Você está na página 1de 11

Sheet1

BOQ FOR ELECTRICAL WORKS


SL
NO.

DESCRIPTION OF ITEM / WORK

UNIT QTY

PART - A : ELECTRICAL WORKS


Energy Meter Cubicle :
Fabrication, Supply, Installation, testing & Commissioning of enery
Meter cubicle made out of 16 SWG CRCA sheet with view glass and
consisting of following (Complete with all interconnections and
powder coated painting - to be fixed outside the building) :

Separate chamber for 3-Ph energy meter with provision for fixint
CTs, Cutouts & switchgear etc.
3 Nos.125A Open Type bakelite cutout fuse unit with 80A HRC
b
fuses
1 no. 125A 4 pole MCCB 25 KA MDS (to be connected through
c
shunt trip coil)
Shunt trip coil (to be connected to Red Box for emergency tripping)
d
a

Set

Emergency Off Box (Red Box):


Supply & Installation of 230V, 2 Element, SP Red Push Button
mounted on a suitable metallic enclosure (red colour painted) with
nos.
all interconnections so as to trip the Incomers of DG & KSEB at AMF
on pushing the button.
3
CABLE LAYING AND TERMINATIONS :
a Cable :
Supply, laying and dressing of the following size of 1.1 KV grade
PVC insulated armoured cable with aluminium conductor concealed
or clamped on wall / ceiling / trench / cable traylamps if necessary.
i

3.5x 50 Sq.mm AYFY XLPE (Main Cable) mtr.


Page 1

100

RATE /
UNIT

TOTAL RATE

Sheet1

ii

4 x 35 Sq.mm AYFY XLPE (From DG set to Change over Switch)

mtr.

100

mtr.

25

4x10 Sq.mm AYFY XLPE( LDB) mtr.


b Service Wire (for Sign Board & Light etc.):
Supply and laying of 2x4 sq.mm weather proof alumjinium service
mtr.
wire for Board Light Connection (if there is no provision to fix the
board light to the branch).
c Cable end Terminations :
End termination of the following size of cables using flange type
cable glands and heavy duty tinned aluminium crimping type cable
sockets including gland earthing.

25

iii

4 x 25 Sq.mm AYFY XLPE Cable (To AC VDB and UPS DB)

iv

i) 3.5x50 Sq.mm AYFY


ii) 4 x 35 Sq.mm AYFY
iii) 4 x 25 Sq.mm AYFY
v) 4x10 Sq.mm AYFY

nos.
nos.
nos.
nos.

50

8
8
8
8

CHANGE OVER SWITCH :i) UPS Change Over (ROTARY) :


Supply erection testing and commissioning of 3 Nos. 40A rotary
type change over switch (with THREE contacts) in suitable metal
Set
box with 6 Nos. LED indicator for input / output identification. UPS
Output change over switch board.
ii) Main COS (Manual) :
Supply and installation of 125A, 4P ON LOAD Change Over Switch
with suitable metallic enclosure with cable entry box and powder
Set
coat painted and with 6 nos. LED indicators for the indication of
KSEB or DG Set supply seperately (3-Phases each) with neat
marking
5
Main Switch Board :
Page 2

Sheet1

i) Vertical Distribution Box (VDB):Supply, Installation, testing and commissioning of Double door 8
Way VTPN MCCB Vertical DB consisting of the following along with
all accessories including shunt trip coil (Complete with all
interconnections)
a
125A, 25 kA TP MCCB as Incomer
Set
c
32/40A, TP MCB (C-Series) for LDB + Spare - 2 Nos.
63A, TP MCB (C Series) as AC + UPS + ATM + Spare - 5 Nos.
b
c
d
e
6

20A/32A, SP MCB (C-Series) - 2 Nos. & 10A SP MCB - 1 No.


125A Copper busbar for 3 phases
Shunt Trip Coil

Distribution Boxes :i) LDB : Supply, Installation, testing and commissioning of Double door dust
and vermin proof 4 way ETPN MCB DB consisting of the following
(with complete interconnections)
Incomer : 40A,4P 30mA ELCB + MCB - 1No
Out goings : 6/10 'B' Series MCB - 12 Nos

Set

Set

ii) ACs / UPS Input etc. : Supply, Installation, testing and commissioning of Double door dust
and vermin proof 4 way VTPN MCB DB consisting of the following
(with complete interconnections) for i/p to UPS & ACs etc.
Incomer : 63A,4P 100mA ELCB + MCB - 1No
Out goings : 32A TP MCB - 4 Nos. and 20/32A SP MCB - 3 Nos
(OR) Out goings : 32 A - TP MCB - 1 No. & 20/32A SP MCB - 9
Nos
Page 3

Set

a
for Acs
for UPS / PDB
b
iii) UPS Output Control : Supply, Installation, testing and commissioning of Double door dust
and vermin proof 8 way SPN MCB DB consisting of the following
a (with complete interconnections - For Counters) terminated in
set
Electrical Room with One no. of 15 A Plug.

In comer : 40A, 2 pole MCB isolator - 1 No.


Out Going : 6A / 16A MCB - 6 Nos.
Supply, Installation, testing and commissioning of Double door dust
and vermin proof 4 way SPN MCB DB consisting of the following
b (with complete interconnections - For Server) terminated in
set
Electrical Room with One no. of 15 A Plug.

Sheet1

In comer : 40A, 2 pole MCB isolator - 1 No.


Out Going : 6A / 16A MCB - 2 Nos.
7

ISOLATORS :
i) for UPS Output & Board Light :Supply and Installation of Single Door 6/ 8 Way DB with 3 nos. of
40A, 2 Pole Isolators in suitable metallic enclosure connected in
UPS O/P circuit in Electrical Room
ii) for ACs (3-Ph only) :
Supply and Installation of Single Door 4Way DB with 25A, 4P
Isolator in suitable metallic box for the local control of the 3 phase
airconditioners (in Banking Hall Only for local control)

iii) for Board Light :


Supply & fixing of Single Door 2 way DB with 32 A DP MCB in
suitable mettallic box for local control of Board Light
8
Plug & Sockets :
Page 4

nos.

nos.

nos.

Sheet1

Supply and fixing of following Modular type switches/ plugs / sockets


mounted on suitable box.
3 pin socket - 25 A Modular type socket & Top controlled by 20A
i) / 25A C series MCB on metallic/PVC enclosure for UPS input /.

nos.

for UPS
3 pin socket - 25A Modular type socket with suitable metallic/PVC
nos.
ii) enclosure controlled by a separately located 25A Modular type
DP Switch for air conditioners.
3 Pin Socket - 3 no. x 5/15 A controlled by individual indicator
nos.
switches (for UPS output Termination)
3 Pin Sockets - 2 no. x 5A & 1 no. x 5/15 A controlled by 1 no. x
iv) 15 A switch with indicator (strictly to be followed for UPS Supplly
)

iii)

Counters (1 each) + Cash Cabin(2)

7
2

nos.

22

Counters (1 each) + Cash Cabin(2) nos.


Manager Cabin
Doctors Cabin
3 Pin Sockets - 1 no. x 5/15A controlled by 1 no. x 15 A switch
vi) with indicator in separate location (With plug top)

18

nos.

Manager's Cabin (2) + Server Room (4) (All these should be


connected to Server UPS DB Only - TWO separate sub Circuits
from 2 MCBs)
c
Other Places/doctors cabin
3 Pin Socket - 2 no. x 5A controlled by 2 no. x 5 A switch (strictly
v) to be followed for KSEB supply in counters)
b

a
b
c

Page 5

Sheet1

Banking Hall for kiosk (1 No.) + Server Room for Router (1 No.) nos.

CAC(2Nos)
Strong Room( 2 Nos(1 KSEB + 1 UPS).)
3 Pin Sockets - 1 no. x 5A controlled by 1 no. of 5 A Switch in
vii) separate location
Banking Hall nos.
Other Location
Strong Room (for UPS & KSEB Output Point)
3 Pin Sockets - 1 no. x 5A controlled by 1 no. x 5 A switch (to add
nos.
viii)
to common switch board)
2 Pin Sockets - 2 no. x 5A (on pillers or in separate location - for
nos.
ix) wall mounted fans / Token no displays at counters etc.).
a
b

9
i)
ii)
iii)
iv)
v)
vi)
vii)

Lights, Fixtures & Fans etc.


Supply & installation of Philips FBS 300P5 fixture with 2 x 36 W
CFL lamps on ceiling
Supply & installation of 15 Watts Philips BBS 170 type LED light
fitiing with lamps and white reflector on false ceiling (UPS Light
points)
Supply and fixing of Slim T5 Philips type tube set with lamp on
wall /ceiling.
Supply and fixing of Bulk Head Lamps
Supply and installation of 12" size medium duty exhaust fan.
(UPS Room) Crompton Greaves (Necessary wall cutting & finishing
to be done by Contractor)
Supply and Installation of 400 mm sweep wall fan. (Crompton
Greaves / Usha)
Supply amd installation of 1200 mm sweep ceiling fan. (Crompton
Greaves High Speed)
Page 6

5
10

nos.

25

nos.

15

nos.

12

nos.

nos.

nos.

15

nos.

Sheet1

a
b

Supply and providing fan hook on ceiling. nos.


Supply and Installation of step type modular electronic regulator .
nos.

Supply and providing fan rod with painting (upto 1m length - if


required)
viii) Supply & installation of calling bell
10 Point Wiring for Light, Fan etc. :
Supply all materials and wiring through wall floor etc,
concealed/surface as per colour code with 1.5 sq mm P V C
insulated stranded copper wire for the points and 1.5 sq mm
P.V.C.insulated green colour stranded copper wire as continous
earth for points, with independent earth wire for each circuit,through
ISI grade 20 / 25 mm PVC conduit, including all accessories as per
i)
IS 9537 part II and installation of factory made MS boxes, 2 plate
model modular switches and three plate ceiling rose / connectors etc
of approved make for light/ exhaust fan/ calling bell etc. Number of
cables in conduit should be limitted to the IS standards and as per
the conditions laid down in the tender. Check nuts should be
provided in the PVC conduits in switch boxes, DB etc.PVC bush to
switch- 1boxes
/ DB to protect
the
point controlled
by 1 switch
a be provided in the conduitsAsinabove
chipping
thecontrolled
floor/wallbyetc
and
As above
- 2 points
1 switch
b insulation. The cost includes
replastering
etc,
if
required.
c
As above - 3 points controlled by 1 switch
11 Circuit / Sub circuit Wiring :
Supply and wiring wall / floor etc. / recessed / surface as per colour
code with the following size PVC Insulated copper wire along
with given earth wire for phase neutral and earth conductor with
i) standard colour coding, through ISI marked rigid PVC conduit of
given size with all accessories. The rate includes the cost of
complete wiring from switch box to switch box.
c

Page 7

6
6

nos.

nos.

nos.
nos.
nos.

75
5
2

Sheet1

2 x 1.0 Sqmm PVC Copper wire in 20 mm dia conduit for for


Emergency Stop Box Connection
3 x 1.5 Sqmm PVC Copper wire with in 20 mm dia conduit (The
b rate includes the cost of complete wiring between individual switch
boards)
c 3 x 2.5 Sqmm PVC Copper wire with in 20 mm dia conduit (for
lighting main circuit, 15A plug points & UPS point wiring & 1T AC)
d 5 x 4 Sq.mm PVC Copper wire with in 20 mm dia conduit. (for 3Ph circuits like 3-Ph AC / UPS)
3 x 4 Sq.mm PVC Copper wire with in 20 mm dia conduit. (for
e 1.5/2Tonne AC and UPS I/P & O/P upto UPS O/P DB and for Sign
Boards if there are multiple Nameboards)
12 Earthing & Earth Conductors :
Providing Plate earth Pits as per IS 3043 with 600x600x3.0 mm
GI/CI earth plate, 20 mm GI pipe, filled with sufficient charcoal &
i) others along with construction of ispection chamber & other
necessary works.
a

Supply and laying of the following size of bare copper conductor


iii) along with cables, for interconnections between panels, DBs, COS,
DG Set & Earth Pits etc.
3 X 10 SWG copper conductor without conduit (along with 35 sq.
a
mm & 50 sq. mm cables)
b 2 X 10 SWG copper conductor without conduit for 25sq mm Cable
1 X 10 SWG copper conductor without conduit (i.e. along with 10
c
sq.mm cable)
1 X 6 SWG copper conductor without conduit (i.e. for DG Set
d
Earthing)
e
1x 6 SWG Body earthing and UPS earthing
20mm PVC conduit (to be used for the conductors which expose to
f
weather)

Page 8

Mtr.

30

Mtr.

800

Mtr.

600

Mtr.

300

Mtr.

200

Mtr.

200

Mtr.

50

Mtr.

25

Mtr.

50

Mtr.

50

Mtr.

20

Sheet1

Supply & Installation of 25x3 mm tinned Copper Earth Bench of 30


nos.
iv) cm long for termination of main earth conductors and other
interconnecting earth conductors of UPS & KSEB
13 Others :
Marking of Panels, DBs, its switch and fuse ratings, cable size,
location etc (Neat identification from top to extreme load end of both
light and power distribution including KSEB / UPS plug sockets and
a
LS
generator switchb oards) using white / black paint and stencil. (free
hand writing not allowed). Good quality stickers may also be used.
Charges for preparation of single line diagram of the whole electrical
b installation using AutoCAD, lamination and displaying it inside the
UPS room.
Charges for preparation of single line diagram of the whole
c telephone cabling using AutoCAD, lamination and displaying it
inside the Server Room.
Service charge for liaisoning works with KSEB / Electrical
Inspectorate authorities on behalf of bank for getting / enhancement
of suitable permanent power connection, shifting/replacement of
d
suitable energy meter, submission of completion report, drg.s etc. &
all other necessary works in this regard.
Service charge for liaisoning works with KSEB / Electrical
e Inspectorate authorities on behalf of bank for getting all required
approvals for installing & running higher capacity DG Set.
TOTAL AMOUNT (A) :
PART - B TELEPHONE
Supply and wiring using 2 pair telephone cable 20mm PVC conduit
from the EPABX to the individual points. One separate cable for
1
each point. Number of cables in one conduit limited to 5.
Page 9

LS

LS

Ls

LS

Sheet1

2 pair telephone cabling mtr.


5 pair telephone cabling (for KRONE & double modular sockets)
mtr.
2

Supply and fixing of RJ 11 type modular telephone socket on


suitable PVC / metal boxes.
Telephone socket - single (modular type 1/ counter + 1 in BM Cabin

nos.

Telephone socket - double (modular type) - For BM + Kiosk in


nos.
Banking Hall
Supply and installation of KRONE connector telephone junction box
3
nos.
of 10 pair.
TOTAL AMOUNT (B) :
PART - C DATA CABLING
1 Supply and laying of CAT 6 UTP cable through 25mm dia rigid PVC
conduit with all accessories etc.(2 run for SBI Connect also)
m
2 Supply and installation of 4U wall mounted type rack.
No.
(HCL make) as per site need
3 Supply and fixing of CAT 6 Modular Information outlet with SM box
No.
on wall / partitions etc.
4 Supply and Installation of CAT6 24 port patch panel in the 4U wall
No.
mounted type rack.
5 Supply and installation of CAT6 24 port switch in the 4U wall
No.
mounted type rack(1000mbps).
6 Supply and installation of 1 m long patch chord.(CAT 6)
Nos.
7 Supply and installation of 2 m long patch chord. (CAT 6)
8 Supply and installation of 3 mlong patch chord. (CAT 6)
TOTAL AMOUNT (C) :

Page 10

300
100

12
2
2

500
1
20
2
2
10

Nos.

Nos.

Sheet1

TOTAL (A+B+C) :

VAT @ ______________% of D

Service Tax Contractor's Portion @___________ % of D

Grand Total (D+E+F)

GRAND TOTAL IN WORDS:-

Page 11

Você também pode gostar