Description/Scope
Major Equipments
33kV Switchgear
Engineering, Manufacturing, Testing at Works,
Transportation, Supply, Unloading, Delivered at Site
Supply,Installation/fixing of Base frames, chequer plates
and connected building works
Installation of the panels,Bolting/ tack welding of the panels
to base frames
Testing & Commissioning of the Switchgear including
ADDC witness testing
Coordination with ADDC, Final approval
1.1
a
b
c
d
e
f
1.2
a
b
c
d
e
e
f
g
h
X
X
X
X
X
The remote end works are to be essentially carried out by OEM/ADDC.
NA
X
X
X
X
X
X
X
X
X
X
X
X
X
X
1.5 LV Switchgear
a
Engineering, Manufacturing, Testing at Works,
Transportation, Supply, Unloading, Delivered at Site
b
Supply,Installation/fixing of Base frames, chequer plates
and connected civil works
c
Installation of the panels,Bolting/ tack welding of the panels
to base frames
d
Testing & Commissioning
e
Coordination with ADDC, Final approval of LV System
b
c
d
e
f
g
h
2.2
a
b
NA
Other Equipments
2.1 MV, LV Power Cables & Terminations
a
Design, Supply of MV Cable 33kv, 3c*300sq.mm (Between
Primary Substation to Project Substation-12000 meters)
Remarks
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
Page 1 of 4
SI No
Description/Scope
c
Page 2 of 4
Remarks
SI No
Description/Scope
d
2.3
a
b
c
2.4
a
b
c
2.5
a
b
c
d
e
f
g
3
a
4
a
b
c
d
5
a
b
c
d
e
6
a
c
d
5
6
7
7
a
b
c
d
e
f
X
X
X
X
X
X
X
X
X
X
X
X
X
Not applicable
X
X
Remarks
X
X
Not included, Only DMS Interface shall be provided
Not included
Not included
Not included
Not included
X
X
X
X
X
X
X
X
X
X
X
X
Page 3 of 4
SI No
8
Description/Scope
33kV SERIES REACTORS
a
Supply & installation of 33kV Series Reactor as specified
b
b
c
d
9
a
b
c
d
X
X
X
X
X
X
X
X
Earthing
a
b
c
d
e
f
g
h
i
j
k
l
m
n
o
p
q
r
General Facilities
Access to Site
Mobilization & Demobilization
Custom Fees & Duties
Transportation from Customs, warehouse, port to site
Unpacking & Material Inspections
Providing Instructions for Installation
Tools & Testing Devices for commissioning
Plant & Machinery for subcontract works (Crane, Forklift,
trailer, truck)
Site Office with basic communication facility
Labour rest area
Closed, Covered Store with lockable facility
Water & Sewage Cleaning
Temporary Power
Diesel Generator
Site Security 24x7, Site safety warning signs
Waste Disposal
Watch & Ward
Supervision of 33KV installation from ADDC substation till
plant substation
Supply of Spare Parts of equipments and Maintenance
Tools
Remarks
10
11
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
Page 4 of 4