JOB SAFETY ANALYSIS

Manual Lifting of Materials


WORK ACTIVITY: ___________________________________
Each piece of equipment and crew are associated with known specific hazards that cause accidents to reoccur on one project
after another.
P123456
Mhd. Abdul Rahman LOCATION ;____________________
ARAB -D
SITE SUPERVISOR:___________________
PERMIT #:____________
Probability factors.
5

8
6
4
2
1
No

Evaluation Points
40-20High Risk

Severity Factors
8: Fatality, Permanent Disability

Probability Factors
5 : Extremely High

Abbreviation
E.P :Evaluation Points

1 9 12 Medium Risk

6: Serious Injury (LD>30 days)

4 : Highly Probable

S : Severity Factor

11-5 Low Risk

4: Major Injury (30>LD>4 days)

3 : Probable

P : Probability Factor

2: Minor Injury (4>LD>1 day)

2 : Rare

T : Total Points

1: Negligible

1 : Very Rare

4-1 Negligible

Activity ( Job Steps )

Potential Hazard

Arrival of personnel
and equipments on
site

Unfamiliar with plant


situation and with site
regulation

Work permit from


Client to be obtained.

Unauthorized
commencement of
works may result in
exposing workers and or
potential to harm or
danger

Who/ What Might


Be Harmed
Personnel &
Clients Property

Risk E.P.
SxP=T
4x2=8

Injury to IMCO
Personnel and or
client property.

2x3=6

LD : Lost Workdays

Control/ Recovery Measures


Ensure all personnel are fully
briefed on tasks and responsibilities
Ensure all workers that already
inducted prior to mobilization to
site.
Ensure, prior to work inside the
plant, all workers are having a valid
H2S card.
Authorized PTW holder shall
ensure obtaining and maintaining
valid work permit.
The worksite supervisor responsible
for this activity has to check the
PPE of his staff to ensure that all
required items are available and
properly used.

Target E.P. Responsible/ Action


SxP=T
By
2x1=2
Worksite supervisor
and Site Safety
Officer.

2x1=2

Site supervisor
and Site Safety
Officer.

No

Activity ( Job Steps )

Potential Hazard

Who/ What Might


Be Harmed

Risk E.P.
SxP=T

Pre-task briefing
toolbox talks.

The work force does not


understand the pre task
briefing therefore does
not understand the
potential dangers and
control measures to be
implemented. Some of
the workers could be
lacking PPE or using
defective PPE.

Personnel

2x4=8

Manual lifting of
materials

Cumulative disorders
due to gradual and
cumulative deterioration
of the musculoskeletal
system through
continuous lifting /
handling activities

IMCO personnel

4 x 3 = 12

Page 2 of 3

Control/ Recovery Measures


Inform all workers regarding permit
condition before work starts.
Worksite supervisor shall conduct
toolbox talks about nature of works
and associated potential hazards and
their essential precautionary
measure.
Ensure that the pre task briefing is
given out in a language understood
by the work force, have it
translated.
Ask question regarding the briefing
to get feedback from the staff, this
ensures full comprehension.
Issue required appropriate PPE and
replace PPE that has signs of defect.
PPE must include both hearing
protection as well as dust inhalation
protection.
Designing and organizing tasks to
avoid manual handling completely,
or at least restrict it.
Using automation and lifting
equipment.
Organizing manual handling tasks
in a safe way, with loads split into
smaller ones, and proper rest
periods provided.
Providing information and training
to workers on tasks, and the use of
equipment and correct handling
techniques.
Ensure taking the appropriate

Target E.P.
SxP=T

Responsible/
Action By

2x1=2

Site supervisor
and Site Safety
Officer.

2x1=2

Site supervisor
and Site Safety
Officer.

No

Activity ( Job Steps )

Potential Hazard

Who/ What Might


Be Harmed

Signs of noise distracting IMCO personnel


people, interfering with
their ability to
communicate warnings,
or having the potential to
cause permanent hearing
loss.

Risk E.P.
SxP=T

4x2=8

organizational measures to reduce


the risk if manual handling cannot
be avoided
To ensure that workers receive
adequate information on the weight
of a load, the centre of gravity, or
the heaviest side when a package is
unevenly loaded
To provide proper training and
precise information on how to
handle loads correctly.
Ensure that personnel are wearing
appropriate hearing protection.

PREPARED BY (HSE)
Name

Target E.P.
SxP=T

Control/ Recovery Measures

2x1=2

Responsible/
Action By

Site supervisor
and Site Safety
Officer.

REVIEWED BY (QP)

----------------------------------------

Name

----------------------------------------

Signature ---------------------------------------

Signature ---------------------------------------

Date

Date

---------------------------------------

Page 3 of 3

---------------------------------------

Você também pode gostar