Você está na página 1de 6

PT.

SCHNEIDE
REPORT PROGRESS STATUS
Project Name
Contract No.
PO No.
Scoupe Of Supply
Customer

: DMLZ CV-512 FREEPORT PROJECT


: TP1400071-001
: PO#N15548
: Supervision Installation & Rectification
: PT. Freeport Indonesia

1. Power Control Room (PCR) / Building / Module


A.

B.

Installation PCR / Building / Module each other


a.

Placing to Pedestal

b.
c.
d.
e.

Removing Separation Plate


Removing Square Profile
Installing Rubber Gasket between PCR
Jointing PCR each other

Sealants All Jointing between Building / Module (Outside)


a.
b.
c.
d.

C.

Cover Flashing All Jointing between Building/Module (Outside)


a.
b.
c.

D.

Front Side / Right Side


Rear Side / Left Side
Top Side

Canopy Installation at Front & Rear Side of Building


a.
b.

E.

Front Side / Right Side


Rear Side / Left Side
Top Side
Bottom Side

Front Side / Right Side


Rear Side / Left Side

Canopy Installation at Top of Door


a.
b.

Single Door (at B4)


Double Door (at B1)

F.

Outdoor Lamp HPS 70W Installation (3 Sets)

G.

Sealants All Jointing between Building / Module (Inside)


a.

Front Side / Right Side

b.

Rear Side / Left Side

c.

Top Side

d.

Bottom Side

2. Power Control Room (PCR) / Building / Module ACCESSORIES


A.
B.

C.

INSTALLING CU GROUNDING BAR & GROUNDING CABLE


CABLE TRAY & CABLE PIPE
a.

Rectification Cable Tray Support & Cable Pipe Installation

b.

Rectification Cable Tray Surface from Corrosion (Silver Paint / Pilox)

F&G
a.

Rectification F&G Pipe Support Installation

b.

Installation F&G Equipment / Accessories e.g. :


Cylinder, Sounder Strobe, Alarm Bell, Manual Abort & Release, Control Box

D.

E.

F.

G.

H.

I.

c.

Check Installation in F&G Control Box

d.

Rectification F&G Equipment & Pipe Surface (Red Paint / Pilox)

HVAC
a.

Installation Grill , Hepa Filter & Air Damper

b.

Installation / Assembly HVAC Box at B2

c.

Installation HVAC Cable & Pipe Conduit

d.

Sealant Inside of HVAC

e.

Check Installation in HVAC Control Box

TL LAMP, 3 WAY SWITCH, RECEPTACLE 120 & 240 VAC


a.

Check Interconnection Ordinary & Emergency TL LAMP wiring

b.

Check Interconnection 3 WAY SWITCH (Double Gang) wiring

c.

Check Interconnection REECEPTALE 120VAC & 240VAC wiring

DOOR
a.

Single Door (Re-setting Key & Installing Door Closer)

b.

Double Door (Re-setting Key & Installing Door Closer)

FLOOR
a.

Installation Vinyl Floor (Front Side)

b.

Installation Vinyl Floor (Rear Side)

OTHERS
a.

VCB Trolley for J01, J03 & M03 and VCS Trolley for M01 & M03

b.

Assembly Knock Down Table / Desk inside PCR

FINISHING
a.

Inside Building / Module Wall Cleaning (White Paint / Pilox)

b.

Outside Building / Module Wall Cleaning (Orange Paint / Pilox)

3. 13.8 KV - MV SWITCHGEAR (PIX) & INTERCONNECTION


A.

B.

C.

D.

E.

LINE UP Installation / Jointing


a.

Front Line up Jointing

b.

Rear Line up Jointing

METAL Partition to Main Bus bar Room


a.

Opening / Dismantle

b.

Re-Closing / Re-assembling / Re-Installation

END PANEL Rectification in PIX 12 due to Dented


a.

Opening / Dismantle

b.

Re-Closing / Re-assembling / Re-Installation

SCREN PARTITION / VT Draw Out at Cable Room


a.

Opening / Dismantle

b.

Re-Closing / Re-assembling / Re-Installation

MAIN BUSBAR LINE UP jointing between Building / Module


a.

Opening Metal Partition, Insulation Boot & Couple Alu Busbar

b.

Assembling Bushing for Main Bus bar Line Up between Building / Module

c.

Assembling RST Main Bus bar Line Up between Building / Module

d.

Torsion of RST Main Bus bar Line Up between Building / Module

e.

F.
G.

H.

I.

J.

K.

Re-Assembling Insulation Boot & Metal Partition for Main Busbar Room

CU GROUNDING BAR LINE UP jointing between Building / Module


LV BOX Installation
a.

Installation Wiring Rectification in LV Box

b.

SEL Communication Cable Interconnection between MV SWGR

c.

Plug Connection / Interconnection between Line Up MV SWGR

Interconnection Cable inside Building / Module


a.

Interface Box 1 wiring interconnection / Plug Connection at B4

b.

Interface Box 2 wiring interconnection / Plug Connection at B3

c.

Interface Box 3 wiring interconnection / Plug Connection at B2

d.

Interconnection between PIX MV SWGR

e.

Interconnection F&G wiring / Continuity Check

f.

Interconnection HVAC wiring / Continuity Check

g.

Interconnection 120/240 VAC Board wiring / Continuity Check (from CPT)

h.

Interconnection 120 VAC Board wiring / Continuity Check (From UPS)

i.

Interconnection 125 VDC Board wiring / Continuity Check

J.

Interconnection CLX Panel wiring / Continuity Check

k.

Interconnection Battery wiring / Continuity Check (AMETEX)

l.

Interconnection UPS Panel wiring / Continuity Check (AMETEX)

n.

Interconnection 480 MCC Panel wiring / Continuity Check

o.

Interconnection RP Panel wiring / Continuity Check

Installation ARC FLASH SENSOR CABLE


a.

AF3 for Main Bus bar Line Up (J01-J03, terminated in J01) - PIX17

b.

AF1 for VCB Room & Cable Room (J01-J03, terminated in J01) - PIX17

c.

AF2 for VCB Room & Cable Room (M01-M03, terminated in J01) - PIX M&12

VCB 1250A & VCS 400A for Outgoing / Incoming MV SWGR


a.

4 unit VCB & 4 Unit VCS , Clean up & Insertion to MV SWGR

b.

Mechanical Check : Rack-In & Rack-Out

c.

Manual Operation : Charging , Open & Close

d.

Check Mechanical Interlock (e.g. with ES , with Door)

OTHERS / FINISHING
a.

Sealants for every Jointing between Cubicle of MV SWGR (Front & Rear)

b.

Sealants for every Jointing between LV Box & VCB Room (front)

c.

Sealants for every Jointing between MV SWGR & PCR Floor (front)

d.

Change Lightning Arrester HE05 with HE06 at M01-M03 (PIX 12 & PIX M)

e.

Installing VT Fuse 6/12 kV at M03 & VT Fuse 15/24 kV at J01 & J02

f.

Touch Up for Paint Ral 7032 & Cleaning MV SWGR Room

PT. SCHNEIDER INDONESIA

Progress
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

100%
100%
100%
100%

100%
100%
100%

100%

Remarks

100%
100%

50%
0%
0%
0%
0%

pipe FnG outside


broken

Waiting Material

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

0%
0%

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

Waiting complete installation

Rectification handling with Pak Arthur Team

100%

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
FI Scope
FI Scope
FI Scope
FI Scope
FI Scope
100%
100%
100%
100%
100%
100%
100%

0%
0%
0%
NA
0%
NA

Waiting Material