Escolar Documentos
Profissional Documentos
Cultura Documentos
S.No.
Width
(W)
(m)
42.00
10.00
42.00
42.00
10.70
42.00
40.60
4200.00
310.00
3423.00
3360.00
449.40
2940.00
3248.00
6.90
6.90
6.90
6.90
6.90
6.90
20.30
28980.0
2139.0
23618.7
23184.0
3100.9
20286.0
65934.4
8.49
8.49
8.49
8.49
8.49
8.49
8.49
8.49
8.49
8.49
8.49
8.49
8.49
8.49
2,45,895
18,149
2,00,405
1,96,716
26,311
1,72,127
5,59,453
30.00
30.60
918.00
20.30
18635.4
8.49
8.49
1,58,121
80.00
40.60
3248.00
20.30
65934.4
8.49
8.49
5,59,453
42.00
42.00
10.70
10.70
449.40
449.40
14.00
14.00
6291.6
6291.6
8.49
8.49
8.49
8.49
53,384
53,384
30.00
30.70
921.00
2.60
2394.60
8.49
8.49
20,318
30.00
7.00
210.00
4.90
1029.00
27.00
27.00
27,783
40.00
40.00
30.70
30.70
1228.00
1228.00
2.60
3.60
3192.80
4420.80
8.49
8.49
8.49
8.49
25.00
30.00
10.00
10.00
1004.40
250.00
300.00
3.40
5.00
4.00
3414.96
1250.00
1200.00
9.00
9.00
9.00
9.00
9.00
9.00
27,091
37,510
0
30,735
11,250
10,800
30.00
7.00
210.00
4.90
1029.00
30.00
30.00
30,870
11000 x 3 - EAF
4.00
3.60
3.60
3.60
3.60
9.76
9.76
4.00
3.00
3.00
3.00
3.00
6.36
6.36
16.00
10.80
10.80
10.80
10.80
62.07
62.07
6.90
4.20
4.20
4.20
4.20
4.20
4.20
110.40
45.36
45.36
45.36
45.36
260.71
260.71
#
#
#
#
#
#
#
8
8
8
8
8
8
8
8
8
8
8
8
8
8
883
363
363
363
363
2,086
2,086
900 x 1 - EAF
0.7
25.50
3.50
3.30
10.07
5.06
4.80
256.79
17.71
15.84
6.90
6.90
6.90
1771.82 #
122.20 #
109.30 #
15
10
10
15
10
10
26,577
1,222
1,093
4
2
2
0.2
7.70
10.07
77.54
6.90
535.02
20
20
10,700
6700 x 4- SAF
700 x 2 - EAF
600 x 2 - EAF
6000 x 2 - SAF
4800 x 2 - EAF
9.80
12.45
122.01
3.40
414.83
30
30
12,445
4.20
2.10
4.20
1.30
1.80
1.80
5.46
3.78
7.56
3.40
3.40
3.40
18.56
12.85
25.70
10
10
10
10
10
10
186
129
257
9.00
12.48
391.60
3.40
6,657
2.20
1.70
3.74
5.30
10
10
198
100.00
31.00
81.50
80.00
42.00
70.00
80.00
Unit-1&2
Unit-1
Unit-1
Unit-2
Unit-2
Unit-1
Unit-2
Room Dimensions
Ventilation
Ceiling Room Vol. O Recirc
Fresh Selected Vent Air Qty
Depth
Area
Height = = Area x u ulation
Air
(D)
=WxD
H
H
t
Air
=Maximum of
Chang
T Chang
e (t/h)
(m)
(m)
(m3)
e e (t/h)
(m3/hr)
(m2)
B
m A
Exhaust Fans
Exhaust Fans , Intake Louvers
Air Washer System
Air Washer System
Air Washer System
Air Washer System
Air Washer System
Air Washer System
Note : Equipment Capacities indicated are tentative only for bidding purpose
1331.44 #
19.82
6500 x 2 - EAF
4
2
1.7
100 x 1 - EAF
100 x 1 - EAF
250 x 1 - EAF
7500 x 1 - SAF
1
1
1
0.08
0.8
200 x 1 - EAF
0.03
Page:1/6
S.No.
Width
(W)
(m)
2.20
Room Dimensions
Ventilation
Ceiling Room Vol. O Recirc
Fresh Selected Vent Air Qty
Depth
Area
Height = = Area x u ulation
Air
(D)
=WxD
H
H
t
Air
=Maximum of
Chang
T Chang
e (t/h)
(m)
(m)
(m3)
e e (t/h)
(m3/hr)
(m2)
B
m A
1.70
3.74
5.30
19.82 #
10
10
198
0.03
2.20
1.70
3.74
5.30
19.82
10
10
198
200 x 1 - EAF
0.03
2.20
1.70
3.74
5.30
19.82
10
10
198
200 x 1 - EAF
0.03
19.20
17.00
391.60
4.50
1762.20 #
8,811
5000 x 2 - SAF
1.2
12.40
8.10
100.44
9.00
903.96
20
20
AC AREA
Service bldg.
Ground Floor (0.0M Lvl)
Reception Side Area (0.0m LVL)(A to 1/A)
Area (0.0m LVL)(1/A to 2/A)
12.40
8.50
105.40
10.00
1054.00
10
10
10,540
5000 x 2 - SAF
1.5
4.00
2.50
10.00
4.00
40.00
10
10
400
200 x 2 - EAF
0.1
2.50
1.20
3.00
4.00
12.00
10
10
120
200 x 1 - EAF
0.1
3.70
5.40
19.98
3.00
59.94
10
10
599
300 x 2 - EAF
0.08
3.70
5.40
19.98
3.00
59.94
10
10
599
300 x 2 - EAF
0.08
5.00
5.60
28.00
4.70
131.60
658
1000 x 1 - SAF
NA
3.70
5.40
19.98
3.00
59.94
10
10
599
300 x 2 - EAF
0.08
3.70
5.40
19.98
3.00
59.94
10
10
599
300 x 2 - EAF
0.08
5.00
5.60
28.00
4.80
134.40
672
1000 x 1 - SAF
NA
3.70
5.10
18.87
3.00
56.61
10
10
566
300 x 2 - EAF
0.08
3.70
5.40
19.98
3.00
59.94
10
10
599
300 x 2 - EAF
0.08
5.00
5.60
28.00
6.00
168.00
840
1000 x 1 - SAF
NA
Supply Fans
6.20
0.60
3.72
3.00
11.16
10
10
112
300 x 3 - EAF
0.08
Exhaust Fans
26.10
12.40
323.64
9.00
2912.76 #
20
20
58,255
16000 x 4 - SAF
14000 x 4 - EAF
23.00
10.00
230.00
6.00
1380.00 #
20
20
27,600
6000 x 5 - SAF
Supply Fans
Note : Equipment Capacities indicated are tentative only for bidding purpose
3.8
Page:2/6
S.No.
Width
(W)
(m)
Store room
7
10
1200X 2-EAF
7000x2-EAF
1.8
26.18
5.50
143.99
15
15
12.00
9.50
114.00
5.00
570.00
25.0
25.0
72.00
8.00
576.00
6.00
3456.00 #
20
20
69,120
9200 x 8 - SAF
9.6
20.10
8.30
166.83
5.00
834.15
20
20
16,683
4500 x 4 - SAF
2.3
20.10
8.30
166.83
5.00
834.15
20
20
16,683
4500 x 4 - SAF
2.3
39.00
17.80
694.20
9.60
6664.32 #
20
20
1,33,286
29000 x 4 - SAF
27000 x 4 - EAF
Cable Gallery
39.00
17.80
694.20
3.40
2360.28 #
18,882
33.00
17.80
587.40
5.60
3289.44 #
26,316
PAC ROOM
5.00
5.00
25.00
5.00
125.00
625
600 x 1 - SAF
Stairs area
4.80
3.70
17.76
7.20
127.87
20
20
2,557
17000 x 1 - SAF
0.4
1.80
1.80
1.80
1.80
1.20
1.20
1.20
1.20
2.16
2.16
2.16
2.16
5.30
5.30
5.30
5.30
11.45
11.45
11.45
11.45
#
#
#
#
10
10
10
10
10
10
10
10
114
114
114
114
200 x 1 - EAF
200 x 1 - EAF
200 x 1 - EAF
200 x 1 - EAF
1
1
1
1
0.02
0.02
0.02
0.02
40.00
15.00
600.00
12.00
7200.00 #
20
20
1,44,000
18000 x 4 - SAF
20.00
3.00
900.00
20
20
18,000
4500 x 4 - SAF
2.00
IDCT SWGR
Cooling Tower's Electrical /
Control Room -1
Cooling Tower's Electrical /
Control Room -2
ESP Control Bldg
Toilet
Toilet
Toilet
Toilet
11
Qty
3.40
2,160
7.70
CW Chlorination area
8
Room Dimensions
Ventilation
Ceiling Room Vol. O Recirc
Fresh Selected Vent Air Qty
Depth
Area
Height = = Area x u ulation
Air
(D)
=WxD
H
H
t
Air
=Maximum of
Chang
T Chang
e (t/h)
(m)
(m)
(m3)
e e (t/h)
(m3/hr)
(m2)
B
m A
Mens
Mens
Mens
Mens
(0.0m LVL)
(0.0m LVL)
(13.0m LVL)
(13.0m LVL)
2.6
Supply Fans
Intake Louvers
Intake Louvers
Intake Louvers
Intake Louvers
Battery rooms
7.20
6.50
46.80
3.00
140.40
30
30
4,212
0.44
PAC Room
3.30
7.20
23.76
3.00
71.28
15
15
1,069
SWGR
13.00
7.50
97.50
4.50
438.75
20
20
8775
3000 x 3 - SAF
0.98
Store Room
5.30
3.50
18.55
4.50
83.48
15
15
1252.1
1200 x 1 - SAF
0.14
Office Room
AC Area
15
15
562
600x1 - EAF
0.06
10
10
188
300 x 1 - EAF
0.02
625
600 x 1 - SAF
0.07
First Floor
12
Pantry
3.12
4.80
14.98
2.50
37.44
Toilet
3.00
2.50
7.50
2.50
18.75
5.00
5.00
25.00
5.00
125.00
Note : Equipment Capacities indicated are tentative only for bidding purpose
Page:3/6
S.No.
Width
(W)
(m)
Room Dimensions
Ventilation
Ceiling Room Vol. O Recirc
Fresh Selected Vent Air Qty
Depth
Area
Height = = Area x u ulation
Air
(D)
=WxD
H
H
t
Air
=Maximum of
Chang
T Chang
e (t/h)
(m)
(m)
(m3)
e e (t/h)
(m3/hr)
(m2)
B
m A
36.00
12.00
432.00
5.00
2160.00 #
PAC Room
4.00
4.00
16.00
5.00
80.00
Record Room
4.80
1.50
7.20
5.00
Store Room
3.00
3.40
10.20
Pantry
3.40
2.50
Gents Toilets
3.20
Qty
20
20
43,200
7200 x 6 - SAF
6.0
15
15
1,200
1200 x 1 - SAF
0.13
36.00
15
15
540
600 x 1 - SAF
0.06
5.00
51.00
15
15
765
800 x 1 - EAF
0.09
8.50
5.00
42.50
15
15
638
900 x 1 - SAF
0.07
1.50
4.80
5.00
24.00
10
10
240
300 x 1 - EAF
0.03
2.50
3.40
8.50
5.00
42.50
15
15
638
1000 x 1 - EAF
0.07
4.30
1.50
6.45
5.00
32.25
10
10
323
300 x 1 - EAF
0.04
20
20
35,200
9000 x 4 - SAF
3.91
Ground Floor
13
14
DM Area- RO building
DM Plant Building/Rroom/RO building
15
16
17
Security Room
32.00
11.00
352.00
5.00
1760.00 #
Waiting room
6.00
3.00
18.00
3.50
63.00
10
10
630
650 x 1 - SAF
0.07
5.00
3.00
15.00
3.00
45.00
10
10
450
250 x 2 - EAF
0.05
31.00
16.00
496.00
3.00
1488.00 #
10
10
14,880
1800 x 8 - SAF
1.65
117.00
3.00
351.00
10
10
3,510
1800 x 2 - EAF
0.39
Canteen
6.70
16.17
108.34
3.00
325.02
10
10
3,250
1800 x 2 - SAF
0.36
8.20
4.50
36.90
3.00
110.70
10
10
1,107
1200 x 1 - EAF
0.12
Toilets 2 nos
2.54
1.50
3.81
3.00
11.43
10
10
114
150 x 1 - EAF
0.01
Pantry (F.F)
7.54
5.30
39.96
3.00
119.89
10
10
1,199
1200 x 1 - EAF
0.13
11.50
9200.00 #
15
15
1,38,000
25000 x 6 - SAF
15.33
( G.F or F.F)
18
Quality/Chemical Lab
19
50.00
16.00
Note : Equipment Capacities indicated are tentative only for bidding purpose
800.00
Page:4/6
S.No.
Width
(W)
(m)
20
21
24
25
26
27
16.00
124.80
6.00
748.80
20
20
14,976
5500 x 3 - SAF
1.66
Toilet
2.10
1.70
3.57
3.50
12.50
10
10
125
150 x 1 - EAF
0.01
Change room
4.30
2.70
11.61
3.50
40.64
15
15
610
600 x 1 - EAF
0.07
Pump house
42.30
14.60
617.58
4.25
2624.72 #
30
30
78,741
14500 x 6 - EAF
8.75
FOPH SWGR
12.00
5.00
60.00
11.50
690.00
20
20
13,800
4000 x 4 - EAF
1.53
Toilet
1.40
3.70
5.18
3.50
18.13
10
10
181
200 x 1 - EAF
0.02
23.00
15.00
345.00
5.00
1725.00 #
30
30
51,750
8600 x 6 - SAF
5.75
50.00
50.00
2500.00
5.00
12500.00 #
20
20
2,50,000
25000 x 10 - SAF
10
27.78
12.80
39.00
499.20
5.00
2496.00 #
20
20
49,920
9200 x 6 - SAF
5.55
20.00
10.00
200.00
8.00
1600.00 #
25
25
40,000
7500 x 6 - SAF
4.44
30.00
7.10
213.00
8.00
1704.00 #
25
25
42,600
7800 x 6 - SAF
4.73
29.50
7.30
215.35
8.00
1722.80 #
25
25
43,070
7900 x 6 - SAF
4.79
32.50
9.00
292.50
5.00
1462.50 #
20
20
29,250
5500 x 6 - SAF
3.25
49.00
10.50
514.50
5.00
2572.50 #
20
20
51,450
9500 x 6 - SAF
5.72
12.00
6.00
72.00
5.00
360.00
30
30
10,800
1900 x 6 - EAF
1.20
Toilet
2.10
3.70
7.77
3.50
27.20
10
10
272
300 x 1 - EAF
0.03
PAC Room
3.50
6.00
21.00
5.00
105.00
525
500 x 1 - SAF
17.50
4.60
80.50
5.00
402.50
20
20
8,050
4000 x 2 - SAF
Dozer Shed
Shed
28
Qty
7.80
Workshop SWGR
Room Dimensions
Ventilation
Ceiling Room Vol. O Recirc
Fresh Selected Vent Air Qty
Depth
Area
Height = = Area x u ulation
Air
(D)
=WxD
H
H
t
Air
=Maximum of
Chang
T Chang
e (t/h)
(m)
(m)
(m3)
e e (t/h)
(m3/hr)
(m2)
B
m A
0.89
Stores
Note : Equipment Capacities indicated are tentative only for bidding purpose
Page:5/6
S.No.
Width
(W)
(m)
Room Dimensions
Ventilation
Ceiling Room Vol. O Recirc
Fresh Selected Vent Air Qty
Depth
Area
Height = = Area x u ulation
Air
(D)
=WxD
H
H
t
Air
=Maximum of
Chang
T Chang
e (t/h)
(m)
(m)
(m3)
e e (t/h)
(m3/hr)
(m2)
B
m A
Qty
29
10
10
100.0
6.8
680.00
20
20
13,600
3800 x 4 - SAF
1.51
30
10
10
100.0
6.8
680.00
20
20
13,600
3800 x 4 - SAF
1.51
31
25.0
6.8
170.00
15
15
2550
2700 x 2- SAF
NA
32
7.05
42.3
6.8
287.64
15
15
2550
2700 x 1 - SAF
NA
33
25.0
6.8
170.00
15
15
2550
2700 x 1 - SAF
NA
34
4.76
4.78
22.75
68.3
30
30
2048
2100 x 1 - EAF
0.23
35
4.76
5.95
28.32
85
25
25
2124
1200 x 2 - SAF
0.24
TOTAL
250
Note : 1.This is a preliminary bidding stage document. Bidder to update as per the DDE requirement and HVAC has to be considered accordingly.
2.Bidder can suggest the Supply air and exhaust Air fans configuration as per the above input data and Tender Drgs
Note : Equipment Capacities indicated are tentative only for bidding purpose
Page:6/6