CONSTRUCTION DOCUMENTATION REPORT

VOLUME 2

248_AL ARBI VILLA


TRIPOLI, LIBYA
CONSTRUCTION DOCUMENTATION
STRUCTURAL DESIGN

December, 2014

Allabina/+381 Design

248_Al Arbi Villa, Tripoli,

TABLE OF CONTENTS:

PART 1
1.01
1.02
1.03
1.04
1.05
1.06
1.07

SITE LOCATION
CLIMATIC DATA
GEOLOGICAL CONSTRAINTS
SEISMIC CONSTRAINTS
SUPER STRUCTURE
SUB STRUCTURE
STRUCTURAL DESIGN

PART 2
2.01
2.02
2.03
2.04

STRUCTURAL TECHNICAL REPORT

GROUND FLOOR STRUCTURE ANALYZE


1ST FLOOR STRUCTURE ANALYZE
2ND FLOOR STRUCTURE ANALYZE
ROOF TOP STRUCTURE ANALYZE

PART 3
3.01
3.02
3.03
3.04
3.05
3.06
3.07

STRUCTURAL BRIEF

GRAPHICAL DOCUMENTATION

GENERAL ARRANGEMENT PLANS


FOUNDATIONS REINFORCEMENT PLANS
GROUND FLOOR REINFORCEMENT PLANS
1ST FLOOR REINFORCEMENT PLANS
2ND FLOOR REINFORCEMENT PLANS
ROOF TOP REINFORCEMENT PLANS
DETAILS

Allabina/+381 Design

CONSTRUCTION DOCUMENTATION REPORT

248_Al Arbi Villa, Tripoli,

CONSTRUCTION DOCUMENTATION REPORT

PART 1: STRUCTURAL BRIEF


1.01 Site Location
The site is located between the latitude and longitude 3252'20.59"N- 13 7'45.10"E.
It is located in Tripoli residential, approximately 5 km from city centre and approximately 550 m
distance from the sea.
Topography of the site is slightly sloped. Ground level it is raised 0.75 from the street level, which
allows optimum space for entry/ exit access to Garage level.
Building number of floors is BS+GF+01+RT.

1.02 Climatic data


Data is obtained from http://www.worldweatheronline.com/.

1.02.01 Temperature
Tripoli has a hot subtropical semi-arid climate with long, hot and dry summers with relatively wet
and mild winters with a Mediterranean (dry-summer) rainfall pattern. Summers are hot with temperatures
that often exceed 38 C. Average temperature in July is approximately 27.5. In December,
temperatures have reached as low as 0, but the average remains between 9 and 18C.
In conclusion, the temperature range from 0 to +38C is assumed for design.
1.02.02 Rainfall
The average annual rainfall is less than 400 millimetres, and can be very erratic. But snowfall has occurred
in past years
Allabina/+381 Design

248_Al Arbi Villa, Tripoli,

CONSTRUCTION DOCUMENTATION REPORT

1.02.03 Wind Speed and Direction

According to the work Wind Load Characteristics in Libya (2010) by Prof. Milad M. Alshebani
(the Department of Civil Engineering Alfateh University, Zliten) and Mohammed B. Abohedma
(postgraduate of Civil Engineering Department, Alfateh University, Zliten), Libya is affected by
atmospheric depressions during the winter time and north-eastern trade winds in the summer. Libya is
also exposed to Ghibli " winds, a dry and hot wind that blows from the south several times per year,
usually from late spring throughout summer season.
Over the course of the year, typical wind speed varies from 0 m/s to 8 m/s (calm to fresh breeze),
rarely exceeding 12 m/s (strong breeze). The highest average wind speed of 5m/s (gentle breeze) occurs
around May 30. At that time, the average daily maximum wind speed is 8 m/s (fresh breeze).
The lowest average wind speed of 3 m/s (light breeze) occurs around first week of December. At that
time the average daily maximum wind speed is 6 m/s (moderate breeze).
In Libya, measurement of the wind speed is based on 10-sec gusts wind speed. The most frequent
wind speed is 15 m/s. After examining wind speeds and its frequent durations, it has been envisioned that
Libya can be classified into four wind speed zones in ascending order of its annual maxima wind speed.
According to this classification, Tripoli is placed at Zone 4, with the design wind speed of 121 km/h (33.6
m/s), a return period of 50 years.

Allabina/+381 Design

248_Al Arbi Villa, Tripoli,

CONSTRUCTION DOCUMENTATION REPORT

Figure 1 The design wind speed contour map of Libya with a 50- year

In conclusion, a basic wind speed of 121 km/h (33.6 m/s) is assumed for the design.
Wind load is the major load for secondary structural elements such as parapets, fences etc.
1.03 Geological constraints
1.03.01 Subsoil Condition
The Geotechnical investigation was not carried out up to the time of design process. For
structural analyse is assumed that the ground is consisted from most common type of soil, silty sand and
sand silt mixtures in very loose to very dense state of compaction, non-plastic. This is classified as (SM)
1.03.02 Bearing Capacity Estimation
The allowable bearing capacity is assumed as max. 150 KN/m2. In the case, after the excavation
for the foundations is done, or if the geotechnical investigation is carried out in the meantime, that soil
properties significantly differ, the contractor should consult geotechnical engineer and structural
designer before construction of the foundations continue.
1.03.03 Chemical analysis and corrosion control
For safety reasons is assumed that the total sulphate, chloride and organic concentrations in soil is
not in the allowed level so corrosion is expected and safety precautions are required.
Allabina/+381 Design

248_Al Arbi Villa, Tripoli,

CONSTRUCTION DOCUMENTATION REPORT

1.04 Seismic constraints


1.04.01 Codes and Standards
For Design Eurocode 8 Design of structures for earthquake resistance (BS EN 1998-1:2004) will be
used.
1.04.02 Determination of the seismic hazard
The seismic hazard depends of design ground displacement, ag (m/s) which is derived from ground
peak acceleration (ag40hz = 03,0 m/s
The following map shows the estimated horizontal peak ground acceleration:

Horizontal Peak Ground Acceleration seismic hazard map representing stiff site conditions for an
exceedance or occurrence rate of 10% within 50 years for the Mediterranean region (source: GSHAP GLOBAL SEISMIC HAZARD ASSESSMENT PROGRAM)
From the map above: ag40hz = 1,00 m/s.
The design ground acceleration on type A ground is calculated from equitation:
ag = 0.8 ag40hz1
1 - importance factor, for ordinary buildings is 1 = 1.
ag = 0.8 ag40hz1 = 0.81.01.0 = 0.80
Calculations the ratio, ag/g = 0.80/9.81 = 0.08. These values show that Tripoli is in low seismic hazard.
Taking in account that Alarbi villa is low rise building with only 2 stories, seismic load will not be included in
calculation.

Allabina/+381 Design

248_Al Arbi Villa, Tripoli,

CONSTRUCTION DOCUMENTATION REPORT

1.05 Super Structure


For basement, structural system is reinforced concrete walls with one-way, ribbed slab, 250 mm
thick.
Above the basement, the basic structural system is Confined Masonry Construction. Confined
masonry construction consists of masonry walls and horizontal and vertical reinforced concrete (RC)
confining elements built on all four sides of a masonry wall panel: vertical elements, called tie-columns or
vertical ties, and horizontal elements, called tie-beams or horizontal ties. It is important that these RC
members should be built after the masonry wall has been completed. Confined masonry walls are loadbearing, transmit the gravity load from the slab(s) above down to the strip foundations (along with the
RC tie-columns). Strip RC foundations with RC plinth beam will transmit the load from the walls down to
the foundation. It also protects the ground floor walls from excessive settlement in soft soil conditions and
the moisture penetration into the building.
Tie-columns should be provided at the following locations:
At the free edges of each structural wall element,
At both sides of any wall opening with an area of more than 1.5 m,
Within the wall if necessary in order not to exceed a spacing of 5 m,
At the intersections of structural walls, wherever the confining elements
imposed by the above rules are at a distance larger than 1,5 m.
Tie-columns have dimensions of section equal to thickness of the walls i.e. 200x200 mm.
Tie-beams should be located at every floor level and in any case with a vertical spacing not more than 4
m.
For basic masonry unit is hollow concrete blocks 200 mm thick adopted. Minimum compressive strength
for a masonry unit based on the gross area, fp = 7.5 MPa.
Mortar is on situ made mortar combined of cement, sand and lime. Compressive strength Class: M5,
Nominal compressive strength fj = 5 MPa.
Mortar mix proportions: Cement : lime : sand = 1:1:(not less than 2.25, not more than 3 time of cementitius
materials in volume).
Lime should be non-hydraulic to BS EN 459-1. Sand should conform to the requirements of BS EN 13139
and ideally be clean sand now known as fine aggregate. Cements should conform to BS EN 197-1.
To provide good bonding between a masonry wall and adjacent RC tie-columns and for delaying
undesirable cracking and separation at the wall-to-tie-column interface, it should be achieved by
toothing at the wall-to-tie-column interface. Toothed edges should be left on each side of the wall at the
interface with the tie-columns. Toothing length should be equal to one-quarter of the masonry unit
length, but not less than 50 mm1.

Allabina/+381 Design

248_Al Arbi Villa, Tripoli,

CONSTRUCTION DOCUMENTATION REPORT

1.05.01 Reinforcement Requirements for tie beams


Longitudinal Reinforcement (Tie-beams and Tie-columns):
Minimum 4 reinforcing bars
Bar sizes:
- deformed reinforcing bars of minimum 10-mm diameter (metric sizes) or
- smooth reinforcing bars of 12 mm diameter (when deformed bars are not available).
To ensure the effectiveness of tie-beams in resisting earthquake loads, longitudinal bars should
have a 90 hooked anchorage at intersections, as shown in Figure bellow:

Allabina/+381 Design

248_Al Arbi Villa, Tripoli,

CONSTRUCTION DOCUMENTATION REPORT

1.05.02 The size and spacing


Size: minimum 6 mm diameter bars should be used (either smooth or deformed steel bars) with 135
hooked ends (staggered); note that db denotes tie diameter in Figure 50 a.
Tie spacing (s) should not exceed 200 mm - this applies to RC tie-columns and tie-beams
- For regions of high and very high seismicity, reduced tie spacing (s/2) is required at
the ends of tie-columns, as shown in Figure bellow. The length over which the reduced
tie spacing is used should not exceed the larger of the following two values:
- 2b, where b is the tie-column dimension, or
- ho/6, where ho is the tie-column clear height.
- For regions of moderate seismicity, a uniform tie spacing (s) of 200 mm should be
used throughout - it is not required to reduce tie-spacing at the tie-column ends.
Minimum concrete cover to ties is 20 mm.

Allabina/+381 Design

248_Al Arbi Villa, Tripoli,

CONSTRUCTION DOCUMENTATION REPORT

1.05.03 Slabs and beams


The slabs are ribbed, 250 mm thick, made of hollow blocks (200x450x250 mm), reinforce concrete ribs,
100 mm wide, placed at 500 mm spacing and reinforced concrete slab, 50 mm thick.
Under the partition walls reinforce concrete beams are designed.
For in-situ cast reinforced concrete quality should have fc=30 MPa (C 25/30 according to EN 206) or
better. Reinforcement ribbed steel should have yield strength fyk=360 MPa or better.
The roof is flat and it is not accessible except for normal maintenance and repair.
1.06 Sub Structure
The basement foundations are based at level -3.6 m bellow the ground floor. For reinforcedconcrete basement raft foundation is adopted. Strip foundations with RC plinth beam are adopted for
structural masonry walls.
1.07 Structural Design
Calculation of structure forces was carried out by advances structural software1 in order to
determine real behaviour of structure under the all possible combinations of applied loads. Deflections of
the structure were calculated taking into consideration creep and shrinkage of concrete during the time
of structure exploitation.
Structure resistance to lateral loads is achieved by stiffness of the structural masonry walls in two
orthogonal directions.
1 Structural

software Tower, produced by RADIMPEX SOFTWARE, http://www.radimpex.rs/index.php?lang=en

Allabina/+381 Design

248_Al Arbi Villa, Tripoli,

CONSTRUCTION DOCUMENTATION REPORT

1.07.01 Vertical Loads on Structure


Vertical loads are Self-weight of structure, Dead and Live (Implied) load. Self-weight is calculated by
Programme, Dead load are weight of the floor and roof layers and faade and faade and internal
walls.
Weights of the used materials:
Floor concrete layer,
0.21 KN/m2
Ceramic tiles,
0.24 KN/m2
Wall of concrete hollow blocks, h=200 mm, with
mortar on both sides, 50 mm total thick,
3.40 KN/m2
Wall of concrete hollow blocks, h=150 mm, with
mortar on both sides, 50 mm total thick,
2.55 KN/m2
Ribbed slab, h = 250 mm,
3.60 KN/m2
Plane concrete,
24.00 KN/m3
Reinforced concrete,
25.00 KN/m3
Live load is variable load which intensity depends of use of areas (EN 1990-2001):
1. Living areas: 2.0 KN/m2
2. Stairs, mezzanine, communications, service areas: 3.0 KN/m2
3. Roof top: 0.6 KN/m2
1.07.02 Structure Analyse
The structural analyse was performed in order to:
1. defining all elements of the structure,
2. obtain structural forces and displacements
3. calculation of the concrete reinforcement and steel connections
4. set up the right foundations and check the settlements.
1.07.03 Applied Codes
The following codes were applied:
EN 1990 Eurocode 0: Basis of Structural Design
EN 1991 Eurocode 1: Actions on structures
EN 1992 Eurocode 2: Design of concrete structures
EN 1996 Eurocode 6: Design of masonry structures
EN 1998 Eurocode 8: Design of structures for earthquake resistance
BS 8103-2, Structural design of low rise buildings - Part 2: Code of practice for masonry walls for
housing
BS EN 772-7, Methods of test for masonry units;
BS EN 845-2, Specification for ancillary components for masonry - Part 2: Lintels;
BS EN 998-2, Specification for mortar for masonry - Part 2: Masonry mortar;
BS EN 1015-2, Methods of test for mortar for masonry - Part 2: Bulk sampling of mortars and
preparation of test mortars;
BS EN 1015-11, Methods of test for mortar for masonry - Part 11: Determination of flexural and
compressive strength of hardened mortar;
BS EN 1996-1-1, Eurocode 6 - Design of masonry structures - Part 1-1: General rules for reinforced
and unreinforced masonry structures;
BS EN 1996-2, Eurocode 6 - Design of masonry structures - Part 2: Design considerations, selection
of materials and execution of masonry;

Allabina/+381 Design

248_Al Arbi Villa, Tripoli,

CONSTRUCTION DOCUMENTATION REPORT

1.07.04 Calculation of the of required masonry walls density


Wall density is a key indicator of safety for low-rise confined masonry buildings subjected to
seismic and gravity loads. Evidence from past earthquakes shows that confined masonry buildings with
adequate wall density were able to resist the effects of major earthquakes without collapse.
The wall density is quantified through the wall density index, d, which is equal to:
d = AW/AP
where:
AP is area of the building floor plan, and AW is equal to the cross-sectional area of all walls in one
direction, that is, a product of the wall length and thickness when performing the AW calculations. It is not
necessary to deduct the area of tie-columns and the area of voids in hollow masonry units for the AW
calculations.
It is very important to note that the wall cross-sectional area should not be included in the AW calculation
in the following cases:
a) walls with openings, in which the area of an unconfined opening is greater than 10% of the
wall surface area unless the opening is confined with ties and
b) walls characterized by the height-to-length ratio greater than 1.5.
The d value should be determined for both directions of the building plan (longitudinal and transverse).
Ground floor: total area, AP = 315 m2
For following properties:
1) low seismic hazard (ag/g = 0.08g),
2) soft soil conditions,
3) 2 stories building high and
4) concrete hollow blocks,
the required Density index is 1.5% maximum.
Calculation:
Calculation of the effective height of a wall:
hef = nh
(h is the clear storey height of the wall, n is a reduction factor)
n = 0.75;
h = 3.90 - 0.25 = 3.65 m
hef = 0.75 3.65 = 2.7375 m

Allabina/+381 Design

248_Al Arbi Villa, Tripoli,

Allabina/+381 Design

CONSTRUCTION DOCUMENTATION REPORT

248_Al Arbi Villa, Tripoli,

CONSTRUCTION DOCUMENTATION REPORT

Ground Floor Walls Arrangement


Y - direction:
wall in axis:
total length of the wall,
hw (m)
"A"
5.60
"B"
4.15
"C"
7.15
"D"
5.70
"E"
3.70
Vertical projection of
the inclined walls
7.022

thickness
(m)
0.25
0.25
0.25
0.25
0.25

Area
(m2)
1.40
1.04
1.79
1.43
0.93

0.25
Awy =

1.76
8.33 m2

thickness
(m)
0.25
0.25
0.25
0.25
Awx =

Area
(m2)
2.83
3.61
4.02
2.83
13.29 m2

Awy/AP = 2.6% > min. 1.5% -> the condition is satisfied

X - direction:
wall in axis:
"1"
"2"
"4"
"5"

total length of the wall,


hw (m)
21.019
14.45
16.10
11.30

Awx/AP = 4.2% > min. 1.5% -> the condition is satisfied

Allabina/+381 Design

248_Al Arbi Villa, Tripoli,

PART 2: STRUCTURAL TECHNICAL REPORT


2.01: GROUND FLOOR STRUCTURE ANALYZE
2.01.01 INPUT DATA - STRUCTURE

Allabina/+381 Design

CONSTRUCTION DOCUMENTATION REPORT

248_Al Arbi Villa, Tripoli,

Allabina/+381 Design

CONSTRUCTION DOCUMENTATION REPORT

248_Al Arbi Villa, Tripoli,

2.01.03 RESULTS OF THE STRUCTURE ANALYSE

2.01.04 CALCULATED REINFORCEMENT


Allabina/+381 Design

CONSTRUCTION DOCUMENTATION REPORT

248_Al Arbi Villa, Tripoli,

CONSTRUCTION DOCUMENTATION REPORT

5.02

5.27

3.69

5.75

0.09
0.21

0.
46

0.12

0.31

0.12
0.73

1.89

13.96

0.
06

1.58

0.
30

1.33
0.17

3.54

3.69

0.22 0.09

0.47

1.35

0.93

4.65

5.01

3.56

Merodavno opterecenje: Kompletna sema


@1@EUROCODE, C 25, S360H

7.55

1.59

4.53

4.53

7.44

Calculated Reinforcement in Beams: max Aa2/Aa1= 13.96 cm2


(Aa1 - bottom, Aa2 - top reinforcement)

1.86

1.79

2.34

1.78

1.81
1.81

4.48

4.84

1.
48

3.88

2.71

2.57

1.59

2.31

3.67

2.69

Calculated Shear Reinforcement in Beams: max Aa,s= 4.84 cm2

Allabina/+381 Design

1.63

2.08

3.11

1.63

2.11

3.14

1.84

2.47

2.88

2.69

2.28

2.40

2.38

4.45

Merodavno opterecenje: Kompletna sema


@1@EUROCODE, C 25, S360H

7.56

248_Al Arbi Villa, Tripoli,

CONSTRUCTION DOCUMENTATION REPORT

214(4.39m)

216(2.90m)

m
)

214(1.19m)

316(3.13m)

214(2.20m)

214(2.20m)
316(2.20m)

216(2.20m)

214(1.18m)

216(12.23m)

214(1.19m)

214(1.18m)
2
14
(2
.4
3

216(6.5m)

214(3.13m)

2
14
(2
.4
214(3.13m)
3m
)

316(2.90m)

422(6.60m)

216(10.6m)

216(6.5m)

422(9.10m)

316(4.50m)

416(3.90m)

216(3.90m)

216(4.50m)

8/20(N=16)(m=2)
8
/2
0(
N=
12
)(
m
=2
)

8/20(N=11)(m=2)

8/10(N=2)(m=2)

8/20(N=18)(m=2)

8/10(N=2)(m=2)

8/10(N=8)(m=2)
8/20(N=10)(m=2) 8/20(N=8)(m=2)

8/20(N=6)(m=2)

8/20(N=15)(m=2)

8/20(N=21)(m=2)

Adopted Shear Reinforcement in Beams

Allabina/+381 Design

8/20(N=6)(m=2)

8/10(N=1)(m=2)

8/20(N=15)(m=2)

8/10(N=7)(m=2)

8/20(N=45)(m=2)

8/10(N=2)(m=2)

8/20(N=20)(m=2)

8/20(N=20)(m=2)

8/20(N=20)(m=2)

8/20(N=33)(m=2)

8/10(N=2)(m=2)

8/10(N=2)(m=2)

8/10(N=14)(m=2)

8/20(N=22)(m=2)

8/10(N=8)(m=2)

8/20(N=14)(m=2)

8/20(N=19)(m=2)

8/20(N=20)(m=2)

Usvojena armatura
@1@EUROCODE, C 25, S360H

8/10(N=1)(m=2)

Adopted Longitudinal Reinforcement in Beams

8/20(N=11)(m=2)

416(4.00m)

316(4.00m)

316(4.00m)
216(4.00m)

316(4.00m)

414(0.3m)
214(2.09m)
214(2.00m)

216(4.00m)

316(4.00m)
216(4.00m)

216(4.00m)

216(4.00m)

316(4.00m)

Usvojena armatura
@1@EUROCODE, C 25, S360H

248_Al Arbi Villa, Tripoli,

8/20(N=11)(m=2)

8/10(N=2)(m=2)

8/10(N=2)(m=2)

8/20(N=18)(m=2)

8/10(N=8)(m=2)
8/20(N=10)(m=2) 8/20(N=8)(m=2)

8/20(N=6)(m=2)

8/20(N=15)(m=2)

8/20(N=21)(m=2)

Adopted Shear Reinforcement in Beams

Allabina/+381 Design

8/20(N=6)(m=2)

8/10(N=1)(m=2)

8/20(N=15)(m=2)

8/10(N=7)(m=2)

8/20(N=45)(m=2)

8/10(N=2)(m=2)

8/20(N=20)(m=2)

8/20(N=20)(m=2)
8/20(N=16)(m=2)
8
/2
0(
N=
12
)(
m
=2
)

8/10(N=1)(m=2)

8/20(N=20)(m=2)

8/20(N=33)(m=2)

8/10(N=2)(m=2)

8/10(N=2)(m=2)

8/10(N=14)(m=2)

8/20(N=22)(m=2)

8/10(N=8)(m=2)

8/20(N=14)(m=2)

8/20(N=19)(m=2)

8/20(N=20)(m=2)

Usvojena armatura
@1@EUROCODE, C 25, S360H

CONSTRUCTION DOCUMENTATION REPORT

8/20(N=11)(m=2)

248_Al Arbi Villa, Tripoli,

2.02: 1ST FLOOR STRUCTURE ANALYZE


2.02.01 INPUT DATA - STRUCTURE

2.02.02 INPUT DATA LOADS

Allabina/+381 Design

CONSTRUCTION DOCUMENTATION REPORT

248_Al Arbi Villa, Tripoli,

Allabina/+381 Design

CONSTRUCTION DOCUMENTATION REPORT

248_Al Arbi Villa, Tripoli,

CONSTRUCTION DOCUMENTATION REPORT

2.02.03 RESULTS OF THE STRUCTURE ANALYSE


Opt. 4: 1.35xI+1.35xII+1.5xIII

61.94

45.62 54.41

82.97

46.50

-6.38

6.91

28.66

55.39

-8.21

13.78

-1.18

70.71

46.06

14.67
-0.07

-0.47

0.
33

3.52

91.91

-4.41

0.61

-13.91

12.24

-33.08

3.39

-8.10

13.17

6.38

-17.76

-43.42

-1
.1
4

301.11

8.61
0.89

146.77

-2
.4
5

33.45

49.27

85
5
.2

21.19

0
.6
-2

Calculated Bending Moments in Beams: max M3= 301.11 / min M3= -43.42 kNm
Opt. 4: 1.35xI+1.35xII+1.5xIII

-78.22
10.40

49.19

51.86

31.61

42.24 39.52

65.10

1.83
-31.91

34.28

-29.43

-7.08

-11.75

6.11

-18.98

-16.18

20.15

39.33

6.73
54.58

11
7
-3

8
.2

17.69

-135.72

-38.13

-18.35
2.62

-31.79

-18.04

7
.0

Calculated Shear Forces: max T2= 175.61 / min T2= -135.72 kN

Allabina/+381 Design

-65.09

4
.8

175.61

-42.47
-34.75

31

-72.76

-24.13

-10.59

20.33

-5
.1
5

-3
.8
-1.61
6

-47.68

-18.45

71.23

38.85

-13.04

-56.56

-7.52

7.
99
-0.51

-88.35

2.
53

63.74

172.57

-57.19
-27.48

53.59

20.72

-13.30

-124.52

2.13

59.37

8.14

39.68

-2.72

34.80

69.30

13.29

32.38

-43.83

248_Al Arbi Villa, Tripoli,

CONSTRUCTION DOCUMENTATION REPORT

2.02.04 CALCULATED REINFORCEMENT

0.37

0.02

0.02

4.35 5.28
4.43

1.08

6.52

7.84

2.68

5.37

0.47

2.23

0.18

6.62

4.39

0.05

Merodavno opterecenje: Kompletna sema


@1@EUROCODE, C 25, S360H

0.12

2.38
9.23

0.01

0.18
0.
38

0.13

1.36

0.
05

0.
18

23.66
6.83

0.55

2.25

2.12

0.09

0.69

2.93

3.12

1.00

1.97

1.38

5.43

0.53

5.50

8.46

77
8.

1.95

25
0.

Calculated Reinforcement in Beam: max Aa2/Aa1= 23.66 cm2


(Aa1 - bottom, Aa2 - top reinforcement)
Merodavno opterecenje: Kompletna sema
@1@EUROCODE, C 25, S360H
2.42

2.63

2.82

2.87

1.56

2.08 2.34

3.21

2.20

1.38

2.80

1.96

1.61

3.86

1.63

2.16

2.93

2.35

2.09 2.38

3.21

1.75

1.61

2.46

6.02

6.66

1.56

4.53

4.80

1.37
11.47

2.70

3.22

1.70
4.61

Calculated Shear Reinforcement in Beams: max Aa,s = 11.47 cm2

83
1.

2.69

Allabina/+381 Design

8
.537
11.

6.78

Allabina/+381 Design
8/5(N=18)(m=2)

8/20(N=41)(m=2)

8/10(N=5)(m=4)

Adopted Shear Reinforcement in Beams

Usvojena armatura
@1@EUROCODE, C 25, S360H

8/20(N=29)(m=2)

8/20(N=23)(m=2)

214(2.20m)

(2
.4
3

m
)

214(1.19m)

214(1.19m)

214(3.13m)

m
)

2
14

214(2.19m)

614(4.50m)

8/20(N=11)(m=2)

8/20(N=6)(m=2)

8/20(N=18)(m=2)

/
8

414(0.11m)
214(0.14m)
16
2

8/10(N=2)(m=4)

=
(N
20

5
.7
(7

214(4.00m)
414(4.00m)

414(4.00m)

414(4.00m)

214(4.00m)

414(1.38m)
414(1.72m)
514(0.90m)
214(4.00m)

214(4.00m)

414(4.00m)

214(7.13m)

214(4.55m)

614(4.00m)
214(4.00m)

214(4.55m)

414(4.00m)

214(4.00m)

214(4.00m)

214(2.19m)

8/10(N=3)(m=2)
8/20(N=17)(m=2)
8/10(N=3)(m=2)

214(3.13m)

214(1.18m)
2
14
(2
.4
3

214(3.13m)

8/20(N=20)(m=2)

214(4.26m)
214(2.20m)
214(4.00m)

214(1.18m)

722(6.60m)

614(6.30m)

8/20(N=20)(m=2)

614(3.90m)

314(5.27m)

214(4.00m)

214(6.30m)

8/20(N=20)(m=2)

8
8/20(N=16)(m=2)
8/10(N=3)(m=2)
8/20(N=18)(m=2)
8/10(N=1)(m=2)
/2
0(
N=
12
)(
m
=2
)

8/10(N=3)(m=2)
8/20(N=19)(m=2)

214(3.90m)

514(2.29m)

8/7(N=4)(m=2)
8/20(N=14)(m=2)

8/5(N=5)(m=4)

8/20(N=11)(m=2)

8/10(N=3)(m=2)
8/20(N=1)(m=2)

8/10(N=5)(m=2)
8/20(N=20)(m=2)

216(6.60m)

314(9.10m)

8/20(N=6)(m=2)

8/20(N=10)(m=2)
8/10(N=2)(m=2)
8/20(N=9)(m=2)

8/20(N=18)(m=2)
8/10(N=3)(m=2)
8/10(N=1)(m=2)

314(1.55m)

8/20(N=16)(m=2)
8/20(N=3)(m=4)
8/20(N=1)(m=4)

10/10(N=15)(m=2)
10/10(N=12)(m=2)
10/20(N=20)(m=2)
8/20(N=20)(m=2)

8/20(N=11)(m=2)

)
=2
)(m
9
3

214(3.45m)

214(3.45m)

214(2.19m)

214(2.19m)

)
m

16
5
5
.7
(7
)
m

214(4.50m)

214(4.50m)

Adopted Longitudinal Reinforcement in Beams

8/20(N=17)(m=2)

614(4.00m)

248_Al Arbi Villa, Tripoli,


CONSTRUCTION DOCUMENTATION REPORT

Usvojena armatura
@1@EUROCODE, C 25, S360H

248_Al Arbi Villa, Tripoli,

CONSTRUCTION DOCUMENTATION REPORT

@1@EUROCODE, C 25, S360H

9.10

9.79
0.64

9.62

13.25

1.75

0.37

7.56

0.32

2.62

22.72

2.30

12.73

13.20

Vertical Deflections of the Beams: max v(t)= 22.72 mm

Allabina/+381 Design

7.11

7.32 7.99
3.64

6.33

7.55

248_Al Arbi Villa, Tripoli,

2.03: 2ND FLOOR STRUCTURE ANALYZE


2.03.01 INPUT DATA - STRUCTURE

2.03.02 INPUT DATA LOADS

Allabina/+381 Design

CONSTRUCTION DOCUMENTATION REPORT

248_Al Arbi Villa, Tripoli,

CONSTRUCTION DOCUMENTATION REPORT

Opt. 3: Q_A - variable load on floors

q = -2.00

q = -2.00

q = -2.00

q = -3.00

q = -2.00

q = -2.00
q = -2.00

Variable Loads, Category A

Allabina/+381 Design

248_Al Arbi Villa, Tripoli,

CONSTRUCTION DOCUMENTATION REPORT

2.03.03 RESULTS OF THE STRUCTURE ANALYSE

12.96

71.05
14.59

6.28
-182.35

-20.45

76.56

2.22

0.68

-25.42

8
.3
-3

161.47

17.09

22.33

8.05

-0.43

21.23

-24.18
-37.95

14.13

22.13

-12.56

-13.00

-198.40

5.46

7.71

-23.56

63.66
-18.54
19.19

-22.78

-47.01

-4.53

-98.32
10.49

253.64

56.90

115.39

-6.62

3.07

0.63

14.75

-1.25

72.58
15.25

-10.54

0.14

-0.17
0.04
-0.14
0.05
-0.14
0.04
-0.17
0.14

Opt. 5: 1.35xI+1.35xII+1.05xIII+1.5xIV

11.28

16.54
52

13.54

-1.01

-6.86

3
.0

Allabina/+381 Design

7
.9
-2

Calculated Bending Moments in Beamsi: max M3= 253.64 / min M3= -198.40 kNm

248_Al Arbi Villa, Tripoli,

CONSTRUCTION DOCUMENTATION REPORT

1.36

1.04
5.32

-81.9913.55

34.85

-38.63
-22.18

-2.01

1.73

105.65

-1.64

1.68

1.64

86.26

-1.68

8.88

-1.73

-13.98

-1.36

2.01

Opt. 5: 1.35xI+1.35xII+1.05xIII+1.5xIV

-2.20

9.32
-1.51 0.85

-44.39

-35.80

-4.06

-31.59

-20.29

74.34

46.87

97.04

-96.94

-57.87

17.71
-26.00

12.86

-206.59

0.86

166.36

-67.04
26.36
-15.72

13.56
-35.08

-30.91

8
.7

-0.82

-61.08
9.95
6.16 -5.07

4.75

-28.18

-10.89

9
.3

6
.2

3
-2

12

13.24

13.92

14.01

Calculated Shear Forces: max T2= 191.98 / min T2= -221.99 kN

2.03.04 CALCULATED REINFORCEMENT

2.40

6.77
2.29

5.69

6.66
2.31

3.93

4.98

3.53

7.39

1.68

0.03

Merodavno opterecenje: Kompletna sema


@1@EUROCODE, C 25, S360H

2.63

6.97

0.84

21.08
1.01

9.42
1.84
1.15

19.02

3.67

7.18

3.43

4.14
3.47

3.08

0.53
20.60
2.40

1.27

0.10

1.80

2.65

2.13

1.05

03
5.

Allabina/+381 Design

36
0.

Calculated Reinforcement in Beam: max Aa2/Aa1= 21.08 cm2


(Aa1 - bottom, Aa2 - top reinforcement)

70
0.

16.44

3.22

2.11

4.25

3
-1

139.71

-13.54
-221.99

0
.2

-10.66

32.27

191.98

24

22.78

31.94

-22.97

-4.33

-2.77

39.79
-104.28
-50.17

-36.42

-148.61

-0.26

-9.55
147.18 -52.63

-110.52

1.48

1.94

8.99

55.20

81.84

18.44

53.29

248_Al Arbi Villa, Tripoli,

CONSTRUCTION DOCUMENTATION REPORT

Merodavno opterecenje: Kompletna sema


@1@EUROCODE, C 25, S360H
1.96 1.87

4.04

4.87

3.43
4.24

7.33

4.73

1.71

1.54

3.57

4.43

4.53

4.36

3.75

3.47

3.03
1.34

4.25

2.03
10.94

2.56

3.66

10.18

2.92

2.70
5.16

1.51

1.34

2.24

8.19

1.60

4.78

2.96

50
2.

5.51
2.55

2.33

77
0.

Calculated Shear Reinforcement in Beams: max Aa,s = 10.94 cm2

Usvojena armatura
@1@EUROCODE, C 25, S360H

214(7.50m)

214(1.10m)

214(4.50m)
214(4.50m)

Adopted Longitudinal Reinforcement in Beams

Allabina/+381 Design

214(4.00m)
419(8.40m)

314(3.00m)

214(4.00m)

414(4.00m)
214(2.05m)

419(3.61m)

514(4.00m)

214(3.00m)

314(5.20m)

314(5.20m)
419(4.00m)

419(6.29m)

314(4.40m)

819(0.80m)

214(4.00m)

214(4.00m)

214(4.4m)

214(6.76m)

419(8.40m)

214(4.00m)
1016(2.16m)
1016(3.24m)
1116(1.20m)

216(6.60m)

214(1.10m)

214(3.20m)

314(0.44m)
214(1.96m)
214(5.10m)

214(3.20m)

214(1.58m)
314(0.76m)

214(8.85m)

214(2.93m)
314(4.40m)

214(4.25m)
214(0.72m)
514(2.65m)

414(0.73m)
214(1.32m)

214(4.00m)

419(8.40m)

214(4.4m)

214(4.00m)

214(4.00m)

214(2.60m)

214(2.05m)

214(2.60m)

719(0.65m)
419(5.30m)

314(0.10m)
214(0.15m)

419(8.80m)

419(1.79m)
619(1.66m)

12.13

12.83

Allabina/+381 Design
7.05

8/20(N=44)(m=2)

10/20(N=15)(m=2)

4.61

21.04

Vertical Deflections of the Beams: max v(t)= 22.78 mm


8/20(N=13)(m=2)

12.45
9.82

10/10(N=8)(m=4)

8/10(N=3)(m=2)
8/20(N=9)(m=2)

8/20(N=20)(m=2)

8/10(N=3)(m=2)
8/10(N=5)(m=2)
8/20(N=10)(m=2)
8/20(N=16)(m=2)
8/8(N=3)(m=2)
8/8(N=1)(m=2)
8/8(N=3)(m=2)
8/8(N=4)(m=2)
8/20(N=5)(m=2)
8/20(N=1)(m=2)
8/20(N=1)(m=2)

10/20(N=18)(m=2)

10/10(N=17)(m=4)
8/10(N=4)(m=2)
8/20(N=20)(m=2)
10/10(N=1)(m=4)

8/10(N=5)(m=2)
8/10(N=13)(m=2)
8/20(N=1)(m=2)
8/20(N=13)(m=2)
8/20(N=9)(m=2)

8/5(N=5)(m=2)

4.19

8/20(N=10)(m=2) 8/20(N=14)(m=2)

10/20(N=29)(m=2)

10/10(N=7)(m=2)
10/10(N=16)(m=2)

10/10(N=12)(m=2)
10/10(N=11)(m=2)
10/10(N=2)(m=2)
10/10(N=1)(m=2)
10/20(N=13)(m=2)
10/20(N=12)(m=2)

8/10(N=5)(m=2)
8/10(N=6)(m=2)
8/20(N=1)(m=2)
8/20(N=9)(m=2)

6.12

6.01

8/20(N=20)(m=2)

8/8(N=5)(m=2)

0.79

8/20(N=6)(m=2)

8/10(N=5)(m=2)
8/20(N=10)(m=2)
8/20(N=8)(m=2)

8/15(N=8)(m=4)
8/20(N=16)(m=2)
8/20(N=20)(m=2)

Usvojena armatura
@1@EUROCODE, C 25, S360H

16.31

16.73

8/15(N=15)(m=4)

8/20(N=25)(m=2) 8/10(N=2)(m=2)
8/20(N=11)(m=2)

8/20(N=16)(m=2)

248_Al Arbi Villa, Tripoli,


CONSTRUCTION DOCUMENTATION REPORT

10/10(N=4)(m=4)

10/20(N=19)(m=2)

8/20(N=23)(m=2)

Adopted Shear Reinforcement in Beams

@1@EUROCODE, C 25, S360H

3.10

9.02
11.35

22.78
4.33

0.83

248_Al Arbi Villa, Tripoli,

2.04: ROOF TOP STRUCTURE ANALYZE


2.04.01 INPUT DATA - STRUCTURE

2.04.02 INPUT DATA LOADS

Allabina/+381 Design

CONSTRUCTION DOCUMENTATION REPORT

248_Al Arbi Villa, Tripoli,

Allabina/+381 Design

CONSTRUCTION DOCUMENTATION REPORT

248_Al Arbi Villa, Tripoli,

CONSTRUCTION DOCUMENTATION REPORT

2.04.03 RESULTS OF THE STRUCTURE ANALYSE


Opt. 3: 1.35xI+1.5xII

0.02
-0.03 0.02
-0.03
-0.03

0.01 -0.01
0.01 -0.02
-0.02

-5.21

2.92
-0.02
-0.02

0.09

-25.94

8.36

6.99

-3.19

0.99

-7.16

-9.25

-0.09

13.54

8.79

-4.18

17.60

Calculated Bending Moments in Beams: max M3= 17.60 / min M3= -25.94 kNm
Opt. 3: 1.35xI+1.5xII

21.79

-4.36 -0.29
0.06
-0.40

-0.22
-0.14
-0.06
-0.03
-0.18
-0.20
-0.18
-0.15
-0.12 0.12
-0.08 0.15
-0.03 0.18
0.21
-0.03 0.24
0.29
0.32

0.05
0.13
0.21
0.29
0.32

9.60

-8.00

10.42

14.09

-0.62

15.36
-16.53

-28.63

-15.69
12.55

-15.85

-9.06

9.76

-9.17
19.54

-13.30

Calculated Shear Forces: max T2= 21.79 / min T2= -28.63 kN

Allabina/+381 Design

248_Al Arbi Villa, Tripoli,

CONSTRUCTION DOCUMENTATION REPORT

2.04.04 CALCULATED REINFORCEMENT


Merodavno opterecenje: Kompletna sema
@1@EUROCODE, C 25, S360H

0.81

0.45

0.01

1.13

1.47

0.01

4.49

1.32

1.10

0.49

2.18

0.65

2.91

1.39

Calculated Reinforcement in Beam: max Aa2/Aa1= 4.49 cm2


(Aa1 - bottom, Aa2 - top reinforcement)

1.34

1.84

Merodavno opterecenje: Kompletna sema


@1@EUROCODE, C 25, S360H

1.40

2.42

1.65

Calculated Shear Reinforcement in Beams: max Aa,uz= 2.42 cm2

Allabina/+381 Design

248_Al Arbi Villa, Tripoli,

CONSTRUCTION DOCUMENTATION REPORT

214(3.00m)

214(2.05m)

214(2.05m)

214(4.00m)

Usvojena armatura
@1@EUROCODE, C 25, S360H

214(7.80m)

214(8.40m)

314(0.24m)

214(3.00m)

214(4.16m)

214(4.40m)

214(4.40m)

214(7.80m)

214(2.60m)

214(2.60m)

Adopted Longitudinal Reinforcement in Beams


Usvojena armatura
@1@EUROCODE, C 25, S360H

8/20(N=10)(m=2)

8/20(N=15)(m=2)

8/20(N=22)(m=2)

8/20(N=42)(m=2)

8/20(N=39)(m=2)

8/20(N=13)(m=2)

Adopted Shear Reinforcement in Beams

Allabina/+381 Design

248_Al Arbi Villa, Tripoli,

CONSTRUCTION DOCUMENTATION REPORT

1.27

0.21

@1@EUROCODE, C 25, S360H

11.62

1.46

14.24

Vertical Deflections of the Beams: max v(t)= 14.24 mm

Allabina/+381 Design