EFRTC General Meeting,

Berlin 20th November 2009


DB ProjektBau GmbH Company
Consulting Planning Construction
DB ProjektBau GmbH

Major railway infrastructure projects at DB

I.BV-O-P
Dr. Katharina Klemt-Albert
20.11.2009

DB ProjektBau GmbH, 01.06.2008

EFRTC General Meeting, Berlin


Agenda

1. The Company DB ProjektBau


 Overview
2. Logistics concept for Berlin
a) Berlin Hauptbahnhof (Berlin central station)
b) The new Ostkreuz
3. ABS Berlin - Frankfurt/Oder, Oderbrcke (Oder-bridge)

DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

EFRTC General Meeting, Berlin


Agenda

1. The Company DB ProjektBau


 Overview
2. Logistics concept for Berlin
a) Berlin Hauptbahnhof (Berlin central station)
b) The new Ostkreuz
3. ABS Berlin - Frankfurt/Oder, Oderbrcke (Oder-bridge)

DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

1. The Company
Facts and Figures

 Foundation of DB AGs project management service


provider on 1 January 2003

 Bundling of railway engineering know-how:


competence in planning, project management and
construction supervision

 All services from a single provider, from conceptual


planning through to project completion
 Consulting - planning - construction
for projects of all sizes and for all transportation
routes

 Total project costs


thereof construction costs

 Projects for the future, for customer-friendly and


environmentally compatible mobility

 Number of projects
4.647
thereof number of major projects
28
 Employees

DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

3,2 bill.
2,6 bill.

3.721

1. The Company
DB ProjektBau project handling from one source

Planning

Project
management

Construction
supervision
Talbrcke Froschgrundsee, VDE 8.1

- Major projects
- Railway transportation routes
- Bridges, tunnels, support constructions
- Passenger transport facilities
- Terminals (for commercial transport)
- Roads, railway crossings, ring roads
- Railway control centres, safety facilities for railway crossings
- Factories, plants, depots
- Landscape planning, environment protection

Stuttgart 21

Terminals (for commercial transport)


DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

1. The Company
DB ProjektBau office locations

7 Regional units

With decentralised
structure, straight to
the customer!
DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

1. The Company
Range of products

Railway transportation
routes

Civil engineering
structures

Passenger transport
facilities

Terminals (for
commercial transport)

Roads, overpasses,
ring roads

Safety facilities for


railway crossings

Plants, factories,
depots

Noise remediation,
environment
protection

DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

EFRTC General Meeting, Berlin


Agenda

1. The Company DB ProjektBau


 Overview
2. Logistics concept for Berlin
a) Berlin Hauptbahnhof (Berlin central station)
b) The new Ostkreuz
3. ABS Berlin - Frankfurt/Oder, Oderbrcke (Oderbridge)

DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

2a) Berlin Hauptbahnhof (Berlin central station)


Opening Ceremony, 26.05.2006

DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

2a) Berlin Hauptbahnhof (Berlin central station)


The mushroom concept

Customising the railway


infrastructure to upcoming
requirements
Significant contents:







Station Gesundbrunnen
Berlin Hauptbahnhof (Lehrter Bf)
Station Potsdamer Platz
Station Sdkreuz (Papestrae)
North-south-connection
(Tiergartentunnel)
Construction of the underground
railway line U5 and rapid-transit line
S21
East-west connection (city railway)

Targets:

Bf. Gesundbrunnen

Hamburg

Stralsund

Bf. Spandau
Hannover

Berlin Hbf.
Bf. Zoo

(Lehrter Bf.)

Bf. Ostkreuz

Ostbf.

Bf. Westkreuz

Bf. Sdkreuz
(Papestrae)
Dessau
Magdeburg
Leipzig
Mnchen

Dresden

Considerable decrease of the travel time from / to Berlin


Considerable decrease of the time needed to change train connections
Comfortable travelling due to of modern train stations

DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

10

Frankfurt (O)
Warschau

2a) Berlin Hauptbahnhof (Berlin central station)


Target reduce travel time

Hamburg

4:03

3:20

Stralsund

Rostock
2:54

1:30

2:40
2:03

4:12

1:34

Hannover

Berlin
Hbf.

2:10

3:29

2:20

7:43

Dresden

Frankfurt a. M.

3:45

Erfurt

2:30

1:07
1:50

Leipzig

5:52

Development of travel time


1990
Schedule 2009

8:30

Mnchen
DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

11

2a) Berlin Hauptbahnhof (Berlin central station)


From the past to the present

Bf
Gesundbrunnen

S-Bf Lehrter Bahnhof

Berlin
Hauptbahnhof

Potsdamer
Platz

Hauptbahnhof
(central station)
Berlin Bf
Sdkreuz

DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

12

2a) Berlin Hauptbahnhof (Berlin central station)


Construction site sections

Diversion of the river Spree

Initial excavation pit for a shield machine

Caisson
DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

13

2a) Berlin Hauptbahnhof (Berlin central station)


Method of construction

Wall sole building method


grouting
anchor

retaining
wall

Underwater concrete floor

slotted wall

Pump off ground water

uplifting anchor

tunnel

Aerial view 1998

DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

14

2a) Berlin Hauptbahnhof (Berlin central station)


Aerial view 2002

DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

15

2a) Berlin Hauptbahnhof (Berlin central station)


Excavation 2004

DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

16

2a) Berlin Hauptbahnhof (Berlin central station)


State of construction 2005

Flap bridge of the Beam Buildings 2005

Movement of north south roof

DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

17

2a) Berlin Hauptbahnhof (Berlin central station)


Facts and Figures

Estimated travellers and visitors daily


Total floor-space
Total industrial real estate
Parking spaces for cars
Long-distance traffic daily
Regional rail traffic daily
Rapid-transit railway daily
Concrete
Steel

300.000
approx. 70.000 m
approx. 15.000 m
approx. 900
164 trains
324 trains
616 trains
500.000 m
85.000 t

Escalators
Elevators
Panorama-elevators
Solar cells
Length of the staion concourse north-south
Length of the station concourse east-west
Height of the Beam Buildings

DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

18

54
43
6
2.700 m
160 m
321 m
46 m

EFRTC General Meeting, Berlin


Agenda

1. The Company DB ProjektBau


 Overview
2. Logistics concept for Berlin
a) Berlin Hauptbahnhof (Berlin central station)
b) The new Ostkreuz
3. ABS Berlin - Frankfurt/Oder, Oderbrcke (Oder-bridge)

DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

19

2b) The new Ostkreuz


Facts and Figures

Ostkreuz after the reconstruction,


With new platforms for the regional
rail traffic (simulation), 2016

Berlin Ostkreuz, 2007

DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

20

2b) The new Ostkreuz


Start of construction

 Project costs

DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

21

432,1 mill.

2b) The new Ostkreuz


The advantages for the customer

Overview of the 7 advantages of the new station:




In the future also trains of the regional


rail traffic can stop at Ostkreuz

Barrier-free and convenient access


(for everyone)

Accessible from all parts of the city

Protection against wind and weather

Better orientation when changing to


other trains

Tram connection close to the station

The old charm of Ostkreuz will still


remain after the reconstruction

DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

2b) The new Ostkreuz


State of construction in September 2008

DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

23

2b) The new Ostkreuz


State of construction in November 2008

DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

24

2b) The new Ostkreuz


Aerial view, 13.01.2009

DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

25

2b) The new Ostkreuz


State of construction in September/October 2009

DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

EFRTC General Meeting, Berlin


Agenda

1. The Company DB ProjektBau


 Overview
2. Logistics concept for Berlin
a) Berlin Hauptbahnhof (Berlin central station)
b) The new Ostkreuz
3. ABS Berlin - Frankfurt/Oder, Oderbrcke (Oder-bridge)

DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

27

3. ABS Berlin Frankfurt/Oder, Oderbrcke (Oder-bridge)


Old Oderbrcke

DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

28

3. ABS Berlin Frankfurt/Oder, Oderbrcke (Oder-bridge)


Age of the segments from the bridge

Caption:
Numbers = Date of commissioninge

N
D

Track Polen Germany closed

1951

1900

1900

1900

1900

Odra

Oder

1951

1951

1951

1900

1925

1925

1951

1951
1925

1870/ 1870/
1967 1946

1925

1870/
1946

1925

1925

1870/
1946

DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

1870/
1946

1925

1870/
1946

1925

1870/
1946

29

1870/
1946

1870/
1946

PL

1870/ 1870/
1946 1946

3. ABS Berlin Frankfurt/Oder, Oderbrcke (Oder-bridge)


Transport links

DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

30

3. ABS Berlin Frankfurt/Oder, Oderbrcke (Oder-bridge)


Assembly of the auxiliary bridge

New building railway bridge across the river Oder, assembly of the auxiliary bridge
DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

31

3. ABS Berlin Frankfurt/Oder, Oderbrcke (Oder-bridge)


Installation of the auxiliary bridge

New building railway bridge across the river Oder, removal of the old bridge, foundation for piles
DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

32

3. ABS Berlin Frankfurt/Oder, Oderbrcke (Oder-bridge)


Vorlandbrcke (Vorlandbridge)

DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

33

3. ABS Berlin Frankfurt/Oder, Oderbrcke (Oder-bridge)


Swim out of the old bridge

DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

34

3. ABS Berlin Frankfurt/Oder, Oderbrcke (Oder-bridge)


New bridge

DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

35

3. ABS Berlin Frankfurt/Oder, Oderbrcke (Oder-bridge)


Swim in of the new bridge

DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

36

3. ABS Berlin Frankfurt/Oder, Oderbrcke (Oder-bridge)


Commissioning, 12.12.2008

DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

37

Thank you for your attention

DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

38