I.BV-O-P
Dr. Katharina Klemt-Albert
20.11.2009
1. The Company
Facts and Figures
Number of projects
4.647
thereof number of major projects
28
Employees
3,2 bill.
2,6 bill.
3.721
1. The Company
DB ProjektBau project handling from one source
Planning
Project
management
Construction
supervision
Talbrcke Froschgrundsee, VDE 8.1
- Major projects
- Railway transportation routes
- Bridges, tunnels, support constructions
- Passenger transport facilities
- Terminals (for commercial transport)
- Roads, railway crossings, ring roads
- Railway control centres, safety facilities for railway crossings
- Factories, plants, depots
- Landscape planning, environment protection
Stuttgart 21
1. The Company
DB ProjektBau office locations
7 Regional units
With decentralised
structure, straight to
the customer!
DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009
1. The Company
Range of products
Railway transportation
routes
Civil engineering
structures
Passenger transport
facilities
Terminals (for
commercial transport)
Roads, overpasses,
ring roads
Plants, factories,
depots
Noise remediation,
environment
protection
Station Gesundbrunnen
Berlin Hauptbahnhof (Lehrter Bf)
Station Potsdamer Platz
Station Sdkreuz (Papestrae)
North-south-connection
(Tiergartentunnel)
Construction of the underground
railway line U5 and rapid-transit line
S21
East-west connection (city railway)
Targets:
Bf. Gesundbrunnen
Hamburg
Stralsund
Bf. Spandau
Hannover
Berlin Hbf.
Bf. Zoo
(Lehrter Bf.)
Bf. Ostkreuz
Ostbf.
Bf. Westkreuz
Bf. Sdkreuz
(Papestrae)
Dessau
Magdeburg
Leipzig
Mnchen
Dresden
10
Frankfurt (O)
Warschau
Hamburg
4:03
3:20
Stralsund
Rostock
2:54
1:30
2:40
2:03
4:12
1:34
Hannover
Berlin
Hbf.
2:10
3:29
2:20
7:43
Dresden
Frankfurt a. M.
3:45
Erfurt
2:30
1:07
1:50
Leipzig
5:52
8:30
Mnchen
DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009
11
Bf
Gesundbrunnen
Berlin
Hauptbahnhof
Potsdamer
Platz
Hauptbahnhof
(central station)
Berlin Bf
Sdkreuz
12
Caisson
DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009
13
retaining
wall
slotted wall
uplifting anchor
tunnel
14
15
16
17
300.000
approx. 70.000 m
approx. 15.000 m
approx. 900
164 trains
324 trains
616 trains
500.000 m
85.000 t
Escalators
Elevators
Panorama-elevators
Solar cells
Length of the staion concourse north-south
Length of the station concourse east-west
Height of the Beam Buildings
18
54
43
6
2.700 m
160 m
321 m
46 m
19
20
Project costs
21
432,1 mill.
23
24
25
27
28
Caption:
Numbers = Date of commissioninge
N
D
1951
1900
1900
1900
1900
Odra
Oder
1951
1951
1951
1900
1925
1925
1951
1951
1925
1870/ 1870/
1967 1946
1925
1870/
1946
1925
1925
1870/
1946
1870/
1946
1925
1870/
1946
1925
1870/
1946
29
1870/
1946
1870/
1946
PL
1870/ 1870/
1946 1946
30
New building railway bridge across the river Oder, assembly of the auxiliary bridge
DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009
31
New building railway bridge across the river Oder, removal of the old bridge, foundation for piles
DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009
32
33
34
35
36
37
38