Escolar Documentos
Profissional Documentos
Cultura Documentos
SCHNEIDE
REPORT PROGRESS STATUS
Project Name
Contract No.
PO No.
Scoupe Of Supply
Customer
B.
Placing to Pedestal
b.
c.
d.
e.
C.
D.
E.
F.
G.
b.
c.
Top Side
d.
Bottom Side
C.
b.
F&G
a.
b.
D.
E.
F.
G.
H.
I.
c.
d.
HVAC
a.
b.
c.
d.
e.
b.
c.
DOOR
a.
b.
FLOOR
a.
b.
OTHERS
a.
VCB Trolley for J01, J03 & M03 and VCS Trolley for M01 & M03
b.
FINISHING
a.
b.
B.
C.
D.
E.
b.
Opening / Dismantle
b.
Opening / Dismantle
b.
Opening / Dismantle
b.
b.
Assembling Bushing for Main Bus bar Line Up between Building / Module
c.
d.
e.
F.
G.
H.
I.
J.
K.
Re-Assembling Insulation Boot & Metal Partition for Main Busbar Room
b.
c.
b.
c.
d.
e.
f.
g.
h.
i.
J.
k.
l.
n.
o.
AF3 for Main Bus bar Line Up (J01-J03, terminated in J01) - PIX17
b.
AF1 for VCB Room & Cable Room (J01-J03, terminated in J01) - PIX17
c.
AF2 for VCB Room & Cable Room (M01-M03, terminated in J01) - PIX M&12
b.
c.
d.
OTHERS / FINISHING
a.
Sealants for every Jointing between Cubicle of MV SWGR (Front & Rear)
b.
Sealants for every Jointing between LV Box & VCB Room (front)
c.
Sealants for every Jointing between MV SWGR & PCR Floor (front)
d.
Change Lightning Arrester HE05 with HE06 at M01-M03 (PIX 12 & PIX M)
e.
Installing VT Fuse 6/12 kV at M03 & VT Fuse 15/24 kV at J01 & J02
f.
Progress
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
Remarks
100%
100%
50%
0%
0%
0%
0%
Waiting Material
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
0%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
FI Scope
FI Scope
FI Scope
FI Scope
FI Scope
100%
100%
100%
100%
100%
100%
100%
0%
0%
0%
NA
0%
NA
Waiting Material