List of PP Transport Request and their IMG Path

1) Define Distribution Keys


IMG > Production Planning for Process Industries > Master Data > Material List >
Item Data > Item Data from related areas > Define Distribution Keys

2) Determine Person responsible for Resource u2013


IMG > Production Planning for Process Industries > Master Data > Resource > Gene
ral Data > Determine Person responsible

3Define Planner GroupIMG > Production Planning for Process Industries > Master Data > Master Recipe >
Define Capacity Planner

4) Define Capacity Planner u2013


IMG > Production Planning for Process Industries > Master Data > Resource > Capa
city Requirement Planning > Determine Capacity Planner

5) Determine Standard Value Parameter u2013


IMG > Production Planning for Process Industries > Master Data > Resource > Gene
ral Data > Standard Value > Define Parameter

6) Define Setup Groups and Setup Group Categories


Define set up groups and set up categories u2013
IMG > Production Planning for Process Industries > Master Data > Master Recipe >
Data for operations and phases > Define set up groups and set up group categori
es

7) Define copy setting between plants-Process


IMG > Production Planning for Process Industries > Process Management > Tools >
Define copy setting between plants

8) Define Set Up Control Recipe destination u2013


IMG > Production Planning for Process Industries > Process Management > Control
Recipe/PI sheet > Set up control recipe destination

9Define MRP controller u2013


IMG > Material Management > Consumption based Planning > Master Data > Define MR
P controller
10) Special Procurement u2013
IMG > Material Management > Consumption based Planning > Master Data > Define Sp
ecial procurement types

11) Define Floats (Scheduled Margin Key)IMG > Material Management > Consumption based Planning > Planning > Define Float
s (Scheduled Margin Key)

12Define Splitting of Forecast requirements for MRPIMG > Material Management > Consumption based Planning > Evaluation > Forecast >
Define Splittng of forecast requirements of MRP

13) Maintain Correction Factors for Forecast


IMG > Material Management > Consumption based Planning > Planning > Procurement
> Maintain Correction factors for forecast

14 Carry Out Overall Maintenance of Plant Parameters


Maintaining plant parameters in MRP u2013
IMG > Material Management > Consumption based Planning > Plant Parameters > Carr
y out overall maintenance of plant parameters

15) Define Planning Horizon


Define Planning Horizon u2013
IMG > Material Management > Consumption based Planning > Planning > MRP calculat
ion > Define Planning Horizon

16) Activate Requirement Planning u2013


IMG > Material Management > Consumption based Planning > Planning > Activate Req
uirement Planning

17) Define Range of Coverage Profiles (Dynamic Safety Stock)


Range of coverage profile u2013
IMG > Material Management > Consumption based Planning > Planning > MRP calculat
ion > Define range of coverage profile (Dynamic Safety Stock)

18) Define Stock in Transfer and Blocked Stock Availability


IMG > Material Management > Consumption based Planning > Planning > MRP calculat
ion > Stocks > Define Stock in transfer and blocked stock

19) Define MRP Areas


IMG > Material Management > Consumption based Planning > Master Data > MRP areas
> Define MRP areas

20) Carry out maintenance of MRP groups


IMG > Material Management > Consumption based Planning > MRP groups> Carry out m
aintenance of MRP groups

21) Define Scope of total Planning - MRP


IMG > Material Management > Consumption based Planning > Planning > Define Scope
of total Planning

22 Define Order Types


Define Order TypeIMG > Production Planning for Process Industries > Process Order > Master Data >
Order > Define Order Type

23Define Order Type Dependent parameters u2013


IMG > Production Planning for Process Industries > Process Order > Master Data >
Order > Define Order Type Dependent parameters

24) Define Production Scheduler u2013


IMG > Production Planning for Process Industries > Process Order > Master Data >
Bill of Material > Define Production Scheduler

25 Define Checking Control - Process Order


Define Availability Check u2013 Define Checking Control u2013
IMG > Production Planning for Process Industries > Process Order > Operations >
Availabilty Check > Define Checking Control

26) Define Checking Rule for backorder processing u2013


IMG > Production Planning for Process Industries > Process Order > Operations >
Availabilty Check > Define Checking rule for back order processing

27Define Stock and batch determination for good movement u2013


IMG > Production Planning for Process Industries > Process Order > Operations >
Define Stock and batch determination for good movement

28) Specify Scheduling Parameters


Specify Scheduling Parameters u2013
IMG > Production Planning for Process Industries > Process Order > Operations >
Scheduling > Specify Scheduling Parameters

29) Define Reduction Strategies


Define Reduction Strategy u2013
IMG > Production Planning for Process Industries > Process Order > Operations >
Scheduling > Resource data > Define Reduction Strategy

30) Define Confirmation Parameters


Define Order Confirmation u2013
IMG > Production Planning for Process Industries > Process Order > Operations >
Confirmation > Define Confirmation Parameters

31) Define Valuation of Goods Received


Define valuation of goods receive u2013
IMG > Production Planning for Process Industries > Process Order > Integration >
Define Valuation of goods received

32) MRP creation indicator u2013


IMG > Material Management > Consumption based Planning > Planning > Define creat
ion indicator

33) Define safety stock u2013


IMG > Material Management > Consumption based Planning > Planning > MRP calculat
ion > Stocks > Define Safety Stocks

34) Define alternative determination of Production u2013


IMG > Production Planning for Process Industries > Process Order > Operations >
BOM selection > Define alternate determination of production

35) Define no. ranges u2013


IMG > Production Planning for Process Industries > Process Order > Master data >
Order > Number Ranges > Define number ranges for orders

Further you need to do Manual Configuration in PP after Transport Request tran


sfer in Production Server:

1) Define Distribution Keys


2) Determine Person responsible for Resource
3Define Planner Group4) Define Capacity Planner
5) Determine Standard Value Parameter u2013
6) Define Setup Groups and Setup Group Categories
7) Define copy setting between plants-Process
8) Define Set Up Control Recipe destination
9Define MRP controller u2013
10) Special Procurement
11) Define Floats (Scheduled Margin Key)
12Define Splitting of Forecast requirements for MRP
13) Maintain Correction Factors for Forecast

14 Carry Out Overall Maintenance of Plant Parameters


15) Define Planning Horizon
16) Activate Requirement Planning
17) Define Range of Coverage Profiles (Dynamic Safety Stock)
18) Define Stock in Transfer and Blocked Stock Availability
19) Define MRP Areas
20) Carry out maintenance of MRP groups
21) Define Scope of total Planning - MRP
22 Define Order Types
23Define Order Type Dependent parameters
24) Define Production Scheduler
25 Define Checking Control - Process Order
26) Define Checking Rule for backorder processing
27Define Stock and batch determination for good movement
28) Specify Scheduling Parameters
29) Define Reduction Strategies
30) Define Confirmation Parameters
31) Define Valuation of Goods Received
32) MRP creation indicator
33) Define safety stock
34) Define alternative determination of Production
35) Define no. ranges

Following Number ranges you need to define :

In OPPQ you need to define Number Ranges for :

Planned Orders
Reservations / Dependent Requirements
Purchase Requisitions

MRP Lists
Simulative Dependent Requirements

Similarly you need to define Number Range for :

Production Order in CO82


Confirmations in CO80
Reservations in CO83
Operations in CO81
Capacity Requirements in CO84

Same way you need to maintain all other number ranges in Production Server manua
lly. However first you need to transfer Number range object through Transport Re
quest.

Hope this helps.