m
34.437 m
34.967 m
15.376 m
A-B-C-D-E-F-G-H-I-J-K-L-M-N-P-O
01-02
01-02
12.640 l/s
(l/s)
(m)
Longitud
Real (m)
Tipo de
Longitud
Longitud
Virtual: Lv
(m)
QPROPIO_TRAMO (l/s)
AB
BC
CD
DE
EG
DF
GI
GF
FB
FH
IH
HA
IL
135.64
131.56
122.17
122.60
128.96
133.05
135.80
125.98
131.35
135.78
125.98
131.40
122.92
D
S
S
S
S
D
S
D
D
D
D
D
S
271.28
131.56
122.17
122.60
128.96
266.10
135.80
251.96
262.70
271.56
251.96
262.80
122.92
0.7051
0.3420
0.3176
0.3187
0.3352
0.6917
0.3530
0.6549
0.6828
0.7059
0.6549
0.6831
0.3195
HK
LK
122.92
126.02
D
D
245.84
252.04
0.6390
0.6551
KJ
KN
LO
OP
PM
RR'
R'Q
ST
TU
UV
135.31
128.66
128.75
85.29
176.13
69.38
106.88
65.73
76.46
69.13
D
D
S
S
D
D
S
D
D
D
Lv
270.62
257.32
128.75
85.29
352.26
138.76
106.88
131.46
152.92
138.26
4862.77
0.7034
0.6689
0.3347
0.2217
0.9156
0.3607
0.2778
0.3417
0.3975
0.3594
q = 0.00260 l/s.m
D =
4 *Q
*V
1.00 m/s
150
37.30 m
3041.54
Para PVC
3078.84
(RNE)
Tramo
Caudal (l/s)
Lv (m)
Dimetro
Calculado
(Pulg)
Dimetro
Escogido
(Pulg)
Prdida de Carga
Presin (m)
Tramo
Diseo
Sf
Hf
Inicial
Final
Inicial
Final
Inicial
Final
AB
0.7051
6.4138
271.28
3.56
0.006070
1.647
3041.54
3047.50
3078.84
3077.19
37.30
29.69
BC
0.3420
3.0253
131.56
2.44
0.006137
0.807
3047.50
3058.00
3077.19
3076.38
29.69
18.38
CD
0.3176
0.6362
122.17
1.12
0.000343
0.042
3058.00
3064.00
3076.38
3076.34
18.38
12.34
BF
0.6828
2.6834
262.70
2.30
0.004915
1.291
3047.50
3055.40
3077.19
3075.90
29.69
20.50
AH
0.6831
4.7326
262.80
3.06
0.003459
0.909
3041.54
3051.00
3078.84
3077.93
37.30
26.93
HI
0.6549
1.3431
251.96
1.63
0.001366
0.344
3051.00
3053.70
3077.93
3077.58
26.93
23.88
IG
0.3530
0.6882
135.80
1.17
0.000397
0.054
3053.70
3061.20
3077.58
3077.53
23.88
16.33
GE
0.3352
0.3352
128.96
0.81
0.000105
0.014
3061.20
3072.50
3077.53
3077.52
16.33
5.02
HF
0.7059
2.7064
271.56
2.31
0.004994
1.356
3051.00
3055.40
3077.93
3076.57
26.93
21.17
FG
0.6549
0.9901
251.96
1.40
0.000777
0.196
3055.40
3061.20
3076.57
3076.38
21.17
15.18
FD
0.6917
1.0104
266.10
1.41
0.000807
0.215
3055.40
3064.00
3076.57
3076.36
21.17
12.36
DE
0.3187
0.3187
122.60
0.79
0.000095
0.012
3064.00
3072.50
3076.36
3076.35
12.36
3.85
JK
0.7034
7.0548
270.62
3.73
0.029390
7.953
3042.50
3044.80
3086.15
3078.19
43.65
33.39
KL
0.6551
1.6629
252.04
1.81
0.002028
0.511
3044.80
3044.40
3078.19
3077.68
33.39
33.28
LI
0.3195
1.0077
122.92
1.41
0.000803
0.099
3044.40
3053.70
3077.68
3077.58
33.28
23.88
KH
0.6390
4.6885
245.84
3.04
0.003400
0.836
3044.80
3051.00
3077.58
3076.75
32.78
25.75
MP
0.9156
2.4797
352.26
2.21
0.004248
1.496
3041.30
3035.30
3079.51
3078.01
38.21
42.71
PO
0.2217
1.5641
85.29
1.76
0.001811
0.154
3035.30
3035.20
3078.01
3077.86
42.71
42.66
OL
0.3347
1.3424
128.75
1.63
0.001365
0.176
3035.20
3044.40
3077.86
3077.68
42.66
33.28
NK
0.6689
7.0202
257.32
3.72
0.007175
1.846
3036.50
3044.80
3080.04
3078.19
43.54
33.39
Nota: Como se observa se est cumpliendo con las presiones mximas y mnimas en las tuberas de servicio, salvo el punto E que llega con una presin mayor a 3.5 mca. Segn el
RNE, se podra abastecer a travs de piletas; caso contrario, se tendra que redisear la red principal o reubicar el reservorio (si fuera posible).
Water at 20C(68F)
coordinates:
X-Y
Settings:
Hydraulic Grade
Tank Levels:
Elevations
Round Pipe Lengths to the Nearest:
0.01
El siguiente paso consiste en configurar escalas y anotaciones:
Nuestro proyecto est siendo realizado por esquema Shematic
luego configuramos :
Symbol Size:
8.00
Text Height:
8.00
Annotation Height:
6.00
Realizamos el esquema de la red principal con la barra de herramientas y el panel de dibujo
R
6
Elevacin
(m)
3080.00
Water Table-Junction Report
Elevation
(m)
3041.54
3034.00
3032.17
3036.00
3041.30
3040.50
Base Flow
(l/s)
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Diameter
(in)
12
6
6
6
3
3
4
6
Material
PVC
PVC
PVC
PVC
PVC
PVC
PVC
PVC
Hazen Williams C
140
140
140
140
140
140
140
140
REPORTE DE RESULTADOS
NUDOS:
Demanda
Gradiente
Label
hidrulica (m)
(l/s)
NUDO 01
9.04
2731.428
NUDO 02
10.94
2724.279
NUDO 03
9.53
2719.528
NUDO 04
19.00
2716.351
NUDO 05
10.40
2712.872
NUDO 06
12.26
2724.449
REPORTE DE RESULTADOS
TUBERAS:
Velocidad
Descarga
Label
(m/s)
(l/s)
L
0.975
71.17
L-1
1.886
34.397
L-2
1.286
23.457
L-3
1.217
22.201
L-4
0.702
3.201
L-5
1.579
7.199
L-6
1.021
8.274
L-7
1.520
27.733
Presin
(m H2O)
39.85
26.03
36.95
21.81
22.53
33.18
corriente abajo
2732.34
2731.43
2724.28
2719.53
2716.35
2712.87
2724.45
2724.45
2731.43
2724.28
2719.53
2716.35
2712.87
2724.45
2719.53
2731.43