1.0
INTRODUCTION
This specification establishes the Quality Assurance requirements to
be met by Contractors (including turnkey contractors) and vendors.
In case of any conflict between this specification and other
provisions of the contract / purchase order, the same shall be
brought to the notice of HPCL, at the stage of bidding and shall be
resolved with HPCL, prior to the placement of order.
2.0
DEFINITION
2.1
Bidder
For the purpose of this specification, the work Bidder means the
person(s), firm, company or organization who is under the process
of being contracted by HPCL/Owner for delivery of some products
(including service). The word is considered synonymous to supplier,
contractor or vendor.
2.2
Correction
Action taken to eliminate the detected non-conformity.
Refers to repair, rework of adjustment and relates to the
disposition of an existing non-conformity.
2.4
Preventive Action
Action taken to eliminate the causes of a potential nonconformity,
defect or other undesirable situation in order to prevent occurrence.
2.5
Process
Set of inter-related resources and activities which transform inputs
into outputs.
2.4
Special Process
Page42 of 175.
3.0
3.1
3.1.1
3.1.2
The bidder shall submit milestones chart showing the time required
for each milestone activity and linkages between different milestone
activities along with overall time period required to complete the
entire scope of work.
3.1.3
3.1.4
The bidder shall submit, along with the bid, a manual or equivalent
document describing / indicating / addressing various control / check
points for t he purpose of quality assurance and the responsibilities of
various functions responsible for quality assurance.
3.2
and submit
manpower
and
resource
Page43 of 175.
3.3.1
During job execution, the bidder shall fully comply with all quality
documents submitted and finalized / agreed against the requirements
of this specification. Approval of HPCL on all these documents shall
be sought before start of work.
3.3.2
3.3.3
3.3.4
4.0
4.1.1
Page44 of 175.
4.2
The bidder shall plan the contract scope of work on quality plan
format such that no major variation is expected during delivery of
contract scope of work. These quality plan shall be made on
enclosed format complete in all respect. The quality plan shall be
assumed to be detailing bidders understanding and planning for the
contract / offered scope of work. The bidder shall plan the type of
resources including various work methodology which he agrees to
utilize for delivery of contract scope of work.
4.3
4.4
4.5
For all documents which the bidder is likely to utilise for delivery of
contract scope of work, a system must exist which assures that
latest / required version(s) of the document(s) is available at all
location / point of use.
4.6
4.7
Page45 of 175.
4.8
4.9
4.10
4.11
4.12
4.13
4.14
Page46 of 175.
4.15
For all special processes, bidder shall deploy only qualified performers. Wherever
HPCL observes any deficiency, the bidder shall arrange the adequate training to
the performer(s) before any further delivery of work.
Page47 of 175.
MEASUREMENT OF WORKS
1.1
1.2
1.3
1.4
1.5
No other payment either for temporary works connected with this contract
or for any other item such as weld, shims, packing plates etc. shall be
made. Such items shall be deemed to have been included for in the rates
quoted.
1.6
1.7
i)
Weights
MT or Kg.
ii)
Length
M (Meter)
iii)
Number
No.
iv)
Volume
Cu. M.
v)
Area
Sq. M.
Page48 of 175.
SCOPE
This specification covers the requirements of design, materials,
manufacturing, testing and inspection at Vendor's works of Low Voltage
switchgear for voltage not exceeding 1000 V A C.
2.0
Page49 of 175.
IS: 3155
3.0
Voltage transformer
IS: 3231
Electrical relay for protection
IS: 1248
Indicating instruments
IS: 722
Integrating instruments
IS: 6875
Control switches and push buttons
IS: 1822
AC motor starters of voltage not exceeding
1000 V
Indian Electricity Act and Rules (as amended
up to date) and approval of FIA of India.
CONSTRUCTIONAL FEATURES FOR WALL MOUNTED PANELS
3.1
The major parameters of the switchgear and other required features are
given in Annexure-1.
3.2
3.3
3.4
All sheet steel work shall be thoroughly cleaned of rust, scale, oil,
grease, dirt and swarf by pickling, emulsion cleaning etc. The sheet
steel shall be phosphate and then painted with two coats of zinc rich
primer paints. After application of the primer, two coats of finished
synthetic enamel oven baked / stoved, paint shall be applied or powder
coated.
3.5
Painting shall be with 2 coats of epoxy primer along with two coats of PU
paint [Anti corrosive paint]. Paint shade shall be confirmed with the
client. Alternatively they can be powder coated after proper cleaning.
The thickness of painting shall be between 70-80 microns.
3.6
4.0
4.1
The major parameters of the switchgear and other required features are
given in Annexure-1.
4.2
4.3
4.4
Page50 of 175.
4.6
Removable gland plates shall be provided for power and control cables.
The gland plates shall be 3mm thick for panel with breaker cubicles and
2mm thick for other cubicles. The gland plates for single core cables
shall be of non-magnetic material.
4.7
All sheet steel work shall be thoroughly cleaned of rust, scale, oil,
grease, dirt and swarf by pickling, emulsion cleaning etc. The sheet
steel shall be phosphated and then painted with two coats of zinc rich
primer paints. After application of the primer, two coats of finished
synthetic enamel ovenbaked / stoved, paint shall be applied or powder
coated.
4.8
4.9
Each switchgear cubicle shall be fitted with a label in the front and back
of the cubicle. Each switchgear shall also be fitted with label indicating
the switchgear designation, rating and duty. Each relay, instrument,
switch, fuse and other devices shall be provided with separate labels.
4.10
4.11
4.12
The size of the Panels shall be designed in such a way that the internal
space is sufficient for hot air movement and the electrical component
does not attain temperature more than 45c. All electrical components
shall be derated for 50c.
4.13
Removable gland plates shall be provided for power and control cables.
The gland plates shall be 3mm thick for panel with breaker cubicles and
2mm thick for other cubicles. The gland plates for single core cables
shall be of non-magnetic material.
4.14
completely
metal
enclosed,
busbar
compartment
running
Page51 of 175.
4.15.1
4.15.2
4.15.3
4.15.4
4.15.5
All bus bar connections shall be done by drilling holes in bus bars and
connecting by chromium plated or tinned plated brass bolts and nuts.
Additional cross-section of bus bar shall be provided in all Panels to
cover up the holes drilled in the bus bar. Spring and flat washers shall
be used for tightening the bolts.
4.15.6
All connections between bus bars and circuit breakers / switches and
cable terminals shall be through aluminium strips of proper size to carry
full rated current and suitable for connecting required cable. These
strips shall be insulated with insulating tapes.
4.15.7
4.15.8
4.15.9
The bus bar shall be arranged such that minimum clearance between the
bus bars to be maintained as below:
Between phases : 25 mm. minimum
Between phases and neutral : 25 mm.
Between phases and earth : 25 mm.
Between neutral and earth : 20 mm. Minimum
Page52 of 175.
4.16.1
4.16.2
4.16.3
4.16.4
4.16.5
5.0
5.1
Air break switches shall be of the heavy duty, group operated loadbreak, fault-make type.
5.2
5.3
Whenever solid link are used for the connections between switches and
fuses, such links shall be fitted with insulated sleeves. Whenever the
links are of less than 100 mm length where sleeves cannot be fitted,
taping is acceptable.
5.4
5.5
5.6
It shall be possible to open the door only when the switch is in the 'off'
position.
5.7
Page53 of 175.
FUSES
6.1
6.2
Fuses shall be provided with visible indication to show that they have
operated.
6.3
6.4
6.5
7.0
MOTOR STARTERS
7.1
DIRECT-ON-LINE STARTERS
7.1.1
7.2
7.2.1
7.2.2
7.2.3
8.0
CONTACTORS
8.1
8.2
8.3
Class of coordination for starter module shall be class '2' as per IS13947.
9.0
Page54 of 175.
9.1
9.2
9.3
'Stop' push button of the starter and hand reset device shall be separate
from each other.
9.4
Overload relay hand reset push button shall be brought out on the front
of the compartment door.
10.0
10.1
Switch and contactor rating for various motor starter modules shall be
selected by the bidder as per Type-2 co-ordination though the same is
indicated in SLD. BIDDER shall also select appropriate ratings for HRC
fuses and ranges for thermal overload relays and indicate the same in
the bid. These details shall be subject to the HPCL'S approval.
11.0
11.1
11.2
11.3
12.0
12.1
12.2
12.3
The MCBs shall be flush mounted and shall be provided with trip free
manual operating mechanism with mechanical `ON and `OFF
indications.
12.4
The circuit breaker dollies shall be of the trip free pattern to prevent
closing the breaker on a faulty circuit.
Page55 of 175.
12.5
The MCB contacts shall be silver nickel and silver graphite alloy and tip
coated with silver. Proper arc chutes shall be provided to quench the arc
immediately.
12.6
MCBs shall be provided with magnetic fluid plunger release for over
current and short circuit protection. The overload or short circuit device
shall have a common trip bar in the case of DP,TP and TPN miniature
circuit breakers. All the MCBs shall be tested and certified as per Indian
Standards, prior to installation.
13.0
CURRENT TRANSFORMERS
13.1
The CTs shall be dry type and withstand momentary and short time
current ratings of the associated switchgear. For feeders with fuse, CTs
shall have withstand capacity equal to let-through current of associated
fuse.
Measuring CTs - 10VA, accuracy Class 1.0 and ISF of 5 Protective CTs
- 10 VA, accuracy class of 5P20.
CTs shall be provided with test links in both secondary leads for carrying
out current and phase angle measurement.
14.0
14.1
14.2
15.0
15.1
Terminals
15.1.1
15.1.2
All auxiliary wiring shall be carried out with 660/1100 volts grade, single
core, stranded copper conductor with FRLS PVC insulation. The sizes
of wire shall be not less than 4 mm for power wiring, 2.5 mm per lead
of CT circuits and 1.5 mm per lead of other circuits.
15.1.3
Terminal blocks shall be of stud type, 1100 volts grade, 10 amps. rated
complete with insulated barriers. Terminal blocks for CTs and VTs shall
be provided with test links and isolating facilities and CT terminals shall
be disconnecting type and shall have short circuiting and earthing
facility.
15.1.4
Page56 of 175.
15.1.5
15.1.6
Horizontal PVC wire way with screwed covers shall be provided at the
bottom/top to take interconnecting control wiring between different
vertical sections.
15.2
Indicating Instruments
15.2.1
15.2.2
Digital Multi Function Meter: The meter shall be of digital type with RS485
port. It should measure KW, KVA, KVAR, V, I, PF etc.
15.3
Protective Relays
15.3.1
All protective relays shall be in draw-out cases with built-in test facilities.
Necessary test plugs shall be supplied loose and shall be included in
the VENDOR'S scope of supply. All auxiliary relays and timers shall be
supplied in non-draw-out cases. All relays shall be of self reset type
except lockout relay unless otherwise specified. Externally operated
hand reset flag indicators shall be provided on all relays and timers.
Timers shall be of electromagnetic or electronic type only.
15.4
Switches
15.4.1
15.5
15.5.1
15.5.2
A name plate with the Panels designation in bold letters shall be fixed at
top of the central panel. A separate name plate giving feeder details
shall be provided for each feeder module door.
15.5.3
15.5.4
15.5.5
Page57 of 175.
adhesives.
15.6
15.6.1
15.6.2
The danger notice plate shall indicate danger notice both in Hindi and
English and with a sign of skull and bones.
15.6.3
The danger notice plate, in general, shall meet the requirements of local
inspecting authorities.
15.6.4
15.6.5
The danger notice plate shall be made from minimum 1.6 mm. thick mild
steel sheet and after due pre-treatment to the plate, the
same shall be
painted white with vitreous enamel paint on both front and rear surface of
the plate.
15.6.6
The letters, the figures, the conventional skull and bones etc. shall be
positioned on plate as per recommendation of IS: 2551-1982.
15.6.7
The said letters, the figures and the sign of skull and bones shall be painted
in signal red colour as per IS: 5-1978.
15.6.8
The danger plate shall have rounded corners. Location of fixing holes for
the plate shall be decided to suit design of the Panels.
15.6.9
15.7
15.8
16.0
Indicating lamps shall be transformer operated low voltage rated and shall
be supplied complete with translucent covers to diffuse the lamplight.
Colour shade for the indicating lamps shall be as below the LED shall be
22.5 mm and self coloured:
ON indicating lamp : Red
OFF indicating lamp : Green
TRIP indicating lamp : Amber
PHASE indicating lamp : Red, Yellow, and Blue
17.0
EARTHING
Page58 of 175.
17.1
17.2
17.3
17.4
18.0
SPARE PARTS
The BIDDER shall furnish a list of recommended spare parts for two
years operation along with unit prices.
19.0
19.1
Type test reports for the switchgear and circuit breakers shall be furnished
along with the tender and subsequently.
19.2
19.3
Type and routine test report shall be submitted for the approval of
HPCL/TPI before the equipment is dispatched. Bound copies of test reports
shall be furnished along with the switchgear.
19.4
All meters and other reference devices used for testing shall have valid
calibration from reputed national laboratories/institutes. Inspection by
HPCL/TPI will not be carried out unless the vendor confirms that calibrated
equipment are ready for proceeding with the tests.
19.5
Equipment shall not be dispatched unless the test certificates are duly
approved by the HPCL/TPI
20.0
20.1
20.2
20.3
20.4
Page59 of 175.
20.5
Itemised bill of material for each module, listing all devices mounted and
also
otherwise
furnished
like
cable
glands, indicating
the
MANUFACTURERs type, rating, quantity & special notes, if any
20.6
20.7
20.8
20.9
Space heater ratings and numbers provided per cubicle and the internal
distribution scheme for the same, for each switchgear
20.10
TEST CERTIFICATES
20.11
INSTRUCTION MANUALS
Handling at site.
g) Erection.
h) Precommissioning tests.
i)
Operating procedures.
j)
Maintenance procedures.
Page60 of 175.
Annexure-1
1.0
1.1
1.2
Effectively earthed
1.3
457 V
1.4
240 V
1.5
2500 VOLTS
B) CONTROL CIRCUITS
1500 VOLTS
2000 VOLTS
1.6
BY BIDDER
1.7
REFERENCE AMBIENT
TEMPERATURE
50C
1.8
MAXIMUM TEMPERATURE OF
BUSBARS, DROPPERS AND
CONTACTS AT CONTINUOUS
CURRENT RATING UNDER SITE
REFERENCE AMBIENT
TEMPERATURE
1.9
2.0
B) DYNAMIC RATING
SWITCHGEAR PARTICULARS:
DESIGNATION
BUSBAR
Type
Mounting
CABLE
ENTRY
TOP (T) /
BOTTOM
(B)
Page61 of 175.
2.1
Essential loads
Panel
As per
SOQ/SLD
Compartmentalized,
Fixed type,
Single/Double front
as per site
conditions
Floor
/Stand
mounted
Bottom
2.2
MOV/DBBV
panel
As per
SOQ/SLD
Non
Compartmentalized,
Fixed type, Single
Front
Floor
/Stand
mounted
Bottom
2.3
HVLR PDB
As per
SOQ/SLD
Non
Compartmentalized,
Fixed type, Single
Front
Wall/ Stand
mounted
Bottom
2.4
Main Lighting
DB/Panel
As per
SOQ/SLD
Non
Compartmentalized,
Fixed type, Single
Front
Floor/Stand
Mounted
Bottom
2.5
RIM SEAL DB
As per
SOQ/SLD
Non
Compartmentalized,
Fixed type, Single
Front
Wall/ Stand
mounted
Bottom
2.6
As per
SOQ/SLD
Non
Compartmentalized,
Fixed type, Single
Front
Wall/
Structure
mounted
Bottom
2.7
As per
SOQ/SLD
Non
Compartmentalized,
Fixed type, Single
Front
Wall/
Structure
mounted
Bottom
2.8
As per
SOQ/SLD
Non
Compartmentalized,
Fixed type, Single
Front
Wall/
Stand
mounted
Bottom
3.0
3.1
THICKNESS OF SHEET
STEEL
3.2
Base Channel
Page62 of 175.
3.3
DEGREE OF PROTECTION
AS PER IS:13947
IP-52
3.4
INTERIOR / EXTERIOR
RL7032-Siemens gray
3.5
EARTHING BUS
MATERIAL
GI
SIZE
50 x 6 mm
3.6
Bus Bar
3.7
Aluminum 91 E
SMC
Epoxy Moulded ( Resin )
Fibre Glass / Poly Carbonate Of Minimum
1.5 Mm Thick And To Be Of Fr4 Class
0.8 Amp. / mm
Aluminium
GI
3.9
Bus Joints
3.10
Panel lifting
3.11
HPCL'S EARTHING
CONDUCTOR
3.12
CLEARANCES IN AIR OF
LIVE PARTS
4.0
STARTERS
4.1
TYPE
3.8
4.2
AC3
4.3
UTILISATION CATEGORY
AS PER IS:13947
AC3
4.4
CONTROL SUPPLY
4.5
SINGLE PHASING
PREVENTOR REQUIRED
YES
Page63 of 175.
4.6
MANUAL
5.0
MCCBS
5.1
5.2
5.3
RATED BREAKING
CAPACITY (AT 415V 0.25
P.F.)
Refer SLDs
5.4
5.5
Refer SLDs
5.6
ON/OFF OPERATION :
MANUAL
YES
REMOTE POWER
OPERATED
YES
Page64 of 175.
1.0
SCOPE
This specification covers the design, construction features,
manufacture, inspection and testing at Vendors/his Sub-Vendors
works, delivery at site and performance testing at site of L.T. shunt
capacitors and accessories used for power factor improvement.
2.0
2.1
3.0
CONSTRUCTIONAL FEATURE
3.1
3.2
The rated voltage of the capacitor shall be selected such a that, it shall
provide the rated kVAR at the service voltage of 415V.
3.3
3.4
3.5
4.0
OPERATIONAL FEATURE
When the emergency panel is fed from the transformer, capacitor
banks shall remain connected to the busbar of an emergency panel
and supply reactive power.
When the incomer of an emergency panel is transferred to DG set
Page65 of 175.
TEMPERATURE RISE
The temperature rise above the specified ambient of any part of the
capacitor and associated equipments shall not exceed the maximum
permissible temperature as specified in IS : 13585 / 13925.
6.0
6.1
6.2
Type test certificates for similar capacitor units shall be furnished with
the bid.
6.3
All testing instruments shall be calibrated with proper validity and have
traceability to National Standards.
Page66 of 175.
Annexure-1
1.0
GENERAL
1.1
APPLICATION/DESIGNATION
1.2
ITEM NO.
1.3
QUANTITY
1.4
RATED CAPACITY
KVAR
AS per SLD
1.5
RATED VOLTAGE
VOLTS
415 V
1.6
FREQUENCY
Hz
50
1.7
NO OF PHASES
1.8
0.99
1.9
EXPECTED DISTORTION
FACTOR
2.0
DESIGN REQUIREMENT
2.1
AMBIENT TEMPERATURE
50
2.2
TEMPERATURE RISE
40
2.3
TYPE
2.6
INSULATION LEVEL
2.7
SIZE OF CABLE
2.8
2.10
2.11
3.0
DISCHARGE DEVICE
P.F. IMPROVEMENT
AS per SLD
C
C
ALL
POLYPROPYLENE
(Double Layer)
660V
YES/NO
AS per Cable
Schedule
NO
SHALL BE PART OF
AN EMERGENCY
PANEL
DELTA
RESISTOR
3.1
RATED VOLTAGE
660
4.2
RATED RESISTANCE
OHMS
BY BIDDER
4.3
WATTS
BY BIDDER
4.4
6.0
SERIES REACTOR
6.1
APPLICATION
BY BIDDER
To minimize inrush
and to restrict impact
of harmonics due
Page67 of 175.
lighting load
6.2
TYPE/MAKE
6.3
NO. OF PHASES
6.4
BIL
kV
6.5
FREQUENCY
Hz
50
6.6
REACTANCE IN OHMS/IN
PERCENTAGE
6.7
CURRENT RATING
6.8
6.9
VOLTAGE RATING
KV
BY BIDDER
6.10
AMP
BY BIDDER
6.11
TYPE OF SHIELDING
MAGNETIC/NON-MAGNETIC
6.12
TYPE OF COOLING
7.0
SPECIAL TESTS TO BE
CONDUCTED
AIR CORED
3
BY BIDDER
AMP
BY BIDDER
BY BIDDER
BY BIDDER
OIL/AIR
AIR
AS PER IS
Page68 of 175.
SCOPE
1.1
2.0
2.1
2.2
IS 3975 : 1988
IS 4826 : 1979
IS 5831 : 1984
IS 6380 : 1984
IS 6474 : 1984
IS 7098 (Part1) :
1988
IS 7098 (Part2) :
1985
IS 8130 : 1984
IS:1885-(Part32)
(1993)
tapes for
Page69 of 175.
IS:3961-(Part4)
(1968)
IS:10462
(1983)
3.0
(Part
1)
IEC:60540& 60540A
ASTM: D2863
IECAS-61-402
NEMAWC5
IECAS-66-524
NEMAWC5
SPECIFICATIONS
The following aspects are applicable for all the types of cables covered in
this specification.
3.1
Page70 of 175.
Conductor
Conductor shall be composed of high conductivity aluminium wires.
Conductors shall be stranded, grade H4, Class 2 as per IS 8130 and
shall be circular or sector shaped.
3.1.2
Conductor Screening
Conductor screening shall be provided over the conductor by applying
non-metallic semi-conducting XLPE by extrusion method.
3.1.3
Insulation
Insulation for cables shall be extruded crosslink polyethylene (XLPE) and
shall conform IS-6474 and the thickness of Insulation shall be as per
Table 2 of IS 7098, Part-2.
3.1.4
Insulation Screening
Insulation screening shall be provided over the insulation by applying nonmetallic semi-conducting XLPE by extrusion method. Copper tape
screening having short circuit withstand of 0.3kA for 1 sec shall be
provided on Insulation.
3.1.5
Core Identification
Colour coding shall be used for code identifications.
3.1.6
Inner Sheath
Inner sheath shall be extruded type ST2 PVC and thickness shall be as
per Table 3 of IS 7098 (Part 2 )1988.
3.1.7
Armour
Armouring for the cables shall comprise galvanised steel or hard drawn
aluminium, in the form of round wires or strips. The size of armour shall
be as per Table 4 of IS 7098 (Part 2 ) 1985.
3.1.8
Outer Sheath
The Outer sheath shall be extruded ST-2 PVC, elastomer. Thickness of
outer sheath shall be as per Table 5 of IS 7098 (Part- 2) 1988. The
sheath shall be resistant to water, ultra violet radiation, fungus, termite
and rodent attacks. The colour of the outer sheath shall be black for
power and control cables and Green for earthing cables.
Page71 of 175.
3.2.1
Conductor
Conductor shall be composed of plain annealed high conductivity copper
wires or aluminium wires.
Wires up to 1.5.mm2 shall be either solid or stranded in case of copper
conductor and solid in case of aluminium conductor.
Wires above 1.5 Sq. mm shall have stranded conductors. Conductors
having cross sectional area up to 25 mm2 shall be circular and above 25
mm2 may be circular or sector shaped.
Aluminium conductor, stranded, grade H4, Class 2 as per IS 8130
(conductors for insulated electric cables and flexible cords).
Annealed, stranded Copper Conductor, Class 2 as per IS 8130.
3.2.2
Insulation
Insulation for cables shall be extruded crosslink polyethylene (XLPE) and
shall conform IS-6474 and the thickness of Insulation shall be as per
Table 3 of IS 7098 (Part 1)-1988.
3.2.3
Core Identification
Colour coding shall be acceptable for all cables upto 5 cores. Cables with
more than 5 cores shall have printed numerals on each core.
3.2.4
Inner Sheath
Inner sheath shall be extruded type ST2 PVC and thickness shall be as
per Table 5 of IS 7098 (Part I ).
3.2.5
Armour
Armouring for the cables shall comprise galvanised steel or hard drawn
aluminium, in the form of round wires or strips. The size of armour shall
be as per Table 6 of IS 7098 (Part I ) 1988.
3.2.6
Outer Sheath
The Outer sheath shall be extruded ST-2 PVC, elastomer. Thickness of
outer sheath shall be as per Table 8 of IS 7098 (Part I) 1988. The sheath
shall be resistant to water, ultra violet radiation, fungus, termite and
rodent attacks. The colour of the outer sheath shall be black for power
and control cables and Green for earthing cables.
Page72 of 175.
4.0
4.1
Oxygen Index
Flammability
i.
Cables shall pass test under fire conditions as per IS-10810- Part-53.
ii.
Cables shall also pass tests as per IS-10810 Part- 61 & Part-62.
iii. Fire survival cables in addition to tests (i) and (ii) above shall pass
tests as per IEC-331.
Sampling for these tests is to be done randomly once for each order
provided outer sheath remains same. The acceptance criteria for tests
conducted shall be as under:Part-61:- The cable meets the requirement if there is no visible damage
on the test specimen within 300mm from its upper end.
Part-62:- The maximum extent of the charred portion measu8red on the
test sample should not have reached a height exceeding 2.5 m above the
bottom edge of the burner at the front of the ladder
4.2
Page73 of 175.
4.4
4.5
4.6
4.7
Page74 of 175.
Only FS Cables: CWZ tests for FS cables as per BS 6387. Test certificate
with respect to this test (not older than one year) from recognized testing
laboratory to be furnished for review by Third Party Inspection Agency
before dispatch clearance of cables. In case test certificates are not
available, test is to be conducted by vendor at his own cost in any
recognized test laboratory or in house testing laboratory, before dispatch
clearance of cables. Sampling for this test is to be done randomly once
for each order, provided type of insulation remains same.
5.0
6.0
Cable Drums
6.5
6.6
Page75 of 175.
The BIDDER shall indicate in the offer, the maximum length for each size
of cable, which can be supplied on one drum. The actual length supplied
on each drum shall be within tolerance limit of +5% with an overall ceiling
of +2% on total ordered quantity of each size of cable.
Cables shall be supplied in drum lengths as follows, if not specified
6.7.1
-1000 m.
6.7.2
Power cables from 10 sq. mm upto and including 300 sq. mm -500m.
6.7.3
6.7.4
6.7.5
6.8
6.9
7.0
7.5
Cable Catalogs
Page76 of 175.
7.6
Sr.
no.
1
2
3
4
5
6
7
8
9
(i)
(ii)
(iii)
(iv)
(v)
10
(i)
(ii)
11
(i)
(ii)
12
(i)
(ii)
13
14
15
(i)
(ii)
(iii)
Page77 of 175.
Description
Calculated Dia. over I/Sh.(mm)
ARMOUR
Material
Type of Armouring
Nominal Dimension of strip (mm)
Calculated Dia. over armour (mm)
OUTER SHEATH
Material
Minimum Thickness....(mm)
Appr. Overall Dia. of cable (mm)
Appr. Weight of cable (kg / km)
20
Approx. gross weight (Cable + drum) kg for std. length as per cl.21
21
22
23
24
25
26
27
28
7.7
Test Certificates
7.7.1
Type/Routine test certificates for all types of cables included in the order
and special tests on FRLS/FS cables.
7.7.2
7.7.3
Page78 of 175.
Page79 of 175.
Page80 of 175.
Page81 of 175.
Page82 of 175.
Page83 of 175.
Page84 of 175.
Page85 of 175.
SCOPE
2.0
3.0
3.1
4.0
4.1
4.2
4.3
4.4
4.5
Cable glands shall be flame proof nickel plated brass, double compression
type suitable for outdoor termination in the classified area. They shall be
CMRS tested and certified and CCOE approved.
4.6
Cable glands, and blind / blanket plugs, shall be part of the delivery and
shall be of metric type. Actual Cable Outer diameter will be furnished to
successful bidder.
4.7
4.8
Page86 of 175.
4.10
The enclosures shall be treated and prepared for painting with two coats of
anti corrosive epoxy paint with light grey colour (shade no. 631 of IS-5)
both internal & external surfaces.
4.11
4.12
4.13
All cable entries shall be MT thread type and glands / plugs shall also be of
MT thread type.
4.14
5.0
5.1
5.2
The rated voltage for Ex-type junction boxes shall be low voltage (<500),
for lighting, motor and small power.
5.3
The enclosures shall be treated and prepared for painting with two coats of
epoxy paint with final light grey colour (shade no. 631 of IS-5) both internal
& external surfaces.
5.4
5.5
6.0
MARKING
6.1
6.2
6.3
Ex-type installation material shall have a name plate with the information
required by IEC 60439-1.
6.4
6.5
Each device installed in the Ex-type junction box, each terminal strip and
each indicating and operating element, shall be identified with permanently
attached tags or labels.
6.6
6.7
Page87 of 175.
7.0
CERTIFICATION
7.1
8.0
8.1
All Junction Boxes shall be routine tested in accordance with the relevant
standards. Bidder shall submit the routine test reports to HPCL/TPI for
review before dispatch of the equipment.
8.2
9.0
MAINTENANCE REQUIREMENTS
9.1
9.2
10.0
10.1
10.2
10.3
10.4
Page88 of 175.
1.0
1.1
ITEM
SECTION: C
SHEET 1 OF 1
UNIT
1.2
Rated current
1.3
Area Classification
Zone 2, IIC, T4
1.4
Housing material
1.5
Protection type
IP65
1.6
No. of Terminals
1.7
Incoming cable
1.8
Outgoing cable
1.9
Page89 of 175.
SECTION: C
SHEET 1 OF 1
1.0
2.0
3.0
IS 2206
(Part1 & 2)
4.0
IS 5571
5.0
6.0
7.0
8.0
IS-5
9.0
IEC 60079
10.0
IEC 60529
11.0
12.0
13.0
14.0
Page90 of 175.
SECTION : C
1.0
LITERATURE / DRAWINGS
TEST CERTIFICATES
3.1. The manual shall furnish catalogue numbers of all components liable to be
replaced during the life of the fixtures/ equipment.
3.2. Any special instructions regarding assembling and handling of Junction
Boxes.
Page91 of 175.
SCOPE
1.1
This specification covers the requirements of Cabling System Installation Work. The
installation, testing and commissioning of the complete cabling system shall be carried out in
accordance with the enclosed General Notes & Details, the HPCLs typical and specific
project drawings, and as stipulated in this specification.
1.2
The installation work shall include unloading at site, transportation to contractors stores /
yard / workspot, storing in contractors stores / yard, erection, jointing / termination, testing,
commissioning and any other work items necessary for completing the job.
1.3
The CONTRACTOR shall furnish all supervision, labour, tools, welding equipment, tackles
and testing equipment as required for installation work. All incidental hardware and
miscellaneous items such as saddles, spacers, nuts/ bolts / washers, anchor fasteners,
cable route and joint markers and protective covers for buried cables / GI wire, earthing as
required for the cabling installation shall be deemed to be included by the CONTRACTOR as
part of the installation work.
1.4
Civil Works for cable trenches is included in the scope of Contractor. In addition to this,
minor civil works such as making holes / grooves in floor slab / wall, and patching up in an
approved manner any holes made in the walls / floors shall be done by the electrical
CONTRACTOR, embedment of short lengths of conduits, plates in floors, walls, etc., if not
already done by civil CONTRACTOR shall be deemed to be included in the scope of
electrical CONTRACTOR. The Electrical CONTRACTOR shall work in co-ordination with
the civil, air-conditioning, piping and equipment installation CONTRACTORs at site.
1.5
1.6
Any change in routes of cables which are required to be made to suit site conditions shall be
carried out by the CONTRACTOR in consultation with the HPCL and after his approval. All
such changes shall be incorporated by the Contractor in the relevant project drawings and in
cable schedules for which the HPCL will furnish floppies of original drawings / cable
schedules. The contractor shall take Plots / Prints as the case may be after incorporating all
changes carried out at site and forward the same along with soft copy to HPCL for further
action.
1.7
All thefts and damage of cables or equipment to which cables are to be connected, till the
installation is handed over to the HPCL, shall be made good by the CONTRACTOR.
1.8
CONTRACTOR shall also arrange for dewatering of trenches, pits, manholes, tunnels,
sumps, etc., by using diesel or portable electric pumps.
2.0
2.1
The cabling system installation work shall comply with the latest applicable Standards,
Regulations and Safety Codes of the locality where the installation is carried out including
fire insurance regulations and standards. Nothing in this specification shall be construed to
relieve the CONTRACTOR of this responsibility.
Page92 of 175.
The installation work shall conform to the latest applicable Codes of Practices, Electricity
rules, Fire Insurance Regulations and Standards indicated in Data Sheet A2 and installation
notes and details.
3.0
ITEMISED SCOPE
3.1
CABLE LAYING
3.1.1
The CONTRACTOR shall install, test and commission power and control cables. The unit
rates quoted should be firm for any addition or deletion of quantities.
3.1.2
The cables shall be laid in built-up trenches, directly buried in ground, on cable trays, vertical
raceways, clamped on structures / walls / ceiling, pulled through pipes and conduits, etc., as
per the relevant cable installation practice notes and typical / project drawings.
3.1.3
The scope of cable laying shall include laying, pulling cables as above, proper dressing of
cables, supply and installation of cable fixing saddles, spacers and nylon cord for tying as
required.
3.1.4
The work of excavation, backfilling, etc., associated with direct burial of cables shall be
separately indicated as per clause 3.4 to follow.
3.2
CABLE INSTALLATION
3.2.1
CONTRACTOR shall furnish unit rates to supply, install, connect, test and charge cables for
power and control as required. Where unit rates for any particular size or No. of cores of a
particular type of cable are not available at the time of actual installation, unit rates for that
particular size or number of cores shall be extrapolated from the rates available for other
sizes / cores for that type of cable. HPCLs decision in this regard shall be final and binding
on the CONTRACTOR. Unit rates quoted for installation of cable shall be same irrespective
of method of laying.
3.2.2
The unit rates quoted for cable installation shall include supply and installation of
accessories like cleats, clamps, identification tags and associated hardware. Unit rates shall
be applicable for the actual length laid (as measured between the cable lugs at the two ends
of a cable), irrespective of the route and method of laying.
3.2.3
The rates for cable installation shall include additional clamping of the cables to cable trays
and cable supporting arms by means of cable ties / strips (including supply) at 1.5 m
intervals, in their horizontal run, after installation of cables. Interval of clamping shall be 1.5
m for cable trays in vertical disposition.
3.2.4
Sizes and approximate quantity of various cables to be installed are listed in price schedule
of this specification.
3.3
CABLE TERMINATION
3.3.1
All cables shall be terminated at both ends. CONTRACTOR shall clearly note that all
charges for connecting cables to various equipment shall not be included under individual
equipment installation charges, and shall be included under unit prices for cable
terminations. Cables shall be additionally supported near the entry point of equipment in
order to avoid the whole weight of the cables, coming on to the gland plate / cable box. The
CONTRACTOR shall quote unit prices for termination of cable at one end, for each type /
size of cable.
3.3.2
The scope of termination at each end shall include dressing, and connecting all the cores of
the cables. The following shall be included in the scope of work :
Page93 of 175.
Making the requisite holes on the gland plate of the switchgear / any other panel, fixing
glands, terminating the cables in the cable boxes, mounting of core balance CT on the cable
where called for,earthing the cable armour, crimping of cable lugs on each, neatly clamping
the cables inside switchgear / panel cable alleys, wiring troughs and connecting to terminals
as per the HPCLs wiring diagrams and schedules. The cable and core identifying tags and
core identifying ferrules respectively shall be supplied and installed by the CONTRACTOR
as a part of cable termination work.
3.3.3
3.3.4
Cost of supplying and Installation works of cable glands, cable lugs and cable termination
kits shall not be included under unit rates for cable termination. These shall be furnished
under a separate schedule for each type / size of cable. Where these are supplied by the
respective equipment suppliers, unit rates for termination only shall apply.
3.3.5
The equipment will be generally provided with undrilled gland plates for cables / conduit
entry. The CONTRACTOR shall be responsible for punching, drilling of gland plates,
painting and touching up. Holes shall be made by gas cutting / drilling.
3.3.6
Control and instrumentation cables / cable cores entering control panel / switchgear / MCC /
miscellaneous panels shall be neatly run in PVC channels/ trough or bunched, clamped and
tied with cable ties to keep them in position. Brick-casing to the opening for cables in MCC
room shall be provided. Sealing shall be provided in GI pipe at the location where cables
enters the MCC room.
3.3.7
The CONTRACTOR shall tag / ferrule all control cable cores at all terminations, as instructed
by the HPCL. The panels where a large number of cables are to be terminated and cable
identification may be difficult, each core ferrule shall include the complete cable number as
well as the terminal number, as per the drawing.
3.3.8
Spare cores shall be similarly tagged / ferruled / cross ferruled with a suffix letter S along
with cable numbers and coiled up after end sealing.
3.3.9
All cable entry points shall be sealed and made vermin and dust protected.
openings shall be effectively sealed.
Unused
3.3.10 If the cable-end box or terminal enclosure provided on the equipment is found unsuitable
and requires modifications, the same shall be carried out by the CONTRACTOR, as directed
by the HPCL.
3.4
3.4.1
The installation of buried cables shall conform in all respects to the details shown in
Standard Dwg as per OISD 149.Attached vide Annexure A1.
3.4.2
Total cost of supplying quality brick covers (having compressive strength greater than or
equal to 35kg/m2) for HV,medium and low voltage cables, route markers, and supply of
sand below and above the cables shall be included in the rate of directly buried cables on
cubic metre basis. It is the responsibility of the CONTRACTOR to estimate the quantities of
protective covers, markers & sand required to complete the job from the drawing.
Page94 of 175.
Wherever hard rock strata is observed at depth of less than 750 mm depth, cables shall be
laid in HDPE pipes of suitable size(ISI marked) as approved by HPCL. Job to be completed
as described in SOQ Item. Cost inclusive of excavation, supply & laying bricks, sand, HDPE
pipes & backfilling.
3.4.4
3.5
3.5.1
All cable racks, vertical raceways and supporting steel shall be installed at the locations
shown in the various layout drawings.
3.5.2
The rate quoted for installation shall include all hardware, welding materials, touch-up paint
and other consumables. No separate rates shall be admissible for accessories like elbows,
tees, reducers, etc.. These shall be included in the straight run measurements. However,
the cable tray installation rates shall not include the rates for steel supports which are
covered under a separate item. The CONTRACTOR shall also include earthing of the cable
trays at distance not exceeding 10 Mtrs interval.
3.5.3
Installation rates shall be same for horizontal or vertical run / disposition of cable trays.
3.6
3.6.1
All cable trays shall be covered by painted / galvanised MS sheet covers with 16 guage
sheets.
3.6.2
The scope of work shall include the supply and installation of these trays with covers
including hardware and excluding structural steel.
3.7
Cable Tray Mounting Arrangements, Vertical Raceways and Cable Carrier Structures.
3.7.1
The CONTRACTOR shall install the following as per relevant enclosed drawings / general
notes :
3.7.2
(a)
Mounting arrangements for cable trays. Any cable trays junction bends which are nonstandard shall be fabricated using standard steel sections to suit installation drawings.
(b)
Vertical cable raceways and accessories (angles and plates) required to seal the floor
openings in the case of indoor raceways.
(c)
(d)
Supporting steel for junction / marshalling boxes, push-buttons, vertical structures for
clamping trefoil cables, cable-boxes if mounted below switchgears, etc., as required.
The above mounting structures / cable racks shall be fabricated from standard structural
steel members as indicated in enclosed drawings (channels, plates, angles, and flats). The
approximate estimated quantity of steel are furnished in price schedule and the rate for the
same shall be quoted separately. Unit rates quoted shall hold good for any addition and
deletion in quantities furnished.
Page95 of 175.
However, in cases where no such embedded steel inserts are available, the CONTRACTOR
shall have to secure supports from walls / floors by suitable anchoring by using anchor
fasteners at no extra cost to the HPCL.
3.7.4
The cable racks and supports shall be painted after installation with one coat of red lead
primer, one coat of oil primer followed by two finishing coats of black paint.
3.7.5
The successful BIDDER shall determine the actual requirements of structural steel members
based on the cable tray layout drawings which would be furnished by the HPCL. The
quantities indicated in schedule of prices are tentative and for guidance only.
3.7.6
The unit rate quoted shall also include galvanised nuts, bolts and washers as well as welding
works required for fabrication and installation.
3.8
3.8.1
The CONTRACTOR shall install all conduits / pipes required for the cable work as per
enclosed drawings / notes. The sizes and approximate quantities shall be as indicated in
price schedule.
For crossing the road / rail track, cables shall be laid in concrete cable ducts/ hume pipes/ GI
pipes. 25% spare duct /pipe openings / pipes shall be available.
3.8.2
The CONTRACTORs scope of construction work for directly buried pipes / conduits shall
include excavation and back filling as per project drawings. The BIDDER to indicate unit
rates for this scope on per cubic metre basis.
3.8.3
Conduits/pipes shall be laid buried in ground, laid along the walls/structural members, along
floors and ceilings. Conduits and pipe sleeves which are required to be embedded in walls,
roof slabs. floors, trench and tunnel walls, under roads and tracks etc. will in general be
furnished in places wherever necessary by the HPCL for the portion of civil work completed
until the CONTRACTOR for cabling work reaches site. However, in places where such pipe
sleeves have not been provided by the HPCL, the CONTRACTOR shall install conduit/pipe
sleeves by breaking walls/floors as required by the ENGINEER to HPCLs satisfaction. All
conduits/pipes shall have their ends closed by caps until cables are pulled.
3.8.4
Water-proof sealing shall be done for all outdoor to indoor conduit/pipe sleeves by means of
bell mouth termination pieces and bitumen based cold set water-proof compound. The
water-proof sealing of pipe sleeves shall be as per the typical enclosed drawings. The
supply rates of the necessary water-proof/fire-proof sealing compounds shall be separately
indicated by the CONTRACTOR.
3.8.5
The scope of installation of conduits/pipes as indicated in the above clauses 3.8.2 and 3.8.3
shall include supply and installation of all accessories like tees, elbows, pull-boxes, conduit
end plugs, bell-mouths, GI wire for cable pulling, GI saddles, spacers, screws, nuts and
bolts.
3.8.6
The scope of work shall include preparing and laying of the compound. The supply and
installation rates for the compound shall be indicated separately by the CONTRACTOR and
the installation of steel accessories required for closing the opening shall be as indicated
earlier.
3.9
CABLE JOINTS
3.9.1
No cable joints are allowed in the new cables of equipments, however if cable joints are
unavoidable in old cables, Cable Jointing to be carried out .Feasibility of Providing Joint Kit
shall be checked at site . Otherwise Junction box shall be used for Cable jointing purpose.
Page96 of 175.
JUNCTION/MARSHALLING BOXES
3.10.1 The CONTRACTOR shall install junction/marshalling boxes wherever indicated in the project
drawings for the convenience of marshalling several cables at a local point near the
equipment or central to various field mounted equipments. The estimated sizes and quantity
of these boxes are as indicated in price schedule.
3.10.2 The scope of installation of junction/marshalling boxes shall be mounting on walls, columns,
structures, including necessary bolts, nuts, screws, and welding work as necessary.
3.11
3.11.1 Each cable shall be tagged with numbers that appear in the cable schedule.
3.11.2 The tag shall be aluminium with the number punched on it and securely attached to the
cable/conduit by not less than two turns of 20SWG GI wire conforming to IS:280. Cable tags
shall be of rectangular shape for cables.
3.11.3 Location of cables laid directly underground shall be clearly indicated with cable marker
made of galvanised steel plate.
3.11.4 Location of underground cable shall be indicated with cable marker. Wherever junction
boxes are provided for cable joint of control cable, the CONTRACTOR shall indicate in as
built drawing indicating location of junction boxes and submit the same to HPCL. Location of
underground cables entering the building shall be clearly indicated with a cable entry marker,
made out of galvanised steel plate.
3.11.5 The marker shall project 150mm above ground and shall be spaced at an interval of 30
metres, and at every change in direction. They shall be located on both side of road and
drain crossings. Top of cable marker/joint marker shall be sloped, to avoid accumulation of
water/dust on marker.
3.11.6 Cable tags shall be provided on all cables at each and (just before entering the equipment
enclosure), on both sides of a wall or floor crossings, on each duct/conduit entry, and at
every ten (10) metres in cable tray runs. Cable tags shall also be provided inside the
switchgear, motor control centres, control and relay panels, etc., cable identification is also
required where number of cables enter together a gland plate.
Cable route markers shall be provided along straight runs of the cable and at locations
approved by the engineer-in-charge, at intervals generally not exceeding 30 meters
MOC details:
Board material - 18" X 9"
Aluminium composite panel (white); Lettering - 3M vinyl 3630-22 ;
Frame - M S white pipe, powder coated;
Structural support - 1" square pipe, powder coated
Cable route marker should carry following min. details :
abcd-
3.11.7 The price of supply and installation cable tags shall be included in the installation rates for
cables/conduits quoted by the BIDDER.
4.0
WORK DETAILS
4.1
CABLING
Page97 of 175.
Standard cable grips and reels shall be utilised for cable pulling. If unduly difficult pulling
occurs, the CONTRACTOR shall check pull required and suspend further pulling until
further procedure has been approved by the HPCL. Maximum pull tension shall not exceed
recommended value for the cable measured by dynamometer. In general any lubricant that
does not injure the overall covering and does not set up undesirable conditions of
electrostatic stress or electrostatic charge may be used in pulling insulated cables in
conduits and ducts. In particular soap shall not be used as lubricant. For cables over 1100V
volts and having non-matallic jackets without adequate static shielding, the lubricant should
not include hygroscopic greases that will leave a conducting film on the surface of the cable.
After pulling cable, the CONTRACTOR shall record cable identification and data pulled,
neatly with water-proof ink on linen tags at all cable ends. This is in addition to the cable
identification tags to be tied by GI wire at each end of the cable as shown in standard
drawing enclosed in notes and details.
4.1.2
Cable drum schedule shall be prepared by contractor to avoid joints and to minimise
wastage. Cable splices will be made only after obtaining permission of the HPCL Splices
where permitted, shall be made in a neat workman like and approved manner by specialists
in this class of work, particular attention being paid to higher voltage splices and splices
involving armour or lead sheath construction. Before splicing, insulated cables shall have
conductor insulation stepped and bound or pencilled for recommended distance back from
splices to provide a long leakage path. After splicing, insulation equal to that of the spliced
conductors shall be applied at each splice. In baring conductors for splices, care shall be
taken to avoid kinking of strands.
4.1.3
Cables shall be protected at all times from mechanical injury and from absorption of moisture
at unprotected ends. Damaged cables shall be replaced at the CONTRACTORs expense.
4.1.4
Sharp bending and kinking of cables shall be avoided. The bending radii for various types of
cables shall not be less than those specified in cable installation notes. If shorter radius
appears necessary, no bend shall be made until clearance and instructions are obtained
from the HPCL.
4.1.5
Where cables cross roads they shall be run in hume pipes. The depth of burial of the pipes
shall be as indicated on project drawings; however, it shall not be less than 600mm.
4.1.6
GI pipes shall be used at the drain crossings, All G.I. Pipes shall be laid as per layout
drawings and site conditions. Before fabrication of various profiles of' pipes by hydraulically
operated bending machine (which is to be arranged by the contractor) all the burrs from the
pipes shall be removed. GI Pipes having bends shall be buried in soil / concrete in such a
way that the bend shall be totally concealed. For G.I. pipes buried in soil, bitumen coating
shall be applied on the buried lengths, Installation of G.I. pipes shall be undertaken well
before paving is completed and necessary co-ordination with paving agency shall be the
responsibility of Electrical Contractor
Following guide shall be used for sizing of G.I. pipe.
a) 1 cable in a pipe - 53% of pipe cross-sectional area occupied by cables.
b) 2 cables in a pipe - 31 % of pipe cross-sectional area occupied by cables.
c) 3 cables in a pipe - 43% of pipe cross-sectional area occupied by cables.
d) 4 and above cables in a pipe - 40% of pipe cross-sectional area occupied by cables.
The trench cut through the road-ways or other paved areas inside building shall be restored
to the same density and materials as in the surrounding areas at no extra cost. Black-toping
of the road will, however, be not done by the contractor
4.1.7
When power cables are laid in the proximity of communication cables, minimum separation
between power and communication cables shall be not less than 460mm Page98
for single-core
of 175.
Installation of directly buried cables shall be carried out as per typical enclosed drawings of
installation practice and the relevant standards.
The end portions of directly buried cables shall be protected as indicated in the relevant
enclosed typical drawings, by bringing out the cables from earth at the entry/exit points in
conduits/pipes.
4.1.9
Cable on cable racks, in cable trays and upon emerging from conduits shall be formed to
avoid bearing against edges of trays, racks, conduits or their supports upon entering or
leaving trays, racks or conduits. Cables in horizontal runs in trays shall be tied by 3mm
nylon cord to the cable trays. Sequence of cables transversely in trays shall avoid
unnecessary crossing of other cables when some of the cables make turns into lateral trays,
or upon entering or leaving a run of tray. Cables shall be laid flat in trays, with allowance for
angles, offsets and branches. Cables shall then be restrained temporarily in an approved
manner on one side of each angle, branch or offset in turn, cables shall be formed to the
change in tray direction so that the finished cable will lie flat and straight in the tray in a neat
and approved manner without restraint and without looping out of trays along straight runs
of trays, on any change of direction. Where excess length has been fed into a tray ,such
excess length shall be backed out of tray as cable is formed at bends and is trimmed flat and
straight in trays, and finally out to correct length upto its terminal point. Where cabinet,
cubicle, switchgear or other terminal point for cable are equipped with cable or wiring trays
or through gutters, the CONTRACTOR shall pull sufficient length of each cable to permit
neat arrangement of all entering cables, with leads formed and clamped as each conductor
is brought to its terminal connection. Cables shall be clamped at every 1.5 meters on the
trays/racks slotted channels in trenches.
4.1.10 Cables shall be clamped along walls, ceilings, columns, structures, compound walls etc. on
emerging out from trenches, trays, embedded conduits etc. before they are connected at
equipment terminals/enter into junction boxes etc.
The arrangement and interval of clamping of cables shall be as per the relevant enclosed
cable installation drawings. Control and power cables shall be clamped separately. It will be
responsibility of the CONTRACTOR to check the neatness of such cable runs and to see
that horizontal/vertical runs of cables are parallel to fixed axes in respective plans.
4.1.11 The CONTRACTOR shall make connections to small electrically operated devices on
equipment installed as accessories to, or assembled with other equipment and requiring twowire or three-wire connections. Connections to recording instruments, float switches, limit
switches, pressure switches, thermocouples, thermostats and other miscellaneous
equipment shall be done as per the MANUFACTURERs drawings and schedules.
4.1.12 The CONTRACTOR shall be responsible for correct phasing of the motor power connections
and shall interchange connections at the motor terminal box, if necessary after each motor is
test run.
4.1.13 TERMINATIONS:
a)
All PVC cables up to 1100V grade shall be terminated at the equipment by means of
compression type cables glands suitable for the cable size. They shall have a screwed
nipple with conduit electrical threads and check nut. The cables shall be identified close to
their terminations points at both the ends of cable ( cable numbers shall be punched on
aluminum straps 2 mm thick and securely fastened to the cable, wrapped around it ) and
also along the route at recommended intervals, by cable tag numbers. All cable entries for
outdoor termination shall be preferably through bottom. Outdoor cable termination through
top of equipment shall not be permitted.
Page99 of 175.
c)
d)
e)
f)
g)
h)
i)
Power cables cores wherever color coding is not available shall be identified with red,
yellow and blue PVC tapes. Where copper to aluminum connections are made, necessary
bimetallic washers shall be used.
In case of control cables, all cores shall be identified at both ends by their terminal numbers
by means of PVC ferrules suitable for core size. Wire numbers shall be as per schematic/
wiring/inter-connection diagram. All unused spare cores of control cables shall be neatly
bunched and ferruled with cable tag at both ends, for future use. For trip circuit identification
additional red ferrules shall be used only in the particular cores of control cables at the
termination points in the Switchgear/ Control panels and Control
Switches.
Contractor shall drill holes for fixing glands wherever necessary. Gland plate shall be of
nonmagnetic material/ aluminum sheet in case of single core cables. All unused cable
entries on equipment/panels shall be plugged/ sealed.
The cable shall be terminated at electrical equipment/switchboards through glands of proper
size. The individual cores shall then be dressed and taken along the cables ways or shall be
fixed to the panels with polyethylene straps. The cable glanding shall be done as per
manufacturers instructions. Cable armor shall not be exposed after termination is complete.
In case of termination of cables at the bottom of a panel over a cable trench having no
access from the bottom close fit holes shall be drilled in the gland plate for all the cables in
one line, and then gland plate shall be split in two parts along the centre line of holes. After
fixing bottom plate, uncovered cable holes/gaps shall be sealed with cold setting compound.
Crimping of lugs to cable leads shall be done by hand crimping / hydraulically operated tool
as per requirement. Insulation of the leads shall be removed before crimping. Conductor
surface shall be cleaned and shall not be left open. Suitable conducting jelly shall be applied
on the conductor lead. Lugs shall enclose all strands of cable core. Cutting of strands shall
not be allowed.
The contractor shall bring to the notice of Engineer-in-charge any mismatch in cable glands,
lugs provided with the equipment vis-a-vis to the cable size indicated in cable schedule for
taking corrective action
No unauthorized repairs, modifications shall be carried out on the hazardous area
equipment terminal boxes and junction boxes. Damaged enclosures of hazardous area
equipment shall be brought to the notice of Engineer-in-charge by contractor. After
termination is complete, all the bolts, nuts, hardwares of terminal box shall be properly
placed in its position and tightened.
Where required, cable sealing boxes intended to be used with the apparatus shall be filled
with solid setting type bituminous compound unless otherwise specified.
4.1.14 Control cable terminations shall be made in accordance with wiring diagrams/cable
interconnection diagram and cable schedule furnished to the CONTRACTOR for this
purpose. It is the intent that the CONTRACTOR shall terminate the cables which were
installed and while testing, reversal or other rearrangement of terminations are necessary.
The same shall be performed by the CONTRACTOR at no extra cost to the HPCL.
4.1.15 Special tools, clips and saddles, locknut, etc, required for the connection and termination of
mineral insulated cables shall be supplied by the CONTRACTOR. During installation,
connection and termination of mineral insulated cables, care shall be exercised to ensure
that aluminium sheath is not damaged. The cable shall be bent using special bending tools
approved by HPCL. Groups of mineral insulated cables shall be bent neatly around the
corners by using innermost cable as a form around which to bend the next cable. Cables
shall not be fastened or clamped close to the point of entry to the equipment which may
vibrate severely. If necessary, flexible conduit may be used or special instructions furnished
by the MANUFACTURER shall be strictly followed.
4.1.16 All new cables shall be megger tested before Termination. Before final termination is
completed all L.V. cables shall be megger-tested and H.V. cables (3.3kv and above) Hi-pot
tested before commissioning. The test voltage for Hi-pot testing shall be as per the relevant
cable standards.1100/650 Volt grade cables shall be tested using 1000 volt Megger.
Page100 of 175.
Continuity
b.
c.
d.
The CONTRACTOR shall furnish necesssary testing kit and instruments required for field
testing.
4.2
4.2.1
Cable trays shall be run overhead supported from building steel, floor slab, cable racks,
cable cum pipe racks, etc,.
4.2.2
Vertical trays/raceways and outdoor cable trays shall be covered by removable 16 gauge GS
sheet covers as specified in drawings.
4.2.3
Elevations/Locating dimensions for trays may be measured from building steel and from
finished floor elevations. Change in line or grade, or the addition of offsets by means of
cutting standard tray sections and inserting additional tray fittings to match with existing
arrangement shall be considered as a normal part of the work.
4.2.4
All cable trays and vertical raceways shall have identification designation, as per the
ENGINEERSs drawings, painted at each end of the tray and raceways. For long lengths of
trays the identification shall be painted at intermediate points also.
4.2.5
Clear spacing of min. 15 mm to be maintained from both ends of Cable trays, A clearance
equal to D/2 of the bigger cables shall be maintained between two adjacent higher rated
power cables on the trays/racks/ risers and clamped by separate clamps which shall follow
the profile of the cable. Common clamping/strapping shall be done for a bunch of control
cables and small power cables.
4.2.6
Cable leading to cable box of an equipment shall be supported at a distance of 450 mm from
cable gland/cable box and cable gland shall be suitably earthed.
4.2.7
All cable trays (other than galvanized trays) and supporting steel structures shall be painted
before laying of cables. The under surfaces shall be properly degreased, de-rusted,
descaled and cleaned. The painting shall be done with one coat of red oxide zinc chromate
primer. Final painting shall be done with two coats of approved bituminous aluminum paint
unless otherwise specified. After laying of cables in cable tray minimum 20% area shall be
spare.
4.2.8
All cable trays (other than galvanized trays) and supporting steel structures shall be painted
before laying of cables. The under surfaces shall be properly degreased, de-rusted,
descaled and cleaned. The painting shall be done with one coat of red oxide zinc chromate
primer. Final painting shall be done with two coats of approved bituminous aluminum paint
unless otherwise specified.
4.3
4.3.1
Any damage to existing cables, panels shall be rectified by contractor at his own cost
within 48 hours, Otherwise it will be done by HPCL and amount will be deducted
Page101 of 175.
Wherever buried cables enter the buildings the same shall be taken through GI pipes
embedded at the entry portion. After taking cables through the above pipes, the same shall
be sealed by using suitable compound so as to avoid ingress of water.
4.4
JUNCTION BOXES
4.4.1
Junction Boxes having volume less than 1600 cubic centimetres may be installed without
any support other than that resulting from connecting conduits where two or more rigid
metallic conduits enter and accurately position the box. Boxes shall be installed so that they
are level, plumb and properly aligned and present a pleasing appearance. Boxes with
volume equal to or greater than 1600 cubic centimetres and smaller boxes terminating on
less than two rigid metallic conduits or for other reasons not rigidly held, shall be adequately
supported by auxiliary steel or standard steel shapes or plates to be fabricated and installed.
The CONTRACTOR SHALL perform all drilling, cutting, welding, shimming and bolting
required for attachment to supports. Where indicated in drawings, boxes shall be mounted
on masonry wall by means of anchor fasteners to be set by the CONTRACTOR for this
purpose or shall be mounted on angle, plate or other structural supports fixed to floor, wall,
ceiling or equipment foundations.
Where it is necessary to remove components of boxes in order to install housings properly,
or where housings are delivered separately from their intended components, contents shall
be restored to their housing, before the installation is considered complete. Terminal blocks
shall be mounted in boxes as required. The removable covers for boxes shall be gasketted.
4.5
PAINTING
4.5.1
All surface to be painted shall be thoroughly cleaned for dust grease and other impurities
before application of paint. Cable tray support structures, vertical raceways, mounting
channels and brackets for local devices, etc. shall be given one coat of zinc chromate primer
followed by two coats of aluminium alkyd paint.
4.5.2
Cost of all such paints and painting shall be included in the installation rates for the
respective items.
4.5.3
Holes in steel shall be touched up with red oxide zinc chromate, welds shall be wire brushed
or otherwise cleaned, and welds to galvanised steel shall be touched up with Galvanised
Weld Rod applied in accordance with the MANAUFATURERs instructions.
Other
ungalvanised areas shall be primed with red oxide zinc chromate.
4.6
IDENTIFICATION PLATES
All junction boxes, power receptacle boxes, etc shall be provided with metal identification
plates and danger plates as per the relevent IS specification.
5.0
5.1
Cable drums shall be unloaded, handled and stored in an approved manner on hard and
well drained surface so that they may not sink. In no case shall the drum be stored on the
flat i.e., with flange horizontal. Rolling of drums shall be avoided as far as possible. For
short distances, the drums may be rolled provided they are rolled slowly and in proper
direction as marked on the drum. In absence of any indication, the drums may be rolled in
the same direction as it was rolled during taking up the cables.
5.2
For unrolling the cable, the drum shall be mounted on jacks or on cable wheels without
bending and shall be rolled slowly so that cable should come out over the drum and not
below.
5.3
Page102 of 175.
All possible care shall be taken during unrolling and laying to avoid damage due to twist, kink
or sharp bends.
5.5
Cable ends shall be kept sealed to prevent damage and ingress of moisture.
5.6
6.0
MATERIAL WASTAGE
6.1
All scrap produced by the CONTRACTOR shall be removed daily from the plant area to
OWNERs waste dump, and the work site shall be kept reasonably clean. The cut lengths of
cables, trays etc. which are to be used later for material accounting shall be removed to
CONTRACTORs stores.
7.0
7.1
CONTRACTOR shall arrange for all materials, tools, electrical instruments, test equipment,
test connections and all labour and supervision for these tests. CONTRACTOR shall notify
the HPCL when erection is completed and all main and control connections to the
equipment are made ready for tests to permit witnessing of test by the HPCL.
CONTRACTOR shall record all test values and shall furnish four copies of the test data to
the HPCL .Final test reports shall be submitted to conform to the requirements of Vendors
drawings, Electrical circuits shall be energised or used at nominal operating voltage only
after such reports are accepted as satisfactory, by the HPCL.
7.2
Commissioning checks and tests as per the check lists enclosed shall be carried out by the
CONTRACTOR on all the equipment installed by him. Any other tests prescribed by the
HPCL to verify that the equipments and materials supplied and/or installed are in
accordance with the specifications and standards shall also be carried out by the
CONTRACTOR. The cost of all these tests is deemed to be included in the contract price.
Page103 of 175.
Page104 of 175.
SCOPE
This specification covers the requirements of installation, testing and commissioning of
earthing protection systems. The work shall be carried out in accordance with this specification
along with its data sheet-A, relevant project layout drawings, typical drawings and installation
notes enclosed with the specification.
Vendor Scope for Earthing is limited for the equipments being Supplied and/or installed under
this Tender.
2.0
2.1
The earthing and lightning protection installation work shall conform to the latest applicable
electricity rules, all currently applicable standards, codes of practice, regulations and safety
codes of the locality where the installation is to be carried out. Nothing in this specification shall
be construed to relieve the CONTRACTOR of this responsibility.
2.2
All codes and standards referred to in the specification shall be understood to be the latest
version on the date of offer made by the bidder unless otherwise indicated.
IS 3043 : 1987
IS 2309 : 1989
2.3
The CONTRACTOR shall ensure that instruments and gauges to be used for testing and
inspection of critical parameters as identified in the specification have valid calibration and the
accuracy can be traced to National Standards.
3.0
3.1
The installation work shall include unloading the earthing material at site, storing, laying, fixing,
jointing/termination, testing and commissioning of equipment associated with the safety
earthing system of the plant and lightning protection system for buildings and allied structures.
All welding/brazing equipment, necessary tools and testing equipment shall be furnished by the
CONTRACTOR.
3.2
The CONTRACTOR shall be responsible if any installation materials are lost or damaged
during installation. All damage and thefts shall be made good by the CONTRACTOR till the
installation is handed over to the HPCL.
3.3
The earthing of cable supporting structure, cable carriers, cable trays shall be in the scope of
the CONTRACTOR.
3.4
The CONTRACTOR shall carry out the lightning protection and earthing of all
equipment/panels/structures as indicated in the Project drawings. Whether specifically shown
in drawings or not, building columns, hand-rails, miscellaneous items such as
junction/marshalling boxes, field switches, cable boxes, etc. shall be earthed.
3.5
All exposed metal parts such as LT switchgear / power distribution board/Lighting boards,
lamps brackets, lamp holder, plug sockets enclosure, junction box etc., shall be properly
Page105 of 175.
3.6
Equipment
1.
2.
3.
40mmx6 mm GI strip
4.
25mmx3 mm GI strip
5.
50mmx6 mm GI strip
6.
40mmx6 mm GI strip
7.
25mmx6 mm GI strip
8.
9.
Storage Tanks
10.
11.
12.
50mmx6 mm GI strip
Instruments
13.
Bonding of Pipes
14.
Motors up to 3.7 Kw
15.
16.
40mmx6 mm GI strip.
17.
Page106 of 175.
The CONTRACTOR shall install bare, steel conductors, strips, braids etc. required for the
system and individual equipment earthing. All work such as cutting, bending, supporting,
painting/coating, drilling, brazing /soldering/welding, clamping, bolting and connecting on to
structures, equipment frames,
terminals, rails or other devices shall be in the
CONTRACTORs scope of work. All incidental hardware and consumables such as fixing
cleats/clamps, anchor fasteners, lugs, bolts, nuts, washers, bitumastic compound, welding
rods, anti corrosive paint as required for the complete work shall be deemed to be included by
the CONTRACTOR as part of the installation work.
3.8
The approximate quantities, sizes and material of earthing conductors and electrodes to be
installed are indicated in Schedule of Quantities. However, unit rates called for in the price
schedule are applicable for the actual quantities installed. Routes of the conductors and
locations of electrodes shall be as shown on the project drawings.
3.9
The scope of installation of earth conductors in outdoor areas, buried in ground, shall include
excavation of earth upto 600 mm deep and 450 mm wide ,laying of conductor at 600 mm depth
(unless stated otherwise) brazing/welding/cadwelding if required, of main grid conductor, joints
as well as risers of length 500 mm above ground at required locations and then backfilling.
Backfilling material to be placed over buried conductor shall be free from stones and other
harmful mixtures. Backfill shall be placed in layers of 150 mm, uniformly spread along the
ditch, and tampered utilizing pneumatic tampers or other approved means, If the excavated
soil is found unsuitable for backfilling, the CONTRACTOR shall arrange for suitable soil from
outside.
3.10
The scope of installation of earth connection leads to equipment and risers on steel
structures/walls shall include laying the conductors, welding/cleating at specified intervals,
welding/brazing to the main earth grids, risers, bolting at equipment terminals and coating
welded/brazed joints by bitumen paint. Galvanised conductors shall be touched up with zinc
rich paint where holes are drilled at site for bolting to equipment/structure.
3.11
The scope of installation of electrodes shall include installation of these electrodes such as
directly in earth, and connecting to main buried earth grid, as per project drawings/relevant
standards. The scope of work shall include excavation, construction of the earth pits including
all materials required for construction of earth pits, placing the rod and fixing test links on those
pipe electrodes in test pits and connecting to main earth grid conductors.
4.0
WORK DETAILS
4.1
Work details shall be as per project drawings and Installation Notes where the sizes, number
and material of earth leads for earthing various items is furnished. In addition, the following
practices shall also be considered.
4.1.1
Wherever main earthing conductor crosses cable trenches, they shall be buried below the
trench floor.
4.1.2
Suitable earth risers approved by the ENGINEER shall be provided above finished floor/ground
level, if the equipment is not available at the time of laying of the main earth conductors. The
minimum length of such risers inside the building shall be 200 mm and that for outdoor shall be
500 mm above ground level. The risers to be provided will be marked in project drawings.
4.1.3
Earth leads between earthing riser and equipment earthing terminals shall follow as direct and
as short a path as possible.
4.1.4
Page107 of 175.
Each neutral point of a transformer shall be connected to two separate treated type earth
electrodes.
4.1.6
Crane and track rails shall be bonded with the rail boards and connected to the earthing
system. Adjacent railway tracks shall be bonded across fish plates.
4.1.7
Shield wire in switchyard shall be connected to the earthing grid through test links at every
alternate tower.
4.1.8
An earthing pad as shown in the project layout drawings shall be provided under each
operating handle of the isolator and operating mechanism of HV breakers. Operating handle of
the isolator and supporting structure shall be bonded together by a flexible connection and
connected to the earthing grid.
4.1.9
4.1.10
Wherever earthing conductor passes through walls, galvanised iron sleeves shall be provided
for the passage of earthing conductor. The pipe ends shall be sealed using suitable water
proof compound.
4.2
Earthing Connections
4.2.1
All connections in the main earth conductors in earth/concrete and connection between main
earthing conductor and earth leads shall be of welded. Cadwelding type connections shall be
done only if specifically indicated.
4.2.2
Connection between earth leads and earthing terminal provided on the equipment shall be
bolted type with a locking nut.
4.2.3
4.2.4
4.2.5
All bimetallic connections shall be treated with suitable compound to prevent moisture
ingression.
4.2.6
Metallic conduits and pipes shall be connected to the earthing system unless specified
otherwise.
4.2.7
Lightning protection system down conductors shall not be connected to any earthing
conductors above ground level. Also no intermediate earthing connection shall be made from
support structure of lightning arrestor.
4.2.8
Transformer, generator and CVT earthing shall be directly connected to the earth electrode.
4.3
Earth Electrode
4.3.1
4.3.2
For all earth electrodes, test pits with concrete covers, for periodic testing of earth resistivity,
shall be provided. The details of test pits shall generally be as per project drawings. Installation
of pipe electrodes in test pits shall be suitable for watering. All the necessary materials
required for test pits shall be supplied and installed by CONTRACTOR. The installation work
shall also include connection to main earth grid and civil work such as excavation.
Page108 of 175.
The pit for an earth electrode will be of size not less than and will be dug with its centre at
minimum 0.5 metres away from the plinth protection.
4.3.4
Earth pits shall be treated with salt and charcoal . The minimum requirement shall be 20 kg
charcoal and 30 kg salt per pit.
4.3.5
Soil, salt and charcoal placed around the electrode shall be finely graded, free from stones and
other harmful mixtures. Backfill shall be placed in layers of 250 mm thick uniformly spread and
compacted, if excavated soil is found unsuitable for backfilling, the CONTRACTOR shall
arrange for a suitable soil from outside.
4.3.6
Distance between two earth pits shall not be less than 6 Meters.
4.4
4.2.1
The lightning protection air termination rods and/or horizontal air termination conductors shall
be fixed in such a way that they remain in their installed position even during severe weather
conditions. The necessary accessories such as cleats, clamps, welding materials, bolts, nuts,
shall be supplied by CONTRACTOR.
4.2.2
Air termination system shall be connected to earthing system below ground by down
conductors as shown in various project drawings. The down conductors shall follow a direct
path to earth. There shall not be any sharp bends, turns and kinks in the down conductors..
4.2.3
The lightning protection system shall not be in direct contact with underground metallic service
ducts, cables, cable conduits and metal enclosures of electrical equipment. However all metal
projections, railings, vents, tanks etc. above the roof shall be bonded together to form a part of
roof grid.
5.0
Earth resistance can be directly read through an earth test Megger which has associated Test,
auxiliary Current and Potential electrodes. This instrument which is a combination of ohmmeter
and generator works on fall of potential principle. Test voltage is derived from the generator of
the Megger
Page109 of 175.
SCOPE
This specification details the guidelines for work associated with installation, testing and
commissioning of various electrical equipment including switchyard equipment. The
work shall, however, at all times be carried out strictly as per the instructions of the
HPCL and as per approved drawings where relevant. The scope of work shall be as
indicated in Price Schedule.
2.0
2.1
The electrical installation work shall confirm to the latest /applicable electricity rules,
currently applicable standards, codes of practice, regulations and safety codes of the
locality where the installation is to be carried out. In case of conflict between these
standards and this specification, requirements of this specification shall govern. Nothing
in this specification shall be construed to relieve the CONTRACTOR of his responsibility.
2.2
All codes and standards referred to in the specification shall be understood to be the
latest version on the date of offer made by the bidder unless otherwise indicated.
IS : 10028
IS: 1866
IS : 10118
IS : 900
IS : 5216
IS : 2629
IS : 732
IS : 1646
IS : 2551
IS : 335
INSULATING OIL
2.3
The CONTRACTOR shall ensure that instruments and gauges to be used for testing and
inspection of critical parameters as identified in the specification have valid calibration
and the accuracy can be traced to National Standards.
3.0
GENERAL SCOPE
Page110 of 175.
The CONTRACTOR shall take over the equipment to be erected from the storage
yard/stores/sheds/railway siding, transport the equipment where required in actual
position, erect, assemble all parts of the equipments, test and commission the same.
3.2
The work shall be carried out strictly as per the instructions and layout drawings
approved by HPCL. In case of any doubt/misunderstanding as to correct interpretation of
the drawings or instructions, necessary clarifications shall be obtained from the HPCL.
The CONTRACTOR shall be held responsible for any damage to the equipment
consequent to not following the instructions correctly. MANUFACTURERs equipment
manuals will be furnished to the CONTRACTOR who shall return the same after
completion of work.
3.3
The CONTRACTOR shall furnish all tools, ladders, scaffolding, welding equipment,
rigging materials, testing equipment, test kits etc. required for complete installation,
testing and commissioning of the items included in the contract work.
3.4
Construction of suitable covered equipment storage building / sheds and site construction
office with all required facilities, illumination etc. shall be done by the agency at their own
cost. Space for this shall be provided in HPCLs premises subject to availability.
3.5
The HPCL may engage specialist engineers from the equipment MANUFACTURERS to
supervise the installation, testing and commissioning of their equipment. The
CONTRACTOR shall extend full cooperation to these engineers and carry out the works
as per their instructions. The CONTRACTORs work shall include minor
rewiring/modifications as may be necessitated during commissioning. Providing such
assistance shall be deemed to be included in the CONTRACTORs basic scope.
3.6
The CONTRACTOR shall cooperate through the HPCL with other CONTRACTORS at
site, in all matters of common interest, so as not to obstruct operation of others and to
ensure the safety of all personnel and works at the site. In case of any conflict HPCL /
ENGINEER's decision will be final and binding.
3.7
3.8
It is the responsibility of the CONTRACTOR to provide watch & ward and security for the
equipments/component parts covered in this contract. Any loss of equipment/component
Page111 of 175.
The CONTRACTOR shall be responsible for cleaning all equipment under erection,
under storage, the work area and the project site at regular intervals to the satisfaction of
the HPCL. In case the cleaning is not to the HPCLs satisfaction, he will have the right to
carry out the cleaning operations and any expenditure incurred by the HPCLin this regard
will be to the CONTRACTORs account.
3.10
In order to avoid hazards to personnel moving around the equipment such as switchgear
etc. which is kept charged after installation, before commissioning, such equipment shall
be suitably cordoned off to prevent anyone accidentally going near it.
3.11
The CONTRACTOR shall carry out touch-up painting on any equipment, if the finish paint
on the equipment is soiled or marred during installation/handling. The paint including
primer thinner & shade of the paint to match with HPCLs specification.
3.12
The CONTRACTOR shall ensure workmanship of good quality and shall assign qualified
supervisors/engineers and competent labour who are skilled having valid
licence/authorisation/work permit, careful and experienced in carrying out similar works.
HPCL shall reserve the right to reject non-competent
3.13
4.0
4.1
The CONTRACTOR shall on his own arrange for the temporary lighting arrangement for
the work area to carry out the installation work in the plant premises.
4.2
The CONTRACTOR shall install, test and commission the equipments furnished by the
HPCL/ supplied by contractor.
4.3
4.4
4.5
The CONTRACTOR shall move all equipment into the respective buildings through the
regular doors or floor/wall openings provided specifically for lifting/moving the equipment.
Page112 of 175.
Foundation work for all transformers, switchgears, control panels/desks, cable trenches
etc. will be carried out by CONTRACTOR. Base frames for switchgear/control panel shall
also be fabricated by the CONTRACTOR.
4.7
4.8
The CONTRACTOR shall include the following in his scope, whenever applicable.
4.8.1 Supply & installation of danger/warning plates, labels, insulation rubber sheets/gloves,
first aid chart & box, sand bucket, fire extinguishers etc., quantities shall be by
Contractor.
4.8.2 Danger/warning plate having text written in English, Hindi and applicable vernacular
language shall be provided on all electrical equipment for voltages 415V and above. The
boards shall have the skull and cross bones, danger sign, together with the inscription,
inscribed in white letters on red background. Electrical installation CONTRACTOR shall
mount these boards at site on any of the equipment which are not provided with
danger/warning plates. The danger/warning plates shall comply with IS:2551 and Indian
Electricity Rules.
4.8.3 Site fabrication of items to meet specific situations eg. Junction boxes, wire mesh
enclosures etc. of different sizes is in Contractor scope.
4.8.4 Chipping and punching holes/openings in concrete floors/walls and brick walls and
finishing them good and providing channels and embedments wherever required.
5.0
EQUIPMENT INSTALLATION
5.1
TRANSFORMERS
5.1.1 Site inspection, storage, installation, testing and commissioning of transformers shall be
in accordance with the specified code of practices, MANUFACTURERs instructions and
the commissioning check list enclosed with the specification.
5.1.2 Care shall be taken during handling of insulating oil to prevent ingress of moisture or
foreign matter. In the testing, circulating, filtering or otherwise handling of oil, rubber
hoses shall not be used. Circulation and filtering of oil, heating of oil by regulated short-
Page113 of 175.
LV SWITCHGEARS
5.2.1 All LV switchgear such as MCCs, PDBS, lighting distribution boards etc. shall be installed
in accordance with specified Code of Practice, drawings furnished and the
MANUFACTURERs instructions and respective commissioning check lists enclosed with
the specification. The switchgear/panels shall be installed on finished surfaces or
concrete or steel sills or wall mounted. These panels may be bolted on to the foundation
pockets or welded to base frame members as detailed in the approved Foundation
Drawings. The CONTRACTOR shall be required to install and align any channel sills
which form part of the foundations. Proper aligning, joining of various vertical shipping
sections, busbar connections, inter panel wiring etc. will be the responsibility of the
CONTRACTOR. In joining shipping sections of the switchgear/panels/control centres
together, adjacent housing or panel sections provided shall be bolted together after
alignment has been completed. Power bus enclosures, ground and control splices of
conventional nature shall be cleaned and bolted together, being drawn up with torque
wrench of proper size or by other approved means.
5.3
BUSDUCT
MOTORS
5.4.1 Unless otherwise specified, the motors will be installed by the driven equipment
VENDOR. However, the Electrical CONTRACTOR under this specification shall
undertake pre commissioning checks and testing of the motors. The
installation/commissioning shall be as per the applicable code of practice,
MANUFACTURERs instructions and commissioning check list for motors enclosed with
the specification.
5.5
MISCELLANEOUS ITEMS
5.5.1 Whenever applicable, communication equipment, local starters, and every other electrical
equipment within the plant premises shall be installed, tested and commissioned as per
respective equipment VENDORs instructions, relevant code of practice and the drawings
approved by HPCL. Suitable brackets, angle/channel section for wall mounted
equipment shall be provided by the CONTRACTOR.
Page114 of 175.
LIGHTING/Illumination REQUIREMENT:
1.0 Sufficient lighting shall be provided so as to enable terminal operators to move
safely within the accessible areas of installation and to perform routine operations. Depending
on the nature of job activities carried out, the minimum illumination levels for various areas shall
be as follows
Area
Required
Lux levels
Primary roads
20
Secondary roads
10
Tank farm
20
100
20
60
150
100
150
400
Lube Warehouse
100
Page115 of 175.
300
100
Stairs
50
Corridors
70
20
Page116 of 175.
SERVO CONTROLLED VOLTAGE STABILZER Three Phase, 4 Wire, AC, 50 Hz., Air
Natural Cooled with Standard Accessories and as per details given below :
Three identical Single Phase units connected in Star so as to sense and correct all
three phases individually to deliver a very balanced output irrespective of the
unbalanced load either in the supply or load
Input
Output
Capacity
: 3/ 5 /7.5 KVA
Protection
Accuracy
Auto ON facility
Housing
gauge
Housing Painting
: Powder coated
3. VOLTMETER
4. VOLTMETER SELECTOR
: This switch facilities to indicate either input or
output voltage. Three phase S.S.O. type units are provided with phase to phase
selector switch also.
5. INPUT ON OFF FACILITY
provided
of suitable rating to be
Page117 of 175.
8. RAISE/LOWER SWITCH
: During manual mode of operation the output can be
increased or decreased with this switch to avail the specified output voltage. The switch
should not be accessible from the front i.e should be inside the panel.
9. VOLT LEVEL SET POTENTIO- : The output setting level can be adjusted METER
(Only in Auto Mode) by this potentiometer within 10 Volts. The rated input coverage shall
correspondingly shift when the output setting is disturbed from the specified output. This
should be provided on the PCB.
10. BYPASS SWITCH
provided inside the panel.
Page118 of 175.