Office:
"ndianOil Bhavan"
G-9, Ali Yavar Jung Marg
Bandra(East), Mumbai
Contractor.
Vendor code:
R.A./Final
Bill No.
Name of work:
Date of Bill
Place of Work:
Panaji,Goa
Sl.
No.
PO Sl.No
10
20
30
40
50
60
70
80
Capex
Ref
Particulars
Excavation for
foundation,substructure.trenches, sumps,pits
etc..
Filling in plinth/trenches/pits btswith
selected excavated earth.
With river sand
Providing Dry rubble packing of required
compected thickness 230mm thick
Providing and injecting chemical emulsion.
Providing and laying plain cement concrete
(PCC) with 1:3:6
Providing and laying plain cement concrete
(PCC) with 1:2:4
Providing and placing reinforced cement
concrete using 20mm down grade coarse
Value
E=BxD
Qty
A
Rate
B
Value
C=AxB
Qty
H=F-D
310
194
60140
240
46560
242.73
47089.62
2.73
125
50
6250
80
4000
82.59
4129.5
2.59
166
790
131140
0.50
395
0.50
276
254
70104
240
60960
240.36
61051.44
0.36
276
119
32844
276
32844
276.00
32844
0.00
32
3032
97024
32
97024
32.00
97024
0.00
3583
17915
0.15
537.45
0.15
183
4716
863028
183
863028
183.00
863028
0.00
25000
50
1250000
25000
1250000
25000.00
1250000
0.00
636
358
227688
124
44392
148.29
53087.82
24.29
130
2733
355290
87
237771
91.85
251026.05
4.85
276
725
200100
276
200100
276.00
200100
0.00
90
100
110
120
Supervised By
Designation
Date
Checked by
Designation
Date
Regd. Office:
"ndianOil Bhavan"
G-9, Ali Yavar Jung Marg
Bandra(East), Mumbai
Contractor.
Vendor code:
R.A./Final
Bill No.
Name of work:
Date of Bill
Place of Work:
Panaji,Goa
Sl.
No.
PO Sl.No
130
140
150
Capex
Ref
Particulars
Value
E=BxD
Qty
A
Rate
B
Value
C=AxB
Qty
H=F-D
1410
114
160740
794
90516
1410.00
160740
616.00
690
91
62790
392
35672
530.35
48261.85
138.35
282
167
47094
282
47094
282.00
47094
0.00
Supervised By
Checked by
Designation
Date
Designation
Date
Regd. Office:
"ndianOil Bhavan"
G-9, Ali Yavar Jung Marg
Bandra(East), Mumbai
Final Bill
529.62
129.5
395
91.44
0
0
537.45
0
8695.82
13255.05
0
Supervised By
Checked by
Designation
Date
Designation
Date
Regd. Office:
"ndianOil Bhavan"
G-9, Ali Yavar Jung Marg
Bandra(East), Mumbai
Final Bill
Supervised By
Checked by
Designation
Date
Designation
Date
CERTIFICATE
PAY ORDER
Sr. No.
01
02
Certified that the work is 100% complete according to specifications & drawing
as indicated in the work order referred overleaf.
03
Certified that no material including cement the cost of which has not been
recovered has been issued to the contractor.
04
05
Date.
PO No.
06
07
Description
Total Amt due as per Bill
Deduction - Income TaxTDS @ .. .. ..% of
Sr. No. 01
Deduction - Security
Desposit @ 10 % of
Sr. No. 01
Deduction - Recovery
Amount - as per Bill
Net Bill Amount Payable
after Deductions
(Sr. No. 02-03-04)
Add - Service Tax @
..of Sr. No. 05
Net Amount Payable
(Sr. No. 05 + 06)
Amount
The bill has been checked and found correct as per order placed and entries made
in the registers.Bill is passed t accounts Department for Payments
Project
Contractor's Seal &
Management
Signature
Consultant's Seal &
Signature
Pune Divisional
Office - Officer's
Seal & Signature
MH SO - Officer's
Seal & Signature
Approving Authority
Sr.No.
Particulars
Scheduled Items
6839663.50
1325768.72
1196941.11
232009.53
Total
8036604.61
1557778.25
331108.11
64180.46
Net Total
8367712.72
1621958.71
Previous
unt(Rs.)
Total
8165432.22
1428950.64
9594382.86
395288.57
9989671.43