RENCANA ANGGARAN BIAYA

SURVEY TOPOGRAFI DAN BATHYMETRI


Malinau, Kalimantan Utara
Volume
Lokasi

A. PERSIAPAN, MOBILISASI, DEMOBILISASI)


Volume Pekerjaan
Kapasitas/Tim/Hari
Jumlah Tim
Waktu Pelaksanaan
a. Mobilisasi Personil dan Peralatan
1 Tiket Pesawata Surabaya - Tarakan
Speed Boat (Tarakan - Malinau)
2 Penginapan Base Camp
3 Konsumsi

:
:

6.00
km
Malinau, Kaltara

=
=
=
=

6
1
4
15

km
km
Orang
hari

=
=
=
=

4
4
2
15

Orang
Orang
Unit
hari

x
x
x

2
2
20
4

pp
pp
Hari
org

x
x
x
x

Rp.
Rp.
Rp.
Rp.

2,000,000
400,000
200,000
25,000
Jumlah (A)

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

16,000,000
3,200,000
8,000,000
1,500,000
28,700,000

B. PEMBUATAN/ PEMASANGAN TUGU BM (Bench Mark) dan CP (Control Point)


Volume Pekerjaan
Kapasitas/Tim/Hari
Jumlah Tim
Waktu Pelaksanaan

=
=
=
=

4
2
1
2

Gaji
a. Surveyor
c. Buruh Lokal

=
=

1 Orang
4 Orang

x
x

2 Hari
2 Hari

x
x

Rp.
Rp.

250,000 = Rp.
100,000 = Rp.

500,000
800,000

2.

Uang Makan
a. Surveyor

1 Orang

2 hari

Rp.

100,000 = Rp.

200,000

3.

Biaya Material
a. Tugu BM
b. Patok CP (Paralon)

=
=

4 Tugu
4 Tugu

x
x

Rp.
Rp.

200,000 = Rp.
100,000 = Rp.

800,000
400,000

Tranportasi
a. Sewa kendaraan Roda 4 + BBM

1 Unit

2 hari

Rp.

250,000 = Rp.
Jumlah (B) = Rp .

500,000
3,200,000

1.

4.

C.

SURVEY TOPOGRAFI
Volume

Jumlah Tim
Kapasitas Tim/hari
Waktu Pelaksanaan

=
=
=

1 Tim
4 km
5 hari

Gaji
a. Surveyor
b. Ass. Surveyor
c. Tenaga Lokal

=
=
=

1 Orang
2 Orang
3 Orang

x
x
x

5 Hari
5 Hari
5 Hari

x
x
x

Rp.
Rp.
Rp.

250,000 = Rp.
150,000 = Rp.
100,000 = Rp.

1,250,000
1,500,000
1,500,000

Uang makan
a. Surveyor
b. Ass. Surveyor

=
=

1 Orang
4 Orang

x
x

5 hari
5 hari

x
x

Rp.
Rp.

50,000 = Rp.
50,000 = Rp.

250,000
1,000,000

=
=
=
=

1
1
1
5

x
x
x
x

5
5
5
5

x
x
x
x

Rp.
Rp.
Rp.
Rp.

1.

2.

3.

4.

Biaya alat
a. Theodolite Total Station (TS)
b. Waterpass/ Leveling
c. GPS RTK / Trimbel DGPS
d. Radio Komunikasi/ Handy Talky
e. ATK

20 Ha

Unit
Unit
Unit
Buah

hari
hari
hari
hari

250,000
75,000
1,500,000
25,000
Ls

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

1,250,000
375,000
7,500,000
625,000
100,000

Sew a K en d araan

a. Sewa kendaraan Roda 4 + BBM

D.

tugu
tugu/hari
tim/lokasi
hari

1 Unit

5 hari

Rp.

400,000 = Rp.
Jumlah (C) = Rp.

2,000,000
17,350,000

Volume

2 Titik

Jumlah Tim
Kapasitas Tim/hari
Waktu Pelaksanaan

=
=
=

1 Tim
2 Titik
2 hari

Gaji
a. Surveyor
b. Ass. Surveyor
c. Tenaga Lokal

=
=
=

1 Orang
2 Orang
1 Orang

x
x
x

2 Hari
2 Hari
2 Hari

x
x
x

Rp.
Rp.
Rp.

300,000 = Rp.
200,000 = Rp.
100,000 = Rp.

600,000
800,000
200,000

Uang makan
a. Surveyor
b. Ass. Surveyor

=
=

1 Orang
1 Orang

x
x

2 hari
2 hari

x
x

Rp.
Rp.

50,000 = Rp.
50,000 = Rp.

100,000
100,000

Biaya alat
a. Current Meter
c. GPS Garmin

=
=

1 Unit
1 Unit

x
x

2 hari
2 hari

x
x

Rp.
Rp.

250,000 = Rp.
30,000 = Rp.

500,000
60,000

1 Unit

2 hari

Rp.

1,000,000 = Rp.
Jumlah (D) = Rp.

2,000,000
4,360,000

SURVEY ARUS

1.

2.

3.

4.

Sew a K en d araan

a. Sewa Perahu

SURVEY BATHYMETRI, HIDRO-OCEANOGRAFI


Volume

6 Km

Jumlah Tim
Kapasitas Tim/hari
Waktu Pelaksanaan

=
=
=

1 Tim
2 Km
3 hari

Gaji
a. Surveyor
b. Ass. Surveyor
c. Tenaga Lokal

=
=
=

1 Orang
3 Orang
4 Orang

x
x
x

3 Hari
3 Hari
15 Hari

x
x
x

Rp.
Rp.
Rp.

300,000 = Rp.
150,000 = Rp.
100,000 = Rp.

900,000
1,350,000
6,000,000

Uang makan
a. Surveyor
b. Ass. Surveyor

=
=

1 Orang
2 Orang

x
x

3 hari
3 hari

x
x

Rp.
Rp.

50,000 = Rp.
50,000 = Rp.

150,000
300,000

=
=
=
=
=

1
1
1
1
1

x
x
x
x
x

x
x
x
x
x

Rp.
Rp.
Rp.
Rp.
Rp.

1.

2.

3.

Biaya alat
a. Echosounder + Trimbel DGPS
b. Laptop
e. Pasang Surut
f. Radio Komunikasi/ Handy Talky
g. Sewa Perahu
h. Kayu, Tali

Unit
Unit
Unit
Buah
Buah

3
3
15
3
3

hari
hari
hari
hari
hari

1,500,000
150,000
100,000
50,000
1,000,000

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

4,500,000
450,000
1,500,000
150,000
3,000,000
300,000

Jumlah (E) = Rp.

18,600,000

250,000 = Rp.

3,750,000

Ls = Rp.
Jumlah (F) = Rp.

1,000,000
4,750,000

Ls

=
=
=
=
=
=

PENGOLAHAN DATA ,PENGGAMBARAN DAN PELAPORAN


Waktu pelaksanaan
1.

2.

Gaji
a. Juru Gambar/ Operator CAD

15 hari

1 Orang

Reproduksi/ Pencetakan Peta

15 hari

Rp.

Total (A+B+C+D+E+F) = Rp.


NB ;
- DP 50% di bayar di muka
- Sisa Pembayaran 50% dibayar setelah laporan akhir diterima
- Waktu pelaksanaan pekerjaan 30 hari
- dimulai dari titik awal pengukuran

76,960,000